This is a Standard Operating Procedure (SOP) register and control document for the Hawaii State Department of Education's Regional Kitchen and Finishing Kitchen operational model. The register establishes a prioritized library of 38 required procedures organized into seven functional categories: administration and control (SOP-ADM), receiving and inventory (SOP-RCV, SOP-INV), menu and production (SOP-MENU, SOP-PROD), food safety (SOP-FS), packaging and holding (SOP-PKG, SOP-HOLD), logistics (SOP-LOG), finishing kitchen operations (SOP-FK), sanitation and equipment (SOP-SAN, SOP-EQ), recordkeeping (SOP-REC), traceability (SOP-TRACE), illness response (SOP-ILL), continuity of operations (SOP-COOP), and post-opening reviews (SOP-POST). Of the 38 procedures, 36 have been approved or are effective, with 2 pending source approval; 9 procedures require training and all require validation before opening. The register enforces that interim food-safety critical procedures remain interim until final HACCP or Department of Health approvals are received, explicitly prohibiting invented limits or gaps. All procedures require designated internal owners, approvers, applicable training completion, and documented test or exercise validation before being treated as operating policy. The SOP register also serves as a dependency crosswalk showing how each procedure depends on existing mission products, training sources, and test evidence to prevent duplicate or conflicting systems.
The register establishes mandatory review triggers for all SOPs before opening and upon any governing source, process, menu, recipe, supplier, ingredient, equipment, regulatory, or corrective-action trend change, with food-safety and HACCP-related changes subject to the final approved HACCP maintenance process. All interim modules are explicitly identified as non-final policy until required internal, food-safety, regulatory, or contract acceptance is complete, with accepted contractor products replacing interim modules only through formal state acceptance and data control (DATA-02) supersession procedures with documented binder and source-of-truth updates. The control standard emphasizes that readiness is measured not by the number of SOPs but by the priority, ownership, approval, training, and validation status of each required procedure, with existing branch SOPs and mission controls cross-referenced rather than recreated to avoid duplication. Two post-opening review procedures (SOP-POST-001 at 30 days and SOP-POST-002 at 90 days) are scheduled to capture early operating lessons, unresolved gaps, and required SOP, tool, and training changes following launch of the Regional Kitchen.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Executive Summary
| SOP-01 | SOP Library Control Snapshot | ||||
| The binder explicitly warns that readiness is not the number of SOPs. This register therefore tracks priority, ownership, approval, training and validation for each required procedure. | ||||
| Registered Procedures | Required Before Opening | Approved / Effective | Pending Source | Training Mapped |
| 38 | 36 | 2 | 9 | 38 |
| Control Standard |
| 1. Every Required-Before-Opening SOP needs an owner, approver, applicable training, and validation path before it is treated as operating policy. |
| 2. Food-safety critical procedures remain interim where final HACCP/DOH limits or approvals are not yet available; no limit is invented to make the document look complete. |
| 3. Existing branch SOPs and mission controls are cross-referenced instead of recreated. |
| 4. Accepted contractor products replace interim modules only through State acceptance, DATA-02 supersession, and binder/source-of-truth updates. |
SOP Register
| SOP-01 | RK/FK Master SOP Register | ||||||||||||||||||||
| Prioritized control register for procedures needed to safely and consistently operate the Regional Kitchen / Finishing Kitchen model. Interim modules are not final policy until required internal, food-safety, regulatory or contract acceptance is complete. | ||||||||||||||||||||
| SOP ID | Title | Purpose / Control Objective | Applies To | Document Type | Priority | Internal Owner Area | Approver Area | Controlling / Supporting Source | Food-Safety Critical? | Training Required? | Test / Exercise Required? | Current Status | Current Revision | Effective Date | Approval Status | Training Source | Training Status | Validation / Test Source | Location / Cross-Reference | Notes |
| SOP-ADM-001 | Controlled SOP Use, Revision and Document Access | Control how staff identify the current approved procedure, remove obsolete copies, and route changes. | RK & FK | Control / Register | Required Before Opening | Program Leadership | Program Leadership | DATA-01/02/03/04; SOP-01 | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/03/04 | Mapped | TEST-04 | SOP-04 Sec. 1 | Interim turnover module; final approved contractor/State document may supersede. | ||
| SOP-ADM-002 | Daily Start-Up / Shift Readiness | Verify staffing, equipment, utilities, menu, records, sanitation and critical prerequisites before production/service begins. | RK & FK | Core SOP | Required Before Opening | RK Operations | Program Leadership | PHASE-03; EQUIP; MENU; SAFE; TRN | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-01/04 | SOP-04 Sec. 2 | |||
| SOP-ADM-003 | Shift Closeout and Required Record Review | Close production/service, reconcile records, identify exceptions, secure product/equipment and transfer unresolved issues. | RK & FK | Core SOP | Required Before Opening | RK Operations | Program Leadership | SAFE-02; MENU-02; LOG; DATA-02 | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-02/03 | SOP-04 Sec. 3 | |||
| SOP-RCV-001 | RK Receiving and Product Acceptance | Standardize delivery/purchase verification, quantity, condition, temperature, lot/specification, accept/hold/reject, storage and discrepancy communication. | RK | Core SOP | Required Before Opening | RK Operations | Food Safety / HACCP | PROC; SAFE-02/03; Contract 2.1.3.3 | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-01/02 | SOP-04 Sec. 4 | Approved HACCP/receiving limits remain controlling. | ||
| SOP-INV-001 | FIFO, Dating, Storage and Labeling | Standardize product dating, identification, rotation, storage zones and traceability. | RK & FK | Core SOP | Required Before Opening | RK Operations | Food Safety / HACCP | SAFE-03; PROC; Contract 2.1.3.2 | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-04 | SOP-04 Sec. 5 | Contract requires availability for training before applicable kitchen opens. | ||
| SOP-INV-002 | Inventory Control and Reconciliation | Control daily inventory activity, deliveries, usage, periodic review, monthly physical inventory, discrepancies and disposition. | RK & FK | Core SOP | Required Before Opening | RK Operations | Program Leadership | Contract 2.1.3.5; PROC; MENU | No | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-04 | SOP-04 Sec. 6 | |||
| SOP-MENU-001 | Approved Menu / Recipe / Production Baseline Use | Ensure only the approved menu, standardized recipe and production tool are used and changes are routed through controlled change processes. | RK & FK | Core SOP | Required Before Opening | Menu / Culinary | Program Leadership | MENU-01/02/03/04/05/06; DATA-02 | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/03 | Mapped | TEST-01/04 | SOP-04 Sec. 7 | Does not replace formal menu/nutrition approval. | ||
| SOP-PROD-001 | Production Planning, Sequencing and Batch Release | Translate approved menu/counts into executable sequencing considering capacity, labor, cooling, packaging, storage and dispatch. | RK | Core SOP | Required Before Opening | RK Operations | Program Leadership | MENU-02; STAFF; EQUIP; Contract 2.1.2.2/.3 | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-01/02 | SOP-04 Sec. 8 | |||
| SOP-PROD-002 | Standardized Recipe Execution | Use current recipe, approved ingredients/substitutions, batch scaling and required production records. | RK | Core SOP | Required Before Opening | Menu / Culinary | Food Safety / HACCP | MENU-02/03/04; PROC-05; SAFE-01/02 | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-01/02 | SOP-04 Sec. 9 | |||
| SOP-PROD-003 | Large-Batch Production Quality Control | Establish QC checkpoints from ingredient staging through final release. | RK | Core SOP | Required Before Opening | RK Operations | Menu / Culinary | Contract 2.1.2.5; MENU; SAFE-02 | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-01/02 | SOP-04 Sec. 10 | |||
| SOP-FS-001 | Time / Temperature Monitoring and Corrective Action | Define responsibility for required process monitoring, record completion, deviation escalation and product disposition. | RK & FK | Food-Safety SOP | Required Before Opening | Food Safety / HACCP | Food Safety / HACCP | SAFE-01/02; final approved HACCP | Yes | Yes | Yes | Pending Source | Not Submitted | TRN-01/04 | Mapped | TEST-01/02/04 | SOP-04 Sec. 11 | Do not finalize limits here; final HACCP controls. | ||
| SOP-FS-002 | Cooling and Blast Chilling | Execute approved cooling/blast-chilling method, monitoring, records, corrective action and release. | RK | Food-Safety SOP | Required Before Opening | Food Safety / HACCP | Food Safety / HACCP | SAFE-01/02; final HACCP; equipment manuals | Yes | Yes | Yes | Pending Source | Not Submitted | TRN-01/04 | Mapped | TEST-01/02/04 | SOP-04 Sec. 12 | Process-specific limits intentionally not invented. | ||
| SOP-PKG-001 | Packaging, Labeling and Batch Traceability | Package/label product so identity, batch, destination and handling requirements remain traceable through dispatch/service. | RK | Core SOP | Required Before Opening | RK Operations | Food Safety / HACCP | SAFE-03; MENU; LOG; Contract 2.1.2.5 | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-01/02 | SOP-04 Sec. 13 | |||
| SOP-HOLD-001 | Holding, Storage and Final Product Release | Control product after production through hold/storage and release to distribution using approved food-safety criteria and complete records. | RK | Food-Safety SOP | Required Before Opening | RK Operations | Food Safety / HACCP | SAFE-01/02; LOG-02 | Yes | Yes | Yes | Pending Source | Not Submitted | TRN-01/04 | Mapped | TEST-01/02 | SOP-04 Sec. 14 | |||
| SOP-LOG-001 | Staging, Loading and Dispatch | Stage route loads, verify product/quantity/records, secure carts/containers, release driver and record departure. | RK | Core SOP | Required Before Opening | Logistics | RK Operations | LOG-01/02/04; SAFE-02/03 | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-01/02 | SOP-04 Sec. 15 | |||
| SOP-LOG-002 | Transportation / Cold-Chain / Chain of Custody | Maintain required transport conditions, route/chain-of-custody records and escalation for delays or temperature-control concerns. | RK & FK | Food-Safety SOP | Required Before Opening | Logistics | Food Safety / HACCP | LOG-01/02/05; SAFE-02/03; Contract 2.1.1.1 | Yes | Yes | Yes | Pending Source | Not Submitted | TRN-01/04 | Mapped | TEST-01/02/04 | SOP-04 Sec. 16 | Final transport limits/methods require approved food-safety/contract model. | ||
| SOP-LOG-003 | Delivery Discrepancy / Short / Rejected / Compromised Product | Standardize immediate control, documentation, communication and disposition when delivered product cannot be routinely accepted. | RK & FK | Core SOP | Required Before Opening | Logistics | Food Safety / HACCP | LOG-03; SAFE-02; Contract 2.1.1.1 | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-01/02 | SOP-04 Sec. 17 | |||
| SOP-LOG-004 | Food Carts and Reusable Transportation Equipment | Control staging, loading, securement, delivery, return, cleaning, sanitation, storage, inspection and accountability. | RK & FK | Core SOP | Required Before Opening | Logistics | RK Operations | LOG-04; Contract 2.1.1.4 | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-01/02 | SOP-04 Sec. 18 | |||
| SOP-FK-001 | Finishing Kitchen Ordering from Regional Kitchen | Define what/how/when to order, participation/standing quantity use, adjustment, emergency request and RK fulfillment confirmation. | FK | Core SOP | Required Before Opening | FK Operations | Program Leadership | Contract 2.1.3.4; PHASE; MENU | No | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-04 | SOP-04 Sec. 19 | Software-specific steps must be inserted once approved system/workflow is confirmed. | ||
| SOP-FK-002 | Finishing Kitchen Receiving and Acceptance | Verify delivery identity, count, condition, required food-safety documentation and accept/hold/reject decision; transfer product to storage. | FK | Core SOP | Required Before Opening | FK Operations | Food Safety / HACCP | LOG-03; SAFE-02; Contract 2.1.3.5 | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-01/02 | SOP-04 Sec. 20 | |||
| SOP-FK-003 | Finishing Kitchen Inventory / Storage / Partially Used Product | Control daily inventory, rotation, milk/direct deliveries, partially used bulk product, waste/disposition and monthly reconciliation. | FK | Core SOP | Required Before Opening | FK Operations | Program Leadership | Contract 2.1.3.5; SAFE-02 | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-04 | SOP-04 Sec. 21 | |||
| SOP-FK-004 | Rethermalization / Finishing | Execute approved recipe/equipment/HACCP process for rethermalization or finishing and complete required monitoring. | FK | Food-Safety SOP | Required Before Opening | FK Operations | Food Safety / HACCP | SAFE-01/02; MENU-03; EQUIP-04 | Yes | Yes | Yes | Pending Source | Not Submitted | TRN-01/04 | Mapped | TEST-01/02/04 | SOP-04 Sec. 22 | Final limits controlled by approved HACCP/recipe/equipment source. | ||
| SOP-FK-005 | Holding, Service and Closeout | Maintain approved hot/cold holding and service process; reconcile leftovers/waste/records and close service. | FK | Food-Safety SOP | Required Before Opening | FK Operations | Food Safety / HACCP | SAFE-01/02; MENU; Contract 2.1.6.4 | Yes | Yes | Yes | Pending Source | Not Submitted | TRN-01/04 | Mapped | TEST-01/02/04 | SOP-04 Sec. 23 | |||
| SOP-FS-003 | Employee Health, Personal Hygiene and Handwashing | Apply final employee-health, hygiene and handwashing requirements for RK/FK staff. | RK & FK | Food-Safety SOP | Required Before Opening | Food Safety / HACCP | Food Safety / HACCP | Final HACCP / branch policy; Contract 2.1.6.2.3 | Yes | Yes | Yes | Pending Source | Not Submitted | TRN-01/04 | Mapped | TEST-04 | SOP-04 Sec. 24 | Interim manual provides responsibilities only; final approved food-safety SOP controls. | ||
| SOP-FS-004 | Cross-Contamination and Allergen Controls | Prevent cross-contamination/cross-contact through segregation, workflow, utensils/equipment, sanitation and approved product/recipe information. | RK & FK | Food-Safety SOP | Required Before Opening | Food Safety / HACCP | Food Safety / HACCP | SAFE-01; MENU-03; PROC-05; final allergen SOP | Yes | Yes | Yes | Pending Source | Not Submitted | TRN-01/04 | Mapped | TEST-04 | SOP-04 Sec. 25 | |||
| SOP-SAN-001 | Cleaning and Sanitation | Define routine cleaning/sanitation responsibilities, schedules, chemical/equipment source requirements, verification and corrective action. | RK & FK | Food-Safety SOP | Required Before Opening | RK Operations | Food Safety / HACCP | SAFE-01/02; final sanitation plan; equipment manuals | Yes | Yes | Yes | Pending Source | Not Submitted | TRN-01/04 | Mapped | TEST-04 | SOP-04 Sec. 26 | Chemical concentrations/contact times are not invented. | ||
| SOP-EQ-001 | Operator Pre-Use Inspection and Preventive Operational Maintenance | Perform operator-level checks and escalate conditions threatening production continuity without replacing manufacturer/facilities maintenance. | RK & FK | Core SOP | Required Before Opening | Equipment / Maintenance | RK Operations | EQUIP-03/04; MHE-05; manufacturer manuals; Contract 2.1.1.5 | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-01/04 | SOP-04 Sec. 27 | |||
| SOP-REC-001 | Operational Recordkeeping, Exception and Corrective-Action Control | Ensure required records are complete, linked to deviations/issues and retained in the designated system/location. | RK & FK | Core SOP | Required Before Opening | Technology / Data | Program Leadership | DATA-01/02/03; SAFE-02; TEST-03 | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/03 | Mapped | TEST-04 | SOP-04 Sec. 28 | Retention durations require final policy/source. | ||
| SOP-TRACE-001 | Product Traceability / Recall | Control supplier/lot-to-batch-to-destination trace and recall actions. | RK & FK | Existing Branch SOP | Required Before Opening | Food Safety / HACCP | Program Leadership | SAFE-03/04/05 | Yes | Yes | Yes | Approved / Effective | Not Required | TRN-01/04 | Mapped | TEST-01/04 | Cross-reference SAFE-03 | Do not duplicate SAFE-03; use this row as library cross-reference. | ||
| SOP-ILL-001 | Foodborne Illness Complaint Response | Use existing branch complaint-response procedure with RK/FK traceability crosswalk. | Branch / Systemwide | Existing Branch SOP | Required Before Opening | SFSB / Branch | SFSB / Branch | SOP Food Borne Illness V2; Foodborne Illness Complaint Form; SAFE-05 | Yes | Yes | Yes | Approved / Effective | Not Required | TRN-01/04 | Mapped | TEST-01/04 | Existing branch SOP + SAFE-05 | Existing branch procedure remains controlling; no competing SOP created. | ||
| SOP-COOP-001 | Emergency / Continuity Activation and Command | Define activation, immediate food-safety actions, communications, alternate service and recovery structure. | RK & FK | Emergency / COOP | Required Before Opening | Program Leadership | Program Leadership | SOP-05; contract 2.1.1.3 | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-01/04 | SOP-05 Sec. 1 | |||
| SOP-COOP-002 | Finishing-Kitchen Failure | Respond to inability to rethermalize/finish/service, shortages, spoilage, refrigeration failure or loss of service capability. | FK | Emergency / COOP | Required Before Opening | FK Operations | Program Leadership | SOP-05; LOG; SAFE; MENU | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-01/04 | SOP-05 Sec. 2 | |||
| SOP-COOP-003 | Regional Kitchen Critical Equipment Failure | Respond to critical production-equipment failure with safe stop, alternative method, resequencing and escalation. | RK | Emergency / COOP | Required Before Opening | RK Operations | Program Leadership | SOP-05; EQUIP; MENU | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-01/04 | SOP-05 Sec. 3 | |||
| SOP-COOP-004 | Utility Interruption | Respond to electrical, water, refrigeration, gas/other interruption including product protection/disposition and recovery. | RK & FK | Emergency / COOP | Required Before Opening | Program Leadership | Food Safety / HACCP | SOP-05; SAFE; CONST | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-01/04 | SOP-05 Sec. 4-7 | |||
| SOP-COOP-005 | Transportation Disruption | Respond to breakdown, delay, road closure, accident, temperature-control failure or alternate delivery need. | RK & FK | Emergency / COOP | Required Before Opening | Logistics | Program Leadership | SOP-05; LOG-05; SAFE-02 | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-01/04 | SOP-05 Sec. 8-11 | |||
| SOP-COOP-006 | Weather / Disaster / Staffing / Supply Emergency | Respond to severe weather, island disaster, road closure, staffing shortage, supplier disruption, ingredient shortage and emergency menu need. | RK & FK | Emergency / COOP | Required Before Opening | Program Leadership | Program Leadership | SOP-05; MENU; PROC; staffing/communication controls | Yes | Yes | Yes | Draft Interim | Not Submitted | TRN-01/04 | Mapped | TEST-01/04 | SOP-05 Sec. 12-15 | |||
| SOP-POST-001 | 30-Day Post-Opening Review | Capture early operating lessons, unresolved gaps and required SOP/tool/training changes after launch. | RK & FK | Control / Register | Required Within 30 Days | Program Leadership | Program Leadership | TEST-03/04; DATA-02; SOP-01 | No | Yes | No | Draft Interim | Not Submitted | TRN-01/03 | Mapped | Post-opening review | SOP-01/TEST-04 | Binder recommendation 72. | ||
| SOP-POST-002 | 90-Day Stabilization Review | Assess stabilization, recurring issues, performance trends and controlled updates to SOP/training/tools. | RK & FK | Control / Register | Enhancement | Program Leadership | Program Leadership | TEST-03/04; DATA-02; SOP-01 | No | Yes | No | Draft Interim | Not Submitted | TRN-01/03 | Mapped | Post-opening review | SOP-01/TEST-04 | Binder recommendation 72. |
Dependency Crosswalk
| SOP-01 | Dependency Crosswalk | ||||||||||
| Shows how each SOP depends on existing mission products, training and test evidence. This helps prevent duplicate or conflicting systems. | ||||||||||
| SOP ID | SOP Title | Primary Source / Basis | Training Source | Test / Validation Source | Library Location / Cross-Reference | Food-Safety Critical? | Training Required? | Test Required? | Dependency Status | Notes |
| SOP-ADM-001 | Controlled SOP Use, Revision and Document Access | DATA-01/02/03/04; SOP-01 | TRN-01/03/04 | TEST-04 | SOP-04 Sec. 1 | Yes | Yes | Yes | Open / Validate | |
| SOP-ADM-002 | Daily Start-Up / Shift Readiness | PHASE-03; EQUIP; MENU; SAFE; TRN | TRN-01/04 | TEST-01/04 | SOP-04 Sec. 2 | Yes | Yes | Yes | Open / Validate | |
| SOP-ADM-003 | Shift Closeout and Required Record Review | SAFE-02; MENU-02; LOG; DATA-02 | TRN-01/04 | TEST-02/03 | SOP-04 Sec. 3 | Yes | Yes | Yes | Open / Validate | |
| SOP-RCV-001 | RK Receiving and Product Acceptance | PROC; SAFE-02/03; Contract 2.1.3.3 | TRN-01/04 | TEST-01/02 | SOP-04 Sec. 4 | Yes | Yes | Yes | Open / Validate | |
| SOP-INV-001 | FIFO, Dating, Storage and Labeling | SAFE-03; PROC; Contract 2.1.3.2 | TRN-01/04 | TEST-04 | SOP-04 Sec. 5 | Yes | Yes | Yes | Open / Validate | |
| SOP-INV-002 | Inventory Control and Reconciliation | Contract 2.1.3.5; PROC; MENU | TRN-01/04 | TEST-04 | SOP-04 Sec. 6 | No | Yes | Yes | Open / Validate | |
| SOP-MENU-001 | Approved Menu / Recipe / Production Baseline Use | MENU-01/02/03/04/05/06; DATA-02 | TRN-01/03 | TEST-01/04 | SOP-04 Sec. 7 | Yes | Yes | Yes | Open / Validate | |
| SOP-PROD-001 | Production Planning, Sequencing and Batch Release | MENU-02; STAFF; EQUIP; Contract 2.1.2.2/.3 | TRN-01/04 | TEST-01/02 | SOP-04 Sec. 8 | Yes | Yes | Yes | Open / Validate | |
| SOP-PROD-002 | Standardized Recipe Execution | MENU-02/03/04; PROC-05; SAFE-01/02 | TRN-01/04 | TEST-01/02 | SOP-04 Sec. 9 | Yes | Yes | Yes | Open / Validate | |
| SOP-PROD-003 | Large-Batch Production Quality Control | Contract 2.1.2.5; MENU; SAFE-02 | TRN-01/04 | TEST-01/02 | SOP-04 Sec. 10 | Yes | Yes | Yes | Open / Validate | |
| SOP-FS-001 | Time / Temperature Monitoring and Corrective Action | SAFE-01/02; final approved HACCP | TRN-01/04 | TEST-01/02/04 | SOP-04 Sec. 11 | Yes | Yes | Yes | Open / Validate | |
| SOP-FS-002 | Cooling and Blast Chilling | SAFE-01/02; final HACCP; equipment manuals | TRN-01/04 | TEST-01/02/04 | SOP-04 Sec. 12 | Yes | Yes | Yes | Open / Validate | |
| SOP-PKG-001 | Packaging, Labeling and Batch Traceability | SAFE-03; MENU; LOG; Contract 2.1.2.5 | TRN-01/04 | TEST-01/02 | SOP-04 Sec. 13 | Yes | Yes | Yes | Open / Validate | |
| SOP-HOLD-001 | Holding, Storage and Final Product Release | SAFE-01/02; LOG-02 | TRN-01/04 | TEST-01/02 | SOP-04 Sec. 14 | Yes | Yes | Yes | Open / Validate | |
| SOP-LOG-001 | Staging, Loading and Dispatch | LOG-01/02/04; SAFE-02/03 | TRN-01/04 | TEST-01/02 | SOP-04 Sec. 15 | Yes | Yes | Yes | Open / Validate | |
| SOP-LOG-002 | Transportation / Cold-Chain / Chain of Custody | LOG-01/02/05; SAFE-02/03; Contract 2.1.1.1 | TRN-01/04 | TEST-01/02/04 | SOP-04 Sec. 16 | Yes | Yes | Yes | Open / Validate | |
| SOP-LOG-003 | Delivery Discrepancy / Short / Rejected / Compromised Product | LOG-03; SAFE-02; Contract 2.1.1.1 | TRN-01/04 | TEST-01/02 | SOP-04 Sec. 17 | Yes | Yes | Yes | Open / Validate | |
| SOP-LOG-004 | Food Carts and Reusable Transportation Equipment | LOG-04; Contract 2.1.1.4 | TRN-01/04 | TEST-01/02 | SOP-04 Sec. 18 | Yes | Yes | Yes | Open / Validate | |
| SOP-FK-001 | Finishing Kitchen Ordering from Regional Kitchen | Contract 2.1.3.4; PHASE; MENU | TRN-01/04 | TEST-04 | SOP-04 Sec. 19 | No | Yes | Yes | Open / Validate | |
| SOP-FK-002 | Finishing Kitchen Receiving and Acceptance | LOG-03; SAFE-02; Contract 2.1.3.5 | TRN-01/04 | TEST-01/02 | SOP-04 Sec. 20 | Yes | Yes | Yes | Open / Validate | |
| SOP-FK-003 | Finishing Kitchen Inventory / Storage / Partially Used Product | Contract 2.1.3.5; SAFE-02 | TRN-01/04 | TEST-04 | SOP-04 Sec. 21 | Yes | Yes | Yes | Open / Validate | |
| SOP-FK-004 | Rethermalization / Finishing | SAFE-01/02; MENU-03; EQUIP-04 | TRN-01/04 | TEST-01/02/04 | SOP-04 Sec. 22 | Yes | Yes | Yes | Open / Validate | |
| SOP-FK-005 | Holding, Service and Closeout | SAFE-01/02; MENU; Contract 2.1.6.4 | TRN-01/04 | TEST-01/02/04 | SOP-04 Sec. 23 | Yes | Yes | Yes | Open / Validate | |
| SOP-FS-003 | Employee Health, Personal Hygiene and Handwashing | Final HACCP / branch policy; Contract 2.1.6.2.3 | TRN-01/04 | TEST-04 | SOP-04 Sec. 24 | Yes | Yes | Yes | Open / Validate | |
| SOP-FS-004 | Cross-Contamination and Allergen Controls | SAFE-01; MENU-03; PROC-05; final allergen SOP | TRN-01/04 | TEST-04 | SOP-04 Sec. 25 | Yes | Yes | Yes | Open / Validate | |
| SOP-SAN-001 | Cleaning and Sanitation | SAFE-01/02; final sanitation plan; equipment manuals | TRN-01/04 | TEST-04 | SOP-04 Sec. 26 | Yes | Yes | Yes | Open / Validate | |
| SOP-EQ-001 | Operator Pre-Use Inspection and Preventive Operational Maintenance | EQUIP-03/04; MHE-05; manufacturer manuals; Contract 2.1.1.5 | TRN-01/04 | TEST-01/04 | SOP-04 Sec. 27 | Yes | Yes | Yes | Open / Validate | |
| SOP-REC-001 | Operational Recordkeeping, Exception and Corrective-Action Control | DATA-01/02/03; SAFE-02; TEST-03 | TRN-01/03 | TEST-04 | SOP-04 Sec. 28 | Yes | Yes | Yes | Open / Validate | |
| SOP-TRACE-001 | Product Traceability / Recall | SAFE-03/04/05 | TRN-01/04 | TEST-01/04 | Cross-reference SAFE-03 | Yes | Yes | Yes | Existing / Cross-Reference | |
| SOP-ILL-001 | Foodborne Illness Complaint Response | SOP Food Borne Illness V2; Foodborne Illness Complaint Form; SAFE-05 | TRN-01/04 | TEST-01/04 | Existing branch SOP + SAFE-05 | Yes | Yes | Yes | Existing / Cross-Reference | |
| SOP-COOP-001 | Emergency / Continuity Activation and Command | SOP-05; contract 2.1.1.3 | TRN-01/04 | TEST-01/04 | SOP-05 Sec. 1 | Yes | Yes | Yes | Open / Validate | |
| SOP-COOP-002 | Finishing-Kitchen Failure | SOP-05; LOG; SAFE; MENU | TRN-01/04 | TEST-01/04 | SOP-05 Sec. 2 | Yes | Yes | Yes | Open / Validate | |
| SOP-COOP-003 | Regional Kitchen Critical Equipment Failure | SOP-05; EQUIP; MENU | TRN-01/04 | TEST-01/04 | SOP-05 Sec. 3 | Yes | Yes | Yes | Open / Validate | |
| SOP-COOP-004 | Utility Interruption | SOP-05; SAFE; CONST | TRN-01/04 | TEST-01/04 | SOP-05 Sec. 4-7 | Yes | Yes | Yes | Open / Validate | |
| SOP-COOP-005 | Transportation Disruption | SOP-05; LOG-05; SAFE-02 | TRN-01/04 | TEST-01/04 | SOP-05 Sec. 8-11 | Yes | Yes | Yes | Open / Validate | |
| SOP-COOP-006 | Weather / Disaster / Staffing / Supply Emergency | SOP-05; MENU; PROC; staffing/communication controls | TRN-01/04 | TEST-01/04 | SOP-05 Sec. 12-15 | Yes | Yes | Yes | Open / Validate | |
| SOP-POST-001 | 30-Day Post-Opening Review | TEST-03/04; DATA-02; SOP-01 | TRN-01/03 | Post-opening review | SOP-01/TEST-04 | No | Yes | No | Open / Validate | |
| SOP-POST-002 | 90-Day Stabilization Review | TEST-03/04; DATA-02; SOP-01 | TRN-01/03 | Post-opening review | SOP-01/TEST-04 | No | Yes | No | Open / Validate |
Review Schedule
| SOP-01 | Review & Maintenance Schedule | ||||||||||
| Each procedure should be reviewed when its operating basis changes. Food-safety/HACCP-related changes must align with the final approved HACCP maintenance process. | ||||||||||
| SOP ID | Title | Priority | Owner | Approver | Default Review Trigger | Specific Change Triggers | Last Review | Next Review | Review Result | DATA-02 Change ID |
| SOP-ADM-001 | Controlled SOP Use, Revision and Document Access | Required Before Opening | Program Leadership | Program Leadership | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-ADM-002 | Daily Start-Up / Shift Readiness | Required Before Opening | RK Operations | Program Leadership | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-ADM-003 | Shift Closeout and Required Record Review | Required Before Opening | RK Operations | Program Leadership | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-RCV-001 | RK Receiving and Product Acceptance | Required Before Opening | RK Operations | Food Safety / HACCP | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-INV-001 | FIFO, Dating, Storage and Labeling | Required Before Opening | RK Operations | Food Safety / HACCP | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-INV-002 | Inventory Control and Reconciliation | Required Before Opening | RK Operations | Program Leadership | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-MENU-001 | Approved Menu / Recipe / Production Baseline Use | Required Before Opening | Menu / Culinary | Program Leadership | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-PROD-001 | Production Planning, Sequencing and Batch Release | Required Before Opening | RK Operations | Program Leadership | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-PROD-002 | Standardized Recipe Execution | Required Before Opening | Menu / Culinary | Food Safety / HACCP | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-PROD-003 | Large-Batch Production Quality Control | Required Before Opening | RK Operations | Menu / Culinary | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-FS-001 | Time / Temperature Monitoring and Corrective Action | Required Before Opening | Food Safety / HACCP | Food Safety / HACCP | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-FS-002 | Cooling and Blast Chilling | Required Before Opening | Food Safety / HACCP | Food Safety / HACCP | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-PKG-001 | Packaging, Labeling and Batch Traceability | Required Before Opening | RK Operations | Food Safety / HACCP | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-HOLD-001 | Holding, Storage and Final Product Release | Required Before Opening | RK Operations | Food Safety / HACCP | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-LOG-001 | Staging, Loading and Dispatch | Required Before Opening | Logistics | RK Operations | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-LOG-002 | Transportation / Cold-Chain / Chain of Custody | Required Before Opening | Logistics | Food Safety / HACCP | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-LOG-003 | Delivery Discrepancy / Short / Rejected / Compromised Product | Required Before Opening | Logistics | Food Safety / HACCP | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-LOG-004 | Food Carts and Reusable Transportation Equipment | Required Before Opening | Logistics | RK Operations | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-FK-001 | Finishing Kitchen Ordering from Regional Kitchen | Required Before Opening | FK Operations | Program Leadership | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-FK-002 | Finishing Kitchen Receiving and Acceptance | Required Before Opening | FK Operations | Food Safety / HACCP | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-FK-003 | Finishing Kitchen Inventory / Storage / Partially Used Product | Required Before Opening | FK Operations | Program Leadership | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-FK-004 | Rethermalization / Finishing | Required Before Opening | FK Operations | Food Safety / HACCP | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-FK-005 | Holding, Service and Closeout | Required Before Opening | FK Operations | Food Safety / HACCP | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-FS-003 | Employee Health, Personal Hygiene and Handwashing | Required Before Opening | Food Safety / HACCP | Food Safety / HACCP | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-FS-004 | Cross-Contamination and Allergen Controls | Required Before Opening | Food Safety / HACCP | Food Safety / HACCP | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-SAN-001 | Cleaning and Sanitation | Required Before Opening | RK Operations | Food Safety / HACCP | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-EQ-001 | Operator Pre-Use Inspection and Preventive Operational Maintenance | Required Before Opening | Equipment / Maintenance | RK Operations | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-REC-001 | Operational Recordkeeping, Exception and Corrective-Action Control | Required Before Opening | Technology / Data | Program Leadership | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-TRACE-001 | Product Traceability / Recall | Required Before Opening | Food Safety / HACCP | Program Leadership | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-ILL-001 | Foodborne Illness Complaint Response | Required Before Opening | SFSB / Branch | SFSB / Branch | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-COOP-001 | Emergency / Continuity Activation and Command | Required Before Opening | Program Leadership | Program Leadership | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-COOP-002 | Finishing-Kitchen Failure | Required Before Opening | FK Operations | Program Leadership | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-COOP-003 | Regional Kitchen Critical Equipment Failure | Required Before Opening | RK Operations | Program Leadership | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-COOP-004 | Utility Interruption | Required Before Opening | Program Leadership | Food Safety / HACCP | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-COOP-005 | Transportation Disruption | Required Before Opening | Logistics | Program Leadership | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-COOP-006 | Weather / Disaster / Staffing / Supply Emergency | Required Before Opening | Program Leadership | Program Leadership | Before opening and after any governing source/process change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-POST-001 | 30-Day Post-Opening Review | Required Within 30 Days | Program Leadership | Program Leadership | 30 days after applicable opening, then after material change | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable | ||||
| SOP-POST-002 | 90-Day Stabilization Review | Enhancement | Program Leadership | Program Leadership | 90-day stabilization review, then as needed | Menu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable |
Source Basis
| SOP-01 | Source Basis | ||||
| Sources used to construct this interim register. Where sources are drafts or interim controls, later approved/issued products supersede them through DATA-02 change control. | ||||
| Source ID | Source Product | Use in SOP Chapter | Role | Status / Supersession Note |
| SRC-01 | Regional_Kitchen_Turnover_Binder_DRAFT_v2.docx | Chapter 19 requires a controlled, prioritized SOP library, site readiness checklist, training connection, core SOPs and emergency procedures; emphasizes documentation + training + testing + ownership. | Binder turnover architecture | Current turnover source |
| SRC-02 | Regional_Kitchen_Operational_Support_Contract_8-13-2026.docx | Defines operational-process, distribution, continuity, receiving/inventory, training, FK readiness, HACCP-supporting SOP, trial and final-turnover requirements. | Operational support scope | Current source reviewed; issued/executed contract supersedes |
| SRC-03 | SOP Template.docx | Existing branch-style reference with document number, release/effective date, distribution, subject, purpose, definitions, applies-to and steps fields. | Format / structure reference | Existing source |
| SRC-04 | SOP Food Borne Illness V2.docx | Existing branch foodborne-illness response procedure; remains controlling for complaint response. | Existing branch SOP | Do not duplicate |
| SRC-05 | SAFE-05_Foodborne_Illness_RK_FK_Response_Crosswalk.xlsx | Adds RK/FK traceability/evidence actions without replacing branch complaint procedure. | RK/FK incident crosswalk | Current turnover source |
| SRC-06 | SAFE-01 through SAFE-04 | Interim HACCP, log, traceability and exercise controls. | Food-safety operating controls | Final approved HACCP/DOH product supersedes interim controls |
| SRC-07 | LOG-01 through LOG-05 | Route, dispatch, receiving, returnables and logistics dry-run controls. | Distribution/logistics controls | Future delivery-services model may supersede |
| SRC-08 | TRN-01 through TRN-04 | Training requirements, schedule, materials and competency records. | Training system | Current turnover controls |
| SRC-09 | TEST-01 through TEST-04 | Pilot, data, corrective-action/retest and integrated readiness evidence. | Validation / opening gate | Current turnover controls |
| SRC-10 | DATA-01 through DATA-04 | Source-of-truth, version control, manager tool guidance and hyperlink validation. | Document control | Current turnover controls |
Lists
| Priority | Status | Applies To | Yes/No/TBD | Document Type | Owner Area | Approval Status | Training Status |
| Required Before Opening | Not Started | RK | Yes | Core SOP | Program Leadership | Not Submitted | Not Mapped |
| Required Within 30 Days | Draft Interim | FK | No | Food-Safety SOP | RK Operations | Pending Review | Mapped |
| Enhancement | Under Review | RK & FK | TBD / Validate | Work Instruction | FK Operations | Approved | Scheduled |
| Pending Source | Branch / Systemwide | Existing Branch SOP | Food Safety / HACCP | Approved with Conditions | Complete | ||
| Pending Approval | Emergency / COOP | Logistics | Rejected | Competency Verified | |||
| Approved / Effective | Control / Register | Menu / Culinary | Superseded | Not Required | |||
| Superseded | Procurement | Not Required | TBD / Validate | ||||
| Not Applicable | Training | ||||||
| Contractor Replacement Pending | Equipment / Maintenance | ||||||
| Facilities | |||||||
| Technology / Data | |||||||
| SFSB / Branch | |||||||
| Other |