EX B SOP 01 RK FK SOP Register.xlsx

XLSX spreadsheet 51 KB Posted

Attached to
Regional Kitchen Operational Readiness Validation for HIDOE
Solicitation number
B27000433
Issued by
Hawaii

About this file

This is a Standard Operating Procedure (SOP) register and control document for the Hawaii State Department of Education's Regional Kitchen and Finishing Kitchen operational model. The register establishes a prioritized library of 38 required procedures organized into seven functional categories: administration and control (SOP-ADM), receiving and inventory (SOP-RCV, SOP-INV), menu and production (SOP-MENU, SOP-PROD), food safety (SOP-FS), packaging and holding (SOP-PKG, SOP-HOLD), logistics (SOP-LOG), finishing kitchen operations (SOP-FK), sanitation and equipment (SOP-SAN, SOP-EQ), recordkeeping (SOP-REC), traceability (SOP-TRACE), illness response (SOP-ILL), continuity of operations (SOP-COOP), and post-opening reviews (SOP-POST). Of the 38 procedures, 36 have been approved or are effective, with 2 pending source approval; 9 procedures require training and all require validation before opening. The register enforces that interim food-safety critical procedures remain interim until final HACCP or Department of Health approvals are received, explicitly prohibiting invented limits or gaps. All procedures require designated internal owners, approvers, applicable training completion, and documented test or exercise validation before being treated as operating policy. The SOP register also serves as a dependency crosswalk showing how each procedure depends on existing mission products, training sources, and test evidence to prevent duplicate or conflicting systems.

The register establishes mandatory review triggers for all SOPs before opening and upon any governing source, process, menu, recipe, supplier, ingredient, equipment, regulatory, or corrective-action trend change, with food-safety and HACCP-related changes subject to the final approved HACCP maintenance process. All interim modules are explicitly identified as non-final policy until required internal, food-safety, regulatory, or contract acceptance is complete, with accepted contractor products replacing interim modules only through formal state acceptance and data control (DATA-02) supersession procedures with documented binder and source-of-truth updates. The control standard emphasizes that readiness is measured not by the number of SOPs but by the priority, ownership, approval, training, and validation status of each required procedure, with existing branch SOPs and mission controls cross-referenced rather than recreated to avoid duplication. Two post-opening review procedures (SOP-POST-001 at 30 days and SOP-POST-002 at 90 days) are scheduled to capture early operating lessons, unresolved gaps, and required SOP, tool, and training changes following launch of the Regional Kitchen.

View the file

Other files

File Type Posted
EX B PHASE 01 RK FK Phase Implementation Master.xlsx XLSX spreadsheet
EX B EQUIP 04 Finishing Kitchen Equipment Requirement.xlsx XLSX spreadsheet
EX B SOP 04 RK FK Core Operational SOP Library.docx DOCX document
EX B EQUIP 01 Phase 1 Equipment Master.xlsx XLSX spreadsheet
EX B MENU 01 RK Five Week Cycle Menu.xlsx XLSX spreadsheet
EX B SMW 01 RK FK Smallwares Master Workbook.xlsx XLSX spreadsheet
EX B LOG 01 RK FK Distribution Route Plan.xlsx XLSX spreadsheet
EX B TRN 02 Training Calendar Provider Implementation Plan.xlsx XLSX spreadsheet
IFB D27 055 Addendum B.pdf PDF
IFB D27 055 Solicitation.pdf PDF
EX B TEST 01 RK FK Integrated Pilot Dry Run Plan.xlsx XLSX spreadsheet
IFB D27 055 Addendum A.pdf PDF
EX B MENU 03 RK Standardized Recipe Database.xlsx XLSX spreadsheet
EX B SAFE 03 RK FK Traceability Recall Procedure.docx DOCX document
EX B SOP 02 RK FK Opening Readiness Checklist.xlsx XLSX spreadsheet
EX B SAFE 02 RK FK Food Safety Log Set.xlsx XLSX spreadsheet
EX B MENU 02 RK Menu Recipe Production Manager Workbook.xlsx XLSX spreadsheet
IFB D27 055 Legal Notice.pdf PDF
IFB D27 055 Additional Offer Pages.pdf PDF
EX B CONST 05 Operational Readiness Milestone Plan.xlsx XLSX spreadsheet
EX B SOP 05 RK FK Emergency Continuity of Operations Procedure.docx DOCX document
EX B LOG 03 FK Receiving Discrepancy Procedure.docx DOCX document
EX B PHASE 03 Finishing Kitchen Site Readiness Matrix.xlsx XLSX spreadsheet
EX B TRN 01 RK FK Training Requirements Matrix.xlsx XLSX spreadsheet
EX B LOG 02 RK Loading Dispatch Standard.docx DOCX document
EX B PROC 01 RK Recipe Ingredient Master.xlsx XLSX spreadsheet
EX B Regional Kitchen Materials Index.docx DOCX document
IFB D27 055 Addendum C.pdf PDF
EX B SAFE 01 RK FK HACCP Development and Control Framework.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Executive Summary

SOP-01 | SOP Library Control Snapshot
The binder explicitly warns that readiness is not the number of SOPs. This register therefore tracks priority, ownership, approval, training and validation for each required procedure.
Registered ProceduresRequired Before OpeningApproved / EffectivePending SourceTraining Mapped
38362938
Control Standard
1. Every Required-Before-Opening SOP needs an owner, approver, applicable training, and validation path before it is treated as operating policy.
2. Food-safety critical procedures remain interim where final HACCP/DOH limits or approvals are not yet available; no limit is invented to make the document look complete.
3. Existing branch SOPs and mission controls are cross-referenced instead of recreated.
4. Accepted contractor products replace interim modules only through State acceptance, DATA-02 supersession, and binder/source-of-truth updates.

SOP Register

SOP-01 | RK/FK Master SOP Register
Prioritized control register for procedures needed to safely and consistently operate the Regional Kitchen / Finishing Kitchen model. Interim modules are not final policy until required internal, food-safety, regulatory or contract acceptance is complete.
SOP IDTitlePurpose / Control ObjectiveApplies ToDocument TypePriorityInternal Owner AreaApprover AreaControlling / Supporting SourceFood-Safety Critical?Training Required?Test / Exercise Required?Current StatusCurrent RevisionEffective DateApproval StatusTraining SourceTraining StatusValidation / Test SourceLocation / Cross-ReferenceNotes
SOP-ADM-001Controlled SOP Use, Revision and Document AccessControl how staff identify the current approved procedure, remove obsolete copies, and route changes.RK & FKControl / RegisterRequired Before OpeningProgram LeadershipProgram LeadershipDATA-01/02/03/04; SOP-01YesYesYesDraft InterimNot SubmittedTRN-01/03/04MappedTEST-04SOP-04 Sec. 1Interim turnover module; final approved contractor/State document may supersede.
SOP-ADM-002Daily Start-Up / Shift ReadinessVerify staffing, equipment, utilities, menu, records, sanitation and critical prerequisites before production/service begins.RK & FKCore SOPRequired Before OpeningRK OperationsProgram LeadershipPHASE-03; EQUIP; MENU; SAFE; TRNYesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-01/04SOP-04 Sec. 2
SOP-ADM-003Shift Closeout and Required Record ReviewClose production/service, reconcile records, identify exceptions, secure product/equipment and transfer unresolved issues.RK & FKCore SOPRequired Before OpeningRK OperationsProgram LeadershipSAFE-02; MENU-02; LOG; DATA-02YesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-02/03SOP-04 Sec. 3
SOP-RCV-001RK Receiving and Product AcceptanceStandardize delivery/purchase verification, quantity, condition, temperature, lot/specification, accept/hold/reject, storage and discrepancy communication.RKCore SOPRequired Before OpeningRK OperationsFood Safety / HACCPPROC; SAFE-02/03; Contract 2.1.3.3YesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-01/02SOP-04 Sec. 4Approved HACCP/receiving limits remain controlling.
SOP-INV-001FIFO, Dating, Storage and LabelingStandardize product dating, identification, rotation, storage zones and traceability.RK & FKCore SOPRequired Before OpeningRK OperationsFood Safety / HACCPSAFE-03; PROC; Contract 2.1.3.2YesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-04SOP-04 Sec. 5Contract requires availability for training before applicable kitchen opens.
SOP-INV-002Inventory Control and ReconciliationControl daily inventory activity, deliveries, usage, periodic review, monthly physical inventory, discrepancies and disposition.RK & FKCore SOPRequired Before OpeningRK OperationsProgram LeadershipContract 2.1.3.5; PROC; MENUNoYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-04SOP-04 Sec. 6
SOP-MENU-001Approved Menu / Recipe / Production Baseline UseEnsure only the approved menu, standardized recipe and production tool are used and changes are routed through controlled change processes.RK & FKCore SOPRequired Before OpeningMenu / CulinaryProgram LeadershipMENU-01/02/03/04/05/06; DATA-02YesYesYesDraft InterimNot SubmittedTRN-01/03MappedTEST-01/04SOP-04 Sec. 7Does not replace formal menu/nutrition approval.
SOP-PROD-001Production Planning, Sequencing and Batch ReleaseTranslate approved menu/counts into executable sequencing considering capacity, labor, cooling, packaging, storage and dispatch.RKCore SOPRequired Before OpeningRK OperationsProgram LeadershipMENU-02; STAFF; EQUIP; Contract 2.1.2.2/.3YesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-01/02SOP-04 Sec. 8
SOP-PROD-002Standardized Recipe ExecutionUse current recipe, approved ingredients/substitutions, batch scaling and required production records.RKCore SOPRequired Before OpeningMenu / CulinaryFood Safety / HACCPMENU-02/03/04; PROC-05; SAFE-01/02YesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-01/02SOP-04 Sec. 9
SOP-PROD-003Large-Batch Production Quality ControlEstablish QC checkpoints from ingredient staging through final release.RKCore SOPRequired Before OpeningRK OperationsMenu / CulinaryContract 2.1.2.5; MENU; SAFE-02YesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-01/02SOP-04 Sec. 10
SOP-FS-001Time / Temperature Monitoring and Corrective ActionDefine responsibility for required process monitoring, record completion, deviation escalation and product disposition.RK & FKFood-Safety SOPRequired Before OpeningFood Safety / HACCPFood Safety / HACCPSAFE-01/02; final approved HACCPYesYesYesPending SourceNot SubmittedTRN-01/04MappedTEST-01/02/04SOP-04 Sec. 11Do not finalize limits here; final HACCP controls.
SOP-FS-002Cooling and Blast ChillingExecute approved cooling/blast-chilling method, monitoring, records, corrective action and release.RKFood-Safety SOPRequired Before OpeningFood Safety / HACCPFood Safety / HACCPSAFE-01/02; final HACCP; equipment manualsYesYesYesPending SourceNot SubmittedTRN-01/04MappedTEST-01/02/04SOP-04 Sec. 12Process-specific limits intentionally not invented.
SOP-PKG-001Packaging, Labeling and Batch TraceabilityPackage/label product so identity, batch, destination and handling requirements remain traceable through dispatch/service.RKCore SOPRequired Before OpeningRK OperationsFood Safety / HACCPSAFE-03; MENU; LOG; Contract 2.1.2.5YesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-01/02SOP-04 Sec. 13
SOP-HOLD-001Holding, Storage and Final Product ReleaseControl product after production through hold/storage and release to distribution using approved food-safety criteria and complete records.RKFood-Safety SOPRequired Before OpeningRK OperationsFood Safety / HACCPSAFE-01/02; LOG-02YesYesYesPending SourceNot SubmittedTRN-01/04MappedTEST-01/02SOP-04 Sec. 14
SOP-LOG-001Staging, Loading and DispatchStage route loads, verify product/quantity/records, secure carts/containers, release driver and record departure.RKCore SOPRequired Before OpeningLogisticsRK OperationsLOG-01/02/04; SAFE-02/03YesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-01/02SOP-04 Sec. 15
SOP-LOG-002Transportation / Cold-Chain / Chain of CustodyMaintain required transport conditions, route/chain-of-custody records and escalation for delays or temperature-control concerns.RK & FKFood-Safety SOPRequired Before OpeningLogisticsFood Safety / HACCPLOG-01/02/05; SAFE-02/03; Contract 2.1.1.1YesYesYesPending SourceNot SubmittedTRN-01/04MappedTEST-01/02/04SOP-04 Sec. 16Final transport limits/methods require approved food-safety/contract model.
SOP-LOG-003Delivery Discrepancy / Short / Rejected / Compromised ProductStandardize immediate control, documentation, communication and disposition when delivered product cannot be routinely accepted.RK & FKCore SOPRequired Before OpeningLogisticsFood Safety / HACCPLOG-03; SAFE-02; Contract 2.1.1.1YesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-01/02SOP-04 Sec. 17
SOP-LOG-004Food Carts and Reusable Transportation EquipmentControl staging, loading, securement, delivery, return, cleaning, sanitation, storage, inspection and accountability.RK & FKCore SOPRequired Before OpeningLogisticsRK OperationsLOG-04; Contract 2.1.1.4YesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-01/02SOP-04 Sec. 18
SOP-FK-001Finishing Kitchen Ordering from Regional KitchenDefine what/how/when to order, participation/standing quantity use, adjustment, emergency request and RK fulfillment confirmation.FKCore SOPRequired Before OpeningFK OperationsProgram LeadershipContract 2.1.3.4; PHASE; MENUNoYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-04SOP-04 Sec. 19Software-specific steps must be inserted once approved system/workflow is confirmed.
SOP-FK-002Finishing Kitchen Receiving and AcceptanceVerify delivery identity, count, condition, required food-safety documentation and accept/hold/reject decision; transfer product to storage.FKCore SOPRequired Before OpeningFK OperationsFood Safety / HACCPLOG-03; SAFE-02; Contract 2.1.3.5YesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-01/02SOP-04 Sec. 20
SOP-FK-003Finishing Kitchen Inventory / Storage / Partially Used ProductControl daily inventory, rotation, milk/direct deliveries, partially used bulk product, waste/disposition and monthly reconciliation.FKCore SOPRequired Before OpeningFK OperationsProgram LeadershipContract 2.1.3.5; SAFE-02YesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-04SOP-04 Sec. 21
SOP-FK-004Rethermalization / FinishingExecute approved recipe/equipment/HACCP process for rethermalization or finishing and complete required monitoring.FKFood-Safety SOPRequired Before OpeningFK OperationsFood Safety / HACCPSAFE-01/02; MENU-03; EQUIP-04YesYesYesPending SourceNot SubmittedTRN-01/04MappedTEST-01/02/04SOP-04 Sec. 22Final limits controlled by approved HACCP/recipe/equipment source.
SOP-FK-005Holding, Service and CloseoutMaintain approved hot/cold holding and service process; reconcile leftovers/waste/records and close service.FKFood-Safety SOPRequired Before OpeningFK OperationsFood Safety / HACCPSAFE-01/02; MENU; Contract 2.1.6.4YesYesYesPending SourceNot SubmittedTRN-01/04MappedTEST-01/02/04SOP-04 Sec. 23
SOP-FS-003Employee Health, Personal Hygiene and HandwashingApply final employee-health, hygiene and handwashing requirements for RK/FK staff.RK & FKFood-Safety SOPRequired Before OpeningFood Safety / HACCPFood Safety / HACCPFinal HACCP / branch policy; Contract 2.1.6.2.3YesYesYesPending SourceNot SubmittedTRN-01/04MappedTEST-04SOP-04 Sec. 24Interim manual provides responsibilities only; final approved food-safety SOP controls.
SOP-FS-004Cross-Contamination and Allergen ControlsPrevent cross-contamination/cross-contact through segregation, workflow, utensils/equipment, sanitation and approved product/recipe information.RK & FKFood-Safety SOPRequired Before OpeningFood Safety / HACCPFood Safety / HACCPSAFE-01; MENU-03; PROC-05; final allergen SOPYesYesYesPending SourceNot SubmittedTRN-01/04MappedTEST-04SOP-04 Sec. 25
SOP-SAN-001Cleaning and SanitationDefine routine cleaning/sanitation responsibilities, schedules, chemical/equipment source requirements, verification and corrective action.RK & FKFood-Safety SOPRequired Before OpeningRK OperationsFood Safety / HACCPSAFE-01/02; final sanitation plan; equipment manualsYesYesYesPending SourceNot SubmittedTRN-01/04MappedTEST-04SOP-04 Sec. 26Chemical concentrations/contact times are not invented.
SOP-EQ-001Operator Pre-Use Inspection and Preventive Operational MaintenancePerform operator-level checks and escalate conditions threatening production continuity without replacing manufacturer/facilities maintenance.RK & FKCore SOPRequired Before OpeningEquipment / MaintenanceRK OperationsEQUIP-03/04; MHE-05; manufacturer manuals; Contract 2.1.1.5YesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-01/04SOP-04 Sec. 27
SOP-REC-001Operational Recordkeeping, Exception and Corrective-Action ControlEnsure required records are complete, linked to deviations/issues and retained in the designated system/location.RK & FKCore SOPRequired Before OpeningTechnology / DataProgram LeadershipDATA-01/02/03; SAFE-02; TEST-03YesYesYesDraft InterimNot SubmittedTRN-01/03MappedTEST-04SOP-04 Sec. 28Retention durations require final policy/source.
SOP-TRACE-001Product Traceability / RecallControl supplier/lot-to-batch-to-destination trace and recall actions.RK & FKExisting Branch SOPRequired Before OpeningFood Safety / HACCPProgram LeadershipSAFE-03/04/05YesYesYesApproved / EffectiveNot RequiredTRN-01/04MappedTEST-01/04Cross-reference SAFE-03Do not duplicate SAFE-03; use this row as library cross-reference.
SOP-ILL-001Foodborne Illness Complaint ResponseUse existing branch complaint-response procedure with RK/FK traceability crosswalk.Branch / SystemwideExisting Branch SOPRequired Before OpeningSFSB / BranchSFSB / BranchSOP Food Borne Illness V2; Foodborne Illness Complaint Form; SAFE-05YesYesYesApproved / EffectiveNot RequiredTRN-01/04MappedTEST-01/04Existing branch SOP + SAFE-05Existing branch procedure remains controlling; no competing SOP created.
SOP-COOP-001Emergency / Continuity Activation and CommandDefine activation, immediate food-safety actions, communications, alternate service and recovery structure.RK & FKEmergency / COOPRequired Before OpeningProgram LeadershipProgram LeadershipSOP-05; contract 2.1.1.3YesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-01/04SOP-05 Sec. 1
SOP-COOP-002Finishing-Kitchen FailureRespond to inability to rethermalize/finish/service, shortages, spoilage, refrigeration failure or loss of service capability.FKEmergency / COOPRequired Before OpeningFK OperationsProgram LeadershipSOP-05; LOG; SAFE; MENUYesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-01/04SOP-05 Sec. 2
SOP-COOP-003Regional Kitchen Critical Equipment FailureRespond to critical production-equipment failure with safe stop, alternative method, resequencing and escalation.RKEmergency / COOPRequired Before OpeningRK OperationsProgram LeadershipSOP-05; EQUIP; MENUYesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-01/04SOP-05 Sec. 3
SOP-COOP-004Utility InterruptionRespond to electrical, water, refrigeration, gas/other interruption including product protection/disposition and recovery.RK & FKEmergency / COOPRequired Before OpeningProgram LeadershipFood Safety / HACCPSOP-05; SAFE; CONSTYesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-01/04SOP-05 Sec. 4-7
SOP-COOP-005Transportation DisruptionRespond to breakdown, delay, road closure, accident, temperature-control failure or alternate delivery need.RK & FKEmergency / COOPRequired Before OpeningLogisticsProgram LeadershipSOP-05; LOG-05; SAFE-02YesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-01/04SOP-05 Sec. 8-11
SOP-COOP-006Weather / Disaster / Staffing / Supply EmergencyRespond to severe weather, island disaster, road closure, staffing shortage, supplier disruption, ingredient shortage and emergency menu need.RK & FKEmergency / COOPRequired Before OpeningProgram LeadershipProgram LeadershipSOP-05; MENU; PROC; staffing/communication controlsYesYesYesDraft InterimNot SubmittedTRN-01/04MappedTEST-01/04SOP-05 Sec. 12-15
SOP-POST-00130-Day Post-Opening ReviewCapture early operating lessons, unresolved gaps and required SOP/tool/training changes after launch.RK & FKControl / RegisterRequired Within 30 DaysProgram LeadershipProgram LeadershipTEST-03/04; DATA-02; SOP-01NoYesNoDraft InterimNot SubmittedTRN-01/03MappedPost-opening reviewSOP-01/TEST-04Binder recommendation 72.
SOP-POST-00290-Day Stabilization ReviewAssess stabilization, recurring issues, performance trends and controlled updates to SOP/training/tools.RK & FKControl / RegisterEnhancementProgram LeadershipProgram LeadershipTEST-03/04; DATA-02; SOP-01NoYesNoDraft InterimNot SubmittedTRN-01/03MappedPost-opening reviewSOP-01/TEST-04Binder recommendation 72.

Dependency Crosswalk

SOP-01 | Dependency Crosswalk
Shows how each SOP depends on existing mission products, training and test evidence. This helps prevent duplicate or conflicting systems.
SOP IDSOP TitlePrimary Source / BasisTraining SourceTest / Validation SourceLibrary Location / Cross-ReferenceFood-Safety Critical?Training Required?Test Required?Dependency StatusNotes
SOP-ADM-001Controlled SOP Use, Revision and Document AccessDATA-01/02/03/04; SOP-01TRN-01/03/04TEST-04SOP-04 Sec. 1YesYesYesOpen / Validate
SOP-ADM-002Daily Start-Up / Shift ReadinessPHASE-03; EQUIP; MENU; SAFE; TRNTRN-01/04TEST-01/04SOP-04 Sec. 2YesYesYesOpen / Validate
SOP-ADM-003Shift Closeout and Required Record ReviewSAFE-02; MENU-02; LOG; DATA-02TRN-01/04TEST-02/03SOP-04 Sec. 3YesYesYesOpen / Validate
SOP-RCV-001RK Receiving and Product AcceptancePROC; SAFE-02/03; Contract 2.1.3.3TRN-01/04TEST-01/02SOP-04 Sec. 4YesYesYesOpen / Validate
SOP-INV-001FIFO, Dating, Storage and LabelingSAFE-03; PROC; Contract 2.1.3.2TRN-01/04TEST-04SOP-04 Sec. 5YesYesYesOpen / Validate
SOP-INV-002Inventory Control and ReconciliationContract 2.1.3.5; PROC; MENUTRN-01/04TEST-04SOP-04 Sec. 6NoYesYesOpen / Validate
SOP-MENU-001Approved Menu / Recipe / Production Baseline UseMENU-01/02/03/04/05/06; DATA-02TRN-01/03TEST-01/04SOP-04 Sec. 7YesYesYesOpen / Validate
SOP-PROD-001Production Planning, Sequencing and Batch ReleaseMENU-02; STAFF; EQUIP; Contract 2.1.2.2/.3TRN-01/04TEST-01/02SOP-04 Sec. 8YesYesYesOpen / Validate
SOP-PROD-002Standardized Recipe ExecutionMENU-02/03/04; PROC-05; SAFE-01/02TRN-01/04TEST-01/02SOP-04 Sec. 9YesYesYesOpen / Validate
SOP-PROD-003Large-Batch Production Quality ControlContract 2.1.2.5; MENU; SAFE-02TRN-01/04TEST-01/02SOP-04 Sec. 10YesYesYesOpen / Validate
SOP-FS-001Time / Temperature Monitoring and Corrective ActionSAFE-01/02; final approved HACCPTRN-01/04TEST-01/02/04SOP-04 Sec. 11YesYesYesOpen / Validate
SOP-FS-002Cooling and Blast ChillingSAFE-01/02; final HACCP; equipment manualsTRN-01/04TEST-01/02/04SOP-04 Sec. 12YesYesYesOpen / Validate
SOP-PKG-001Packaging, Labeling and Batch TraceabilitySAFE-03; MENU; LOG; Contract 2.1.2.5TRN-01/04TEST-01/02SOP-04 Sec. 13YesYesYesOpen / Validate
SOP-HOLD-001Holding, Storage and Final Product ReleaseSAFE-01/02; LOG-02TRN-01/04TEST-01/02SOP-04 Sec. 14YesYesYesOpen / Validate
SOP-LOG-001Staging, Loading and DispatchLOG-01/02/04; SAFE-02/03TRN-01/04TEST-01/02SOP-04 Sec. 15YesYesYesOpen / Validate
SOP-LOG-002Transportation / Cold-Chain / Chain of CustodyLOG-01/02/05; SAFE-02/03; Contract 2.1.1.1TRN-01/04TEST-01/02/04SOP-04 Sec. 16YesYesYesOpen / Validate
SOP-LOG-003Delivery Discrepancy / Short / Rejected / Compromised ProductLOG-03; SAFE-02; Contract 2.1.1.1TRN-01/04TEST-01/02SOP-04 Sec. 17YesYesYesOpen / Validate
SOP-LOG-004Food Carts and Reusable Transportation EquipmentLOG-04; Contract 2.1.1.4TRN-01/04TEST-01/02SOP-04 Sec. 18YesYesYesOpen / Validate
SOP-FK-001Finishing Kitchen Ordering from Regional KitchenContract 2.1.3.4; PHASE; MENUTRN-01/04TEST-04SOP-04 Sec. 19NoYesYesOpen / Validate
SOP-FK-002Finishing Kitchen Receiving and AcceptanceLOG-03; SAFE-02; Contract 2.1.3.5TRN-01/04TEST-01/02SOP-04 Sec. 20YesYesYesOpen / Validate
SOP-FK-003Finishing Kitchen Inventory / Storage / Partially Used ProductContract 2.1.3.5; SAFE-02TRN-01/04TEST-04SOP-04 Sec. 21YesYesYesOpen / Validate
SOP-FK-004Rethermalization / FinishingSAFE-01/02; MENU-03; EQUIP-04TRN-01/04TEST-01/02/04SOP-04 Sec. 22YesYesYesOpen / Validate
SOP-FK-005Holding, Service and CloseoutSAFE-01/02; MENU; Contract 2.1.6.4TRN-01/04TEST-01/02/04SOP-04 Sec. 23YesYesYesOpen / Validate
SOP-FS-003Employee Health, Personal Hygiene and HandwashingFinal HACCP / branch policy; Contract 2.1.6.2.3TRN-01/04TEST-04SOP-04 Sec. 24YesYesYesOpen / Validate
SOP-FS-004Cross-Contamination and Allergen ControlsSAFE-01; MENU-03; PROC-05; final allergen SOPTRN-01/04TEST-04SOP-04 Sec. 25YesYesYesOpen / Validate
SOP-SAN-001Cleaning and SanitationSAFE-01/02; final sanitation plan; equipment manualsTRN-01/04TEST-04SOP-04 Sec. 26YesYesYesOpen / Validate
SOP-EQ-001Operator Pre-Use Inspection and Preventive Operational MaintenanceEQUIP-03/04; MHE-05; manufacturer manuals; Contract 2.1.1.5TRN-01/04TEST-01/04SOP-04 Sec. 27YesYesYesOpen / Validate
SOP-REC-001Operational Recordkeeping, Exception and Corrective-Action ControlDATA-01/02/03; SAFE-02; TEST-03TRN-01/03TEST-04SOP-04 Sec. 28YesYesYesOpen / Validate
SOP-TRACE-001Product Traceability / RecallSAFE-03/04/05TRN-01/04TEST-01/04Cross-reference SAFE-03YesYesYesExisting / Cross-Reference
SOP-ILL-001Foodborne Illness Complaint ResponseSOP Food Borne Illness V2; Foodborne Illness Complaint Form; SAFE-05TRN-01/04TEST-01/04Existing branch SOP + SAFE-05YesYesYesExisting / Cross-Reference
SOP-COOP-001Emergency / Continuity Activation and CommandSOP-05; contract 2.1.1.3TRN-01/04TEST-01/04SOP-05 Sec. 1YesYesYesOpen / Validate
SOP-COOP-002Finishing-Kitchen FailureSOP-05; LOG; SAFE; MENUTRN-01/04TEST-01/04SOP-05 Sec. 2YesYesYesOpen / Validate
SOP-COOP-003Regional Kitchen Critical Equipment FailureSOP-05; EQUIP; MENUTRN-01/04TEST-01/04SOP-05 Sec. 3YesYesYesOpen / Validate
SOP-COOP-004Utility InterruptionSOP-05; SAFE; CONSTTRN-01/04TEST-01/04SOP-05 Sec. 4-7YesYesYesOpen / Validate
SOP-COOP-005Transportation DisruptionSOP-05; LOG-05; SAFE-02TRN-01/04TEST-01/04SOP-05 Sec. 8-11YesYesYesOpen / Validate
SOP-COOP-006Weather / Disaster / Staffing / Supply EmergencySOP-05; MENU; PROC; staffing/communication controlsTRN-01/04TEST-01/04SOP-05 Sec. 12-15YesYesYesOpen / Validate
SOP-POST-00130-Day Post-Opening ReviewTEST-03/04; DATA-02; SOP-01TRN-01/03Post-opening reviewSOP-01/TEST-04NoYesNoOpen / Validate
SOP-POST-00290-Day Stabilization ReviewTEST-03/04; DATA-02; SOP-01TRN-01/03Post-opening reviewSOP-01/TEST-04NoYesNoOpen / Validate

Review Schedule

SOP-01 | Review & Maintenance Schedule
Each procedure should be reviewed when its operating basis changes. Food-safety/HACCP-related changes must align with the final approved HACCP maintenance process.
SOP IDTitlePriorityOwnerApproverDefault Review TriggerSpecific Change TriggersLast ReviewNext ReviewReview ResultDATA-02 Change ID
SOP-ADM-001Controlled SOP Use, Revision and Document AccessRequired Before OpeningProgram LeadershipProgram LeadershipBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-ADM-002Daily Start-Up / Shift ReadinessRequired Before OpeningRK OperationsProgram LeadershipBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-ADM-003Shift Closeout and Required Record ReviewRequired Before OpeningRK OperationsProgram LeadershipBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-RCV-001RK Receiving and Product AcceptanceRequired Before OpeningRK OperationsFood Safety / HACCPBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-INV-001FIFO, Dating, Storage and LabelingRequired Before OpeningRK OperationsFood Safety / HACCPBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-INV-002Inventory Control and ReconciliationRequired Before OpeningRK OperationsProgram LeadershipBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-MENU-001Approved Menu / Recipe / Production Baseline UseRequired Before OpeningMenu / CulinaryProgram LeadershipBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-PROD-001Production Planning, Sequencing and Batch ReleaseRequired Before OpeningRK OperationsProgram LeadershipBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-PROD-002Standardized Recipe ExecutionRequired Before OpeningMenu / CulinaryFood Safety / HACCPBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-PROD-003Large-Batch Production Quality ControlRequired Before OpeningRK OperationsMenu / CulinaryBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-FS-001Time / Temperature Monitoring and Corrective ActionRequired Before OpeningFood Safety / HACCPFood Safety / HACCPBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-FS-002Cooling and Blast ChillingRequired Before OpeningFood Safety / HACCPFood Safety / HACCPBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-PKG-001Packaging, Labeling and Batch TraceabilityRequired Before OpeningRK OperationsFood Safety / HACCPBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-HOLD-001Holding, Storage and Final Product ReleaseRequired Before OpeningRK OperationsFood Safety / HACCPBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-LOG-001Staging, Loading and DispatchRequired Before OpeningLogisticsRK OperationsBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-LOG-002Transportation / Cold-Chain / Chain of CustodyRequired Before OpeningLogisticsFood Safety / HACCPBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-LOG-003Delivery Discrepancy / Short / Rejected / Compromised ProductRequired Before OpeningLogisticsFood Safety / HACCPBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-LOG-004Food Carts and Reusable Transportation EquipmentRequired Before OpeningLogisticsRK OperationsBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-FK-001Finishing Kitchen Ordering from Regional KitchenRequired Before OpeningFK OperationsProgram LeadershipBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-FK-002Finishing Kitchen Receiving and AcceptanceRequired Before OpeningFK OperationsFood Safety / HACCPBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-FK-003Finishing Kitchen Inventory / Storage / Partially Used ProductRequired Before OpeningFK OperationsProgram LeadershipBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-FK-004Rethermalization / FinishingRequired Before OpeningFK OperationsFood Safety / HACCPBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-FK-005Holding, Service and CloseoutRequired Before OpeningFK OperationsFood Safety / HACCPBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-FS-003Employee Health, Personal Hygiene and HandwashingRequired Before OpeningFood Safety / HACCPFood Safety / HACCPBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-FS-004Cross-Contamination and Allergen ControlsRequired Before OpeningFood Safety / HACCPFood Safety / HACCPBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-SAN-001Cleaning and SanitationRequired Before OpeningRK OperationsFood Safety / HACCPBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-EQ-001Operator Pre-Use Inspection and Preventive Operational MaintenanceRequired Before OpeningEquipment / MaintenanceRK OperationsBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-REC-001Operational Recordkeeping, Exception and Corrective-Action ControlRequired Before OpeningTechnology / DataProgram LeadershipBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-TRACE-001Product Traceability / RecallRequired Before OpeningFood Safety / HACCPProgram LeadershipBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-ILL-001Foodborne Illness Complaint ResponseRequired Before OpeningSFSB / BranchSFSB / BranchBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-COOP-001Emergency / Continuity Activation and CommandRequired Before OpeningProgram LeadershipProgram LeadershipBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-COOP-002Finishing-Kitchen FailureRequired Before OpeningFK OperationsProgram LeadershipBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-COOP-003Regional Kitchen Critical Equipment FailureRequired Before OpeningRK OperationsProgram LeadershipBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-COOP-004Utility InterruptionRequired Before OpeningProgram LeadershipFood Safety / HACCPBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-COOP-005Transportation DisruptionRequired Before OpeningLogisticsProgram LeadershipBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-COOP-006Weather / Disaster / Staffing / Supply EmergencyRequired Before OpeningProgram LeadershipProgram LeadershipBefore opening and after any governing source/process changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-POST-00130-Day Post-Opening ReviewRequired Within 30 DaysProgram LeadershipProgram Leadership30 days after applicable opening, then after material changeMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable
SOP-POST-00290-Day Stabilization ReviewEnhancementProgram LeadershipProgram Leadership90-day stabilization review, then as neededMenu/recipe; supplier/ingredient; equipment/process; regulatory; corrective-action trend; form/log revision; contractor supersession as applicable

Source Basis

SOP-01 | Source Basis
Sources used to construct this interim register. Where sources are drafts or interim controls, later approved/issued products supersede them through DATA-02 change control.
Source IDSource ProductUse in SOP ChapterRoleStatus / Supersession Note
SRC-01Regional_Kitchen_Turnover_Binder_DRAFT_v2.docxChapter 19 requires a controlled, prioritized SOP library, site readiness checklist, training connection, core SOPs and emergency procedures; emphasizes documentation + training + testing + ownership.Binder turnover architectureCurrent turnover source
SRC-02Regional_Kitchen_Operational_Support_Contract_8-13-2026.docxDefines operational-process, distribution, continuity, receiving/inventory, training, FK readiness, HACCP-supporting SOP, trial and final-turnover requirements.Operational support scopeCurrent source reviewed; issued/executed contract supersedes
SRC-03SOP Template.docxExisting branch-style reference with document number, release/effective date, distribution, subject, purpose, definitions, applies-to and steps fields.Format / structure referenceExisting source
SRC-04SOP Food Borne Illness V2.docxExisting branch foodborne-illness response procedure; remains controlling for complaint response.Existing branch SOPDo not duplicate
SRC-05SAFE-05_Foodborne_Illness_RK_FK_Response_Crosswalk.xlsxAdds RK/FK traceability/evidence actions without replacing branch complaint procedure.RK/FK incident crosswalkCurrent turnover source
SRC-06SAFE-01 through SAFE-04Interim HACCP, log, traceability and exercise controls.Food-safety operating controlsFinal approved HACCP/DOH product supersedes interim controls
SRC-07LOG-01 through LOG-05Route, dispatch, receiving, returnables and logistics dry-run controls.Distribution/logistics controlsFuture delivery-services model may supersede
SRC-08TRN-01 through TRN-04Training requirements, schedule, materials and competency records.Training systemCurrent turnover controls
SRC-09TEST-01 through TEST-04Pilot, data, corrective-action/retest and integrated readiness evidence.Validation / opening gateCurrent turnover controls
SRC-10DATA-01 through DATA-04Source-of-truth, version control, manager tool guidance and hyperlink validation.Document controlCurrent turnover controls

Lists

PriorityStatusApplies ToYes/No/TBDDocument TypeOwner AreaApproval StatusTraining Status
Required Before OpeningNot StartedRKYesCore SOPProgram LeadershipNot SubmittedNot Mapped
Required Within 30 DaysDraft InterimFKNoFood-Safety SOPRK OperationsPending ReviewMapped
EnhancementUnder ReviewRK & FKTBD / ValidateWork InstructionFK OperationsApprovedScheduled
Pending SourceBranch / SystemwideExisting Branch SOPFood Safety / HACCPApproved with ConditionsComplete
Pending ApprovalEmergency / COOPLogisticsRejectedCompetency Verified
Approved / EffectiveControl / RegisterMenu / CulinarySupersededNot Required
SupersededProcurementNot RequiredTBD / Validate
Not ApplicableTraining
Contractor Replacement PendingEquipment / Maintenance
Facilities
Technology / Data
SFSB / Branch
Other

File details come from the government source that posted it. Updated .