Drawings 13 of 15 MECHANICAL.pdf
PDF 19 MB Posted
- Attached to
- Y1AZ--TIERED EVALUATIONS - Build New Community Living Center Minor Construction - Montrose 620-334
- Solicitation number
- 36C77623R0156
About this file
This document provides details for a federal contract opportunity to construct a new community living center. The solicitation number is 36C77623R0156 and seeks to build a new community living center minor construction project located in Montrose, Colorado for the Department of Veterans Affairs Technology Acquisition Center Austin. The related file is a set of mechanical drawings containing 19 pages of specifications and diagrams for the mechanical systems and infrastructure of the proposed new construction project. Relevant information includes the project location, scope of constructing a new community living center, the soliciting agency as the Department of Veterans Affairs, and mechanical design documents to support the proposed construction work.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATIVE OF WORK TO BE PROVIDED (FURNISHED AND INSTALLED) UNDER
THIS CONTRACT. DRAWINGS SHOULD NOT BE SCALED.
2. THE CONTRACTOR IS RESPONSIBLE TO EXAMINE THE EXISTING CONDITIONS UNDER WHICH THEY SHALL OPERATE AND VERIFY THE
EXTENT OF WORK REQUIRED TO COMPLETE THE WORK UNDER THIS CONTRACT.
3. PRIOR TO ORDERING AND FABRICATING ANY EQUIPMENT, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO EXAMINE THE PHYSICAL CONDITIONS AT THE PROJECT SITE AND VERIFY SPACE AND SUFFICIENT CLEARANCES ARE AVAILABLE FOR INSTALLING EQUIPMENT, DUCTWORK, PIPING, AND APPURTENANCES, AND TO DETERMINE ANY NECESSARY MODIFICATIONS.
4. PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, REGULATIONS, AND STANDARDS ADOPTED BY THE AUTHORITY HAVING JURISDICTION. IF CONFLICTS EXIST BETWEEN THESE ENGINEERING DOCUMENTS AND
CODES, THE MOST STRINGENT REQUIREMENTS SHALL GOVERN.
5. ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING CODE REQUIREMENTS:
• INTERNATIONAL BUILDING CODE (IBC) 2018
• INTERNATIONAL EXISTING BUILDING CODE 2018
• IBC MECHANICAL 2018
• IBC PLUMBING 2018
• IBC ENERGY CONSERVATION 2018
• INTERNATIONAL FIRE CODE 2018
• NFPA 1-2018, THE UNIFORM FIRE CODE
• NFPA 101-2018, THE LIFE SAFETY CODE
• NFPA 51B-2019, STANDARD FOR FIRE PREVENTION DURING WELDING, CUTTING AND OTHER HOT WORK
• NFPA 13-2019, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
• NFPA 70-2017, NATIONAL ELECTRICAL CODE
• NFPA 90A-2018, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTING SYSTEMS.
• NFPA 99-2018, STANDARD FOR HEALTH CARE FACILITIES
• NFPA 241-2019, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION AND DEMOLITION OPERATIONS.
• ALL APPLICABLE VA DESIGN MANUALS
6. CONTRACTOR SHALL COORDINATE AND SEQUENCE DEMOLITION, CLEANING, AND CONSTRUCTION WORK.
7. CONTRACTOR SHALL NOTE ANY SPECIAL REQUIREMENTS FOR INSTALLATION OF WORK UNDER THIS CONTRACT. DISMANTLE AND REASSEMBLE EQUIPMENT AS NECESSARY FOR ENTRY INTO THE BUILDING AND THE LOCATION OF INSTALLATION.
8. THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT SCHEDULE AND SHALL UPDATE THIS SCHEDULE WEEKLY. ANY
CHANGES SHALL BE NOTED AND AN UPDATED SCHEDULE SHALL BE PROVIDED TO THE OWNER.
9. ALL PERMITS, FEES, TAXES, ETC SHALL BE PAID BY CONTRACTOR AS PART OF THE TOTAL PROJECT COST.
10. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS, CEILINGS, AND FLOORS. SEAL ALL PENETRATIONS THROUGH RATED ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH U.L. REQUIREMENTS TO MAINTAIN THE ASSEMBLY
RATING.
11. CONTRACTOR SHALL FURNISH U.L. APPROVED DRAWINGS FOR EACH TYPE OF FIRE AND SMOKE RATED ASSEMBLY PENETRATION BY DUCTS, PIPES, OR CONDUITS, AND SHALL DISPLAY THESE DRAWINGS ON THE JOB SITE AT ALL TIMES DURING CONSTRUCTION.
12. CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER GUIDANCE.
13. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND EQUIPMENT SUBMITTALS FOR ALL PRODUCTS USED ON PROJECT.
14. THE COR'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR DEVIATIONS FROM THE REQUIREMENTS OF CONTRACT DOCUMENTS UNLESS THE CONTRACTOR HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER TO THE SPECIFIC DEVIATION. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF
RESPONSIBILITY FOR ERRORS OR OMISSIONS IN HIS OR HER SUBMITTAL DATA.
15. THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE O&M MANUALS IN THREE RING BINDERS AT SUBSTANTIAL COMPLETION. MANUALS SHALL INCLUDE INSTALLATION AND MAINTENANCE DATA ON ALL NEW EQUIPMENT AND MATERIALS, CERTIFIED TECHNICAL PRODUCT DATA, EQUIPMENT SHOP DRAWINGS, SPARE PARTS DATA, ETC. PROVIDE AN INDEX AND
ASSOCIATED DIVIDERS.
16. CLOSE OUT DOCUMENTS: THE CONTRACTOR IS TO MAINTAIN ONE SET OF CONSTRUCTION DRAWINGS ON SITE AND KEEP CURRENT WITH MARK UP AS-BUILT CONDITIONS DURING CONSTRUCTION OF THE PROJECT. THIS SET IS TO INCLUDE ALL CONTRACT CHANGES, MODIFICATIONS AND CLARIFICATIONS. THIS SET ALONG WITH ALL SHOP DRAWINGS SHALL BE TURNED OVER TO THE
ARCHITECT/ENGINEER AFTER CONSTRUCTION COMPLETION.
17. IT IS THE RESPONSIBILITY OF ALL BIDDERS TO THOROUGHLY REVIEW AND UNDERSTAND ALL CONSTRUCTION DOCUMENTS. THIS INCLUDES BUT IS NOT LIMITED TO ALL DRAWINGS, SPECIFICATION SECTIONS, ETC. THE DRAWINGS ARE SCHEMATIC IN NATURE.
THEREFORE BEFORE STARTING ANY WORK, THE CONTRACTOR SHALL REVIEW ALL OTHER CONSTRUCTION DOCUMENTS, VERIFY FIELD CONDITIONS AND SHALL MAKE ANY REQUIRED MINOR ADJUSTMENTS WITHOUT EXTRA COST TO THE OWNER. ANY MAJOR DISCREPANCIES FOUND SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER. THE BASE BID SHALL REFLECT THE TOTAL COST OF NEW EQUIPMENT INSTALLATION. THIS INCLUDES LABOR, EQUIPMENT AND MATERIALS. NO CHANGE ORDERS SHALL
BE ISSUED WITHOUT WRITTEN CONSENT AND APPROVAL FROM THE CONTRACTING OFFICER.
ABBREVIATIONS
(E) EXISTING
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AFM AIRFLOW MEASURING DEVICE
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
ATU AIR TERMINAL UNIT
BAS BUILDING AUTOMATION SYSTEM
BHP BRAKE HORSEPOWER
BOD BOTTOM OF DUCT
BOS BOTTOM OF STRUCTURE
BTUH BRITISH THERMAL UNIT PER HOUR
CAV CONSTANT AIR VOLUME
CCV COOLING CONTROL VALVE
CD CEILING SUPPLY AIR DIFFUSER
CF CUBIC FEET
CFM CUBIC FEET PER MINUTE
CG CEILING GRILLE
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
COR CONTRACTING OFFICER'S REPRESENTATIVE
CTE CONNECT TO EXISTING
CU CONDENSING UNIT
CV CONSTANT AIR VOLUME
DD DUCT MOUNTED SMOKE DETECTOR
DIA DIAMETER
DSSI DUCTLESS SPLIT SYSTEM INDOOR UNIT
DSSO DUCTLESS SPLIT SYSTEM OUTDOOR UNIT
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EDH ELECTRIC DUCT HEATER
EF EXHAUST FAN
EG EXHAUST AIR GRILLE
EWT ENTERING WATER TEMPERATURE
FCU FAN COIL UNIT
FD FIRE DAMPER
FLEX FLEXIBLE
FO FLAT OVAL
FPM FEET PER MINUTE
FSD COMBINATION FIRE SMOKE DAMPER
FT FEET
GPM GALLONS PER MINUTE
HCV HEATING CONTROL VALVE
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HP HORSEPOWER
HPS HIGH PRESSURE STEAM (60 PSI)
IBC INTERNATIONAL BUILDING CODE
IN INCH
KW KILOWATT
LAT LEAVING AIR TEMPERATURE
LWT LEAVING WATER TEMPERATURE
LPS LOW PRESSURE STEAM (5 PSI)
MBTUH 1,000 BTUH
MCA MINIMUM CIRCUIT AMPACITY
MOCP MAXIMUM OVERCURRENT PROTECTION
MPS MEDIUM PRESSURE STEAM (20 PSI)
MUA MAKE UP AIR
NC NEW CONNECTION / NOISE CRITERIA
OA OUTSIDE AIR
OAL OUTSIDE AIR LOUVER
OBD OPPOSED BLADE DAMPER
PH PHASE
PSIG POUNDS PER SQUARE INCH GAGE
RA RETURN AIR
REF REFRIGERANT
RG RETURN AIR GRILLE
RH RELATIVE HUMIDITY
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR
SD SMOKE DAMPER
SF SQUARE FEET
SR SUPPLY AIR REGISTER
TAB TEST AND BALANCE
TOD TOP OF DUCT
TYP TYPICAL
V VOLTAGE
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VFD VARIABLE FREQUENCY DRIVE
WG WATER GAUGE
MECHANICAL NOTES
1. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF FIELD CONDITIONS PRIOR TO BEGINNING WORK AND ORDERING EQUIPMENT, AND FOR COORDINATING NEW EQUIPMENT DIMENSIONS AND MEANS AND METHODS
FOR INSTALLATION WITH FIELD CONDITIONS.
2. CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH SUBMITTED EQUIPMENT TO ENSURE ALL INLET/OUTLET CONNECTIONS COORDINATE WITH FIELD INSTALLED DUCTWORK AND MAKE ANY NECESSARY DUCT
MODIFICATIONS TO ENSURE PROPER OPERATION OF MECHANICAL EQUIPMENT.
3. SUBMITTALS SHALL MEET SCHEDULED DESIGN CHARACTERISTICS, INCLUDING BUT NOT LIMITED TO CFMS, EAT(DB/WB), ESP, CAPACITIES, VOLTAGES/PHASES, MCA/MOCP, SONES, ETC.
4. ALL DUCT CONSTRUCTION, INSTALLATION, AND SUPPORTS ARE TO COMPLY WITH LATEST EDITION OF SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE DUCT.
5. INSULATE ALL DUCTWORK ACCORDING TO SPECIFICATIONS.
6. ALL WALL-MOUNTED THERMOSTATS AND/OR TEMPERATURE SENSORS SHALL BE INSTALLED AT AN ELEVATION OF 48" ABOVE FINISHED FLOOR TO THE TOP UNLESS OTHERWISE NOTED ON DRAWINGS. LOCATION OF WALL-MOUNTED THERMOSTATS SHALL BE COORDINATED WITH OTHER TRADES FOR A NEAT APPEARANCE. FINAL LOCATION OF THERMOSTATS SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER OR
REPRESENTATIVE IN THE FIELD.
7. ALL SUPPLY AIR DIFFUSERS SHALL BE 4-WAY THROW UNLESS NOTED OTHERWISE. CONTRACTOR SHALL PAINT INSIDE EACH RETURN GRILLE'S PLENUM AND DUCT CONNECTION FLAT BLACK TO CONCEAL CONNECTION.
COORDINATE AIR DEVICE LOCATIONS WITH LIGHTING FIXTURES AND FIRE SPRINKLER HEADS. PRIOR TO INSTALLATION, THE CONTRACTOR IS TO REFER TO THE ARCHITECTURAL REFLECTED CEILING PLAN FOR ACTUAL
FINAL LOCATIONS OF AIR DEVICES.
8. DIFFUSERS/GRILLES SHALL NEVER BE INSTALLED ON SURFACE OF ACOUSTICAL LAY-IN TILE. ALL DIFFUSERS/GRILLES IN LAY-IN CEILINGS SHALL BE LAY-IN PANEL MOUNT. REFER TO SCHEDULE. GYPSUM BOARD
SURFACE MOUNT DIFFUSERS SHALL NOT BE BEVEL MOUNT.
9. CONTRACTOR SHALL COORDINATE DIFFUSER/GRILLE LOCATIONS WITH STRUCTURE IN EXPOSED SITUATIONS IN ORDER TO ENSURE AIR IS NOT DIRECTLY SUPPLIED OR RETURNED OVER STRUCTURE OR OTHER TRADE COMPONENTS SUCH AS FIRE SPRINKLER PIPING, PLUMBING PIPING, ETC., CAUSING DUST ACCUMULATION. DUCTWORK ALONG WITH DIFFUSER/GRILLE LOCATIONS SHALL BE INSTALLED SYMMETRICALLY WITH ANY ADJACENT DUCTWORK/GRILLES. CENTER DIFFUSERS/GRILLES BETWEEN STRUCTURAL MEMBERS WHERE DUCTWORK AND STRUCTURAL MEMBERS ARE EXPOSED. CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL INSTALLATION APPEARANCE AND SHALL MAKE APPROPRIATE CHANGES WHERE DIRECTED BY ARCHITECT/ENGINEER AT THEIR OWN EXPENSE WHERE ITEMS ARE NOT INSTALLED PER ABOVE STANDARDS.
10. CONTRACTOR SHALL PROVIDE A COPY OF THE TEST AND BALANCE REPORT BY AN AABC OR NEBB CERTIFIED AGENCY. THIS REPORT MUST BE REVIEWED AND APPROVED BY THE ENGINEER PRIOR TO THE FINAL INSPECTION. THE CONTRACTOR MUST ALSO PROVIDE ALL REPORTS REQUIRED BY THE SPECIFICATION. OUTDOOR TEMPERATURE (DB); OUTSIDE AIR (DB/WB & CFM); SUPPLY AIR AT UNIT DISCHARGE (DB/WB & CFM);
RETURN AIR {MIXED} (DB/WB & CFM); LEAVING COIL (DB/WB); DIFFUSER/GRILLE (DB/WB); EQUIPMENT (EWT/LWT); EQUIPMENT (EAT/LAT); EQUIPMENT (GPM); EQUIPMENT (PRESSURES). OUTSIDE AIR CFM SHALL BE MEASURED DIRECTLY AND NOT CALCULATED FROM THE DIFFERENCE BETWEEN SUPPLY AIR CFM AND RETURN AIR CFM.
11. CONTRACTOR SHALL MAKE NECESSARY ADJUSTMENTS DURING TEST AND BALANCE AS REQUIRED TO ENSURE EQUIPMENT IS OPERATING WITHIN 10% OF THE SPECIFIED CRITERIA. THIS INCLUDES, BUT IS NOT LIMITED
TO, ADJUSTING BELTS, SHEAVES, PULLEYS, AND IMPELLERS.
12. ALL AIR HANDLING UNITS SHALL BE MECHANICALLY ATTACHED TO OTHER AIR DISTRIBUTION SYSTEM COMPONENTS. AIR HANDLING UNITS LOCATED OUTSIDE THE CONDITIONED SPACE SHALL BE SEALED USING APPROVED CLOSURE SYSTEMS CONFORMING TO THE APPROVED CLOSURE AND MECHANICAL APPLICATION REQUIREMENTS OF INTERNATIONAL BUILDING CODE.
13. ALL DUCTWORK MUST BE INSTALLED 6" AWAY FROM ANY FIRE RATED WALL TO FACILITATE INSPECTION.
14. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL TRADES INSTALLATION SCHEDULES. FIXED WORK SUCH AS DUCTWORK AND PLUMBING SHALL BE INSTALLED PRIOR TO ANY TRADE WORK THAT CAN BE EASILY RELOCATED OR OFFSET SUCH AS ELECTRICAL CONDUITS, SMALL WATER LINES, ETC. IDEALLY DUCTWORK SHALL BE INSTALLED FIRST. CONTRACTOR TO PROVIDE COORDINATION DRAWINGS TO COR PRIOR TO
CONSTRUCTION.
15. PROVIDE A FIRE DAMPER AT EVERY DUCT PENETRATION OF A FIRE-RATED WALL OR CEILING, WHETHER SHOWN ON DRAWINGS OR NOT. ALL FIRE DAMPERS SHALL BE DYNAMIC TYPE WITH BLADES OUTSIDE
AIRSTREAM, UNLESS NOTED OTHERWISE.
16. PROVIDE FIRE, SMOKE, AND COMBINATION FIRE/SMOKE DAMPERS AT EVERY LOCATION WHERE REQUIRED BY SECTION 607.5 OF THE IBC-MECHANICAL OR VA DESIGN MANUALS, WHETHER SHOWN ON DRAWINGS OR NOT. PROVIDE PROPER DAMPER ACTUATION IN ACCORDANCE WITH SECTION 607.3.3 OF THE IBC-MECHANICAL. PROVIDE ACCESS AND IDENTIFICATION IN ACCORDANCE WITH SECTION 607.4 OF THE IBC-MECHANICAL.
17. WHERE SMOKE OR COMBINATION FIRE/SMOKE DAMPERS ARE REQUIRED, THE ELECTRICAL OR FIRE ALARM CONTRACTOR (MECHANICAL CONTRACTOR TO COORDINATE) SHALL PROVIDE 120V POWER AND ENSURE PROPER OPERATION UPON ACTIVATION. PROVIDE PROPER DAMPER ACTUATION IN ACCORDANCE WITH SECTION 607.3.3.2 OF THE IBC-MECHANICAL.
18. PROVIDE A DUCT SMOKE DETECTOR IN THE SUPPLY AIR DUCT, DOWNSTREAM OF THE AIR FILTERS AND AHEAD OF ANY BRANCH CONNECTIONS, FOR ALL SYSTEMS HAVING A DESIGN CAPACITY GREATER THAN 2,000 CFM. DUCT SMOKE DETECTOR SHALL BE PROVIDED AND WIRED BY THE ELCTRICAL CONTRACOTR AND INSTALLED BY THE MECHANICAL CONTRACTOR..
19. PROVIDE DUCT SMOKE DETECTORS WHERE REQUIRED BY SECTION 606.2 AND 607.3.3.2 OF THE IBC-MECHANICAL. LOCATIONS OF DUCT MOUNTED SMOKE DETECTORS SHOWN ON DRAWINGS ARE DIAGRAMMATIC IN LOCATION ONLY. FINAL PLACEMENT OF DETECTORS IN DUCTWORK SHALL MEET THE REQUIREMENTS OF THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. PROVIDE A PRESSURE DIFFERENTIAL TEST AND MANUFACTURER'S TEST KIT. A COPY OF ALL TEST DATA SHALL BE MADE AVAILABLE AT FINAL INSPECTION. PROVIDE A READILY ACCESSIBLE DUCT ACCESS DOOR FOR INSPECTING AND SERVICING EACH DETECTOR.
PROVIDE CEILING/WALL ACCESS PANELS WHERE INSTALLED IN INACCESSIBLE LOCATIONS; ACCESS PANELS IN RATED CONSTRUCTION SHALL BEAR A U.L. LABEL. ELECTRICAL CONTRACTOR SHALL FURNISH AND WIRE DETECTOR, MECHANICAL CONTRACTOR SHALL INSTALL DETECTOR WITHIN THE DUCTWORK. ELECTRICAL OR FIRE ALARM CONTRACTOR (MECHANICAL CONTRACTOR TO COORDINATE) SHALL PROVIDE 120V POWER AND ENSURE PROPER OPERATION FOR EACH DETECTOR. OTHER THAN IN MECHANICAL SMOKE CONTROL SYSTEMS, UPON ACTIVATION, THE ASSOCIATED AIR DISTRIBUTION SYSTEM SHALL SHUT DOWN AND A
SUPERVISORY SIGNAL SHALL BE GENERATED PER SECTION 606.4 OF THE IBC-MECHANICAL.
20. PENETRATIONS FOR PIPES, CONDUITS OR OTHER PURPOSES THROUGH ASSEMBLIES (FLOORS, ROOF, WALLS, PARTITIONS, ETC.) WITH A REQUIRED FIRE RESISTANCE RATING SHALL BE SEALED TO THE PENETRATING MEMBER IN AN APPROVED MANNER WHICH MAINTAINS THE REQUIRED FIRE RESISTANCE RATING OF THE ASSEMBLY.
21. INTENT OF MECHANICAL NOTES ON DRAWINGS IS TO CLARIFY THE SCOPE OF WORK AND ALERT CONTRACTOR OF EXISTING CONDITIONS. CONTRACTOR IS TO VISIT THE SITE AND VERIFY ALL CLEARANCES BEFORE FABRICATION OF DUCTWORK, AND PROVIDE ADDITIONAL OFFSET AND/OR CHANGES IN DUCT SIZES TO MEET FIELD CONDITIONS, AND TO COORDINATE WITH ELECTRICAL, PLUMBING, AND FIRE PROTECTION
SUBCONTRACTORS, BEFORE ANY CONSTRUCTION WORK.
22. FLEXIBLE AND RIGID ROUND DUCT TAKE-OFFS FOR DIFFUSERS SHALL BE THE SAME SIZE AS DIFFUSER NECK. MAXIMUM FLEXIBLE DUCT LENGTH SHALL BE 5'-0".
23. INSTALL DUCTWORK AS HIGH AS POSSIBLE, TIGHT TO BOTTOM OF STRUCTURE, UNLESS NOTED OTHERWISE. COORDINATE DUCT ELEVATIONS WITH RAIN LEADERS, WATER PIPING, SANITARY DRAINS, AND MAJOR
ELECTRICAL CONDUITS.
24. CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTARY STEEL, STRUCTURES, INSERTS, SLEEVES, AND HANGING DEVICES REQUIRED TO INSTALL AND ADEQUATELY SUPPORT MECHANICAL EQUIPMENT AND COMPONENTS IN A MANNER WHICH WILL NOT OVERLOAD BUILDING STRUCTURE. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND ALL BUILDING TRADES TO AVOID CONFLICTS AND TO MAINTAIN EQUIPMENT
ACCESS AND SERVICEABILITY.
25. CONTRACTOR SHALL INSTALL MOTORIZED OUTSIDE AIR DAMPERS FOR ALL AIR HANDLING EQUIPMENT. AIR HANDLING UNITS SHALL HAVE AN EQUIVALENT OR BETTER OF RUSKIN "CD50" DAMPER, WHICH SHALL MODULATE PER 24V ACTUATOR MECHANICALLY WIRED. ALL DAMPERS SHALL CLOSE UPON UNIT SHUTDOWN.
26. PROVIDE A TRAP IN ALL CONDENSATE PIPING LOCATED AT THE AIR HANDLING EQUIPMENT. INSULATE ALL CONDENSATE LINES WITH 1/2" CLOSED CELL FOAM INSULATION. ALL PIPING EXPOSED TO EXTERNAL ELEMENTS
SHALL BE JACKETED WITH UV STABILIZED PVC OR ALUMINUM SHEETING.
27. PROVIDE A 4" HIGH CONCRETE HOUSEKEEPING PAD UNDER ALL MECHANICAL EQUIPMENT, UNLESS NOTED OTHERWISE. PADS SHALL BE 6" LARGER THAN EQUIPMENT ON ALL SIDES.
28. ALL UNDERGROUND PIPING SHALL HAVE A MINIMUM 3'-0" OF COVER, UNLESS NOTED OTHERWISE.
29. IT IS THE RESPONSIBILITY OF THE MECHANICAL INSTALLER TO PATCH AND REPAIR ANY DUCT OPENINGS WHICH RESULT FROM THE RELOCATION OR ELIMINATION OF ANY EXISTING AIR DEVICES. THE PATCH IS TO BE OF A SIMILAR MATERIAL TO THE REPAIRED DUCT AND TO BE SEALED IN ACCORDANCE WITH SMACNA STANDARDS.
30. AIR HANDLING EQUIPMENT WARRANTIES SHALL BE EQUAL TO OR EXCEED WARRANTY OF SCHEDULED EQUIPMENT, UNLESS NOTED OTHERWISE.
31. PROVIDE SEISMIC RESTRAINTS FOR DUCTWORK AND PIPING CONFORMING TO THE LATEST EDITION OF THE "SMACNA GUIDELINES FOR SEISMIC RESTRAINTS OF MECHANICAL SYSTEMS AND PLUMBING SYSTEMS."
32. PROVIDE ADDITIONAL DUCTWORK AND PIPING SUPPORTS ON BOTH SIDES AND WITHIN 18" OF EACH FIRE RATED WALL. DUCTWORK OR PIPING SHALL NOT BE SUPPORTED FROM ANY FIRE RATED WALL.
33. PROVIDE SINGLE WALL TURNING VANES IN ALL RECTANGULAR DUCT ELBOWS WITH ANGLES FROM 45 DEGREES TO 90 DEGREES, EXCEPT FOR TRANSFER AIR ELBOWS. TURNING VANES SHALL BE PROVIDED
ACCORDING TO SMACNA HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE.
34. DUCT DIMENSIONS SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS (FREE AREA).
35. CONTRACTOR SHALL COORDINATE ALL INTAKE/EXHAUST LOCATIONS TO ENSURE MINIMUM 10'-0" DISTANCE BETWEEN ANY INTAKES AND EXHAUSTS, PLUMBING VENTS, RELIEF, ETC.
36. ALL HVAC EQUIPMENT SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS UNLESS INDICATED OTHERWISE.
37. MECHANICAL CONTRACTOR SHALL SIZE AND INSTALL REFRIGERANT PIPING PER MANUFACTURER'S RECOMMENDATIONS. REFRIGERANT PIPING SHALL BE TYPE "L" COPPER WITH SOLDERED OR BRAZED JOINTS AND 1" CLOSED CELL INSULATION. ALL PIPING EXPOSED TO EXTERNAL ELEMENTS SHALL BE JACKETED WITH UV STABILIZED PVC OR ALUMINUM SHEETING. PRE-CHARGED LINES AND SOLDER ON SHORT 90'S ARE NOT ACCEPTABLE. CONTRACTOR SHALL USE SWEEPING 90'S AT EVERY BEND WITH EXCEPTION OF EQUIPMENT CONNECTIONS.
38. CONTRACTOR SHALL PROVIDE A PERMANENT/PROFESSIONAL LABEL FOR EACH PIECE OF EQUIPMENT, ASSOCIATED THERMOSTAT(S) AND/OR SENSOR(S).
39. EQUIPMENT LOCATION IDENTIFICATIONS AT CEILINGS: WHERE VALVES, EQUIPMENT SUCH AS VAV BOXES, FANS, ETC., CIRCUIT BREAKERS, OR OTHER ITEMS SUBJECT TO ROUTINE SERVICE, ARE MOUNTED IN A CONCEALED AREA ABOVE A CEILING, THE CEILING MUST BE MARKED WITH A LABEL UNDER THE SERVICED DEVICE. THE LABEL SHALL CARRY APPROPRIATE IDENTIFICATION TAG.
40. DUCTWORK, DIFFUSERS, REGISTERS, GRILLES, AND OTHER MECHANICAL SYSTEM COMPONENTS SHALL NOT BE SUPPORTED BY THE CEILING OR CEILING SUSPENSION SYSTEM.
41. METAL DUCTWORK SHALL BE CONNECTED TO MECHANICAL EQUIPMENT WITH FLEXIBLE DUCT CONNECTORS EQUAL TO DURO DYNE "SUPER METAL-FAB" WITH EXCELON FABRIC; "GRIP LOC" SEAM; 24 GAGE METAL TABS.
INSULATION SHALL BE INSTALLED OVER METAL TABS AS TO NOT CAUSE FRICTION ON FABRIC.
42. ALL EXHAUST DUCT WORK SHALL BE NON-INSULATED SHEET METAL, UNLESS NOTED OTHERWISE.
43. ALL FLEXIBLE DUCTS SHALL BE LISTED AND LABELED TO UL 181 AND SHALL BE CLASS 0 OR CLASS 1. FLEXIBLE DUCTS SHALL HAVE A MINIMUM RATED AIR VELOCITY OF 4000 FPM, A MINIMUM POSITIVE PRESSURE RATING
OF 4 IN. WG, AND A MINIMUM NEGATIVE PRESSURE RATING OF 1 IN. WG.
44. CONTRACTOR SHALL SUPPLY PIPE SUPPORTS 4'-0" ON CENTERS FOR REFRIGERANT LINES AND CONDENSATE LINES. SUPPORTS SHALL BE PER DETAILS.
45. ALL DOOR UNDERCUTS FOR THE PURPOSE OF BALANCING RETURN AIR SHALL BE MINIMUM 1".
46. ALL CONTROL WIRING SHALL BE INCLUDED AS PART OF MECHANICAL WORK; REFER TO ELECTRICAL SPECIFICATIONS FOR CONDUIT AND WIRING REQUIREMENTS. COORDINATE WITH ELECTRICAL CONTRACTOR TO ENSURE THAT REQUIRED INTERFACE DEVICES ARE PROVIDED WITH ELECTRICAL COMPONENTS (I.E. FAN SPEED RHEOSTATS, AUXILIARY CONTACTS, INTERLOCKS, ETC.).
47. ALL EQUIPMENT DISCONNECTS, WHETHER INTERNALLY MOUNTED OR EXTERNALLY MOUNTED, SHALL BE FURNISHED AND INSTALLED BY MECHANICAL CONTRACTOR, WIRED BY ELECTRICAL CONTRACTOR. IF EXTERNALLY MOUNTED, PROVIDE DISCONNECTING MEANS AT SAME ELEVATION AS EQUIPMENT. REFER TO ELECTRICAL SPECIFICATIONS FOR REQUIREMENTS.
48. MECHANICAL CONTRACTOR SHALL COORDINATE ELECTRICAL CHARACTERISTICS AND REQUIREMENTS OF ALL MECHANICAL EQUIPMENT WITH ELECTRICAL CONTRACTOR BEFORE BIDDING/ORDERING AND
INSTALLATION.
49. WHERE MOTOR SPEED CONTROL IS REQUIRED, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE APPROPRIATE METHOD OF SPEED CONTROL. TYPICALLY, SINGLE PHASE MOTORS REQUIRE SPEED
CONTROLLERS, AND THREE PHASE MOTORS REQUIRE VFD'S.
50. WHERE JOB CONDITIONS REQUIRE CHANGES FROM THE CONTRACT DOCUMENTS THAT DO NOT CHANGE THE SCOPE OR NATURE OF WORK REQUIRED, THE CONTRACTOR SHALL MAKE SUCH CHANGES WITHOUT ADDITIONAL COST TO THE OWNER. NO OTHER CHANGES MAY BE MADE WITHOUT WRITTEN PERMISSION FROM THE ENGINEER.
51. PROVIDE COMMISSIONING FOR ALL MECHANICAL EQUIPMENT ACCORDING TO MECHANICAL SYSTEMS COMMISSIONING AND COMPLETION REQUIREMENTS OF VA SPECIFICATION SECTION 019100 AND INTERNATIONAL
ENERGY CODE 2017 SECTION C408, INCLUDING BUT NOT LIMITED TO:
A. A COMMISSIONING PLAN IN COMPLIANCE WITH SECTION C408.2.1.
B. TESTING, ADJUSTING, AND BALANCING OF SYSTEMS ACCORDING TO C408.2.2.
C. CONDUCT FUNCTIONAL PERFORMANCE TESTING ACCORDING TO C408.2.3.
D. PRELIMINARY COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS PER C408.2.4.
E. PRIOR TO FINAL INSPECTION, PROVIDE RECORD DRAWINGS, OPERATING AND MAINTENANCE MANUALS, SYSTEM BALANCING REPORT, AND FINAL COMMISSIONING REPORT TO THE OWNER ACCORDING TO C408.2.5.
AIR DISTRIBUTION SYMBOLS
LIMIT OF DEMOLITION
(WALL TYPE)
DN
DN
UP
UP
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
SIDEWALL SUPPLY REGISTER OR GRILLE (WALL TYPE)
SIDEWALL EXHAUST OR RETURN REGISTER OR GRILLE
CONNECT NEW DUCT TO EXISTING DUCT
D
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
R
DNUP RETURN DUCT (UP & DOWN)
10ø
FLEXIBLE CONNECTION, EQUIPMENT,
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
STANDARD RADIUS ELBOW (LONG RADIUS)
ROUND DUCT
(INSIDE DIMENSIONS: DIAMETER)
EXISTING DUCT TO REMAIN
SMOKE DAMPER
MANUAL VOLUME DAMPER
FLEXIBLE DUCTWORK (INSULATED)
FIRE DAMPER
EXISTING DUCT TO BE REMOVED
VIBRATION
SUPPLY
RETURN45°
RETURN, NO SPLITTER (45° TAP)
STANDARD BRANCH SUPPLY OR
45°
COMBINATION FIRE/SMOKE DAMPER
AIR TERMINAL SYMBOLS
PIPING SYMBOLS
AIR DISTRIBUTION SYMBOLS
D D F S
D
10x8 RECTANGULAR DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
10x8ø OVAL DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
U 1" DOOR UNDERCUT
F D
S D
CONTROLS DEVICE SYMBOLS
SPACE THERMOSTAT - WALL MOUNTT
SPACE TEMPERATURE SENSOR - WALL MOUNTT
SPACE HUMIDITY SENSOR - WALL MOUNTH
SPACE PRESSURE CONTROLLER & DISPLAY - WALL MOUNT
SPACE PRESSURE SENSOR - WALL MOUNTPS
PC
DRAWING SYMBOLS
DRAWING MATCHLINE
MOTORIZED CONTROL DAMPER
AIRFLOW MEASURING DEVICE
M A
F M
DD
DUCT SMOKE DETECTOR PROVIDED AND WIRED BY
ELECTRICAL. INSTALLED BY MECHANICAL.
AIR TERMINAL UNIT
WITH REHEAT COIL
EQUIPMENT ANNOTATIONS
1-ATU27-1
BUILDING NO. WHERE EQUIPMENT IS LOCATED
ITEM (AIR TERMINAL UNIT SHOWN)
ITEM NUMBER (TERMINAL UNIT NO. 1)
SERVED BY AIR HANDLING UNIT NO. 27
AIR TERMINAL UNIT
WITHOUT REHEAT COIL
SQUARE SUPPLY AIR CEILING DIFFUSER
GENERAL PIPING SYMBOLS
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
PRESSURE GAGE
THERMOMETER
PIPE UP
PIPE DOWN
VALVE SYMBOLS
BALL VALVE
CHECK VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
GATE VALVE
FLEXIBLE CONNECTION
THREE-WAY CONTROL VALVE
QUICK-COUPLE HOSE CONNECTOR
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
AV
MANUAL AIR VENT
MV
GATE VALVE WITH 3/4" HOSE ADAPTER
WYE STRAINER (WITH BALL VALVE & HOSE
CONNECTION)
AUTOMATIC FLOW CONTROL VALVE
CALIBRATED BALANCING VALVE
GLOBE VALVE
ANGLE GLOBE VALVE
HOT WATER HEATING SUPPLY
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSATE DRAIN LINE
HOT WATER HEATING RETURN
HHWS
HHWR
CHWR
CHWS
CD
X EXISTING PIPE TO BE REMOVED
RECTANGULAR EXHAUST AIR CEILING GRILLE
RECTANGULAR RETURN AIR CEILING GRILLE
ACCESS PANEL IN INACCESSIBLE CEILING (24x24, UNO)
MECHANICAL LEGEND
HIGH PRESSURE STEAM - 60 PSI
PUMPED STEAM CONDENSATE
MEDIUM PRESSURE STEAM - 30 PSI
HPS
MPS
PC
STEAM DRIP RETURNDR
STEAM VACUUM RETURNVR
CIRCUIT SETTER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP
550 North Reo Street, Suite 203 Tampa, FL 33609
(813) 289-4700 Nicholas Stephenson, PE
Structural 315 West James Street, Suite 102 Lancaster, PA 17603
(717) 481-2991 Jason Vannoy, SE, PE
Protective Design Specialist 240 West 35th St. Suite 1004 New York, NY 10001
(212) 967-4890 Corrine Tan, SE
Landscape Architect 418 North Toole Avenue Tucson, AZ 85701
(520) 622-9565 Josh Orth., PLA
B
IM
/6
-3
N e w
C o m m u n it y L iv in g C e n te r/
M
E P
V
A M o n tr o s e C
L C
R
.r v t
/2
/2
:3
:3
P
M
M-001
NOTES AND LEGEND - HVAC
TRIPLE C - The A/E Group
201 E. Jefferson Street, Suite 200
Syracuse, NY 13202
(315) 484-5958
Mat Perkins
620-334
CLC
07/21/2021 CJF/NPS NS
NEW COMMUNITY LIVING
CENTER
2094 Albany Post Road, Montrose, NY 10548
ISSUED FOR
CONSTRUCTION
DRAWING INDEX - HVAC
M-001 NOTES AND LEGEND - HVAC
M-002 SCHEDULES - HVAC
M-003 SCHEDULES - HVAC
MH100 MECHANICAL FLOOR PLAN - BASEMENT
MH101 MECHANICAL OVERALL PLAN - LEVEL 1
MH101A MECHANICAL FLOOR PLAN - LEVEL 1 - AREA A
MH101B MECHANICAL FLOOR PLAN - LEVEL 1 - AREA B
MH102 MECHANICAL FLOOR PLAN - PENTHOUSE
MH102A MECHANICAL FLOOR PLAN - PENTHOUSE - AREA A
MH102B MECHANICAL FLOOR PLAN - PENTHOUSE - AREA B
MH201A MECHANICAL AIRFLOWS PLAN - LEVEL 1 - AREA A
MH201B MECHANICAL AIRFLOWS PLAN - LEVEL 1 - AREA B
MH301 MECHANICAL SECTIONS
MH401 ENLARGED VIEWS - HVAC
MH402 ENLARGED VIEWS - HVAC
MH403 ENLARGED VIEWS - HVAC
MP101 MECHANICAL OVERALL PIPING PLAN - LEVEL 1
MP101A MECHANICAL PIPING PLAN - LEVEL 1 - AREA A
MP101B MECHANICAL PIPING PLAN - LEVEL 1 - AREA B
MP102 MECHANICAL PIPING PLAN - PENTHOUSE
M-501 DETAILS - HVAC
M-502 DETAILS - HVAC
M-503 DETAILS - HVAC
M-504 DETAILS - HVAC
M-601 CONTROLS - HVAC
M-602 CONTROLS - HVAC
M-603 CONTROLS - HVAC
M-604 CONTROLS - HVAC
Revisions: Date: 7/21/2021
STAMP
05/09/20225/09/2022
(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXCERCISED
IN THE ORDER PRESENTED) FOR A DETAILED DESCRIPTION OF EACH
DEDUCTIVE ALTERNATE REFR TO COVER SHEET ON GI000
DEDUCTIVE ALTERNATE #2 : ELIMINATE TUNNEL (EAST LEG).
DEDUCTIVE ALTERNATE #6 : REDUCE PLATFORM AT CHILLER
DEDUCTIVE ALTERNATE NOTES
EQUIPMENT MEETING OR EXCEEDING THE BASIS OF DESING LISTED
BELOW MAY BE SUBMITTED. BASIS OF DESIGN MANUFACTUERER
ASHBERRY, EQUIPMENT MODELS LISTED BELOW
ACA-10G-1 SINGLE CARBON FILTER SYSTEM
Qty (1) 10" Diameter x 54" FRP Pressure Vessels Non-Code Pressure Vessel, 150 psig Rating 1 ft³ Carbon Filtration Media Washed Gravel Sub-Fill for Media Support 1" Fleck Model 2750 Top-Mounted Control Valves for Automatic Operation Automatic Backwash Flow Controller (6 gpm) Pentair 3200 12-Day Calendar Clock Controller RO Lockout switch 120V/1Ph/60Hz Electrical Power Rating Estimated Shipping Weight, lbs: 165
MAT-45M-1 TWIN ALTERNATING SOFTENER SYSTEM
Qty (2) 10" Diameter x 54" FRP Pressure Vessels Non-Code Pressure Vessels, 150 psig Rating
1.5 ft³ Softening Resin Per Vessel (45,000 grains Capacity Per Vessel) 1" Fleck Model 9100 Top-Mounted Control Valves for Automatic Operation Pentair 'SXT' digital display electronic timer 120/24 VAC, 60 Hz Electrical Power Rating Alternating Flow Control Configuration for Continuous Treated Water Supply Qty (1) Fleck Noryl Inline Paddlewheel-Type Flow Sensor(s) for Volume Initiated Regeneration Cycle Qty (1) 18" x 40" Polyethylene Brine Storage Tank Assembly with Salt Shelf and Safety Overflow Valve Water Hardness Testing Kit Estimated Shipping Weight, lbs: 265
MRO-2500-2.5 SINGLE REVERSE OSMOSIS SYSTEM
2,500 gpd Nominal Product Output from the RO Machine (1.75 gpm @ 77° F) Powder-coated steel wall-mount bracket Pump, 0.75 HP, brass, 120 VAC, 1-Ph, 60 Hz Polypropylene Cartridge Type Sediment Prefilter Housing (5-micron) Polypropylene Cartridge Type Carbon Prefilter Housing Qty (3) FRP Membrane Housings Qty (3) Thin-Film Composite Low Pressure Membrane Elements (2.5" x 40") Polyethylene interconnecting tubing Panel Mounted RO Permeate, Concentrate and Recycle Flow Meters Panel Mounted Pressure Gauges Concentrate and Recycle Flow Control Valves Automatic Inlet Feed Valve Low Inlet Pressure Switch with Shut-Down Estimated Shipping Weight, lbs: 115
TANK ASSY RO 160 GAL TITAN 3/4HP
160 gals of RO Storage 26" x 68" Flat Bottomed Polyethylene tank Tank Comes Complete w/Inlet and Outlet Bulkhead Fittings Installed Qty (1) 304SS Single Stage Centrifugal Pump (5 gpm @ 40 psi) 120 VAC, 1 Phase, 60 Hz, 3/4 HP TEFC Motor Integral Bladder on Pump Qty (2) Single Pull Double Throw Level Switches to Control RO Pump & Transfer Pump Approximate Shipping Weight, lbs: 96
CSG WATER TREATMENT
FT-B:
PROVIDE 12" DIAMTER BY 24" LONG HORIZONTAL FLASH TANK.
PRVODIE A 3" VENT OUT, A 2-1/2" PIPE IN, AND 1-1/2" PIPE OUT. REFER
TO DETAIL FOR MORE INFORMATION.
FLASH TANK SPECIFICATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP
550 North Reo Street, Suite 203 Tampa, FL 33609
(813) 289-4700 Nicholas Stephenson, PE
Structural 315 West James Street, Suite 102 Lancaster, PA 17603
(717) 481-2991 Jason Vannoy, SE, PE
Protective Design Specialist 240 West 35th St. Suite 1004 New York, NY 10001
(212) 967-4890 Corrine Tan, SE
Landscape Architect 418 North Toole Avenue Tucson, AZ 85701
(520) 622-9565 Josh Orth., PLA
B
IM
/6
-3
N e w
C o m m u n it y L iv in g C e n te r/
M
E P
V
A M o n tr o s e C
L C
R
.r v t
/2
/2
:3
:4
P
M
M-002
SCHEDULES - HVAC
TRIPLE C - The A/E Group
201 E. Jefferson Street, Suite 200
Syracuse, NY 13202
(315) 484-5958
Mat Perkins
620-334
CLC
07/21/2021 CJF/NPS NS
NEW COMMUNITY LIVING
CENTER
2094 Albany Post Road, Montrose, NY 10548
ISSUED FOR
CONSTRUCTION
DUCTLESS SPLIT SYSTEM SCHEDULE
MARK MANUFACTURER
MODEL
NUMBER
TYPE
TOTAL
COOLING
CAPACITY *
SEER * AIR FLOW
ELECTRICAL DATA
CONDENSATE
DRAIN SIZE
REFRIGERANT
TYPE
UNIT
WEIGHT
REMARKS
VOLTAGE PHASE MCA MOCP
DSSI-01 MITSUBISHI FE12NA
INDOOR UNIT;
WALL MOUNTED
12,000 Btu/h 0 350 CFM 208 V 1 0 A 0 A 1 1/2" R-410A 27 lb 1-8
DSSO-01 MITSUBISHI MUZ-FE12NA
OUTDOOR UNIT;
HEAT PUMP
12,000 Btu/h 24.6 0 CFM 0 V 1 9 A 15 A 0" R-410A 80 lb 1,2,3,4,8
* COOLING PERFORMANCE AT AHRI RATING CONDITIONS OF 95 °Fdb OUTSIDE AIR, 80 °Fdb / 67 °Fwb ENTERING AIR TEMPERATURE.
NOTES:
1. REFRIGERANT PIPING SHALL BE SIZED BY MANUFACTURER. PROVIDE ALL ASSOCIATED COMPONENTS AND ACCESSORIES RECOMMENDED BY MANUFACTURER.
2. COORDINATE INSTALLATION OF EQUIPMENT TO PROVIDE REQUIRED CLEARANCES.
3. PROVIDE ALL REQUIRED INTERFACES, THERMOSTAT, SUB-COMPONENTS, AND SENSORS FOR A COMPLETE INSTALLATION AND INTERFACE WITH BUILDING AUTOMATION SYSTEM.
4. INDOOR UNIT RECEIVES POWER FROM OUTDOOR UNIT.
5. PROVIDE UNIT WITH WASHABLE FILTER.
6. PROVIDE WITH CONDENSATE PUMP, RESERVOIR, AND DRAIN PAN LEVEL SENSOR WITH CONTROL TO SHUT UNIT OFF PRIOR TO DRAIN PAN OVERFLOW. PROVIDE CHECK VALVE AT CONDENSATE
OUTLET.
7. PROVIDE BACKLIT, WIRED, WALL-MOUNT REMOTE CONTROLLER.
8. DISCONNECT TO BE PROVIDED BY MECHANICAL CONTRACTOR AND WIRED BY ELECTRICAL CONTRACTOR.
NOTES:
1. PROVIDE WITH PRE-WIRED DISCONNECT SWITCH. PROVIDED BY MECHANICAL, WIRED BY ELECTRICAL.
2. PROVIDE GRAVITY BACKDRAFT DAMPER.
3. PROVIDE ALUMINUM BIRDSCREEN AT EXTERIOR WALL OR ROOF PENETRATION.
4. PROVIDE WITH VFD.
5. PROVIDE THERMAL OVERLOAD MOTOR PROTECTION.
6. PROVIDE WITH FABRICATED ROOF CURB.
7. PROVIDE WITH SPRING ISOLATOR KIT.
8. INTERLOCK FAN WITH ASSOCIATED AHU.
EXHAUST/RELIEF FAN SCHEDULE
MARK TYPE SERVICE AIR FLOW
EXTERNAL
STATIC
PRESSURE
FAN
SPEED
(RPM)
FAN
MOTOR
POWER
MOTOR
SPEED
(RPM)
FAN
DRIVE
SOUND
LEVEL
(SONES)
ELECTRICAL BASIS OF DESIGN
REMARKS
VOLTAGE PHASE MANUFACTURER MODEL NUMBER
EF-01 ROOF DOWNBLAST
AH01;
GENERAL
2610 CFM 1.00 in-wg 1286 2 hp 1725 DIRECT 16.0 208 V 1 GREENHECK G-163-VG 1-8
EF-02 ROOF DOWNBLAST
AH02;
GENERAL
2860 CFM 1.00 in-wg 1341 2 hp 1725 DIRECT 17.0 208 V 1 GREENHECK G-163-VG 1-8
RF-2-01 MIXEDFLOW - HORIZONTAL
AH01 -
RETURN
8875 CFM 1.00 in-wg 1770 5 hp 1770 DIRECT 31.0 208 V 3 GREENHECK QEID-22-60 1-2,5,7-8
RF-2-02 MIXEDFLOW - HORIZONTAL
AH02 -
RETURN
9320 CFM 1.00 in-wg 1770 3 hp 1170 DIRECT 31.0 208 V 3 GREENHECK QEID-24-75 1-2,5,7-8
NOTES:
1. PROVIDE MODULAR, HORIZONTAL DRAW-THROUGH UNIT WITH VERTICAL DISCHARGE. PROVIDE UNIT WITH HINGED ACCESS DOORS. PROVIDE ACCESS SECTION AFTER COOLING COIL FOR COIL CLEANING.
2. PROVIDE MODULATING ELECTRONIC CONTROL VALVE ON RETURN LINE FOR EACH HYDRONIC COIL.
3. PROVIDE UNIT WITH 6" BASE RAIL FACTORY CONNECTED (LEGS NOT ACCEPTABLE) AND EXTENDING THE ENTIRE LENGTH OF UNIT. ENSURE THAT PROPER RISE IS PROVIDED FOR CONDENSATE P-TRAP.
4. PROVIDE WITH 2 SETS OF FILTERS. AT PROJECT COMPLETION, INSTALL NEW FILTERS IN UNIT AND PROVIDE ONE EXTRA SET OF FILTERS FOR OWNER. UNITS SHALL NOT BE RUN WITHOUT SCHEDULED FILTERS IN PLACE.
5. PROVIDE UNIT-MOUNTED VFD, WITH SOFT START, MANUAL BYPASS SWITCH, SURGE PROTECTION, AND FUSED DISCONNECT.
6. ALL MOTORS SHALL BE PREMIUM EFFICIENCY, COMPATIBLE WITH VARIABLE FREQUENCY DRIVE OPERATION.
7. COORDINATE INSTALLATION OF EQUIPMENT TO PROVIDE ACCESS FOR MAINTENANCE AND FILTER REPLACEMENT.
8. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF FIELD CONDITIONS AND COORDINATING EQUIPMENT DIMENSIONS AND INSTALLATION WITH FIELD CONDITIONS.
9. FOR ALL SYSTEMS WITH DESIGN SUPPLY AIR GREATER THAN 2000 CFM, PROVIDE A DUCT SMOKE DETECTOR IN THE SUPPLY AIR DUCT, DOWNSTREAM OF THE AIR FILTERS AND AHEAD OF ANY BRANCH CONNECTIONS.
CHILLED WATER AIR HANDLER SCHEDULE
MARK MODEL
PLENUM SUPPLY FAN DATA PREHEAT COIL DATA COOLING COIL DATA HUMIDIFIER
AIR FILTER
DATA
SHIPPING
WEIGHT
OPERATING
WEIGHTEXPANSION
AIRFLOW
QTY
DESIGN
AIRFLOW
DESIGN OA
AIRFLOW
ESP TSP
HP
(EACH)
VOLTAGE
SYSTEM
TYPE
FACE
AREA
FACE
VELOCITY
ROWS EAT DB LAT DB
GPM
TOTAL
CAPACITY
EWT LWT
SYSTEM
TYPE
FACE
AREA
FACE
VELOCITY
ROWS EAT DB EAT WB LAT DB LAT WB
TOTAL
CAPACITY
SENSIBLE
CAPACITY
EWT LWT
STEAM
PRESSURE
STEAM FLOW
RATE EAT DB ENTERING RH LEAVING RH
CONDENSATE
FLOW RATE
2-AH01 CSAA025 12290 CFM 1 12290 CFM
4450 CFM
3.00 in-wg 6.23 in-wg 25 hp 208 V Hot water 24.74 SF 500 FPM 1 40 °F 70 °F
44 GPM
401,670 Btu/h 180 °F 160 °F Chilled water 24.74 SF 500 FPM 6 81 °F 66 °F 52 °F 52 °F 518,580 Btu/h 392,201 Btu/h 44 °F 56 °F 15 psig 129.98 lb/hr 60 15% 35% 17.95 lb/hr 4" high eff - 95% eff - MERV 14 3,822 lb 3,961 lb
2-AH02 CSAA025 12605 CFM 1 12605 CFM
4180 CFM
3.00 in-wg 6.24 in-wg 25 hp 208 V Hot water 24.74 SF 500 FPM 1 40 °F 70 °F
44 GPM
402,026 Btu/h 180 °F 160 °F Chilled water 24.74 SF 500 FPM 6 81 °F 66 °F 52 °F 52 °F 519,420 Btu/h 392,839 Btu/h 44 °F 56 °F 15 psig 225.35 lb/hr 60 15% 50% 17.97 lb/hr 4" high eff - 95% eff - MERV 14 3,822 lb 3,961 lb
PACKAGED AIR COOLED CHILLER SCHEDULE
MARK
ELECTRICAL FULL LOAD
CAP.
IPLV EWT LWT
PUMPING PACKAGE OPER.
WEIGHT
BASIS OF DESIGN SHIP
WEIGHTFREQ. VOLT. PHASE EER PD FLOW RATE MANUFACTURER MODEL
CH-1 60 Hz 208 V 3 10.302 1169640.0
Btu/h
15.192 54 °F 44 °F 5.26 psi 233 GPM 6 lb
Trane CGAM100 6 lb
CH-2 60 Hz 208 V 3 10.302 1169640.0
Btu/h
15.192 54 °F 44 °F 5.26 psi 233 GPM 6 lb
Trane CGAM100 6 lb
STEAM-TO-HOT WATER HEAT EXCHANGER SCHEDULE
MARK LOCATION SYSTEM TYPE
WATER CONDITIONS STEAM PRESSURE CONTROL VALVE STEAM TRAP ELECTRICAL INFO BASIS OF DESIGN
REMARKS
GPM EWT LWT
MAX PD
(PSI)
ENT CONTROL
VALVE
ENT HX
FOULING
FACTOR
SIZE LBS/HR TRAP # SIZE CAPACITY
QTY
CONNECTIONS
VOLTAGE PHASE MCA MOCP MANUFACTURER MODEL
HX-01
144 -
MECHANICAL
HYDRONIC
WATER
SHELL AND
TUBE
150 GPM 160 °F 180 °F 0.2 30 psi 30 psi 0 2 1/2" 1508 ST-B-3 0' - 0 9/16" 3016
120 V 1 4 A 15 A CEMLINE
HTP848EX-S-D
-SKID
1,2,3,5,6,7
HX-02
144 -
MECHANICAL
DOMESTIC
HOT WATER
SHELL AND
TUBE
50 GPM 47 °F 180 °F 15 30 psi 30 psi 0 2" 3581 ST-B-4 0' - 1 5/8" 7162
120 V 1 4 A 15 A CEMLINE
10SEH1030-D
W
1-8
NOTES:
1. PROVIDE SKID MOUNTED, PRE-WIRED, DUPLEX PACKAGE SYSTEM COMPLETE WITH ASME 150 PSIG DUAL CARBON STEEL SHELL AND COPPER TUBE HEAT EXCHANGERS, DUPLEX CONTROL PANEL WITH DISCONNECTS.
2. PROVIDE WITH SKID MOUNTED ACCESSORIES INCLUDING EXPANSION TANK, AIR VENT.
3. INCLUDE ALL INTERCONNECTING PIPING AND ACCESSORIES INCLUDING TRAP, SERVICE AND STOP VALVES, CHECK VALVES, FLEXIBLE CONNECTORS, PRESSURE GAUGES, INLET AND OUTLET THERMOMETERS, AND ALL OTHER RELATED AND REQUIRED
COMPONENTS FOR A COPMLETE WORKING SYSTEM.
4. PROVIDE MIXING VALVE TO DISCHARGE 140F HOT WATER.
5. REFER TO DETAILS AND CONTROL DIAGRAMS
6. SYSTEM IS TO BE DESIGNED FOR 100% REDUNDANCY.
7. PROVIDE WITH INTEGRAL STEAM TRAPS.
8. LWT SHOWN IS NORMAL OPERATING TEMPERATURE. UNIT SHALL BE CAPABLE OF PROVIDING 180 DEG F LWT FOR THERMAL ERADICATION PURPOSES.
NOTES:
1. DISCONNECT PROVIDED AND INSTALLED BY MECHANICAL, WIRED BY ELECTRICAL.
2. PROVIDE WITH VFD CONTROL FOR EACH PUMP.
3. PROVIDE EQUIPMENT PAD WITH VIBRATION ISOLATION.
4. REFER TO DETAILS FOR MORE INFORMATION.
5. INSTALL VIBRATION ISOLATION BASE PER TO DETAIL 7 ON SHEET M-501.
HYDRONIC WATER PUMP SCHEDULE
MARK LOCATION AREA SERVED TYPE
CIRCULATING FLUID ELECTRICAL DATA BASIS OF DESIGN
NOTES
FLUID GPM TOTAL HEAD
NPSH
AVAILABLE
TEMPERATURE MOTOR POWER VOLTAGE PHASE RPM
SPEED
CONTROL
MANUFACTURE
R
MODEL
NUMBER
CWP-1
MECHANICAL
PENTHOUSE
CLC - BLDG XX END SUCTION CHILLED WATER 235 GPM 50 ftH2O 5 ftH2O 56 °F 7.500 hp 208 V 1 1800 VFD
BELL &
GOSSETT
2.5 BB 1-5
CWP-2
MECHANICAL
PENTHOUSE
CLC - BLDG XX END SUCTION CHILLED WATER 235 GPM 50 ftH2O 5 ftH2O 56 °F 7.500 hp 208 V 1 1800 VFD
BELL &
GOSSETT
2.5 BB 1-5
HWP-1
MECHANICAL
ROOM
CLC - BLDG XX END SUCTION
HEATING HOT
WATER
150 GPM 50 ftH2O 5 ftH2O 160 °F 5.000 hp 208 V 1 1800 VFD
BELL &
GOSSETT
2 BD 1-5
HWP-2
MECHANICAL
ROOM
CLC - BLDG XX END SUCTION
HEATING HOT
WATER
150 GPM 50 ftH2O 5 ftH2O 160 °F 5.000 hp 208 V 1 1800 VFD
BELL &
GOSSETT
2 BD 1-5
NOTES:
1. PROVIDE WITH 136 GALLON CHILLED WATER BAFFLED STORAGE TANK ACCESSORY WITH ELECTRIC TANK
HEATERS AND THERMOSTAT CONTROL.
2. PROVIDE WITH FACTORY INSTALLED EVAPORATOR HEATER FREEZE PROTECTION.
3. PROVIDE HEAT TAPE INSULATION ON ALL EXPOSED PIPING.
4. PROVIDE WITH SINGLE POINT POWER CONNECTION AND UNIT MOUNTED NON-FUSED DISCONNECT.
5. PROVIDE WITH DIGITAL COMPRESSOR
6. PROVIDE WITH ALL NOISE REDUCTION PACKAGES.
7. PROVIDE WITH FACTORY VIBRATION ISOLATION PACKAGE.
8. PROVIDE WITH CONTROLS CAPABLE OF STAND ALONE OPERATION AND INTERFACE WITH NIAGARA SYSTEM.
AIR DEVICE SCHEDULE
MARK
BASIS OF DESIGN
TYPE
AIRFLOW PANEL
SIZE (IN.)
NECK SIZE
(IN.)
NOTES
MANUFACTURER MODEL MIN. MAX.
CD-11 PRICE ASPD PLAQUE FACE 40 CFM 85 CFM 12x12 6ø
CD-12 PRICE ASPD PLAQUE FACE 90 CFM 185 CFM 12x12 8ø
CD-21 PRICE ASPD PLAQUE FACE 40 CFM 85 CFM 24x24 6ø
CD-22 PRICE ASPD PLAQUE FACE 90 CFM 185 CFM 24x24 8ø
CD-23 PRICE ASPD PLAQUE FACE 190 CFM 345 CFM 24x24 10ø
CD-24 PRICE ASPD PLAQUE FACE 350 CFM 475 CFM 24x24 12ø
EG-11 PRICE 630
LOUVERED, FIXED FACE
EXHAUST GRILLE
40 CFM 95 CFM 12x12 6x6
EG-12 PRICE 630
LOUVERED, FIXED FACE
EXHAUST GRILLE
100 CFM 195 CFM 12x12 8x8
EG-22 PRICE 630
LOUVERED, FIXED FACE
EXHAUST GRILLE
100 CFM 195 CFM 24x24 8x8
RG-11 PRICE 630
LOUVERED, FIXED FACE
RETURN GRILLE
40 CFM 95 CFM 12x12 6x6
RG-21 PRICE 630
LOUVERED, FIXED FACE
RETURN GRILLE
40 CFM 95 CFM 24x24 6x6
RG-22 PRICE 630
LOUVERED, FIXED FACE
RETURN GRILLE
100 CFM 195 CFM 24x24 8x8
RG-23 PRICE 630
LOUVERED, FIXED FACE
RETURN GRILLE
200 CFM 295 CFM 24x24 10x10
RG-24 PRICE 630
LOUVERED, FIXED FACE
RETURN GRILLE
300 CFM 500 CFM 24x24 12x12
SD-1 PRICE 620 SURFACE 0 CFM 0 CFM N/A 10x6
SD-2 PRICE 620 SURFACE 0 CFM 0 CFM N/A 20x6
SD-3 PRICE 630 SURFACE 0 CFM 0 CFM N/A 14x6
SD-4 PRICE 630 SURFACE 0 CFM 0 CFM N/A 20x10
SD-5 PRICE 620 SURFACE 0 CFM 0 CFM N/A 10x8
SG-1 PRICE 630 SURFACE 0 CFM 0 CFM NA 16x8
SG-2 PRICE 630 SURFACE 0 CFM 0 CFM NA 40x24
SG-3 PRICE 630 SURFACE 0 CFM 0 CFM NA 20x14
SGE-1 PRICE 630 SURFACE 0 CFM 0 CFM NA 10x6
NOTES:
1. BASIS OF DESIGN EQUIPMENT WITH REQUIRED PERFORMANCE CHARACTERISTICS IS SCHEDULED.
OTHER MANUFACTURERS ARE ACCEPTABLE; HOWEVER EQUIPMENT NOT MEETING EQUIVALENT
CRITERIA CANNOT BE CONSIDERED.
2. NECK SIZE AS INDICATED. RUNOUT BRANCH DUCTS SHALL BE THE SAME SIZE AS INDICATED NECK
SIZE. PROVIDE TRANSITION IF NECESSARY.
3. PROVIDE VOLUME DAMPER INSTALLED IN BRANCH DUCT SERVING EACH DIFFUSER.
4. PROVIDE ALL REQUIRED ACCESSORIES FOR A COMPLETE INSTALLATION.
5. PROVIDE EXHAUST GRILLES LOCATED IN HARD CEILINGS WITH BALANCING DAMPER ADJUSTABLE AT
FACE OF GRILLE.
STEAM CONDENSATE PUMP SCHEDULE
MARK LOCATION
SYSTEM SERVED
TYPE
GPM EACH
PUMP
DISCHARGE
PRESSURE
MAIN RECEIVER
SIZE
MOTOR
REMARKS
HP EACH VOLTAGE PHASE
CRU-1 BASEMENT
HEAT EXCHANGERS,
MAIN, PRESSURE
REDUCING STATION
DUPLEX 75 GPM 20.00 psi 65.0 gal 1.50 hp 208 V 3 1-7
CRU-2 PENTHOUSE
CLEAN STEAM
GENERATOR PLANT SIDE
CONDENSATE
DUPLEX 3 GPM 10.00 psi 15.0 gal 0.34 hp 208 V 3 1-7
CRU-3 PENTHOUSE
CLEAN STEAM
GENERATOR PLANT SIDE
CONDENSATE
DUPLEX 3 GPM 10.00 psi 15.0 gal 0.34 hp 208 V 3 1-7
NOTES:
1. PROVIDE WITH UL LISTED CONTROL PANEL MOUNTED AND WIRED WITH LIQUID TIGHT CONDUIT. PANEL TO INCLUDE 2 FUSED DISCONNECT AND COVER, INTERLOCK WITH EACH MOTOR, HOA SELECTOR, NUMBERED TERMINAL STRIP, TWO PUMP RUNNING PILOT LIGHTS, CONTROL POWER SWITCHING RELAY.
2. PROVIDE WATER LEVEL GAUGE WITH SHUTOFF VALVE.
3. PROVIDE CAST IRON RECEIVER WARRANTED FOR 20 YEARS.
4. PROVIDE HIGH LEVEL ALARM WITH SILENCING RELAY.
5. PROVIDE WITH EQUIPMENT PAD IF NEEDED.
6. REFER TO DETAILS FOR ADDITIONAL REQUIREMENTS AND INFORMATION.
7. PROVIDE WITH CONTROLS CAPABLE OF STAND ALONE OPERATION AND INTERFACE WITH FACILITY NIAGARA AND BACNET SYSTEMS.
STEAM TRAP SCHEDULE
MARK
EQUIPMENT
EQUIPMENT STEAM
CONDITIONS
STEAM TRAP
NOTES
EQUIPMENT SERVED
LOCATION
(AREA)
DEMAND
(#/HR)
PRESSURE
(PSI)
CAPACITY
(#/HR)
MINIMUM
DIFFERENTIAL
PRESSURE
MAXIMUM
DIFFERENTIAL
PRESSURE
PIPE
CONNECTION
SIZE
STEAM TRAP TYPE
ST-B-1 60 PSI STEAM MAIN SUPPLY BASEMENT 98 60 294 2 60 3/4" THERMODYNAMIC 1,2
ST-B-2
60 PSI SIDE PRESSURE REDCING
STATION
BASEMENT 6 60 17 2 60 3/4" THERMODYNAMIC 1,2
ST-B-3 HEATING HOT WATER HX BASEMENT 1508 30 3016 2 30 2"
FLOAT AND
THERMOSTATIC
1,2
ST-B-4 DOMESTIC WATER HX BASEMENT 3581 30 7162 2 30 2-1/2"
FLOAT AND
THERMOSTATIC
1,2
ST-B-5
30 PSI SIDE PRESSURE REDCING
STATION
BASEMENT 4 60 13 2 30 3/4" THERMODYNAMIC 1,2
ST-B-6 30 PSI STEAM MAIN SUPPLY BASEMENT 8 30 24 2 60 3/4" THERMODYNAMIC 1,2
ST-B-7 PRESSURE REDCING STATION BASEMENT 3 30 9 2 30 3/4" THERMODYNAMIC 1,2
ST-B-8 FLASH TANK BASEMENT 4772 30 14317 2 30 2-1/2" THERMODYNAMIC 1,2
ST-P-1
CLEAN STEAM GENERATOR
(PLANT SIDE)
PENTHOUSE 504 30 1512 2 30 3/4"
FLOAT AND
THERMOSTATIC
1,2
ST-P-2 2-AHU02 HUMIDIFIER PENTHOUSE 18 15 54 2 15 3/4"
FLOAT AND
THERMOSTATIC
1,2
ST-P-3 2-AHU01 HUMIDIFIER PENTHOUSE 18 15 54 2 15 3/4"
FLOAT AND
THERMOSTATIC
1,2
ST-P-4 15 PSI STEAM MAIN PENTHOUSE 4 15 12 2 15 3/4" THERMODYNAMIC 1,2
NOTES:
1. PROVIDE ALL REQUIRED FITTINGS AND ACCESSORIES FOR A PROPERLY OPERATING SYSTEM.
2. PROVIDE WITH CYPRESS ENVIROSYSTEMS WIRELESS STEAM TRAP MONITOR (WSTM-100) AND TIE-IN TO EXISTING CYPRESS WIRELESS STEAM TRAP MONITORING
SYSTEM.
LOUVER SCHEDULE
vv TYPE
AIR FLOW VELOCITY
MAX AIR
PRESSURE
DROP
SIZE FREE AREA
BASIS OF DESIGN
NOTES
MANUFACTURER
MODEL
NUMBER
OAL-1 INTAKE 24895 CFM 960 FPM 0.17 in-wg 138x48 26.00 SF GREENHECK EVH-501D 1,2
RL-1 EXHAUST 24895 CFM 830 FPM 0.11 in-wg 102x72 30.10 SF GREENHECK EVH-501D 1,2
CLEAN STEAM GENERATOR SCHEDULE
MARK LOCATION SYSTEM SERVED
INLET WATER
FLOW RATE
(GPM)
PLANT STEAM
SUPPLY
PRESSURE
STEAM INLET
DIAMATER
CLEAN STEAM
OUTPUT RATE (lb/hr)
STEAM
PRESSURE
PLANT STEAM
FLOW RATE
(lb/hr)
STEAM TRAP
NUMBER
POWER
NOTESVOLTS PHASE
2-CSG01 PENTHOUSE AHU HUMIDIFIERS 3.5 30 psi 1 1/2" 360 15 psi 504 ST-P-1 120 1 1-5
STEAM PRESSURE REDUCING STATION
MARK LOCATION SYSTEM SERVED VALVE SIZE
REQUIRED
CAPACITY (lb/hr) PRESSURE IN
PRESSURE
OUT REMARKS
PRV-1
BASEMENT HEAT
EXCHANGERS &
CLEAN STEAM
GENERATOR
1 1/2" 5595 60.00 psi 30.00 psi
NOTES:
1. PROVIDE WITH UL LISTED CONTROL PANEL MOUNTED AND WIRED WITH LIQUID TIGHT CONDUIT.
2. PROVIDE WITH EQUIPMENT PAD.
3. PROVIDE WITH CONTROLS CAPABLE OF STAND ALONE OPERATION AND INTERFACE WITH NIAGARA AND BACNET SYSTEMS.
4. PROVIDE WITH POINT-OF-USE REVERSE OSMOSIS FILTER STATION CAPABLE OF SUPPLYING 1400 GALLONS OF TREATED WATER PER DAY. REFER TO CSG WATER TREATMENT NOTES ON THIS
SHEET FOR MORE INFORMATION.
5. PROVIDE WITH CLEAN STEAM SIDE CONDESATE COOLER.
NOTES:
1. PROVIDE WITH BAKED ENAMEL FINISH. COORDINATE WITH ARCHITECT FOR FINAL PAINT COLOR.
2. PROVIDE WITH BIRDSCREEN, INSECT SCREEN AND ALL OTHER ACCESSORIES REQUIRED FOR A COMPLETE INSTALLATION.
Revisions: Date: 7/21/2021
STAMP
DESIGN CONDITIONS
DESIGN CONDITIONS
SUMMER WINTER
TEMPERATURE
RELATIVE
HUMIDITY
TEMP
RELATIVE
HUMIDITY
°Fdb °Fwb % °Fdb %
OUTDOOR DESIGN
CONDITIONS
91 77 53 43 NA
OUTDOOR
DEHUMIDIFICATION
DESIGN CONDITION
88 80 71 43 NA
INDOOR AREA TEMPERATURE/HUMIDITY SETPOINTS
CLASSROOMS /
CONFERENCE ROOMS
75 63 50 70 30
CORRIDORS 75 63 50 70 30
COMMUNICATION
ROOMS
77 64 50 - -
LOUNGES 75 63 50 70 30
ELECTRICAL ROOMS 86 66 50 - -
OFFICES 75 63 50 70 30
TOILETS 77 64 50 70 30
WAITING AREAS 75 63 50 70 30
ALL OTHER SPACES 75 63 50 70 30
DATA CENTER 70 60 55 65 30
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP
550 North Reo Street, Suite 203 Tampa, FL 33609
(813) 289-4700 Nicholas Stephenson, PE
Structural 315 West James Street, Suite 102 Lancaster, PA 17603
(717) 481-2991 Jason Vannoy, SE, PE
Protective Design Specialist 240 West 35th St. Suite 1004 New York, NY 10001
(212) 967-4890 Corrine Tan, SE
Landscape Architect 418 North Toole Avenue Tucson, AZ 85701
(520) 622-9565 Josh Orth., PLA
B
IM
/6
-3
N e w
C o m m u n it y L iv in g C e n te r/
M
E P
V
A M o n tr o s e C
L C
R
.r v t
/2
/2
:5
:2
P
M
M-003
SCHEDULES - HVAC
TRIPLE C - The A/E Group
201 E. Jefferson Street, Suite 200
Syracuse, NY 13202
(315) 484-5958
Mat Perkins
620-334
CLC
07/21/2021 NPS TMR
NEW COMMUNITY LIVING
CENTER
2094 Albany Post Road, Montrose, NY 10548
ISSUED FOR
CONSTRUCTION
VAV AIR TERMINAL UNIT SCHEDULE - HOT WATER REHEAT - AHU-1
MARK
NOMINAL
SIZE
AIRFLOW
MAX.
TOTAL UNIT
PRESSURE
DROP
SPACE
NOISE
CRITERIA
(NC)
HOT WATER HEATING COIL
CONTROL
TYPE
CONTROL
SEQUENCE
BASIS OF DESIGN
NOTES
MAXIMUM MINIMUM
HEATING
AIRFLOW
ENTERING
AIR TEMP.
ENTERING
WATER
TEMP.
LEAVING
WATER
TEMP.
HEATING
WATER
FLOW
COIL
CAPACITY
HOT
WATER
PIPING
RUNOUT
SIZE
MANUFACTURER
MODEL
NUMBER
TU1-01 6 240 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-02 6 240 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-03 6 240 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-04 6 240 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-05 6 270 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-06 6 270 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-07 6 270 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-08 6 270 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-09 6 315 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-10 6 320 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-11 6 325 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-12 6 320 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-13 6 325 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-14 6 340 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 4,000 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-15 10 710 CFM 710 CFM 0.25 in-wg 35 280 CFM 55.0 °F 180 °F 160 °F 3.0 GPM 27,000 Btu/h 3/4" DDC CV PRICE INDUSTRIES SDV-10 1-4
TU1-16 8 415 CFM 415 CFM 0.25 in-wg 35 180 CFM 55.0 °F 180 °F 160 °F 2.0 GPM 15,800 Btu/h 3/4" DDC CV PRICE INDUSTRIES SDV-08 1-4
TU1-17 6 130 CFM 130 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 4,900 Btu/h 3/4" DDC CV PRICE INDUSTRIES SDV-06 1-4
TU1-18 6 120 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-19 6 85 CFM 30 CFM 0.25 in-wg 35 25 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-20 14 1900 CFM 1900 CFM 0.25 in-wg 35 610 CFM 61.6 °F 180 °F 160 °F 5.0 GPM 72,200 Btu/h 3/4" DDC CV PRICE INDUSTRIES SDV-14 1-4
TU1-21 6 100 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.0 GPM 3,800 Btu/h 3/4" DDC CV PRICE INDUSTRIES SDV-06 1-4
TU1-22 6 180 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.0 GPM 3,800 Btu/h 3/4" DDC CV PRICE INDUSTRIES SDV-06 1-4
TU1-23 10 1060 CFM 320 CFM 0.25 in-wg 35 320 CFM 55.0 °F 180 °F 160 °F 1.5 GPM 12,200 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-10 1-4
TU1-24 8 590 CFM 180 CFM 0.25 in-wg 35 180 CFM 55.0 °F 180 °F 160 °F 1.0 GPM 6,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-08 1-4
TU1-25 6 60 CFM 60 CFM 0.25 in-wg 35 20 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC CV PRICE INDUSTRIES SDV-06 1-4
TU1-26 6 280 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-27 6 230 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-28 6 100 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-29 6 100 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-31 14 1810 CFM 1810 CFM 0.25 in-wg 35 600 CFM 61.6 °F 180 °F 160 °F 5.0 GPM 68,700 Btu/h 3/4" DDC CV PRICE INDUSTRIES SDV-14 1-4
TU1-32 6 300 CFM 300 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 1.5 GPM 11,400 Btu/h 3/4" DDC CV PRICE INDUSTRIES SDV-06 1-4
TU1-33 6 80 CFM 80 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,000 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-34 6 90 CFM 80 CFM 0.25 in-wg 35 180 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,000 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
TU1-35 6 120 CFM 80 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,000 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4
NOTES:
1. ALL AIR TERMINAL UNITS SHALL BE PRESSURE INDEPENDENT TYPE WITH VELOCITY RESET CONTROLLERS.
2. HOT WATER REHEAT COIL SHALL HAVE A MAXIMUM WATER PRESSURE DROP OF 3.0 FT. WG.
3. PROVIDE WITH ARI 880 RATED MAXIMUM DAMPER LEAKAGE OF 2% NOMINAL AIRFLOW AT 3 INCH W.G. INLET STATIC PRESSURE.
4. INSTALL…