About this file

This document is a maintenance guide for the Energenics VAC-155 Lint Vacuum, which provides recommended weekly, monthly, and quarterly maintenance procedures. It covers inspecting the filter, measuring static pressure, and testing the fire sensor. It also provides instructions for cleaning the filter screen using degreasers and hot air.

The related federal contract opportunity is for Laundry Equipment Preventive Maintenance (PM) and Repair Services for the Gulf Coast Veterans Healthcare System in Biloxi, MS. This is a total small business set-aside solicitation for services to ensure continuous, uninterrupted operation of the laundry facility in support of veteran patient care. The contract is being issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 16.

View the file

Other files

File Type Posted
S06 FINAL Amendment 36C25624Q0735 0002.pdf PDF
S06 FINAL Amendment 36C25624Q0735 0001.pdf PDF
Milnor Tunnel Dryer Loading Convey 48 Conveyer.pdf PDF
TEA Pump PM Requirements.pdf PDF
Energenics Kartwasher.pdf PDF
Kaesar Compressor Model ASD 40S T.pdf PDF
Milnor Washer Unloading Convey 48 Conveyer.pdf PDF
Wage Determination 2015-5147 Revision Number 22 Dated 12-26-2023 Harrison County MS.pdf PDF
Chicago Ironer Model Powerhouse CT.pdf PDF
Milnor CWES Tunnel.pdf PDF
Chicago Small Piece Folder Model Air XL.pdf PDF
Spencer Central Vacuum System.pdf PDF
Felins Traffic Control Conveyor.pdf PDF
Felins Wrapper.pdf PDF
Chicago Separator Model Cascade CT.pdf PDF
Milnor Tunnel Dryer Unloading Convey 42 Conveyer.pdf PDF
Colmac Steam Tunnel Model CFS 900.pdf PDF
Milnor 450 Lb. Washer Extractor Model 68036H5N.pdf PDF
QASP Laundry Equipment Preventive Maintenance and Repair Services.pdf PDF
PWS Addendum--List of Attachments.pdf PDF
E-Tech Rail System Clean Storage Lines 3 4.pdf PDF
Felins Heat Shrink Tunnel.pdf PDF
E-Tech Rail System Clean Storage SPFs.pdf PDF
Felins H-Curve Conveyor LH.pdf PDF
Milnor Cake Elevator Conveyor.pdf PDF
E-Tech Cart Dumper.pdf PDF
Felins Incline Conveyor.pdf PDF
E-Tech Wind Up Fold Table.pdf PDF
Energenics Lint Scrubber.pdf PDF
Energenics Tunnel Dryer Lint Filter.pdf PDF
E-Tech Rail System Soil Storage-Lift.pdf PDF
E-Tech Rail System Clean Transfer Press and Elevators.pdf PDF
Felins Accumulator Conveyor.pdf PDF
Cissell Dryer Model CT120NREQ1K2W01.pdf PDF
S02 FINAL Combined Synopsis Solcitation 36C25624Q0735 Laundry Equip PM and Repair.pdf PDF
Milnor Press inspection criteria.pdf PDF
Milnor 400lb Dryer Loading Convey 48 Conveyer.pdf PDF
E-Tech Rail System Clean Storage.pdf PDF
Drum Beaters Drum Washer.pdf PDF
Milnor 110 Lb. Washer Extractor Model 36026X8W.pdf PDF
Milnor 400 Lb. Dryer Model 7272TGIL.pdf PDF
Chicago Linen Stream Conveyor Line.pdf PDF
E-Tech Small Piece Feed Conveyor.pdf PDF
TEA Cera-Pure PM Requirements.pdf PDF
Milnor Washer Loading Convey 42 Conveyer.pdf PDF
Solicitation Questions Request Form.docx DOCX document
Jensen Folder Model Jenfold Butterfly Fox Line.pdf PDF
Milnor 300 Lb. Tunnel Dryer Model 6464TGIL Quarterly.pdf PDF
Milnor overhead Cake Convey 42.pdf PDF
E-Tech Rail System Clean Transfer-Dryers.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTENANCE REQUIREMENTS

The frequency of your maintenance requirements depends upon the number of hours of operation and upon variances in your product output. For a single-shift operation, without special problems, the frequency recommended below should suffice. You should set your own schedule based on your experience.

1. WEEKLY

Visually inspect the filter inside and outside, its controls and their operation.

At time of such inspection, note and correct any discrepancies from normal operation.

2. MONTHLY

Check the static pressure. Use a magnehelic gauge, manometer, or U-tube to measure and record the resistance. This will show the pattern of operation of your system. If pressure exceeds 1” W.C., insure the rotor is correctly turning and cleaning the screen.

For vacuum gate valve cleaning and maintenance, the gate assembly must be disassembled by removing the nuts from the housing, removing the rubber seals and blow compressed air in the body.

Watch the air pressure gauge on the filter. Record the drop, in pressure during the blow down cycle. A normal pressure is from 100psi at the and no lower than 60 psi after 10 seconds. Any less will not reliably clean the screen.

3. QUARTERLY

Test the Fenwall fire sensor accessed through the inspection door. Heat the Fenwell fire sensor with a heat lamp or other convenient source. When the audible/visual indicators actuate as well as the water solenoid remove heat source and allow Fenwell fire sensor to cool. The fire suppression system will reset after 60 seconds.

FILTER SCREEN MAINTENANCE

Chemicals present in the laundry uniforms, shop towels or other linen may eventually clog the filter screen. When this occurs, try the following:

1. Spray with an engine degreaser like GUNK. Allow soaking per the instructions for cleaning an auto engine. Spray clean with water.

2. Operate one dryer without a load to blow hot air through the filter to dry it.

Restart the dryer. Operation should be perfectly normal. It should not be necessary to replace the screen unless it is punctured.

File details come from the government source that posted it. Updated .