EX B EQUIP 04 Finishing Kitchen Equipment Requirement.xlsx
XLSX spreadsheet 48 KB Posted
- Solicitation number
- B27000433
- Issued by
- Hawaii
About this file
This is an equipment requirements worksheet for the Hawaii Department of Education's (HIDOE) finishing kitchen equipment procurement (EQUIP-04), supporting the state's transition from centralized food production to regional kitchen models serving approximately 86 schools statewide. The document provides detailed school-by-school gross planning quantities and site survey controls for five equipment categories: combi ovens, heated holding cabinets, refrigerated holding cabinets, mobile pan racks, and insulated pan carriers. The procurement spans four implementation phases (PI-Y1, PI-Y2, PII-Y1, and PII-Y2) across four quarters each, with initial Phase I implementation targeting 20 schools in the Leilehua-Mililani-Waialua complex by June 2027. Gross planning requirements total 86 combi ovens, 162 heated holding units, 162 refrigerated holding units, and 107 pan carriers across all phases. Net purchase quantities must be determined following completed site surveys that verify existing serviceable equipment and validate electrical, utility, capacity, and spatial compatibility at each school location. All schools listed show "Not Started" survey status as of the 9/1/2026 baseline date.
Equipment specifications are tiered by school size (S, M, L, and XL tiers) with varying quantities per tier level, ranging from single units for small schools to six units for extra-large facilities. The site survey controls establish a structured validation process requiring documentation of existing equipment condition, electrical and utility compatibility, capacity adequacy for projected meal volumes, dimensional and clearance compliance, and storage and staging space sufficiency before final net purchase orders are placed. The final net purchase formula is calculated as gross planning quantity minus verified serviceable existing equipment, with a minimum floor of zero. All survey assessments remain incomplete pending facility walkthroughs and engineering confirmation, with compatibility status marked as "Not Assessed" across all 86 schools, indicating that actual procurement quantities cannot be finalized until site validation activities are completed and documented in the related operational readiness contract supporting HIDOE's kitchen equipment implementation.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Executive Summary
| EQUIP-04 | Finishing Kitchen Equipment Snapshot | ||||
| Gross requirements are planning quantities. The net purchase requirement should fall as school site surveys identify serviceable existing equipment. | ||||
| Schools | Gross Combi Ovens | Gross Heated Holding | Gross Refrigerated Holding | Surveys Complete |
| 86 | 162 | 162 | 107 | 0 |
| Phase | Schools | Net Combi Ovens | Net Heated Holding | Net Refrigerated Holding | Net Pan Carriers |
| PI-Y1 | 20 | 27 | 27 | 21 | 47 |
| PI-Y2 | 22 | 38 | 38 | 25 | 61 |
| PII-Y1 | 26 | 53 | 53 | 35 | 82 |
| PII-Y2 | 18 | 44 | 44 | 26 | 64 |
School Equipment Requirements
| EQUIP-04 | Finishing Kitchen Equipment Requirements | ||||||||||||||||||||||||||||||||
| School-by-school gross planning requirements are preloaded from the 9/1/2026 FK School Rollout. Net purchase quantities must be based on verified serviceable existing equipment and site/utility compatibility. | ||||||||||||||||||||||||||||||||
| Phase | Quarter | School | Projected ME with Growth | Serving Lines | Meal Tier | Site Survey Status | Gross Combi Ovens | Existing Serviceable Combi Ovens | Net Combi Ovens | Gross Heated Holding | Existing Serviceable Heated Holding | Net Heated Holding | Gross Refrigerated Holding | Existing Serviceable Refrigerated Holding | Net Refrigerated Holding | Gross Mobile Pan Racks | Existing Serviceable Pan Racks | Net Pan Racks | Gross Insulated Pan Carriers | Existing Serviceable Pan Carriers | Net Pan Carriers | Electrical / Utility Compatibility | Water / Drain / Ventilation | Doorway / Clearance Compatibility | Storage / Staging Capacity | Overall Equipment Compatibility | Critical Barrier? | Priority | Site Survey Date | Reviewer / Role | Planning Note | Source / Reference |
| PI-Y1 | Q1 | Wahiawā Elementary School | 565 | 1 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y1 | Q1 | Wahiawā Middle School | 402 | 2 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y1 | Q1 | ʻIliahi Elementary School | 354 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y1 | Q1 | Leilehua High School | 591 | 3 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y1 | Q2 | Helemano Elementary School | 493 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y1 | Q2 | Kaʻala Elementary School | 460 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y1 | Q2 | 1SG Samuel K. Solomon Elementary School | 482 | 2 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y1 | Q2 | Daniel K. Inouye Elementary School | 440 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y1 | Q2 | Major Sheldon Wheeler Elementary School | 492 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y1 | Q2 | Major Sheldon Wheeler Middle School | 416 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y1 | Q3 | Kīpapa Elementary School | 407 | 2 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y1 | Q3 | Mililani High School | 998 | 4 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y1 | Q3 | Mililani Uka Elementary School | 552 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y1 | Q3 | Mililani Waena Elementary School | 553 | 1 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y1 | Q4 | Haleʻiwa Elementary School | 159 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y1 | Q4 | Waialua Elementary School | 334 | 2 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y1 | Q4 | Waialua High & Intermediate School | 309 | 2 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y1 | Q4 | Mililani ʻIke Elementary School | 370 | 2 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y1 | Q4 | Mililani Middle School | 1223 | 6 | L | Not Started | 3 | 0 | 3 | 3 | 0 | 3 | 2 | 0 | 2 | 4 | 0 | 4 | 4 | 0 | 4 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y1 | Q4 | Mililani Mauka Elementary School | 491 | 3 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q1 | Admiral Arthur W. Radford High School | 1361 | 2 | L | Not Started | 3 | 0 | 3 | 3 | 0 | 3 | 2 | 0 | 2 | 4 | 0 | 4 | 4 | 0 | 4 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q1 | ʻAiea High School | 905 | 3 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q1 | Āliamanu Elementary School | 736 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q1 | Āliamanu Middle School | 903 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q1 | Alvah A. Scott Elementary School | 504 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q1 | Waimalu Elementary School | 314 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q2 | Moanalua Elementary School | 709 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q2 | Moanalua High School | 2395 | 7 | XL | Not Started | 4 | 0 | 4 | 4 | 0 | 4 | 3 | 0 | 3 | 6 | 0 | 6 | 6 | 0 | 6 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q2 | Moanalua Middle School | 926 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q2 | Red Hill Elementary School | 474 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q3 | Lt. Col. Horace M. Hickam Elementary School | 565 | 1 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q3 | Admiral C.W. Nimitz Elementary School | 636 | 1 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q3 | Mokulele Elementary School | 241 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q3 | Pearl Harbor Elementary School | 448 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q3 | Pearl Harbor Kai Elementary School | 458 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q4 | Major General William R. Shafter Elementary School | 414 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q4 | Pearl Ridge Elementary School | 424 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q4 | Makalapa Elementary School | 623 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q4 | Salt Lake Elementary School | 727 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q4 | Gustav H. Webling Elementary School | 477 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q4 | ʻAiea Elementary School | 355 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PI-Y2 | Q4 | ʻAiea Intermediate School | 528 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q1 | Momilani Elementary School | 465 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q1 | Pearl City Elementary School | 424 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q1 | Pearl City High School | 1770 | 4 | XL | Not Started | 4 | 0 | 4 | 4 | 0 | 4 | 3 | 0 | 3 | 6 | 0 | 6 | 6 | 0 | 6 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q1 | Waiau Elementary School | 554 | 1 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q1 | Mānana Elementary School | 283 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q1 | Pearl City Highlands Elementary School | 603 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q2 | Highlands Intermediate School | 938 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q2 | Palisades Elementary School | 364 | 2 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q2 | Waipahu Elementary School | 912 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q2 | Waipahu High School | 2878 | 6 | XL | Not Started | 4 | 0 | 4 | 4 | 0 | 4 | 3 | 0 | 3 | 6 | 0 | 6 | 6 | 0 | 6 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q2 | Waipahu Intermediate School | 1294 | 2 | L | Not Started | 3 | 0 | 3 | 3 | 0 | 3 | 2 | 0 | 2 | 4 | 0 | 4 | 4 | 0 | 4 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q2 | Honowai Elementary School | 642 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q3 | August Ahrens Elementary School | 1278 | 4 | L | Not Started | 3 | 0 | 3 | 3 | 0 | 3 | 2 | 0 | 2 | 4 | 0 | 4 | 4 | 0 | 4 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q3 | Kaleiopuʻu Elementary School | 854 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q3 | Kanoelani Elementary School | 799 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q3 | Lehua Elementary School | 283 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q3 | Waikele Elementary School | 609 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q3 | Nānākuli Elementary School | 427 | 2 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q3 | Nānākuli High & Intermediate School | 1083 | 4 | L | Not Started | 3 | 0 | 3 | 3 | 0 | 3 | 2 | 0 | 2 | 4 | 0 | 4 | 4 | 0 | 4 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q4 | Leihōkū Elementary School | 835 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q4 | Māʻili Elementary School | 683 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q4 | Mākaha Elementary School | 412 | 1 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q4 | Nānāikapono Elementary School | 789 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q4 | Waiʻanae Elementary School | 490 | 2 | S | Not Started | 1 | 0 | 1 | 1 | 0 | 1 | 1 | 0 | 1 | 2 | 0 | 2 | 2 | 0 | 2 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q4 | Waiʻanae High School | 1788 | 3 | XL | Not Started | 4 | 0 | 4 | 4 | 0 | 4 | 3 | 0 | 3 | 6 | 0 | 6 | 6 | 0 | 6 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y1 | Q4 | Waiʻanae Intermediate School | 841 | 3 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y2 | Q1 | Barbers Point Elementary School | 610 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y2 | Q1 | Hoʻokele Elementary School | 908 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y2 | Q1 | Kapolei High School | 2018 | 3 | XL | Not Started | 4 | 0 | 4 | 4 | 0 | 4 | 3 | 0 | 3 | 6 | 0 | 6 | 6 | 0 | 6 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y2 | Q1 | Kapolei Middle School | 923 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y2 | Q2 | ʻIlima Intermediate School | 867 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y2 | Q2 | James Campbell High School | 3333 | 5 | XL | Not Started | 4 | 0 | 4 | 4 | 0 | 4 | 3 | 0 | 3 | 6 | 0 | 6 | 6 | 0 | 6 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y2 | Q2 | Kaʻimiloa Elementary School | 771 | 1 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y2 | Q2 | Pōhākea Elementary School | 544 | 1 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y2 | Q2 | ʻEwa Elementary School | 1242 | 2 | L | Not Started | 3 | 0 | 3 | 3 | 0 | 3 | 2 | 0 | 2 | 4 | 0 | 4 | 4 | 0 | 4 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y2 | Q2 | ʻEwa Makai Middle School | 1402 | 2 | L | Not Started | 3 | 0 | 3 | 3 | 0 | 3 | 2 | 0 | 2 | 4 | 0 | 4 | 4 | 0 | 4 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y2 | Q2 | Kapolei Elementary School | 745 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y2 | Q2 | Makakilo Elementary School | 505 | 1 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y2 | Q3 | Mauka Lani Elementary School | 593 | 1 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y2 | Q3 | ʻEwa Beach Elementary School | 818 | 1 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y2 | Q3 | Holomua Elementary School | 1216 | 2 | L | Not Started | 3 | 0 | 3 | 3 | 0 | 3 | 2 | 0 | 2 | 4 | 0 | 4 | 4 | 0 | 4 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y2 | Q3 | Honouliuli Middle School | 948 | 2 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y2 | Q3 | Iroquois Point Elementary School | 645 | 1 | M | Not Started | 2 | 0 | 2 | 2 | 0 | 2 | 1 | 0 | 1 | 3 | 0 | 3 | 3 | 0 | 3 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout | ||
| PII-Y2 | Q4 | Keoneʻula Elementary School | 1041 | 1 | L | Not Started | 3 | 0 | 3 | 3 | 0 | 3 | 2 | 0 | 2 | 4 | 0 | 4 | 4 | 0 | 4 | Not Assessed | Not Assessed | Not Assessed | Not Assessed | Not Assessed | No | Medium | Gross planning requirement; subtract serviceable existing assets after site survey. | 9/1/2026 RK/FK Equipment & Smallwares workbook - FK School Rollout |
Tier Equipment Standards
| EQUIP-04 | Finishing Kitchen Tier Equipment Standards | ||||||||||
| Gross planning standards carried from the 9/1/2026 FK package. S <=500 meals; M 501-1,000; L 1,001-1,600; XL >1,600. Final school purchase quantities require site survey and usable-asset verification. | ||||||||||
| Equipment | Specification / Basis | Tier S | Tier M | Tier L | Tier XL | PI-Y1 Gross | PI-Y2 Gross | PII-Y1 Gross | PII-Y2 Gross | Validation Note |
| Rethermalization / combi oven | Electric, boilerless, programmable; full-size hotel/sheet-pan capable; capacity sized by tier | 1 | 2 | 3 | 4 | 27 | 38 | 53 | 44 | Deduct serviceable existing equipment after site/utility survey. |
| Mobile heated holding cabinet | Full-height, insulated, humidity capable; 120V where feasible | 1 | 2 | 3 | 4 | 27 | 38 | 53 | 44 | Verify electrical load, capacity and existing assets. |
| Mobile refrigerated holding cabinet | Full-height, roll-in or reach-in; 41°F or below | 1 | 1 | 2 | 3 | 21 | 25 | 35 | 26 | Validate existing refrigeration capacity and condition. |
| Full-height mobile pan rack / speed rack | 20-pan, 18 x 26 in or dual 12 x 20 in rails; locking high-temp casters | 2 | 3 | 4 | 6 | 47 | 61 | 82 | 64 | Confirm oven rail spacing and doorway clearance. |
| Insulated full-size food pan carrier | Front-loading, non-electric, full-size 12 x 20 in pan compatible | 2 | 3 | 4 | 6 | 47 | 61 | 82 | 64 | Select compatible carrier/dolly and validate delivery/return workflow. |
Site Survey Controls
| EQUIP-04 | Site Survey & Net Purchase Controls | |||||
| Use these rules before converting gross planning quantities into purchase quantities. This worksheet complements PHASE-03 but focuses specifically on equipment suitability and quantity. | |||||
| Control | Verify | Evidence | If Acceptable | If Not Acceptable | Workbook Action |
| Existing equipment condition | Model, capacity, age/condition, sanitation, serviceability | Asset inventory, inspection, maintenance record | Count as existing serviceable asset | Exclude from serviceable count; plan repair/replacement | Enter serviceable quantity by equipment type. |
| Electrical / utilities | Voltage/phase/load, outlets, water, drain, ventilation and other utility needs | Site walk, drawings, qualified facilities/engineering confirmation | Mark Compatible | Mark modification/technical review/replacement required | Update compatibility status and barrier/priority. |
| Capacity | Can existing equipment handle projected meal volume and menu process? | Menu/production requirement, equipment capacity, trial where feasible | Retain equipment | Add/replace capacity | Net purchase formula should reflect added quantity. |
| Dimensions / clearance | Doorways, aisles, equipment footprint, service clearance, rack/pan compatibility | Field measurements, cut sheets | Retain planned model | Select approved equal/change layout | Do not order until compatibility resolved. |
| Storage / staging | Space for hot/cold staging, pan racks, carriers and safe workflow | Site assessment | Proceed | Modify quantity/layout or resolve space | Document in site notes and PHASE-03 corrective actions. |
| Final net purchase | Gross planning quantity less verified serviceable existing quantity | Completed survey and approved requirement | Use calculated net quantity | Hold purchase if unresolved | Net = MAX(Gross - Serviceable Existing, 0). |
Lists
| Survey Status | Compatibility Status | Priority | Yes/No |
| Not Started | Not Assessed | Critical | Yes |
| Scheduled | Compatible | High | No |
| In Progress | Compatible with Modification | Medium | |
| Complete | Replacement Required | Low | |
| Needs Revisit | Technical Review Required | ||
| Not Required |