Drawings 13 of 15 MECHANICAL.pdf

PDF 19 MB Posted

Attached to
Y1AZ--TIERED EVALUATIONS - Build New Community Living Center Minor Construction - Montrose 620-334
Solicitation number
36C77623R0156
Issued by

About this file

This document provides details for a federal contract opportunity to construct a new community living center. The solicitation number is 36C77623R0156 and seeks to build a new community living center minor construction project located in Montrose, Colorado for the Department of Veterans Affairs Technology Acquisition Center Austin. The related file is a set of mechanical drawings containing 19 pages of specifications and diagrams for the mechanical systems and infrastructure of the proposed new construction project. Relevant information includes the project location, scope of constructing a new community living center, the soliciting agency as the Department of Veterans Affairs, and mechanical design documents to support the proposed construction work.

View the file

Other files

File Type Posted
620-334-Responses to Tech Questions - 1-30-24.pdf PDF
36C77623R0156 0003.pdf PDF
620-334-Pre Bid Presentation20240109.pdf PDF
36C77623R0156 0002.pdf PDF
620-334-Responses to Tech Questions - 1-25-24.pdf PDF
Site Visit Sign-In Sheet - 01-09-24.pdf PDF
36C77623R0156 0001.pdf PDF
DBA Wage Rates - Westchester County - 01-05-24.pdf PDF
Drawings 8 of 15 ARCHITECTURAL 3.pdf PDF
Site Visit Campus Map.pdf PDF
Drawings 14 of 15 ELECTRICAL 1.pdf PDF
Specifications 10-30-23.pdf PDF
Small Business Subcontracting Plan Model.docx DOCX document
Drawings 5 of 15 STRUCTURAL.pdf PDF
RFP 36C77623R0156 - 12-20-23.pdf PDF
Drawings 12 of 15 PLUMBING.pdf PDF
Drawings 1 of 15 GENERAL.pdf PDF
Drawings 4 of 15 LANDSCAPE.pdf PDF
Drawings 6 of 15 ARCHITECTURAL 1.pdf PDF
Drawings 2 of 15 CIVIL 1.pdf PDF
Drawings 7 of 15 ARCHITECTURAL 2.pdf PDF
Drawings 10 of 15 ARCH SIGN-EQUIP.pdf PDF
DBA Wage Rates - Westchester County - 11-17-23.pdf PDF
Limitations on Subcontracting - Construction.docx DOCX document
Drawings 15 of 15 ELECTRICAL 2.pdf PDF
Brand Name J_A - Montrose.pdf PDF
Site Visit Instructions.pdf PDF
Drawings 11 of 15 FIRE PROTECTION.pdf PDF
Drawings 9 of 15 ARCHITECTURAL 4.pdf PDF
Drawings 3 of 15 CIVIL 2.pdf PDF
Construction Cost Breakdown.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATIVE OF WORK TO BE PROVIDED (FURNISHED AND INSTALLED) UNDER

THIS CONTRACT. DRAWINGS SHOULD NOT BE SCALED.

2. THE CONTRACTOR IS RESPONSIBLE TO EXAMINE THE EXISTING CONDITIONS UNDER WHICH THEY SHALL OPERATE AND VERIFY THE

EXTENT OF WORK REQUIRED TO COMPLETE THE WORK UNDER THIS CONTRACT.

3. PRIOR TO ORDERING AND FABRICATING ANY EQUIPMENT, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO EXAMINE THE PHYSICAL CONDITIONS AT THE PROJECT SITE AND VERIFY SPACE AND SUFFICIENT CLEARANCES ARE AVAILABLE FOR INSTALLING EQUIPMENT, DUCTWORK, PIPING, AND APPURTENANCES, AND TO DETERMINE ANY NECESSARY MODIFICATIONS.

4. PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, REGULATIONS, AND STANDARDS ADOPTED BY THE AUTHORITY HAVING JURISDICTION. IF CONFLICTS EXIST BETWEEN THESE ENGINEERING DOCUMENTS AND

CODES, THE MOST STRINGENT REQUIREMENTS SHALL GOVERN.

5. ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING CODE REQUIREMENTS:

• INTERNATIONAL BUILDING CODE (IBC) 2018

• INTERNATIONAL EXISTING BUILDING CODE 2018

• IBC MECHANICAL 2018

• IBC PLUMBING 2018

• IBC ENERGY CONSERVATION 2018

• INTERNATIONAL FIRE CODE 2018

• NFPA 1-2018, THE UNIFORM FIRE CODE

• NFPA 101-2018, THE LIFE SAFETY CODE

• NFPA 51B-2019, STANDARD FOR FIRE PREVENTION DURING WELDING, CUTTING AND OTHER HOT WORK

• NFPA 13-2019, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS

• NFPA 70-2017, NATIONAL ELECTRICAL CODE

• NFPA 90A-2018, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTING SYSTEMS.

• NFPA 99-2018, STANDARD FOR HEALTH CARE FACILITIES

• NFPA 241-2019, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION AND DEMOLITION OPERATIONS.

• ALL APPLICABLE VA DESIGN MANUALS

6. CONTRACTOR SHALL COORDINATE AND SEQUENCE DEMOLITION, CLEANING, AND CONSTRUCTION WORK.

7. CONTRACTOR SHALL NOTE ANY SPECIAL REQUIREMENTS FOR INSTALLATION OF WORK UNDER THIS CONTRACT. DISMANTLE AND REASSEMBLE EQUIPMENT AS NECESSARY FOR ENTRY INTO THE BUILDING AND THE LOCATION OF INSTALLATION.

8. THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT SCHEDULE AND SHALL UPDATE THIS SCHEDULE WEEKLY. ANY

CHANGES SHALL BE NOTED AND AN UPDATED SCHEDULE SHALL BE PROVIDED TO THE OWNER.

9. ALL PERMITS, FEES, TAXES, ETC SHALL BE PAID BY CONTRACTOR AS PART OF THE TOTAL PROJECT COST.

10. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS, CEILINGS, AND FLOORS. SEAL ALL PENETRATIONS THROUGH RATED ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH U.L. REQUIREMENTS TO MAINTAIN THE ASSEMBLY

RATING.

11. CONTRACTOR SHALL FURNISH U.L. APPROVED DRAWINGS FOR EACH TYPE OF FIRE AND SMOKE RATED ASSEMBLY PENETRATION BY DUCTS, PIPES, OR CONDUITS, AND SHALL DISPLAY THESE DRAWINGS ON THE JOB SITE AT ALL TIMES DURING CONSTRUCTION.

12. CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER GUIDANCE.

13. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND EQUIPMENT SUBMITTALS FOR ALL PRODUCTS USED ON PROJECT.

14. THE COR'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR DEVIATIONS FROM THE REQUIREMENTS OF CONTRACT DOCUMENTS UNLESS THE CONTRACTOR HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER TO THE SPECIFIC DEVIATION. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF

RESPONSIBILITY FOR ERRORS OR OMISSIONS IN HIS OR HER SUBMITTAL DATA.

15. THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE O&M MANUALS IN THREE RING BINDERS AT SUBSTANTIAL COMPLETION. MANUALS SHALL INCLUDE INSTALLATION AND MAINTENANCE DATA ON ALL NEW EQUIPMENT AND MATERIALS, CERTIFIED TECHNICAL PRODUCT DATA, EQUIPMENT SHOP DRAWINGS, SPARE PARTS DATA, ETC. PROVIDE AN INDEX AND

ASSOCIATED DIVIDERS.

16. CLOSE OUT DOCUMENTS: THE CONTRACTOR IS TO MAINTAIN ONE SET OF CONSTRUCTION DRAWINGS ON SITE AND KEEP CURRENT WITH MARK UP AS-BUILT CONDITIONS DURING CONSTRUCTION OF THE PROJECT. THIS SET IS TO INCLUDE ALL CONTRACT CHANGES, MODIFICATIONS AND CLARIFICATIONS. THIS SET ALONG WITH ALL SHOP DRAWINGS SHALL BE TURNED OVER TO THE

ARCHITECT/ENGINEER AFTER CONSTRUCTION COMPLETION.

17. IT IS THE RESPONSIBILITY OF ALL BIDDERS TO THOROUGHLY REVIEW AND UNDERSTAND ALL CONSTRUCTION DOCUMENTS. THIS INCLUDES BUT IS NOT LIMITED TO ALL DRAWINGS, SPECIFICATION SECTIONS, ETC. THE DRAWINGS ARE SCHEMATIC IN NATURE.

THEREFORE BEFORE STARTING ANY WORK, THE CONTRACTOR SHALL REVIEW ALL OTHER CONSTRUCTION DOCUMENTS, VERIFY FIELD CONDITIONS AND SHALL MAKE ANY REQUIRED MINOR ADJUSTMENTS WITHOUT EXTRA COST TO THE OWNER. ANY MAJOR DISCREPANCIES FOUND SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER. THE BASE BID SHALL REFLECT THE TOTAL COST OF NEW EQUIPMENT INSTALLATION. THIS INCLUDES LABOR, EQUIPMENT AND MATERIALS. NO CHANGE ORDERS SHALL

BE ISSUED WITHOUT WRITTEN CONSENT AND APPROVAL FROM THE CONTRACTING OFFICER.

ABBREVIATIONS

(E) EXISTING

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AFM AIRFLOW MEASURING DEVICE

AHJ AUTHORITY HAVING JURISDICTION

AHU AIR HANDLING UNIT

ATU AIR TERMINAL UNIT

BAS BUILDING AUTOMATION SYSTEM

BHP BRAKE HORSEPOWER

BOD BOTTOM OF DUCT

BOS BOTTOM OF STRUCTURE

BTUH BRITISH THERMAL UNIT PER HOUR

CAV CONSTANT AIR VOLUME

CCV COOLING CONTROL VALVE

CD CEILING SUPPLY AIR DIFFUSER

CF CUBIC FEET

CFM CUBIC FEET PER MINUTE

CG CEILING GRILLE

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

COR CONTRACTING OFFICER'S REPRESENTATIVE

CTE CONNECT TO EXISTING

CU CONDENSING UNIT

CV CONSTANT AIR VOLUME

DD DUCT MOUNTED SMOKE DETECTOR

DIA DIAMETER

DSSI DUCTLESS SPLIT SYSTEM INDOOR UNIT

DSSO DUCTLESS SPLIT SYSTEM OUTDOOR UNIT

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EDH ELECTRIC DUCT HEATER

EF EXHAUST FAN

EG EXHAUST AIR GRILLE

EWT ENTERING WATER TEMPERATURE

FCU FAN COIL UNIT

FD FIRE DAMPER

FLEX FLEXIBLE

FO FLAT OVAL

FPM FEET PER MINUTE

FSD COMBINATION FIRE SMOKE DAMPER

FT FEET

GPM GALLONS PER MINUTE

HCV HEATING CONTROL VALVE

HHWR HEATING HOT WATER RETURN

HHWS HEATING HOT WATER SUPPLY

HP HORSEPOWER

HPS HIGH PRESSURE STEAM (60 PSI)

IBC INTERNATIONAL BUILDING CODE

IN INCH

KW KILOWATT

LAT LEAVING AIR TEMPERATURE

LWT LEAVING WATER TEMPERATURE

LPS LOW PRESSURE STEAM (5 PSI)

MBTUH 1,000 BTUH

MCA MINIMUM CIRCUIT AMPACITY

MOCP MAXIMUM OVERCURRENT PROTECTION

MPS MEDIUM PRESSURE STEAM (20 PSI)

MUA MAKE UP AIR

NC NEW CONNECTION / NOISE CRITERIA

OA OUTSIDE AIR

OAL OUTSIDE AIR LOUVER

OBD OPPOSED BLADE DAMPER

PH PHASE

PSIG POUNDS PER SQUARE INCH GAGE

RA RETURN AIR

REF REFRIGERANT

RG RETURN AIR GRILLE

RH RELATIVE HUMIDITY

RPM REVOLUTIONS PER MINUTE

SA SUPPLY AIR

SD SMOKE DAMPER

SF SQUARE FEET

SR SUPPLY AIR REGISTER

TAB TEST AND BALANCE

TOD TOP OF DUCT

TYP TYPICAL

V VOLTAGE

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER

VFD VARIABLE FREQUENCY DRIVE

WG WATER GAUGE

MECHANICAL NOTES

1. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF FIELD CONDITIONS PRIOR TO BEGINNING WORK AND ORDERING EQUIPMENT, AND FOR COORDINATING NEW EQUIPMENT DIMENSIONS AND MEANS AND METHODS

FOR INSTALLATION WITH FIELD CONDITIONS.

2. CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH SUBMITTED EQUIPMENT TO ENSURE ALL INLET/OUTLET CONNECTIONS COORDINATE WITH FIELD INSTALLED DUCTWORK AND MAKE ANY NECESSARY DUCT

MODIFICATIONS TO ENSURE PROPER OPERATION OF MECHANICAL EQUIPMENT.

3. SUBMITTALS SHALL MEET SCHEDULED DESIGN CHARACTERISTICS, INCLUDING BUT NOT LIMITED TO CFMS, EAT(DB/WB), ESP, CAPACITIES, VOLTAGES/PHASES, MCA/MOCP, SONES, ETC.

4. ALL DUCT CONSTRUCTION, INSTALLATION, AND SUPPORTS ARE TO COMPLY WITH LATEST EDITION OF SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE DUCT.

5. INSULATE ALL DUCTWORK ACCORDING TO SPECIFICATIONS.

6. ALL WALL-MOUNTED THERMOSTATS AND/OR TEMPERATURE SENSORS SHALL BE INSTALLED AT AN ELEVATION OF 48" ABOVE FINISHED FLOOR TO THE TOP UNLESS OTHERWISE NOTED ON DRAWINGS. LOCATION OF WALL-MOUNTED THERMOSTATS SHALL BE COORDINATED WITH OTHER TRADES FOR A NEAT APPEARANCE. FINAL LOCATION OF THERMOSTATS SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER OR

REPRESENTATIVE IN THE FIELD.

7. ALL SUPPLY AIR DIFFUSERS SHALL BE 4-WAY THROW UNLESS NOTED OTHERWISE. CONTRACTOR SHALL PAINT INSIDE EACH RETURN GRILLE'S PLENUM AND DUCT CONNECTION FLAT BLACK TO CONCEAL CONNECTION.

COORDINATE AIR DEVICE LOCATIONS WITH LIGHTING FIXTURES AND FIRE SPRINKLER HEADS. PRIOR TO INSTALLATION, THE CONTRACTOR IS TO REFER TO THE ARCHITECTURAL REFLECTED CEILING PLAN FOR ACTUAL

FINAL LOCATIONS OF AIR DEVICES.

8. DIFFUSERS/GRILLES SHALL NEVER BE INSTALLED ON SURFACE OF ACOUSTICAL LAY-IN TILE. ALL DIFFUSERS/GRILLES IN LAY-IN CEILINGS SHALL BE LAY-IN PANEL MOUNT. REFER TO SCHEDULE. GYPSUM BOARD

SURFACE MOUNT DIFFUSERS SHALL NOT BE BEVEL MOUNT.

9. CONTRACTOR SHALL COORDINATE DIFFUSER/GRILLE LOCATIONS WITH STRUCTURE IN EXPOSED SITUATIONS IN ORDER TO ENSURE AIR IS NOT DIRECTLY SUPPLIED OR RETURNED OVER STRUCTURE OR OTHER TRADE COMPONENTS SUCH AS FIRE SPRINKLER PIPING, PLUMBING PIPING, ETC., CAUSING DUST ACCUMULATION. DUCTWORK ALONG WITH DIFFUSER/GRILLE LOCATIONS SHALL BE INSTALLED SYMMETRICALLY WITH ANY ADJACENT DUCTWORK/GRILLES. CENTER DIFFUSERS/GRILLES BETWEEN STRUCTURAL MEMBERS WHERE DUCTWORK AND STRUCTURAL MEMBERS ARE EXPOSED. CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL INSTALLATION APPEARANCE AND SHALL MAKE APPROPRIATE CHANGES WHERE DIRECTED BY ARCHITECT/ENGINEER AT THEIR OWN EXPENSE WHERE ITEMS ARE NOT INSTALLED PER ABOVE STANDARDS.

10. CONTRACTOR SHALL PROVIDE A COPY OF THE TEST AND BALANCE REPORT BY AN AABC OR NEBB CERTIFIED AGENCY. THIS REPORT MUST BE REVIEWED AND APPROVED BY THE ENGINEER PRIOR TO THE FINAL INSPECTION. THE CONTRACTOR MUST ALSO PROVIDE ALL REPORTS REQUIRED BY THE SPECIFICATION. OUTDOOR TEMPERATURE (DB); OUTSIDE AIR (DB/WB & CFM); SUPPLY AIR AT UNIT DISCHARGE (DB/WB & CFM);

RETURN AIR {MIXED} (DB/WB & CFM); LEAVING COIL (DB/WB); DIFFUSER/GRILLE (DB/WB); EQUIPMENT (EWT/LWT); EQUIPMENT (EAT/LAT); EQUIPMENT (GPM); EQUIPMENT (PRESSURES). OUTSIDE AIR CFM SHALL BE MEASURED DIRECTLY AND NOT CALCULATED FROM THE DIFFERENCE BETWEEN SUPPLY AIR CFM AND RETURN AIR CFM.

11. CONTRACTOR SHALL MAKE NECESSARY ADJUSTMENTS DURING TEST AND BALANCE AS REQUIRED TO ENSURE EQUIPMENT IS OPERATING WITHIN 10% OF THE SPECIFIED CRITERIA. THIS INCLUDES, BUT IS NOT LIMITED

TO, ADJUSTING BELTS, SHEAVES, PULLEYS, AND IMPELLERS.

12. ALL AIR HANDLING UNITS SHALL BE MECHANICALLY ATTACHED TO OTHER AIR DISTRIBUTION SYSTEM COMPONENTS. AIR HANDLING UNITS LOCATED OUTSIDE THE CONDITIONED SPACE SHALL BE SEALED USING APPROVED CLOSURE SYSTEMS CONFORMING TO THE APPROVED CLOSURE AND MECHANICAL APPLICATION REQUIREMENTS OF INTERNATIONAL BUILDING CODE.

13. ALL DUCTWORK MUST BE INSTALLED 6" AWAY FROM ANY FIRE RATED WALL TO FACILITATE INSPECTION.

14. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL TRADES INSTALLATION SCHEDULES. FIXED WORK SUCH AS DUCTWORK AND PLUMBING SHALL BE INSTALLED PRIOR TO ANY TRADE WORK THAT CAN BE EASILY RELOCATED OR OFFSET SUCH AS ELECTRICAL CONDUITS, SMALL WATER LINES, ETC. IDEALLY DUCTWORK SHALL BE INSTALLED FIRST. CONTRACTOR TO PROVIDE COORDINATION DRAWINGS TO COR PRIOR TO

CONSTRUCTION.

15. PROVIDE A FIRE DAMPER AT EVERY DUCT PENETRATION OF A FIRE-RATED WALL OR CEILING, WHETHER SHOWN ON DRAWINGS OR NOT. ALL FIRE DAMPERS SHALL BE DYNAMIC TYPE WITH BLADES OUTSIDE

AIRSTREAM, UNLESS NOTED OTHERWISE.

16. PROVIDE FIRE, SMOKE, AND COMBINATION FIRE/SMOKE DAMPERS AT EVERY LOCATION WHERE REQUIRED BY SECTION 607.5 OF THE IBC-MECHANICAL OR VA DESIGN MANUALS, WHETHER SHOWN ON DRAWINGS OR NOT. PROVIDE PROPER DAMPER ACTUATION IN ACCORDANCE WITH SECTION 607.3.3 OF THE IBC-MECHANICAL. PROVIDE ACCESS AND IDENTIFICATION IN ACCORDANCE WITH SECTION 607.4 OF THE IBC-MECHANICAL.

17. WHERE SMOKE OR COMBINATION FIRE/SMOKE DAMPERS ARE REQUIRED, THE ELECTRICAL OR FIRE ALARM CONTRACTOR (MECHANICAL CONTRACTOR TO COORDINATE) SHALL PROVIDE 120V POWER AND ENSURE PROPER OPERATION UPON ACTIVATION. PROVIDE PROPER DAMPER ACTUATION IN ACCORDANCE WITH SECTION 607.3.3.2 OF THE IBC-MECHANICAL.

18. PROVIDE A DUCT SMOKE DETECTOR IN THE SUPPLY AIR DUCT, DOWNSTREAM OF THE AIR FILTERS AND AHEAD OF ANY BRANCH CONNECTIONS, FOR ALL SYSTEMS HAVING A DESIGN CAPACITY GREATER THAN 2,000 CFM. DUCT SMOKE DETECTOR SHALL BE PROVIDED AND WIRED BY THE ELCTRICAL CONTRACOTR AND INSTALLED BY THE MECHANICAL CONTRACTOR..

19. PROVIDE DUCT SMOKE DETECTORS WHERE REQUIRED BY SECTION 606.2 AND 607.3.3.2 OF THE IBC-MECHANICAL. LOCATIONS OF DUCT MOUNTED SMOKE DETECTORS SHOWN ON DRAWINGS ARE DIAGRAMMATIC IN LOCATION ONLY. FINAL PLACEMENT OF DETECTORS IN DUCTWORK SHALL MEET THE REQUIREMENTS OF THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. PROVIDE A PRESSURE DIFFERENTIAL TEST AND MANUFACTURER'S TEST KIT. A COPY OF ALL TEST DATA SHALL BE MADE AVAILABLE AT FINAL INSPECTION. PROVIDE A READILY ACCESSIBLE DUCT ACCESS DOOR FOR INSPECTING AND SERVICING EACH DETECTOR.

PROVIDE CEILING/WALL ACCESS PANELS WHERE INSTALLED IN INACCESSIBLE LOCATIONS; ACCESS PANELS IN RATED CONSTRUCTION SHALL BEAR A U.L. LABEL. ELECTRICAL CONTRACTOR SHALL FURNISH AND WIRE DETECTOR, MECHANICAL CONTRACTOR SHALL INSTALL DETECTOR WITHIN THE DUCTWORK. ELECTRICAL OR FIRE ALARM CONTRACTOR (MECHANICAL CONTRACTOR TO COORDINATE) SHALL PROVIDE 120V POWER AND ENSURE PROPER OPERATION FOR EACH DETECTOR. OTHER THAN IN MECHANICAL SMOKE CONTROL SYSTEMS, UPON ACTIVATION, THE ASSOCIATED AIR DISTRIBUTION SYSTEM SHALL SHUT DOWN AND A

SUPERVISORY SIGNAL SHALL BE GENERATED PER SECTION 606.4 OF THE IBC-MECHANICAL.

20. PENETRATIONS FOR PIPES, CONDUITS OR OTHER PURPOSES THROUGH ASSEMBLIES (FLOORS, ROOF, WALLS, PARTITIONS, ETC.) WITH A REQUIRED FIRE RESISTANCE RATING SHALL BE SEALED TO THE PENETRATING MEMBER IN AN APPROVED MANNER WHICH MAINTAINS THE REQUIRED FIRE RESISTANCE RATING OF THE ASSEMBLY.

21. INTENT OF MECHANICAL NOTES ON DRAWINGS IS TO CLARIFY THE SCOPE OF WORK AND ALERT CONTRACTOR OF EXISTING CONDITIONS. CONTRACTOR IS TO VISIT THE SITE AND VERIFY ALL CLEARANCES BEFORE FABRICATION OF DUCTWORK, AND PROVIDE ADDITIONAL OFFSET AND/OR CHANGES IN DUCT SIZES TO MEET FIELD CONDITIONS, AND TO COORDINATE WITH ELECTRICAL, PLUMBING, AND FIRE PROTECTION

SUBCONTRACTORS, BEFORE ANY CONSTRUCTION WORK.

22. FLEXIBLE AND RIGID ROUND DUCT TAKE-OFFS FOR DIFFUSERS SHALL BE THE SAME SIZE AS DIFFUSER NECK. MAXIMUM FLEXIBLE DUCT LENGTH SHALL BE 5'-0".

23. INSTALL DUCTWORK AS HIGH AS POSSIBLE, TIGHT TO BOTTOM OF STRUCTURE, UNLESS NOTED OTHERWISE. COORDINATE DUCT ELEVATIONS WITH RAIN LEADERS, WATER PIPING, SANITARY DRAINS, AND MAJOR

ELECTRICAL CONDUITS.

24. CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTARY STEEL, STRUCTURES, INSERTS, SLEEVES, AND HANGING DEVICES REQUIRED TO INSTALL AND ADEQUATELY SUPPORT MECHANICAL EQUIPMENT AND COMPONENTS IN A MANNER WHICH WILL NOT OVERLOAD BUILDING STRUCTURE. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND ALL BUILDING TRADES TO AVOID CONFLICTS AND TO MAINTAIN EQUIPMENT

ACCESS AND SERVICEABILITY.

25. CONTRACTOR SHALL INSTALL MOTORIZED OUTSIDE AIR DAMPERS FOR ALL AIR HANDLING EQUIPMENT. AIR HANDLING UNITS SHALL HAVE AN EQUIVALENT OR BETTER OF RUSKIN "CD50" DAMPER, WHICH SHALL MODULATE PER 24V ACTUATOR MECHANICALLY WIRED. ALL DAMPERS SHALL CLOSE UPON UNIT SHUTDOWN.

26. PROVIDE A TRAP IN ALL CONDENSATE PIPING LOCATED AT THE AIR HANDLING EQUIPMENT. INSULATE ALL CONDENSATE LINES WITH 1/2" CLOSED CELL FOAM INSULATION. ALL PIPING EXPOSED TO EXTERNAL ELEMENTS

SHALL BE JACKETED WITH UV STABILIZED PVC OR ALUMINUM SHEETING.

27. PROVIDE A 4" HIGH CONCRETE HOUSEKEEPING PAD UNDER ALL MECHANICAL EQUIPMENT, UNLESS NOTED OTHERWISE. PADS SHALL BE 6" LARGER THAN EQUIPMENT ON ALL SIDES.

28. ALL UNDERGROUND PIPING SHALL HAVE A MINIMUM 3'-0" OF COVER, UNLESS NOTED OTHERWISE.

29. IT IS THE RESPONSIBILITY OF THE MECHANICAL INSTALLER TO PATCH AND REPAIR ANY DUCT OPENINGS WHICH RESULT FROM THE RELOCATION OR ELIMINATION OF ANY EXISTING AIR DEVICES. THE PATCH IS TO BE OF A SIMILAR MATERIAL TO THE REPAIRED DUCT AND TO BE SEALED IN ACCORDANCE WITH SMACNA STANDARDS.

30. AIR HANDLING EQUIPMENT WARRANTIES SHALL BE EQUAL TO OR EXCEED WARRANTY OF SCHEDULED EQUIPMENT, UNLESS NOTED OTHERWISE.

31. PROVIDE SEISMIC RESTRAINTS FOR DUCTWORK AND PIPING CONFORMING TO THE LATEST EDITION OF THE "SMACNA GUIDELINES FOR SEISMIC RESTRAINTS OF MECHANICAL SYSTEMS AND PLUMBING SYSTEMS."

32. PROVIDE ADDITIONAL DUCTWORK AND PIPING SUPPORTS ON BOTH SIDES AND WITHIN 18" OF EACH FIRE RATED WALL. DUCTWORK OR PIPING SHALL NOT BE SUPPORTED FROM ANY FIRE RATED WALL.

33. PROVIDE SINGLE WALL TURNING VANES IN ALL RECTANGULAR DUCT ELBOWS WITH ANGLES FROM 45 DEGREES TO 90 DEGREES, EXCEPT FOR TRANSFER AIR ELBOWS. TURNING VANES SHALL BE PROVIDED

ACCORDING TO SMACNA HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE.

34. DUCT DIMENSIONS SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS (FREE AREA).

35. CONTRACTOR SHALL COORDINATE ALL INTAKE/EXHAUST LOCATIONS TO ENSURE MINIMUM 10'-0" DISTANCE BETWEEN ANY INTAKES AND EXHAUSTS, PLUMBING VENTS, RELIEF, ETC.

36. ALL HVAC EQUIPMENT SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS UNLESS INDICATED OTHERWISE.

37. MECHANICAL CONTRACTOR SHALL SIZE AND INSTALL REFRIGERANT PIPING PER MANUFACTURER'S RECOMMENDATIONS. REFRIGERANT PIPING SHALL BE TYPE "L" COPPER WITH SOLDERED OR BRAZED JOINTS AND 1" CLOSED CELL INSULATION. ALL PIPING EXPOSED TO EXTERNAL ELEMENTS SHALL BE JACKETED WITH UV STABILIZED PVC OR ALUMINUM SHEETING. PRE-CHARGED LINES AND SOLDER ON SHORT 90'S ARE NOT ACCEPTABLE. CONTRACTOR SHALL USE SWEEPING 90'S AT EVERY BEND WITH EXCEPTION OF EQUIPMENT CONNECTIONS.

38. CONTRACTOR SHALL PROVIDE A PERMANENT/PROFESSIONAL LABEL FOR EACH PIECE OF EQUIPMENT, ASSOCIATED THERMOSTAT(S) AND/OR SENSOR(S).

39. EQUIPMENT LOCATION IDENTIFICATIONS AT CEILINGS: WHERE VALVES, EQUIPMENT SUCH AS VAV BOXES, FANS, ETC., CIRCUIT BREAKERS, OR OTHER ITEMS SUBJECT TO ROUTINE SERVICE, ARE MOUNTED IN A CONCEALED AREA ABOVE A CEILING, THE CEILING MUST BE MARKED WITH A LABEL UNDER THE SERVICED DEVICE. THE LABEL SHALL CARRY APPROPRIATE IDENTIFICATION TAG.

40. DUCTWORK, DIFFUSERS, REGISTERS, GRILLES, AND OTHER MECHANICAL SYSTEM COMPONENTS SHALL NOT BE SUPPORTED BY THE CEILING OR CEILING SUSPENSION SYSTEM.

41. METAL DUCTWORK SHALL BE CONNECTED TO MECHANICAL EQUIPMENT WITH FLEXIBLE DUCT CONNECTORS EQUAL TO DURO DYNE "SUPER METAL-FAB" WITH EXCELON FABRIC; "GRIP LOC" SEAM; 24 GAGE METAL TABS.

INSULATION SHALL BE INSTALLED OVER METAL TABS AS TO NOT CAUSE FRICTION ON FABRIC.

42. ALL EXHAUST DUCT WORK SHALL BE NON-INSULATED SHEET METAL, UNLESS NOTED OTHERWISE.

43. ALL FLEXIBLE DUCTS SHALL BE LISTED AND LABELED TO UL 181 AND SHALL BE CLASS 0 OR CLASS 1. FLEXIBLE DUCTS SHALL HAVE A MINIMUM RATED AIR VELOCITY OF 4000 FPM, A MINIMUM POSITIVE PRESSURE RATING

OF 4 IN. WG, AND A MINIMUM NEGATIVE PRESSURE RATING OF 1 IN. WG.

44. CONTRACTOR SHALL SUPPLY PIPE SUPPORTS 4'-0" ON CENTERS FOR REFRIGERANT LINES AND CONDENSATE LINES. SUPPORTS SHALL BE PER DETAILS.

45. ALL DOOR UNDERCUTS FOR THE PURPOSE OF BALANCING RETURN AIR SHALL BE MINIMUM 1".

46. ALL CONTROL WIRING SHALL BE INCLUDED AS PART OF MECHANICAL WORK; REFER TO ELECTRICAL SPECIFICATIONS FOR CONDUIT AND WIRING REQUIREMENTS. COORDINATE WITH ELECTRICAL CONTRACTOR TO ENSURE THAT REQUIRED INTERFACE DEVICES ARE PROVIDED WITH ELECTRICAL COMPONENTS (I.E. FAN SPEED RHEOSTATS, AUXILIARY CONTACTS, INTERLOCKS, ETC.).

47. ALL EQUIPMENT DISCONNECTS, WHETHER INTERNALLY MOUNTED OR EXTERNALLY MOUNTED, SHALL BE FURNISHED AND INSTALLED BY MECHANICAL CONTRACTOR, WIRED BY ELECTRICAL CONTRACTOR. IF EXTERNALLY MOUNTED, PROVIDE DISCONNECTING MEANS AT SAME ELEVATION AS EQUIPMENT. REFER TO ELECTRICAL SPECIFICATIONS FOR REQUIREMENTS.

48. MECHANICAL CONTRACTOR SHALL COORDINATE ELECTRICAL CHARACTERISTICS AND REQUIREMENTS OF ALL MECHANICAL EQUIPMENT WITH ELECTRICAL CONTRACTOR BEFORE BIDDING/ORDERING AND

INSTALLATION.

49. WHERE MOTOR SPEED CONTROL IS REQUIRED, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE APPROPRIATE METHOD OF SPEED CONTROL. TYPICALLY, SINGLE PHASE MOTORS REQUIRE SPEED

CONTROLLERS, AND THREE PHASE MOTORS REQUIRE VFD'S.

50. WHERE JOB CONDITIONS REQUIRE CHANGES FROM THE CONTRACT DOCUMENTS THAT DO NOT CHANGE THE SCOPE OR NATURE OF WORK REQUIRED, THE CONTRACTOR SHALL MAKE SUCH CHANGES WITHOUT ADDITIONAL COST TO THE OWNER. NO OTHER CHANGES MAY BE MADE WITHOUT WRITTEN PERMISSION FROM THE ENGINEER.

51. PROVIDE COMMISSIONING FOR ALL MECHANICAL EQUIPMENT ACCORDING TO MECHANICAL SYSTEMS COMMISSIONING AND COMPLETION REQUIREMENTS OF VA SPECIFICATION SECTION 019100 AND INTERNATIONAL

ENERGY CODE 2017 SECTION C408, INCLUDING BUT NOT LIMITED TO:

A. A COMMISSIONING PLAN IN COMPLIANCE WITH SECTION C408.2.1.

B. TESTING, ADJUSTING, AND BALANCING OF SYSTEMS ACCORDING TO C408.2.2.

C. CONDUCT FUNCTIONAL PERFORMANCE TESTING ACCORDING TO C408.2.3.

D. PRELIMINARY COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS PER C408.2.4.

E. PRIOR TO FINAL INSPECTION, PROVIDE RECORD DRAWINGS, OPERATING AND MAINTENANCE MANUALS, SYSTEM BALANCING REPORT, AND FINAL COMMISSIONING REPORT TO THE OWNER ACCORDING TO C408.2.5.

AIR DISTRIBUTION SYMBOLS

LIMIT OF DEMOLITION

(WALL TYPE)

DN

DN

UP

UP

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

SIDEWALL SUPPLY REGISTER OR GRILLE (WALL TYPE)

SIDEWALL EXHAUST OR RETURN REGISTER OR GRILLE

CONNECT NEW DUCT TO EXISTING DUCT

D

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

R

DNUP RETURN DUCT (UP & DOWN)

10ø

FLEXIBLE CONNECTION, EQUIPMENT,

VANED ELBOW (PROVIDE ALL SQUARE OR

RECTANGULAR ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

STANDARD RADIUS ELBOW (LONG RADIUS)

ROUND DUCT

(INSIDE DIMENSIONS: DIAMETER)

EXISTING DUCT TO REMAIN

SMOKE DAMPER

MANUAL VOLUME DAMPER

FLEXIBLE DUCTWORK (INSULATED)

FIRE DAMPER

EXISTING DUCT TO BE REMOVED

VIBRATION

SUPPLY

RETURN45°

RETURN, NO SPLITTER (45° TAP)

STANDARD BRANCH SUPPLY OR

45°

COMBINATION FIRE/SMOKE DAMPER

AIR TERMINAL SYMBOLS

PIPING SYMBOLS

AIR DISTRIBUTION SYMBOLS

D D F S

D

10x8 RECTANGULAR DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

10x8ø OVAL DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

U 1" DOOR UNDERCUT

F D

S D

CONTROLS DEVICE SYMBOLS

SPACE THERMOSTAT - WALL MOUNTT

SPACE TEMPERATURE SENSOR - WALL MOUNTT

SPACE HUMIDITY SENSOR - WALL MOUNTH

SPACE PRESSURE CONTROLLER & DISPLAY - WALL MOUNT

SPACE PRESSURE SENSOR - WALL MOUNTPS

PC

DRAWING SYMBOLS

DRAWING MATCHLINE

MOTORIZED CONTROL DAMPER

AIRFLOW MEASURING DEVICE

M A

F M

DD

DUCT SMOKE DETECTOR PROVIDED AND WIRED BY

ELECTRICAL. INSTALLED BY MECHANICAL.

AIR TERMINAL UNIT

WITH REHEAT COIL

EQUIPMENT ANNOTATIONS

1-ATU27-1

BUILDING NO. WHERE EQUIPMENT IS LOCATED

ITEM (AIR TERMINAL UNIT SHOWN)

ITEM NUMBER (TERMINAL UNIT NO. 1)

SERVED BY AIR HANDLING UNIT NO. 27

AIR TERMINAL UNIT

WITHOUT REHEAT COIL

SQUARE SUPPLY AIR CEILING DIFFUSER

GENERAL PIPING SYMBOLS

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

ECCENTRIC REDUCER

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

UNION

RISE OR DROP IN PIPE

CAPPED OUTLET

PRESSURE GAGE

THERMOMETER

PIPE UP

PIPE DOWN

VALVE SYMBOLS

BALL VALVE

CHECK VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

GATE VALVE

FLEXIBLE CONNECTION

THREE-WAY CONTROL VALVE

QUICK-COUPLE HOSE CONNECTOR

TEST PLUG (PRESSURE/TEMPERATURE)

AUTOMATIC AIR VENT

AV

MANUAL AIR VENT

MV

GATE VALVE WITH 3/4" HOSE ADAPTER

WYE STRAINER (WITH BALL VALVE & HOSE

CONNECTION)

AUTOMATIC FLOW CONTROL VALVE

CALIBRATED BALANCING VALVE

GLOBE VALVE

ANGLE GLOBE VALVE

HOT WATER HEATING SUPPLY

CHILLED WATER SUPPLY

CHILLED WATER RETURN

CONDENSATE DRAIN LINE

HOT WATER HEATING RETURN

HHWS

HHWR

CHWR

CHWS

CD

X EXISTING PIPE TO BE REMOVED

RECTANGULAR EXHAUST AIR CEILING GRILLE

RECTANGULAR RETURN AIR CEILING GRILLE

ACCESS PANEL IN INACCESSIBLE CEILING (24x24, UNO)

MECHANICAL LEGEND

HIGH PRESSURE STEAM - 60 PSI

PUMPED STEAM CONDENSATE

MEDIUM PRESSURE STEAM - 30 PSI

HPS

MPS

PC

STEAM DRIP RETURNDR

STEAM VACUUM RETURNVR

CIRCUIT SETTER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP

550 North Reo Street, Suite 203 Tampa, FL 33609

(813) 289-4700 Nicholas Stephenson, PE

Structural 315 West James Street, Suite 102 Lancaster, PA 17603

(717) 481-2991 Jason Vannoy, SE, PE

Protective Design Specialist 240 West 35th St. Suite 1004 New York, NY 10001

(212) 967-4890 Corrine Tan, SE

Landscape Architect 418 North Toole Avenue Tucson, AZ 85701

(520) 622-9565 Josh Orth., PLA

B

IM

/6

-3

N e w

C o m m u n it y L iv in g C e n te r/

M

E P

V

A M o n tr o s e C

L C

R

.r v t

/2

/2

:3

:3

P

M

M-001

NOTES AND LEGEND - HVAC

TRIPLE C - The A/E Group

201 E. Jefferson Street, Suite 200

Syracuse, NY 13202

(315) 484-5958

Mat Perkins

620-334

CLC

07/21/2021 CJF/NPS NS

NEW COMMUNITY LIVING

CENTER

2094 Albany Post Road, Montrose, NY 10548

ISSUED FOR

CONSTRUCTION

DRAWING INDEX - HVAC

M-001 NOTES AND LEGEND - HVAC

M-002 SCHEDULES - HVAC

M-003 SCHEDULES - HVAC

MH100 MECHANICAL FLOOR PLAN - BASEMENT

MH101 MECHANICAL OVERALL PLAN - LEVEL 1

MH101A MECHANICAL FLOOR PLAN - LEVEL 1 - AREA A

MH101B MECHANICAL FLOOR PLAN - LEVEL 1 - AREA B

MH102 MECHANICAL FLOOR PLAN - PENTHOUSE

MH102A MECHANICAL FLOOR PLAN - PENTHOUSE - AREA A

MH102B MECHANICAL FLOOR PLAN - PENTHOUSE - AREA B

MH201A MECHANICAL AIRFLOWS PLAN - LEVEL 1 - AREA A

MH201B MECHANICAL AIRFLOWS PLAN - LEVEL 1 - AREA B

MH301 MECHANICAL SECTIONS

MH401 ENLARGED VIEWS - HVAC

MH402 ENLARGED VIEWS - HVAC

MH403 ENLARGED VIEWS - HVAC

MP101 MECHANICAL OVERALL PIPING PLAN - LEVEL 1

MP101A MECHANICAL PIPING PLAN - LEVEL 1 - AREA A

MP101B MECHANICAL PIPING PLAN - LEVEL 1 - AREA B

MP102 MECHANICAL PIPING PLAN - PENTHOUSE

M-501 DETAILS - HVAC

M-502 DETAILS - HVAC

M-503 DETAILS - HVAC

M-504 DETAILS - HVAC

M-601 CONTROLS - HVAC

M-602 CONTROLS - HVAC

M-603 CONTROLS - HVAC

M-604 CONTROLS - HVAC

Revisions: Date: 7/21/2021

STAMP

05/09/20225/09/2022

(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXCERCISED

IN THE ORDER PRESENTED) FOR A DETAILED DESCRIPTION OF EACH

DEDUCTIVE ALTERNATE REFR TO COVER SHEET ON GI000

DEDUCTIVE ALTERNATE #2 : ELIMINATE TUNNEL (EAST LEG).

DEDUCTIVE ALTERNATE #6 : REDUCE PLATFORM AT CHILLER

DEDUCTIVE ALTERNATE NOTES

EQUIPMENT MEETING OR EXCEEDING THE BASIS OF DESING LISTED

BELOW MAY BE SUBMITTED. BASIS OF DESIGN MANUFACTUERER

ASHBERRY, EQUIPMENT MODELS LISTED BELOW

ACA-10G-1 SINGLE CARBON FILTER SYSTEM

Qty (1) 10" Diameter x 54" FRP Pressure Vessels Non-Code Pressure Vessel, 150 psig Rating 1 ft³ Carbon Filtration Media Washed Gravel Sub-Fill for Media Support 1" Fleck Model 2750 Top-Mounted Control Valves for Automatic Operation Automatic Backwash Flow Controller (6 gpm) Pentair 3200 12-Day Calendar Clock Controller RO Lockout switch 120V/1Ph/60Hz Electrical Power Rating Estimated Shipping Weight, lbs: 165

MAT-45M-1 TWIN ALTERNATING SOFTENER SYSTEM

Qty (2) 10" Diameter x 54" FRP Pressure Vessels Non-Code Pressure Vessels, 150 psig Rating

1.5 ft³ Softening Resin Per Vessel (45,000 grains Capacity Per Vessel) 1" Fleck Model 9100 Top-Mounted Control Valves for Automatic Operation Pentair 'SXT' digital display electronic timer 120/24 VAC, 60 Hz Electrical Power Rating Alternating Flow Control Configuration for Continuous Treated Water Supply Qty (1) Fleck Noryl Inline Paddlewheel-Type Flow Sensor(s) for Volume Initiated Regeneration Cycle Qty (1) 18" x 40" Polyethylene Brine Storage Tank Assembly with Salt Shelf and Safety Overflow Valve Water Hardness Testing Kit Estimated Shipping Weight, lbs: 265

MRO-2500-2.5 SINGLE REVERSE OSMOSIS SYSTEM

2,500 gpd Nominal Product Output from the RO Machine (1.75 gpm @ 77° F) Powder-coated steel wall-mount bracket Pump, 0.75 HP, brass, 120 VAC, 1-Ph, 60 Hz Polypropylene Cartridge Type Sediment Prefilter Housing (5-micron) Polypropylene Cartridge Type Carbon Prefilter Housing Qty (3) FRP Membrane Housings Qty (3) Thin-Film Composite Low Pressure Membrane Elements (2.5" x 40") Polyethylene interconnecting tubing Panel Mounted RO Permeate, Concentrate and Recycle Flow Meters Panel Mounted Pressure Gauges Concentrate and Recycle Flow Control Valves Automatic Inlet Feed Valve Low Inlet Pressure Switch with Shut-Down Estimated Shipping Weight, lbs: 115

TANK ASSY RO 160 GAL TITAN 3/4HP

160 gals of RO Storage 26" x 68" Flat Bottomed Polyethylene tank Tank Comes Complete w/Inlet and Outlet Bulkhead Fittings Installed Qty (1) 304SS Single Stage Centrifugal Pump (5 gpm @ 40 psi) 120 VAC, 1 Phase, 60 Hz, 3/4 HP TEFC Motor Integral Bladder on Pump Qty (2) Single Pull Double Throw Level Switches to Control RO Pump & Transfer Pump Approximate Shipping Weight, lbs: 96

CSG WATER TREATMENT

FT-B:

PROVIDE 12" DIAMTER BY 24" LONG HORIZONTAL FLASH TANK.

PRVODIE A 3" VENT OUT, A 2-1/2" PIPE IN, AND 1-1/2" PIPE OUT. REFER

TO DETAIL FOR MORE INFORMATION.

FLASH TANK SPECIFICATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP

550 North Reo Street, Suite 203 Tampa, FL 33609

(813) 289-4700 Nicholas Stephenson, PE

Structural 315 West James Street, Suite 102 Lancaster, PA 17603

(717) 481-2991 Jason Vannoy, SE, PE

Protective Design Specialist 240 West 35th St. Suite 1004 New York, NY 10001

(212) 967-4890 Corrine Tan, SE

Landscape Architect 418 North Toole Avenue Tucson, AZ 85701

(520) 622-9565 Josh Orth., PLA

B

IM

/6

-3

N e w

C o m m u n it y L iv in g C e n te r/

M

E P

V

A M o n tr o s e C

L C

R

.r v t

/2

/2

:3

:4

P

M

M-002

SCHEDULES - HVAC

TRIPLE C - The A/E Group

201 E. Jefferson Street, Suite 200

Syracuse, NY 13202

(315) 484-5958

Mat Perkins

620-334

CLC

07/21/2021 CJF/NPS NS

NEW COMMUNITY LIVING

CENTER

2094 Albany Post Road, Montrose, NY 10548

ISSUED FOR

CONSTRUCTION

DUCTLESS SPLIT SYSTEM SCHEDULE

MARK MANUFACTURER

MODEL

NUMBER

TYPE

TOTAL

COOLING

CAPACITY *

SEER * AIR FLOW

ELECTRICAL DATA

CONDENSATE

DRAIN SIZE

REFRIGERANT

TYPE

UNIT

WEIGHT

REMARKS

VOLTAGE PHASE MCA MOCP

DSSI-01 MITSUBISHI FE12NA

INDOOR UNIT;

WALL MOUNTED

12,000 Btu/h 0 350 CFM 208 V 1 0 A 0 A 1 1/2" R-410A 27 lb 1-8

DSSO-01 MITSUBISHI MUZ-FE12NA

OUTDOOR UNIT;

HEAT PUMP

12,000 Btu/h 24.6 0 CFM 0 V 1 9 A 15 A 0" R-410A 80 lb 1,2,3,4,8

* COOLING PERFORMANCE AT AHRI RATING CONDITIONS OF 95 °Fdb OUTSIDE AIR, 80 °Fdb / 67 °Fwb ENTERING AIR TEMPERATURE.

NOTES:

1. REFRIGERANT PIPING SHALL BE SIZED BY MANUFACTURER. PROVIDE ALL ASSOCIATED COMPONENTS AND ACCESSORIES RECOMMENDED BY MANUFACTURER.

2. COORDINATE INSTALLATION OF EQUIPMENT TO PROVIDE REQUIRED CLEARANCES.

3. PROVIDE ALL REQUIRED INTERFACES, THERMOSTAT, SUB-COMPONENTS, AND SENSORS FOR A COMPLETE INSTALLATION AND INTERFACE WITH BUILDING AUTOMATION SYSTEM.

4. INDOOR UNIT RECEIVES POWER FROM OUTDOOR UNIT.

5. PROVIDE UNIT WITH WASHABLE FILTER.

6. PROVIDE WITH CONDENSATE PUMP, RESERVOIR, AND DRAIN PAN LEVEL SENSOR WITH CONTROL TO SHUT UNIT OFF PRIOR TO DRAIN PAN OVERFLOW. PROVIDE CHECK VALVE AT CONDENSATE

OUTLET.

7. PROVIDE BACKLIT, WIRED, WALL-MOUNT REMOTE CONTROLLER.

8. DISCONNECT TO BE PROVIDED BY MECHANICAL CONTRACTOR AND WIRED BY ELECTRICAL CONTRACTOR.

NOTES:

1. PROVIDE WITH PRE-WIRED DISCONNECT SWITCH. PROVIDED BY MECHANICAL, WIRED BY ELECTRICAL.

2. PROVIDE GRAVITY BACKDRAFT DAMPER.

3. PROVIDE ALUMINUM BIRDSCREEN AT EXTERIOR WALL OR ROOF PENETRATION.

4. PROVIDE WITH VFD.

5. PROVIDE THERMAL OVERLOAD MOTOR PROTECTION.

6. PROVIDE WITH FABRICATED ROOF CURB.

7. PROVIDE WITH SPRING ISOLATOR KIT.

8. INTERLOCK FAN WITH ASSOCIATED AHU.

EXHAUST/RELIEF FAN SCHEDULE

MARK TYPE SERVICE AIR FLOW

EXTERNAL

STATIC

PRESSURE

FAN

SPEED

(RPM)

FAN

MOTOR

POWER

MOTOR

SPEED

(RPM)

FAN

DRIVE

SOUND

LEVEL

(SONES)

ELECTRICAL BASIS OF DESIGN

REMARKS

VOLTAGE PHASE MANUFACTURER MODEL NUMBER

EF-01 ROOF DOWNBLAST

AH01;

GENERAL

2610 CFM 1.00 in-wg 1286 2 hp 1725 DIRECT 16.0 208 V 1 GREENHECK G-163-VG 1-8

EF-02 ROOF DOWNBLAST

AH02;

GENERAL

2860 CFM 1.00 in-wg 1341 2 hp 1725 DIRECT 17.0 208 V 1 GREENHECK G-163-VG 1-8

RF-2-01 MIXEDFLOW - HORIZONTAL

AH01 -

RETURN

8875 CFM 1.00 in-wg 1770 5 hp 1770 DIRECT 31.0 208 V 3 GREENHECK QEID-22-60 1-2,5,7-8

RF-2-02 MIXEDFLOW - HORIZONTAL

AH02 -

RETURN

9320 CFM 1.00 in-wg 1770 3 hp 1170 DIRECT 31.0 208 V 3 GREENHECK QEID-24-75 1-2,5,7-8

NOTES:

1. PROVIDE MODULAR, HORIZONTAL DRAW-THROUGH UNIT WITH VERTICAL DISCHARGE. PROVIDE UNIT WITH HINGED ACCESS DOORS. PROVIDE ACCESS SECTION AFTER COOLING COIL FOR COIL CLEANING.

2. PROVIDE MODULATING ELECTRONIC CONTROL VALVE ON RETURN LINE FOR EACH HYDRONIC COIL.

3. PROVIDE UNIT WITH 6" BASE RAIL FACTORY CONNECTED (LEGS NOT ACCEPTABLE) AND EXTENDING THE ENTIRE LENGTH OF UNIT. ENSURE THAT PROPER RISE IS PROVIDED FOR CONDENSATE P-TRAP.

4. PROVIDE WITH 2 SETS OF FILTERS. AT PROJECT COMPLETION, INSTALL NEW FILTERS IN UNIT AND PROVIDE ONE EXTRA SET OF FILTERS FOR OWNER. UNITS SHALL NOT BE RUN WITHOUT SCHEDULED FILTERS IN PLACE.

5. PROVIDE UNIT-MOUNTED VFD, WITH SOFT START, MANUAL BYPASS SWITCH, SURGE PROTECTION, AND FUSED DISCONNECT.

6. ALL MOTORS SHALL BE PREMIUM EFFICIENCY, COMPATIBLE WITH VARIABLE FREQUENCY DRIVE OPERATION.

7. COORDINATE INSTALLATION OF EQUIPMENT TO PROVIDE ACCESS FOR MAINTENANCE AND FILTER REPLACEMENT.

8. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF FIELD CONDITIONS AND COORDINATING EQUIPMENT DIMENSIONS AND INSTALLATION WITH FIELD CONDITIONS.

9. FOR ALL SYSTEMS WITH DESIGN SUPPLY AIR GREATER THAN 2000 CFM, PROVIDE A DUCT SMOKE DETECTOR IN THE SUPPLY AIR DUCT, DOWNSTREAM OF THE AIR FILTERS AND AHEAD OF ANY BRANCH CONNECTIONS.

CHILLED WATER AIR HANDLER SCHEDULE

MARK MODEL

PLENUM SUPPLY FAN DATA PREHEAT COIL DATA COOLING COIL DATA HUMIDIFIER

AIR FILTER

DATA

SHIPPING

WEIGHT

OPERATING

WEIGHTEXPANSION

AIRFLOW

QTY

DESIGN

AIRFLOW

DESIGN OA

AIRFLOW

ESP TSP

HP

(EACH)

VOLTAGE

SYSTEM

TYPE

FACE

AREA

FACE

VELOCITY

ROWS EAT DB LAT DB

GPM

TOTAL

CAPACITY

EWT LWT

SYSTEM

TYPE

FACE

AREA

FACE

VELOCITY

ROWS EAT DB EAT WB LAT DB LAT WB

TOTAL

CAPACITY

SENSIBLE

CAPACITY

EWT LWT

STEAM

PRESSURE

STEAM FLOW

RATE EAT DB ENTERING RH LEAVING RH

CONDENSATE

FLOW RATE

2-AH01 CSAA025 12290 CFM 1 12290 CFM

4450 CFM

3.00 in-wg 6.23 in-wg 25 hp 208 V Hot water 24.74 SF 500 FPM 1 40 °F 70 °F

44 GPM

401,670 Btu/h 180 °F 160 °F Chilled water 24.74 SF 500 FPM 6 81 °F 66 °F 52 °F 52 °F 518,580 Btu/h 392,201 Btu/h 44 °F 56 °F 15 psig 129.98 lb/hr 60 15% 35% 17.95 lb/hr 4" high eff - 95% eff - MERV 14 3,822 lb 3,961 lb

2-AH02 CSAA025 12605 CFM 1 12605 CFM

4180 CFM

3.00 in-wg 6.24 in-wg 25 hp 208 V Hot water 24.74 SF 500 FPM 1 40 °F 70 °F

44 GPM

402,026 Btu/h 180 °F 160 °F Chilled water 24.74 SF 500 FPM 6 81 °F 66 °F 52 °F 52 °F 519,420 Btu/h 392,839 Btu/h 44 °F 56 °F 15 psig 225.35 lb/hr 60 15% 50% 17.97 lb/hr 4" high eff - 95% eff - MERV 14 3,822 lb 3,961 lb

PACKAGED AIR COOLED CHILLER SCHEDULE

MARK

ELECTRICAL FULL LOAD

CAP.

IPLV EWT LWT

PUMPING PACKAGE OPER.

WEIGHT

BASIS OF DESIGN SHIP

WEIGHTFREQ. VOLT. PHASE EER PD FLOW RATE MANUFACTURER MODEL

CH-1 60 Hz 208 V 3 10.302 1169640.0

Btu/h

15.192 54 °F 44 °F 5.26 psi 233 GPM 6 lb

Trane CGAM100 6 lb

CH-2 60 Hz 208 V 3 10.302 1169640.0

Btu/h

15.192 54 °F 44 °F 5.26 psi 233 GPM 6 lb

Trane CGAM100 6 lb

STEAM-TO-HOT WATER HEAT EXCHANGER SCHEDULE

MARK LOCATION SYSTEM TYPE

WATER CONDITIONS STEAM PRESSURE CONTROL VALVE STEAM TRAP ELECTRICAL INFO BASIS OF DESIGN

REMARKS

GPM EWT LWT

MAX PD

(PSI)

ENT CONTROL

VALVE

ENT HX

FOULING

FACTOR

SIZE LBS/HR TRAP # SIZE CAPACITY

QTY

CONNECTIONS

VOLTAGE PHASE MCA MOCP MANUFACTURER MODEL

HX-01

144 -

MECHANICAL

HYDRONIC

WATER

SHELL AND

TUBE

150 GPM 160 °F 180 °F 0.2 30 psi 30 psi 0 2 1/2" 1508 ST-B-3 0' - 0 9/16" 3016

120 V 1 4 A 15 A CEMLINE

HTP848EX-S-D

-SKID

1,2,3,5,6,7

HX-02

144 -

MECHANICAL

DOMESTIC

HOT WATER

SHELL AND

TUBE

50 GPM 47 °F 180 °F 15 30 psi 30 psi 0 2" 3581 ST-B-4 0' - 1 5/8" 7162

120 V 1 4 A 15 A CEMLINE

10SEH1030-D

W

1-8

NOTES:

1. PROVIDE SKID MOUNTED, PRE-WIRED, DUPLEX PACKAGE SYSTEM COMPLETE WITH ASME 150 PSIG DUAL CARBON STEEL SHELL AND COPPER TUBE HEAT EXCHANGERS, DUPLEX CONTROL PANEL WITH DISCONNECTS.

2. PROVIDE WITH SKID MOUNTED ACCESSORIES INCLUDING EXPANSION TANK, AIR VENT.

3. INCLUDE ALL INTERCONNECTING PIPING AND ACCESSORIES INCLUDING TRAP, SERVICE AND STOP VALVES, CHECK VALVES, FLEXIBLE CONNECTORS, PRESSURE GAUGES, INLET AND OUTLET THERMOMETERS, AND ALL OTHER RELATED AND REQUIRED

COMPONENTS FOR A COPMLETE WORKING SYSTEM.

4. PROVIDE MIXING VALVE TO DISCHARGE 140F HOT WATER.

5. REFER TO DETAILS AND CONTROL DIAGRAMS

6. SYSTEM IS TO BE DESIGNED FOR 100% REDUNDANCY.

7. PROVIDE WITH INTEGRAL STEAM TRAPS.

8. LWT SHOWN IS NORMAL OPERATING TEMPERATURE. UNIT SHALL BE CAPABLE OF PROVIDING 180 DEG F LWT FOR THERMAL ERADICATION PURPOSES.

NOTES:

1. DISCONNECT PROVIDED AND INSTALLED BY MECHANICAL, WIRED BY ELECTRICAL.

2. PROVIDE WITH VFD CONTROL FOR EACH PUMP.

3. PROVIDE EQUIPMENT PAD WITH VIBRATION ISOLATION.

4. REFER TO DETAILS FOR MORE INFORMATION.

5. INSTALL VIBRATION ISOLATION BASE PER TO DETAIL 7 ON SHEET M-501.

HYDRONIC WATER PUMP SCHEDULE

MARK LOCATION AREA SERVED TYPE

CIRCULATING FLUID ELECTRICAL DATA BASIS OF DESIGN

NOTES

FLUID GPM TOTAL HEAD

NPSH

AVAILABLE

TEMPERATURE MOTOR POWER VOLTAGE PHASE RPM

SPEED

CONTROL

MANUFACTURE

R

MODEL

NUMBER

CWP-1

MECHANICAL

PENTHOUSE

CLC - BLDG XX END SUCTION CHILLED WATER 235 GPM 50 ftH2O 5 ftH2O 56 °F 7.500 hp 208 V 1 1800 VFD

BELL &

GOSSETT

2.5 BB 1-5

CWP-2

MECHANICAL

PENTHOUSE

CLC - BLDG XX END SUCTION CHILLED WATER 235 GPM 50 ftH2O 5 ftH2O 56 °F 7.500 hp 208 V 1 1800 VFD

BELL &

GOSSETT

2.5 BB 1-5

HWP-1

MECHANICAL

ROOM

CLC - BLDG XX END SUCTION

HEATING HOT

WATER

150 GPM 50 ftH2O 5 ftH2O 160 °F 5.000 hp 208 V 1 1800 VFD

BELL &

GOSSETT

2 BD 1-5

HWP-2

MECHANICAL

ROOM

CLC - BLDG XX END SUCTION

HEATING HOT

WATER

150 GPM 50 ftH2O 5 ftH2O 160 °F 5.000 hp 208 V 1 1800 VFD

BELL &

GOSSETT

2 BD 1-5

NOTES:

1. PROVIDE WITH 136 GALLON CHILLED WATER BAFFLED STORAGE TANK ACCESSORY WITH ELECTRIC TANK

HEATERS AND THERMOSTAT CONTROL.

2. PROVIDE WITH FACTORY INSTALLED EVAPORATOR HEATER FREEZE PROTECTION.

3. PROVIDE HEAT TAPE INSULATION ON ALL EXPOSED PIPING.

4. PROVIDE WITH SINGLE POINT POWER CONNECTION AND UNIT MOUNTED NON-FUSED DISCONNECT.

5. PROVIDE WITH DIGITAL COMPRESSOR

6. PROVIDE WITH ALL NOISE REDUCTION PACKAGES.

7. PROVIDE WITH FACTORY VIBRATION ISOLATION PACKAGE.

8. PROVIDE WITH CONTROLS CAPABLE OF STAND ALONE OPERATION AND INTERFACE WITH NIAGARA SYSTEM.

AIR DEVICE SCHEDULE

MARK

BASIS OF DESIGN

TYPE

AIRFLOW PANEL

SIZE (IN.)

NECK SIZE

(IN.)

NOTES

MANUFACTURER MODEL MIN. MAX.

CD-11 PRICE ASPD PLAQUE FACE 40 CFM 85 CFM 12x12 6ø

CD-12 PRICE ASPD PLAQUE FACE 90 CFM 185 CFM 12x12 8ø

CD-21 PRICE ASPD PLAQUE FACE 40 CFM 85 CFM 24x24 6ø

CD-22 PRICE ASPD PLAQUE FACE 90 CFM 185 CFM 24x24 8ø

CD-23 PRICE ASPD PLAQUE FACE 190 CFM 345 CFM 24x24 10ø

CD-24 PRICE ASPD PLAQUE FACE 350 CFM 475 CFM 24x24 12ø

EG-11 PRICE 630

LOUVERED, FIXED FACE

EXHAUST GRILLE

40 CFM 95 CFM 12x12 6x6

EG-12 PRICE 630

LOUVERED, FIXED FACE

EXHAUST GRILLE

100 CFM 195 CFM 12x12 8x8

EG-22 PRICE 630

LOUVERED, FIXED FACE

EXHAUST GRILLE

100 CFM 195 CFM 24x24 8x8

RG-11 PRICE 630

LOUVERED, FIXED FACE

RETURN GRILLE

40 CFM 95 CFM 12x12 6x6

RG-21 PRICE 630

LOUVERED, FIXED FACE

RETURN GRILLE

40 CFM 95 CFM 24x24 6x6

RG-22 PRICE 630

LOUVERED, FIXED FACE

RETURN GRILLE

100 CFM 195 CFM 24x24 8x8

RG-23 PRICE 630

LOUVERED, FIXED FACE

RETURN GRILLE

200 CFM 295 CFM 24x24 10x10

RG-24 PRICE 630

LOUVERED, FIXED FACE

RETURN GRILLE

300 CFM 500 CFM 24x24 12x12

SD-1 PRICE 620 SURFACE 0 CFM 0 CFM N/A 10x6

SD-2 PRICE 620 SURFACE 0 CFM 0 CFM N/A 20x6

SD-3 PRICE 630 SURFACE 0 CFM 0 CFM N/A 14x6

SD-4 PRICE 630 SURFACE 0 CFM 0 CFM N/A 20x10

SD-5 PRICE 620 SURFACE 0 CFM 0 CFM N/A 10x8

SG-1 PRICE 630 SURFACE 0 CFM 0 CFM NA 16x8

SG-2 PRICE 630 SURFACE 0 CFM 0 CFM NA 40x24

SG-3 PRICE 630 SURFACE 0 CFM 0 CFM NA 20x14

SGE-1 PRICE 630 SURFACE 0 CFM 0 CFM NA 10x6

NOTES:

1. BASIS OF DESIGN EQUIPMENT WITH REQUIRED PERFORMANCE CHARACTERISTICS IS SCHEDULED.

OTHER MANUFACTURERS ARE ACCEPTABLE; HOWEVER EQUIPMENT NOT MEETING EQUIVALENT

CRITERIA CANNOT BE CONSIDERED.

2. NECK SIZE AS INDICATED. RUNOUT BRANCH DUCTS SHALL BE THE SAME SIZE AS INDICATED NECK

SIZE. PROVIDE TRANSITION IF NECESSARY.

3. PROVIDE VOLUME DAMPER INSTALLED IN BRANCH DUCT SERVING EACH DIFFUSER.

4. PROVIDE ALL REQUIRED ACCESSORIES FOR A COMPLETE INSTALLATION.

5. PROVIDE EXHAUST GRILLES LOCATED IN HARD CEILINGS WITH BALANCING DAMPER ADJUSTABLE AT

FACE OF GRILLE.

STEAM CONDENSATE PUMP SCHEDULE

MARK LOCATION

SYSTEM SERVED

TYPE

GPM EACH

PUMP

DISCHARGE

PRESSURE

MAIN RECEIVER

SIZE

MOTOR

REMARKS

HP EACH VOLTAGE PHASE

CRU-1 BASEMENT

HEAT EXCHANGERS,

MAIN, PRESSURE

REDUCING STATION

DUPLEX 75 GPM 20.00 psi 65.0 gal 1.50 hp 208 V 3 1-7

CRU-2 PENTHOUSE

CLEAN STEAM

GENERATOR PLANT SIDE

CONDENSATE

DUPLEX 3 GPM 10.00 psi 15.0 gal 0.34 hp 208 V 3 1-7

CRU-3 PENTHOUSE

CLEAN STEAM

GENERATOR PLANT SIDE

CONDENSATE

DUPLEX 3 GPM 10.00 psi 15.0 gal 0.34 hp 208 V 3 1-7

NOTES:

1. PROVIDE WITH UL LISTED CONTROL PANEL MOUNTED AND WIRED WITH LIQUID TIGHT CONDUIT. PANEL TO INCLUDE 2 FUSED DISCONNECT AND COVER, INTERLOCK WITH EACH MOTOR, HOA SELECTOR, NUMBERED TERMINAL STRIP, TWO PUMP RUNNING PILOT LIGHTS, CONTROL POWER SWITCHING RELAY.

2. PROVIDE WATER LEVEL GAUGE WITH SHUTOFF VALVE.

3. PROVIDE CAST IRON RECEIVER WARRANTED FOR 20 YEARS.

4. PROVIDE HIGH LEVEL ALARM WITH SILENCING RELAY.

5. PROVIDE WITH EQUIPMENT PAD IF NEEDED.

6. REFER TO DETAILS FOR ADDITIONAL REQUIREMENTS AND INFORMATION.

7. PROVIDE WITH CONTROLS CAPABLE OF STAND ALONE OPERATION AND INTERFACE WITH FACILITY NIAGARA AND BACNET SYSTEMS.

STEAM TRAP SCHEDULE

MARK

EQUIPMENT

EQUIPMENT STEAM

CONDITIONS

STEAM TRAP

NOTES

EQUIPMENT SERVED

LOCATION

(AREA)

DEMAND

(#/HR)

PRESSURE

(PSI)

CAPACITY

(#/HR)

MINIMUM

DIFFERENTIAL

PRESSURE

MAXIMUM

DIFFERENTIAL

PRESSURE

PIPE

CONNECTION

SIZE

STEAM TRAP TYPE

ST-B-1 60 PSI STEAM MAIN SUPPLY BASEMENT 98 60 294 2 60 3/4" THERMODYNAMIC 1,2

ST-B-2

60 PSI SIDE PRESSURE REDCING

STATION

BASEMENT 6 60 17 2 60 3/4" THERMODYNAMIC 1,2

ST-B-3 HEATING HOT WATER HX BASEMENT 1508 30 3016 2 30 2"

FLOAT AND

THERMOSTATIC

1,2

ST-B-4 DOMESTIC WATER HX BASEMENT 3581 30 7162 2 30 2-1/2"

FLOAT AND

THERMOSTATIC

1,2

ST-B-5

30 PSI SIDE PRESSURE REDCING

STATION

BASEMENT 4 60 13 2 30 3/4" THERMODYNAMIC 1,2

ST-B-6 30 PSI STEAM MAIN SUPPLY BASEMENT 8 30 24 2 60 3/4" THERMODYNAMIC 1,2

ST-B-7 PRESSURE REDCING STATION BASEMENT 3 30 9 2 30 3/4" THERMODYNAMIC 1,2

ST-B-8 FLASH TANK BASEMENT 4772 30 14317 2 30 2-1/2" THERMODYNAMIC 1,2

ST-P-1

CLEAN STEAM GENERATOR

(PLANT SIDE)

PENTHOUSE 504 30 1512 2 30 3/4"

FLOAT AND

THERMOSTATIC

1,2

ST-P-2 2-AHU02 HUMIDIFIER PENTHOUSE 18 15 54 2 15 3/4"

FLOAT AND

THERMOSTATIC

1,2

ST-P-3 2-AHU01 HUMIDIFIER PENTHOUSE 18 15 54 2 15 3/4"

FLOAT AND

THERMOSTATIC

1,2

ST-P-4 15 PSI STEAM MAIN PENTHOUSE 4 15 12 2 15 3/4" THERMODYNAMIC 1,2

NOTES:

1. PROVIDE ALL REQUIRED FITTINGS AND ACCESSORIES FOR A PROPERLY OPERATING SYSTEM.

2. PROVIDE WITH CYPRESS ENVIROSYSTEMS WIRELESS STEAM TRAP MONITOR (WSTM-100) AND TIE-IN TO EXISTING CYPRESS WIRELESS STEAM TRAP MONITORING

SYSTEM.

LOUVER SCHEDULE

vv TYPE

AIR FLOW VELOCITY

MAX AIR

PRESSURE

DROP

SIZE FREE AREA

BASIS OF DESIGN

NOTES

MANUFACTURER

MODEL

NUMBER

OAL-1 INTAKE 24895 CFM 960 FPM 0.17 in-wg 138x48 26.00 SF GREENHECK EVH-501D 1,2

RL-1 EXHAUST 24895 CFM 830 FPM 0.11 in-wg 102x72 30.10 SF GREENHECK EVH-501D 1,2

CLEAN STEAM GENERATOR SCHEDULE

MARK LOCATION SYSTEM SERVED

INLET WATER

FLOW RATE

(GPM)

PLANT STEAM

SUPPLY

PRESSURE

STEAM INLET

DIAMATER

CLEAN STEAM

OUTPUT RATE (lb/hr)

STEAM

PRESSURE

PLANT STEAM

FLOW RATE

(lb/hr)

STEAM TRAP

NUMBER

POWER

NOTESVOLTS PHASE

2-CSG01 PENTHOUSE AHU HUMIDIFIERS 3.5 30 psi 1 1/2" 360 15 psi 504 ST-P-1 120 1 1-5

STEAM PRESSURE REDUCING STATION

MARK LOCATION SYSTEM SERVED VALVE SIZE

REQUIRED

CAPACITY (lb/hr) PRESSURE IN

PRESSURE

OUT REMARKS

PRV-1

BASEMENT HEAT

EXCHANGERS &

CLEAN STEAM

GENERATOR

1 1/2" 5595 60.00 psi 30.00 psi

NOTES:

1. PROVIDE WITH UL LISTED CONTROL PANEL MOUNTED AND WIRED WITH LIQUID TIGHT CONDUIT.

2. PROVIDE WITH EQUIPMENT PAD.

3. PROVIDE WITH CONTROLS CAPABLE OF STAND ALONE OPERATION AND INTERFACE WITH NIAGARA AND BACNET SYSTEMS.

4. PROVIDE WITH POINT-OF-USE REVERSE OSMOSIS FILTER STATION CAPABLE OF SUPPLYING 1400 GALLONS OF TREATED WATER PER DAY. REFER TO CSG WATER TREATMENT NOTES ON THIS

SHEET FOR MORE INFORMATION.

5. PROVIDE WITH CLEAN STEAM SIDE CONDESATE COOLER.

NOTES:

1. PROVIDE WITH BAKED ENAMEL FINISH. COORDINATE WITH ARCHITECT FOR FINAL PAINT COLOR.

2. PROVIDE WITH BIRDSCREEN, INSECT SCREEN AND ALL OTHER ACCESSORIES REQUIRED FOR A COMPLETE INSTALLATION.

Revisions: Date: 7/21/2021

STAMP

DESIGN CONDITIONS

DESIGN CONDITIONS

SUMMER WINTER

TEMPERATURE

RELATIVE

HUMIDITY

TEMP

RELATIVE

HUMIDITY

°Fdb °Fwb % °Fdb %

OUTDOOR DESIGN

CONDITIONS

91 77 53 43 NA

OUTDOOR

DEHUMIDIFICATION

DESIGN CONDITION

88 80 71 43 NA

INDOOR AREA TEMPERATURE/HUMIDITY SETPOINTS

CLASSROOMS /

CONFERENCE ROOMS

75 63 50 70 30

CORRIDORS 75 63 50 70 30

COMMUNICATION

ROOMS

77 64 50 - -

LOUNGES 75 63 50 70 30

ELECTRICAL ROOMS 86 66 50 - -

OFFICES 75 63 50 70 30

TOILETS 77 64 50 70 30

WAITING AREAS 75 63 50 70 30

ALL OTHER SPACES 75 63 50 70 30

DATA CENTER 70 60 55 65 30

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP

550 North Reo Street, Suite 203 Tampa, FL 33609

(813) 289-4700 Nicholas Stephenson, PE

Structural 315 West James Street, Suite 102 Lancaster, PA 17603

(717) 481-2991 Jason Vannoy, SE, PE

Protective Design Specialist 240 West 35th St. Suite 1004 New York, NY 10001

(212) 967-4890 Corrine Tan, SE

Landscape Architect 418 North Toole Avenue Tucson, AZ 85701

(520) 622-9565 Josh Orth., PLA

B

IM

/6

-3

N e w

C o m m u n it y L iv in g C e n te r/

M

E P

V

A M o n tr o s e C

L C

R

.r v t

/2

/2

:5

:2

P

M

M-003

SCHEDULES - HVAC

TRIPLE C - The A/E Group

201 E. Jefferson Street, Suite 200

Syracuse, NY 13202

(315) 484-5958

Mat Perkins

620-334

CLC

07/21/2021 NPS TMR

NEW COMMUNITY LIVING

CENTER

2094 Albany Post Road, Montrose, NY 10548

ISSUED FOR

CONSTRUCTION

VAV AIR TERMINAL UNIT SCHEDULE - HOT WATER REHEAT - AHU-1

MARK

NOMINAL

SIZE

AIRFLOW

MAX.

TOTAL UNIT

PRESSURE

DROP

SPACE

NOISE

CRITERIA

(NC)

HOT WATER HEATING COIL

CONTROL

TYPE

CONTROL

SEQUENCE

BASIS OF DESIGN

NOTES

MAXIMUM MINIMUM

HEATING

AIRFLOW

ENTERING

AIR TEMP.

ENTERING

WATER

TEMP.

LEAVING

WATER

TEMP.

HEATING

WATER

FLOW

COIL

CAPACITY

HOT

WATER

PIPING

RUNOUT

SIZE

MANUFACTURER

MODEL

NUMBER

TU1-01 6 240 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-02 6 240 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-03 6 240 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-04 6 240 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-05 6 270 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-06 6 270 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-07 6 270 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-08 6 270 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-09 6 315 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-10 6 320 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-11 6 325 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-12 6 320 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-13 6 325 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-14 6 340 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 4,000 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-15 10 710 CFM 710 CFM 0.25 in-wg 35 280 CFM 55.0 °F 180 °F 160 °F 3.0 GPM 27,000 Btu/h 3/4" DDC CV PRICE INDUSTRIES SDV-10 1-4

TU1-16 8 415 CFM 415 CFM 0.25 in-wg 35 180 CFM 55.0 °F 180 °F 160 °F 2.0 GPM 15,800 Btu/h 3/4" DDC CV PRICE INDUSTRIES SDV-08 1-4

TU1-17 6 130 CFM 130 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 4,900 Btu/h 3/4" DDC CV PRICE INDUSTRIES SDV-06 1-4

TU1-18 6 120 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-19 6 85 CFM 30 CFM 0.25 in-wg 35 25 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-20 14 1900 CFM 1900 CFM 0.25 in-wg 35 610 CFM 61.6 °F 180 °F 160 °F 5.0 GPM 72,200 Btu/h 3/4" DDC CV PRICE INDUSTRIES SDV-14 1-4

TU1-21 6 100 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.0 GPM 3,800 Btu/h 3/4" DDC CV PRICE INDUSTRIES SDV-06 1-4

TU1-22 6 180 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.0 GPM 3,800 Btu/h 3/4" DDC CV PRICE INDUSTRIES SDV-06 1-4

TU1-23 10 1060 CFM 320 CFM 0.25 in-wg 35 320 CFM 55.0 °F 180 °F 160 °F 1.5 GPM 12,200 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-10 1-4

TU1-24 8 590 CFM 180 CFM 0.25 in-wg 35 180 CFM 55.0 °F 180 °F 160 °F 1.0 GPM 6,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-08 1-4

TU1-25 6 60 CFM 60 CFM 0.25 in-wg 35 20 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC CV PRICE INDUSTRIES SDV-06 1-4

TU1-26 6 280 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-27 6 230 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-28 6 100 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-29 6 100 CFM 100 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-31 14 1810 CFM 1810 CFM 0.25 in-wg 35 600 CFM 61.6 °F 180 °F 160 °F 5.0 GPM 68,700 Btu/h 3/4" DDC CV PRICE INDUSTRIES SDV-14 1-4

TU1-32 6 300 CFM 300 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 1.5 GPM 11,400 Btu/h 3/4" DDC CV PRICE INDUSTRIES SDV-06 1-4

TU1-33 6 80 CFM 80 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,000 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-34 6 90 CFM 80 CFM 0.25 in-wg 35 180 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,000 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

TU1-35 6 120 CFM 80 CFM 0.25 in-wg 35 100 CFM 55.0 °F 180 °F 160 °F 0.5 GPM 3,000 Btu/h 3/4" DDC VAV PRICE INDUSTRIES SDV-06 1-4

NOTES:

1. ALL AIR TERMINAL UNITS SHALL BE PRESSURE INDEPENDENT TYPE WITH VELOCITY RESET CONTROLLERS.

2. HOT WATER REHEAT COIL SHALL HAVE A MAXIMUM WATER PRESSURE DROP OF 3.0 FT. WG.

3. PROVIDE WITH ARI 880 RATED MAXIMUM DAMPER LEAKAGE OF 2% NOMINAL AIRFLOW AT 3 INCH W.G. INLET STATIC PRESSURE.

4. INSTALL…