This document is a Preventive Maintenance (PM) Instruction Manual for a Linen Conveyor System. It provides detailed guidance on the daily, weekly, and monthly maintenance tasks required to ensure safe and reliable operation of the system. Key details include:

The conveyor system has a simple sequence of operation - it slows down when an item passes the middle photosensor, and stops when an item passes the end photosensor. Operators are responsible for daily visual inspections and notifying maintenance personnel of any issues. Maintenance tasks include cleaning the inverter weekly, checking set screws monthly, and inspecting the conveyor belt. Lockout/tagout procedures must be followed, and power must be disconnected before performing any maintenance.

The related federal contract opportunity is for Laundry Equipment Preventive Maintenance and Repair Services at the Gulf Coast Veterans Health Care System in Biloxi, MS. This is a 100% Small Business set-aside solicitation, with no special socioeconomic categories specified. The services are required to ensure continuous operation of the laundry facility in support of veteran patient care.

View the file

Other files

File Type Posted
S06 FINAL Amendment 36C25624Q0735 0002.pdf PDF
S06 FINAL Amendment 36C25624Q0735 0001.pdf PDF
Milnor Tunnel Dryer Loading Convey 48 Conveyer.pdf PDF
TEA Pump PM Requirements.pdf PDF
Energenics Kartwasher.pdf PDF
Kaesar Compressor Model ASD 40S T.pdf PDF
Milnor Washer Unloading Convey 48 Conveyer.pdf PDF
Wage Determination 2015-5147 Revision Number 22 Dated 12-26-2023 Harrison County MS.pdf PDF
Chicago Ironer Model Powerhouse CT.pdf PDF
Milnor CWES Tunnel.pdf PDF
Chicago Small Piece Folder Model Air XL.pdf PDF
Spencer Central Vacuum System.pdf PDF
Felins Traffic Control Conveyor.pdf PDF
Felins Wrapper.pdf PDF
Chicago Separator Model Cascade CT.pdf PDF
Milnor Tunnel Dryer Unloading Convey 42 Conveyer.pdf PDF
Colmac Steam Tunnel Model CFS 900.pdf PDF
Milnor 450 Lb. Washer Extractor Model 68036H5N.pdf PDF
QASP Laundry Equipment Preventive Maintenance and Repair Services.pdf PDF
PWS Addendum--List of Attachments.pdf PDF
E-Tech Rail System Clean Storage Lines 3 4.pdf PDF
Felins Heat Shrink Tunnel.pdf PDF
E-Tech Rail System Clean Storage SPFs.pdf PDF
Felins H-Curve Conveyor LH.pdf PDF
Milnor Cake Elevator Conveyor.pdf PDF
E-Tech Cart Dumper.pdf PDF
Felins Incline Conveyor.pdf PDF
E-Tech Wind Up Fold Table.pdf PDF
Energenics Lint Scrubber.pdf PDF
Energenics Tunnel Dryer Lint Filter.pdf PDF
E-Tech Rail System Soil Storage-Lift.pdf PDF
E-Tech Rail System Clean Transfer Press and Elevators.pdf PDF
Felins Accumulator Conveyor.pdf PDF
Cissell Dryer Model CT120NREQ1K2W01.pdf PDF
S02 FINAL Combined Synopsis Solcitation 36C25624Q0735 Laundry Equip PM and Repair.pdf PDF
Milnor Press inspection criteria.pdf PDF
Milnor 400lb Dryer Loading Convey 48 Conveyer.pdf PDF
E-Tech Rail System Clean Storage.pdf PDF
Drum Beaters Drum Washer.pdf PDF
Milnor 110 Lb. Washer Extractor Model 36026X8W.pdf PDF
Milnor 400 Lb. Dryer Model 7272TGIL.pdf PDF
E-Tech Small Piece Feed Conveyor.pdf PDF
TEA Cera-Pure PM Requirements.pdf PDF
Milnor Washer Loading Convey 42 Conveyer.pdf PDF
Solicitation Questions Request Form.docx DOCX document
Jensen Folder Model Jenfold Butterfly Fox Line.pdf PDF
Milnor 300 Lb. Tunnel Dryer Model 6464TGIL Quarterly.pdf PDF
Energenics VAC-155 Lint Vacuum.pdf PDF
Milnor overhead Cake Convey 42.pdf PDF
E-Tech Rail System Clean Transfer-Dryers.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LINEN STREAM

Linen Conveyor System

IN

ST

R U

C

TI

O N

M A

N U

A L

3021-033b LinenStream

L-6

Control Functions

Place laundry items on the moving con-veyor.

Verify the following sequence of opera-tion occurs:

When the first item passes in front of the photosensor in the middle of the unit, the conveyor belt slows down.

When the first item passes in front of the photosensor near the end of the unit, the conveyor belt stops.

Press a red STOP button. Turn off the host unit.

1.

2.

3.

2.0 Operation

In order to operate the conveyor safely and with maximum efficiency, it is necessary to become familiar with the recommended procedures for the following.

Safety

Conveyor Movement

Safety

Review the safety instructions in the Instruction Manual.

Always turn the power OFF at the main disconnect switch before attempting to work on the unit.

Conveyor Movement

The unit has a very simple sequence of operation:

When the first item passes in front of the photosensor in the middle of the unit, the conveyor belt slows down.

When the first item passes in front of the photosensor near the end of the unit, the conveyor belt stops.

LinenStream 3021-033b

L-7

3.0 Preventive Maintenance

Various components of the conveyor require scheduled maintenance to ensure long life and trouble-free operation. Unless otherwise indicated, preventive maintenance (PM) should only be done when the unit is completely cool and the main disconnect switch is turned to OFF.

Specific preventive maintenance that requires the unit to run should be done with extreme caution, with attention to detail, and using the “buddy” system. For more information on safety within this bulletin, refer to the INTRODUCTION and OPERATING GUIDELINES sections.

Since operators run the conveyor, they should be trained on site to visually inspect common areas daily and notify maintenance personnel when problems are found (i.e. worn conveyor belt).

The Preventive Maintenance Schedule below outlines all of the PM tasks required at regular intervals. All tasks are the responsibility of maintenance personnel. However, certain indicated tasks may be done by trained operators.

FREQUENCY OF TASKS BASED ON 40 HOURS PER WEEK OPERATION

Preventive Maintenance Tasks Operator Maintenance Stacker Condition

DAILY

GENERAL CLEANLINESS X OFF/DISCONNECT POWER

WEEKLY

CHECK AND CLEAN INVERTER X X OFF/DISCONNECT POWER

MONTHLY

CHECK SETSCREWS X OFF/DISCONNECT POWER

INSPECT CONVEYOR BELT X OFF/DISCONNECT POWER

Use this guide as a quick reference to determine the PM work schedule. All PM intervals are based on 8-hour/day operation. Increase the frequency for two or three shift operations.

WARNING

Follow lockout/ tagout procedures approved for your site. Follow local regulations. Failure to do so could result in serious injury.

Make sure the power is

OFF at the main disconnect switch before beginning any repair procedure.

3021-033b LinenStream

L-8

Daily PM

General Cleanliness

Required Tools vacuum cleaner or compressed air, clean cloth

Perform only when the unit is OFF with power disconnected and COOL.

CAUTION

Do not use compressed air on or around electronic components, doing so may damage them.

Prevent lint, dirt, dust, and foreign material from collecting on the unit during operation.

General cleanliness keeps items clean, prevents sensor errors, and damage to electrical components (Figure L-6).

Weekly PM

Check and Clean Inverter

Required Tools vacuum cleaner

Perform only when the unit is OFF with power disconnected and COOL.

CAUTION

Failure to check and clean the inverter may void the warranty.

Check and clean the inverter (Figure L-7) cooling fins and motor weekly. Failure to do so may void the warranty.

Figure L-6: Sensors (top) and reflectors (bottom) must be free of lint to operate correctly.

Figure L-7: Clean the inverter located in the main electrical box.

LinenStream 3021-033b

L-9

Monthly PM

Check Setscrews

Required Tools Allen wrench

Perform only when the unit is OFF with power disconnected and COOL.

Setscrews are used to secure the motorized drive roll (Figure L-8). Check all setscrews are correctly tightened.

Inspect Conveyor Belt

Perform only when the unit is OFF with power disconnected and COOL.

Inspect the conveyor belt (Figure L-9).

Whenever the belt is still in good shape overall, but has stretched, adjust tension. Replace the belt when it shows signs of excessive wear.

Figure L-9: Check conveyor belt for damage or excessive wear.

Figure L-8: Check that the set screws which help secure both sides of the motorized drive roll are secure.