Exhibit_B_-_Prime_Sub_Form.xls
XLS spreadsheet 38 KB Posted
- Solicitation number
- 26-B-20KW
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form (Exhibit B) for Volusia County's CDBG-DR New Smyrna Beach Corbin Park Stormwater Improvements Construction project (Contract No. C-2059, ITB No. 26-B-20KW). The form requires bidders to list all proposed subcontractors and document the dollar value and percentage of work to be performed by each entity. The anticipated subcontractor disciplines include Landscaping/Sod, Asphalt Paving, Concrete Placement, Underground Utility/Stormwater Construction, Erosion Control/Silt Fence, Site Grading and Earthwork, Temporary Traffic Control, and Dewatering, with additional disciplines available in blank rows as needed. Bidders must complete all green-shaded cells with dollar values assigned to the prime contractor and each subcontractor, with all other cells automatically calculated. The total bid amount must equal 100 percent when calculated. Failure to complete and return this form may result in a non-responsive bid. The prime contractor is responsible for ensuring all subcontractors hold appropriate licenses, and any subcontractor changes during project completion require prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow changes to the total submitted base bid pricing. This form also determines local preference in accordance with Section 2.8, D of the solicitation.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2059 | ITB No. 26-B-20KW | ||||
| EXHIBIT B - PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Exhibit F - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor | |||
| $ - 0 | 0.00% | |||||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | ||||||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor | |||
| (Examples: Electrical, HVAC, Plumbing, | ||||||
| Landscaping, etc. for your project) | $ - 0 | 0.00% | ||||
| Landscaping/Sod | $ - 0 | 0.00% | ||||
| Asphalt Paving | $ - 0 | 0.00% | ||||
| Concrete Placement | $ - 0 | 0.00% | ||||
| Underground Utility/Stormwater Construction | $ - 0 | 0.00% | ||||
| Erosiion Control/Silt Fence | $ - 0 | 0.00% | ||||
| Site Grading and Earthwork | $ - 0 | 0.00% | ||||
| Temporary Traffic Control | $ - 0 | 0.00% | ||||
| Dewatering | $ - 0 | 0.00% | ||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .