Drawings 1 of 15 GENERAL.pdf

PDF 11 MB Posted

Attached to
Y1AZ--TIERED EVALUATIONS - Build New Community Living Center Minor Construction - Montrose 620-334
Solicitation number
36C77623R0156
Issued by

About this file

This document provides details for a federal contract opportunity issued by the Department of Veterans Affairs Technology Acquisition Center Austin. Solicitation number 36C77623R0156 seeks proposals to build a new community living center at the Montrose VA medical center. Offerors should submit proposals to design and construct a minor construction project for an expanded residential facility to serve veterans. The solicitation includes general architectural drawings as an attachment, with a response deadline to be determined. The contract award is expected in the first quarter of fiscal year 2023 contingent upon available funding.

View the file

Other files

File Type Posted
620-334-Responses to Tech Questions - 1-30-24.pdf PDF
36C77623R0156 0003.pdf PDF
620-334-Pre Bid Presentation20240109.pdf PDF
36C77623R0156 0002.pdf PDF
620-334-Responses to Tech Questions - 1-25-24.pdf PDF
Site Visit Sign-In Sheet - 01-09-24.pdf PDF
36C77623R0156 0001.pdf PDF
DBA Wage Rates - Westchester County - 01-05-24.pdf PDF
Drawings 8 of 15 ARCHITECTURAL 3.pdf PDF
Site Visit Campus Map.pdf PDF
Drawings 14 of 15 ELECTRICAL 1.pdf PDF
Specifications 10-30-23.pdf PDF
Small Business Subcontracting Plan Model.docx DOCX document
Drawings 5 of 15 STRUCTURAL.pdf PDF
RFP 36C77623R0156 - 12-20-23.pdf PDF
Drawings 12 of 15 PLUMBING.pdf PDF
Drawings 4 of 15 LANDSCAPE.pdf PDF
Drawings 6 of 15 ARCHITECTURAL 1.pdf PDF
Drawings 2 of 15 CIVIL 1.pdf PDF
Drawings 7 of 15 ARCHITECTURAL 2.pdf PDF
Drawings 10 of 15 ARCH SIGN-EQUIP.pdf PDF
Drawings 13 of 15 MECHANICAL.pdf PDF
DBA Wage Rates - Westchester County - 11-17-23.pdf PDF
Limitations on Subcontracting - Construction.docx DOCX document
Drawings 15 of 15 ELECTRICAL 2.pdf PDF
Brand Name J_A - Montrose.pdf PDF
Site Visit Instructions.pdf PDF
Drawings 11 of 15 FIRE PROTECTION.pdf PDF
Drawings 9 of 15 ARCHITECTURAL 4.pdf PDF
Drawings 3 of 15 CIVIL 2.pdf PDF
Construction Cost Breakdown.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FDR VETERANS HOSPITAL BLVD

FDR VETERANS HOSPITAL BLVD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

201 E. Jefferson Street, Suite 200

Syracuse, NY 13202

(315) 484-5958

Mat Perkins

MEP

550 North Reo Street, Suite 203 Tampa, FL 33609

(813) 289-4700 Nicholas Stephenson, PE

Structural 315 West James Street, Suite 102 Lancaster, PA 17603

(717) 481-2991 Jason Vannoy, SE, PE

Protective Design Specialist 240 West 35th St. Suite 1004 New York, NY 10001

(212) 967-4890 Corrine Tan, SE

Landscape Architect 418 North Toole Avenue Tucson, AZ 85701

(520) 622-9565 Josh Orth., PLA

B

IM

/6

-3

N e w C o m m u n it y L iv in g C e n te r/

-3

.C

L C

-A rc h .r v t

/2

/2

:4

:3

A

M

GI000

GENERAL COVER SHEET 620-334

CLC

M. PERKINS E. DANIELS

ISSUED FOR

CONSTRUCTION

NEW COMMUNITY LIVING

CENTER

2094 Albany Post Road, Montrose, NY 10548

ISSUED FOR CONSTRUCTION

Project No. 620-334 Contract No. 36C24220C0023

620-334 NEW COMMUNITY LIVING CENTER - CLC

VA Hudson Valley Health Care System FDR

THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.

07/21/2021

AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C

TRIPLE C - THE A&E GROUP

SECTION 01 00 00

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION: Work includes general construction, alterations, roads, parking lot, walks, grading, drainage, necessary to a new standalone Community Living Center that will house accommodations for a total of 28 Veteran Residents and provide community space for socialization and family interaction removal on a previously developed site where existing structures have already been remove.

CO: Aletha Bourke Contract Specialist Construction Team A RPO EAST/Network Contracting Office 2 Department of Veterans Affairs VA HVHCS FDR Campus 2094 Albany Post Rd, Bldg. 29, Rm 314 Box 29-2, PO Box 100 Montrose, NY 10548 phone: (914) 737-4400 x2129 aletha.bourke@va.gov

COR: Erik C. Anderson Planning & Design VA Hudson Valley Healthcare System - Montrose Campus 2094 Albany Post Rd Montrose, NY 10548 Phone: (914) 737-4400 x2163 Cell: (845) 505-3735

NTS

F1

SITE MAP

12" = 1'-0" D1

LOCATION MAP

PROJECT

LOCATION

DEDUCT ALTERNATE #1 - REDUCE WATER AND ICE SHIELD COVERAGE

REFER TO SHEET A-103 FOR ADDITIONAL INFORMATION.

DEDUCT ALTERNATE #2 - ELIMINATE TUNNEL (EAST LEG)

REMOVE EAST LEG OF TUNNEL ENTIRELY.

DEDUCT ALTERNATE #3 - ELIMINATE FAUX WINDOWS AT CLERESTORY

REFER TO PLANS FOR LOCATION.

DEDUCT ALTERNATE #4 - ELIMINATE WORK AT B6 CORRIDOR

REMOVE ALL WORK ASSOCIATED WITH B6 CORRIDOR.

DEDUCT ALTERNATE #5 - ELIMINATE CONCRETE

ALL SIDEWALK WORK TO BE REMOVED WITH THE EXCEPTION OF THE FIRE EGRESS PATH.

DEDUCT ALTERNATE #6 - ELIMINATE LANDSCAPE

(NO GAZEBO IS PROVIDED IN THIS SCOPE OF WORK)

REMOVAL OF ALL PLANTS, OUTDOOR SEATING, ROCK MULCH, WOOD MULCH, IRRIGATION & IRRIGATION

CONTROLS.

DEDUCT ALTERNATE #7 - REDUCE PLATFORM AT CHILLER

REMOVE 156 SF OF CHILLER MAINTENANCE PLATFORM.

DEDUCT ALTERNATE #8 - ELIMINATE NETWORK VIDEO RECORDER (NVR) SECURITY

REMOVE SECURITY EQUIPMENT, REFER TO EY101A AND EY101 B FOR LOCATIONS.

DEDUCT ALTERNATE #9 - ELIMINATE LARGE PORCH

REMOVE PORCH CONCRETE SLAB, SHADE STRUCTURE, FENCE, GATE & LIGHTING/POWER.

DEDUCT ALTERNATE #10 - ELIMINATE SMALL PORCH-A

REMOVE PORCH CONCRETE SLAB, SHADE STRUCTURE, FENCE, GATE & LIGHTING/POWER.

DEDUCT ALTERNATE #11 - ELIMINATE SMALL PORCH-B

REMOVE PORCH CONCRETE SLAB, SHADE STRUCTURE, FENCE, GATE & LIGHTING/POWER.

DEDUCT ALTERNATE #12 - ELIMINATE ENTRANCE CANOPY

REMOVE CANOPY 1 & 2 ENTIRELY INCLUDING ALL LIGHTING/POWER.

DEDUCT ALTERNATE #13 - ELIMINATE FENCE/ FAUX ROOFS AT RESIDENT ROOMS

REMOVE ALL DECORATIVE RAILING AND ROOF FACADE DETAIL AT ALL RESIDENT ROOMS

(27 LF OF RAILING / 12 FAUX ROOF FRONTS)

DEDUCT ALTERNATE #14 - ELIMINATE PATIENT LIFTS TRACK EXTENSION

ELIMINATE PATIENT LIFTS TRACK EXTENSION INTO RESIDENT BATHROOMS (26 ROOMS AFFECTED) (FULL EXTENSION TO BATHROOMS IN BARIATRIC ROOMS WILL REMAIN, PT/OT LIFT WILL REMAIN)

DEDUCT ALTERNATE #15 - REDUCE THE POROUS ASPHALT / PARKING / PORTION OF DRIVE ENTRANCE

REDUCE POROUS ASPHALT AREA, REMOVE ALL PARKING AND REDUCE THE DRIVE ENTRANCE WIDTH.

DEDUCT ALTERNATE #16 - ELIMINATE EXTERIOR SIGNAGE

REMOVE ALL EXTERIOR SIGNAGE.

DEDUCTIVE ALTERNATES:

N

Medical Center Director Date

Chief of Engineering Service Date

Review Signature:

(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE ORDER PRESENTED)

Revisions: Date: 05/09/2022

5/09/2022

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

201 E. Jefferson Street, Suite 200

Syracuse, NY 13202

(315) 484-5958

Mat Perkins

MEP

550 North Reo Street, Suite 203 Tampa, FL 33609

(813) 289-4700 Nicholas Stephenson, PE

Structural 315 West James Street, Suite 102 Lancaster, PA 17603

(717) 481-2991 Jason Vannoy, SE, PE

Protective Design Specialist 240 West 35th St. Suite 1004 New York, NY 10001

(212) 967-4890 Corrine Tan, SE

Landscape Architect 418 North Toole Avenue Tucson, AZ 85701

(520) 622-9565 Josh Orth., PLA

B

IM

/6

-3

N e w C o m m u n it y L iv in g C e n te r/

-3

.C

L C

-A rc h .r v t

/1

/2

:1

:1

P

M

GI001

SHEET INDEX 620-334

CLC

07/21/2021 M. PERKINS E. DANIELS

ISSUED FOR

CONSTRUCTION

NEW COMMUNITY LIVING

CENTER

2094 Albany Post Road, Montrose, NY 10548

- DRAWING INDEX -

SHEET NUMBER SHEET NAME

INCLUDED IN

35% SD

INCLUDED IN

65% DD

INCLUDED IN

95% CD

INCLUDED IN

100%

A-554 ARCHITECTURAL INTERIOR DETAILS No No Yes Yes

A-555 ARCHITECTURAL CASEWORK DETAILS Yes Yes Yes Yes

A-557 ARCHITECTURAL CASEWORK DETAILS Yes

A-601 ARCHITECTURAL DOOR, WINDOW, & LOUVER SCHEDULES Yes Yes Yes Yes

A-602 ARCHITECTURAL DOOR & WINDOW FRAME & PANEL TYPES, AND DETAILS No No Yes Yes

A-711 SLIDING DOOR DETAILS No No Yes Yes

A-720 STANDARD PARTITION TYPES Yes Yes Yes Yes

A-721 PARTITION HEAD DETAILS Yes Yes Yes Yes

A-722 PARTITION FRAMING DETAILS Yes Yes Yes Yes

A-723 UL SYSTEMS Yes

A-730 TYPICAL MOUNTING HEIGHTS Yes Yes Yes Yes

A-731 TYPICAL MOUNTING HEIGHTS No No No Yes

ARCHITECTURAL SIGNAGE

AW001 ARCHITECTURAL SIGNAGE ABBREVIATIONS, SYMBOLS, GENERAL NOTES AND SCHEDULE Yes Yes Yes Yes

AW100 ARCHITECTURAL SITE SIGNAGE PLAN No Yes Yes Yes

AW101 ARCHITECTURAL OVERALL SIGNAGE PLAN - BASEMENT, LEVEL 1 & LEVEL 2 PENTHOUSE Yes Yes Yes Yes

AW501 ARCHITECTURAL SIGNAGE DETAILS - EXTERIOR Yes

AW502 ARCHITECTURAL SIGNAGE DETAILS - INTERIOR Yes Yes Yes Yes

INTERIORS

IN001 INTERIOR FINISH ABBREVIATIONS, SYMBOLS, GENERAL NOTES AND FINISH BOARDS Yes Yes

IN101 INTERIOR OVERALL FINISH FLOOR PLAN - LEVEL 1 Yes Yes Yes Yes

IN101A INTERIOR FLOOR FINISH PLAN - LEVEL 1 - AREA A Yes Yes Yes Yes

IN101B INTERIOR FLOOR FINISH PLAN - LEVEL 1 - AREA B Yes Yes Yes Yes

IN201A INTERIOR WALL FINISH PLAN - LEVEL 1 - AREA A No No Yes Yes

IN201B INTERIOR WALL FINISH PLAN - LEVEL 1 - AREA B No No Yes Yes

IN501 INTERIOR FINISH DETAILS Yes Yes Yes Yes

IN601 INTERIOR FINISH LEGEND AND ROOM FINISH SCHEDULE Yes Yes Yes Yes

IN901 INTERIOR RENDERINGS Yes Yes Yes Yes

FURNITURE

IF101 INTERIOR OVERALL FURNITURE PLAN - LEVEL 1 No Yes Yes Yes

IF101A INTERIOR FURNITURE PLAN - LEVEL 1 - AREA A No Yes Yes Yes

IF101B INTERIOR FURNITURE PLAN - LEVEL 1 - AREA B No Yes Yes Yes

EQUIPMENT

Q-101 OVERALL EQUIPMENT PLAN - LEVEL 1 No Yes Yes Yes

Q-101A EQUIPMENT PLAN - LEVEL 1 - AREA A No Yes Yes Yes

Q-101B EQUIPMENT PLAN - LEVEL 1 - AREA B No Yes Yes Yes

Q-601 EQUIPMENT SCHEDULE No Yes Yes Yes

FIRE PROTECTION

F-001 FIRE PROTECTION LEGENDS & NOTES Yes Yes Yes Yes

FS100 FIRE PROTECTION SITE PLAN Yes Yes Yes Yes

FP101 FIRE PROTECTION OVERALL FLOOR PLAN - LEVEL 1 Yes Yes Yes Yes

FP101A FIRE SPRINKLER FLOOR PLAN - LEVEL 1 - AREA A No Yes Yes Yes

FP101B FIRE SPRINKLER FLOOR PLAN - LEVEL 1 - AREA B No Yes Yes Yes

FP102 FIRE SPRINKLER OVERALL FLOOR PLAN - PENTHOUSE Yes Yes Yes Yes

FH101A FIRE PROTECTION HAZARD PLAN - LEVEL 1 - AREA A Yes Yes Yes Yes

FH101B FIRE PROTECTION HAZARD PLAN - LEVEL 1 - AREA B Yes Yes Yes Yes

PLUMBING

P-001 PLUMBING LEGENDS & NOTES Yes Yes Yes Yes

PL100 PLUMBING OVERALL FLOOR PLAN - BASEMENT No Yes Yes Yes

PL101 PLUMBING OVERALL FLOOR PLAN - LEVEL 1 Yes Yes Yes Yes

PL101A SANITARY AND VENT FLOOR PLAN - LEVEL 1 - AREA A Yes Yes Yes Yes

PL101B SANITARY AND VENT FLOOR PLAN - LEVEL 1 - AREA B Yes Yes Yes Yes

PL102 PLUMBING OVERALL FLOOR PLAN - PENTHOUSE Yes Yes Yes Yes

PL201A DOMESTIC WATER FLOOR PLAN - LEVEL 1 - AREA A No Yes Yes Yes

PL201B DOMESTIC WATER FLOOR PLAN - LEVEL 1 - AREA B No Yes Yes Yes

PL401 PLUMBING ENLARGED FLOOR PLAN No No Yes Yes

P-501 PLUMBING DETAILS No Yes Yes Yes

P-502 PLUMBING DETAILS No Yes Yes Yes

P-503 PLUMBING SCHEMATIC No Yes Yes Yes

P-601 SANITARY & VENT ISOMETRICS - LEVEL 1 - AREA A No No Yes Yes

P-602 SANITARY & VENT ISOMETRICS - LEVEL 1 - AREA B No No Yes Yes

P-603 DOMESTIC WATER ISOMETRICS - LEVEL 1 - AREA A No No Yes Yes

P-604 DOMESTIC WATER ISOMETRICS - LEVEL 1 - AREA B No No Yes Yes

MECHANICAL

M-001 NOTES AND LEGEND - HVAC Yes Yes Yes Yes

M-002 SCHEDULES - HVAC Yes Yes Yes Yes

M-003 SCHEDULES - HVAC No No Yes Yes

MH100 MECHANICAL FLOOR PLAN - BASEMENT No Yes Yes Yes

MH101 MECHANICAL OVERALL PLAN - LEVEL 1 Yes Yes Yes Yes

MH101A MECHANICAL FLOOR PLAN - LEVEL 1 - AREA A Yes Yes Yes Yes

MH101B MECHANICAL FLOOR PLAN - LEVEL 1 - AREA B Yes Yes Yes Yes

MH102 MECHANICAL FLOOR PLAN - PENTHOUSE Yes Yes Yes Yes

MH102A MECHANICAL FLOOR PLAN - PENTHOUSE - AREA A Yes Yes Yes Yes

MH102B MECHANICAL FLOOR PLAN - PENTHOUSE - AREA B Yes Yes Yes Yes

MH201A MECHANICAL AIRFLOWS PLAN - LEVEL 1 - AREA A No Yes Yes Yes

MH201B MECHANICAL AIRFLOWS PLAN - LEVEL 1 - AREA B No Yes Yes Yes

MH301 MECHANICAL SECTIONS No Yes Yes Yes

MH401 ENLARGED VIEWS - HVAC Yes Yes Yes Yes

MH402 ENLARGED VIEWS - HVAC No No Yes Yes

MH403 ENLARGED VIEWS - HVAC No No No Yes

MP101 MECHANICAL OVERALL PIPING PLAN - LEVEL 1 No Yes Yes Yes

MP101A MECHANICAL PIPING PLAN - LEVEL 1 - AREA A No Yes Yes Yes

MP101B MECHANICAL PIPING PLAN - LEVEL 1 - AREA B No Yes Yes Yes

MP102 MECHANICAL PIPING PLAN - PENTHOUSE No No Yes Yes

M-501 DETAILS - HVAC Yes Yes Yes Yes

M-502 DETAILS - HVAC Yes Yes Yes Yes

M-503 DETAILS - HVAC Yes Yes Yes Yes

M-504 DETAILS - HVAC Yes Yes Yes Yes

M-601 CONTROLS - HVAC No Yes Yes Yes

M-602 CONTROLS - HVAC No Yes Yes Yes

M-603 CONTROLS - HVAC No No No Yes

M-604 CONTROLS - HVAC No No No Yes

ELECTRICAL

E-001 NOTES AND LEGEND - ELECTRICAL Yes Yes Yes Yes

ED100 ELECTRICAL DEMOLITION SITE PLAN Yes Yes Yes Yes

ES100 ELECTRICAL RENOVATION OVERALL SITE PLAN Yes Yes Yes Yes

ES100A ELECTRICAL RENOVATION SITE PLAN - AREA A Yes Yes

ES100B ELECTRICAL RENOVATION SITE PLAN - AREA B Yes Yes

EL100 LIGHTING FLOOR PLAN - BASEMENT Yes

EL101A LIGHTING FLOOR PLAN - LEVEL 1 - AREA A Yes Yes Yes Yes

EL101B LIGHTING FLOOR PLAN - LEVEL 1 - AREA B Yes Yes Yes Yes

EL102 LIGHTING FLOOR PLAN - MECHANICAL PENTHOUSE Yes

EP100 ELECTRICAL FLOOR PLAN - BASEMENT Yes Yes

EP101A POWER FLOOR PLAN - LEVEL 1 - AREA A Yes Yes Yes Yes

EP101B POWER FLOOR PLAN - LEVEL 1 - AREA B Yes Yes Yes Yes

EP102 ELECTRICAL FLOOR PLAN - MECHANICAL PENTHOUSE Yes Yes Yes Yes

EY100 SPECIAL SYSTEMS RENOVATION OVERALL SITE PLAN Yes Yes

EY101A SPECIAL SYSTEMS FLOOR PLAN - LEVEL 1 - AREA A Yes Yes Yes Yes

EY101B SPECIAL SYSTEMS FLOOR PLAN - LEVEL 1 - AREA B Yes Yes Yes Yes

E-501 ELECTRICAL DETAILS Yes Yes Yes Yes

E-502 ELECTRICAL DETAILS Yes Yes Yes Yes

E-503 ELECTRICAL DETAILS No No Yes Yes

E-601 SINGLE LINE DIAGRAM - ELECTRICAL Yes Yes Yes Yes

E-602 SINGLE LINE DIAGRAM - ELECTRICAL Yes Yes

E-603 SCHEDULES - ELECTRICAL Yes Yes Yes Yes

E-604 SCHEDULES - ELECTRICAL Yes Yes Yes

Grand total: 227

- DRAWING INDEX -

SHEET NUMBER SHEET NAME

INCLUDED IN

35% SD

INCLUDED IN

65% DD

INCLUDED IN

95% CD

INCLUDED IN

100%

GENERAL

GI000 GENERAL COVER SHEET Yes Yes Yes Yes

GI001 SHEET INDEX Yes Yes No Yes

GI021 GENERAL LEED CERTIFICATION Yes Yes Yes Yes

GI022 GENERAL LEED CERTIFICATION Yes Yes Yes Yes

GI050 GENERAL NOTES Yes Yes Yes Yes

GI101 GENERAL LIFE SAFETY PLAN Yes Yes Yes Yes

GI102 GENERAL LIFE SAFETY PLAN No Yes Yes Yes

GI201 SMOKE COMPARTMENT DIAGRAM Yes Yes Yes Yes

GI301 INFECTION CONTROL PLAN & INTERIM LIFE Yes Yes Yes Yes

GI601 PLUMBING CALCULATION SCHEDULE Yes Yes Yes Yes

CIVIL

VF101 CIVIL SURVEY Yes Yes Yes Yes

VF102 CIVIL SURVEY PLAN REFERENCE IMAGES Yes

CD101 CIVIL DEMOLITION PLAN Yes Yes Yes Yes

CS101 CIVIL SITE PLAN Yes Yes Yes Yes

CS102 CIVIL SITE PLAN LINE AND CURVE TABLE No No Yes Yes

CS103 CIVIL SITE PLAN - DEDUCTIVE ALTERNATE LAYOUT No No No Yes

CS104 CIVIL SITE PLAN ENLARGED VIEW Yes

CG101 CIVIL GRADING PLAN Yes Yes Yes Yes

CG102 STORMWATER POLLUTION PREVENTION PLAN No Yes No Yes

CG103 CIVIL GRADING PLAN ENLARGED VIEW - SHEET 1 Yes

CG104 CIVIL GRADING PLAN ENLARGED VIEW - SHEET 2 Yes

CG105 CIVIL GRADING PLAN ENLARGED VIEW - SHEET 3 Yes

CG106 CIVIL GRADING PLAN ENLARGED VIEW - SHEET 4 Yes

CG201 CIVIL GRADING PARKING ACCESS ROAD PLAN AND PROFILE No No Yes Yes

CG501 CIVIL DETAIL SHEET 1 Yes Yes Yes Yes

CG502 CIVIL DETAIL SHEET 2 No Yes Yes Yes

CG503 CIVIL DETAIL SHEET 3 No No Yes Yes

CG504 CIVIL DETAIL SHEET 4 No No Yes Yes

CG505 CIVIL DETAIL SHEET 5 Yes

CG506 CIVIL DETAIL SHEET 6 Yes

CU101 CIVIL UTILITY PLAN Yes Yes Yes Yes

CU102 CIVIL UTILITY AND FOUNDATION PLAN No No Yes Yes

CU103 CIVIL UTILITY PLAN ENLARGED VIEW Yes

CU201 CIVIL UTILITY PLAN & PROFILE ELEC DUCT BANK AT NEW TUNNEL Yes

CT101 CIVIL STRIPING AND SIGNAGE PLAN No No Yes Yes

LANDSCAPE

LP100 LANDSCAPE NOTES AND SCHEDULES - DEDUCTIVE ALTERNATE #5 CONCRETE AND #6 ELIMINATE LANDSCAPE Yes Yes

LP101 LANDSCAPE PLAN - DEDUCTIVE ALTERNATE #5 CONCRETE AND #6 ELIMINATE LANDSCAPE Yes Yes

LP301 LANDSCAPE DETAILS - DEDUCTIVE ALTERNATE #6 ELIMINATE LANDSCAPE Yes Yes

LP302 LANDSCAPE DETAILS - DEDUCTIVE ALTERNATE #6 ELIMINATE LANDSCAPE Yes Yes

LL201 LANDSCAPE LIGHTING PLAN - DEDUCTIVE ALTERNATE #6 ELIMINATE LANDSCAPE Yes Yes

LI400 IRRIGATION NOTES AND SCHEDULES - DEDUCTIVE ALTERNATE #6 ELIMINATE LANDSCAPE Yes Yes

LI401 IRRIGATION PLAN - DEDUCTIVE ALTERNATE #6 ELIMINATE LANDSCAPE Yes Yes

LI501 IRRIGATION DETAILS - DEDUCTIVE ALTERNATE #6 ELIMINATE LANDSCAPE No No Yes Yes

LI502 IRRIGATION DETAILS - DEDUCTIVE ALTERNATE #6 ELIMINATE LANDSCAPE Yes Yes

STRUCTURAL

S-001 GENERAL NOTES No Yes Yes Yes

S-002 WIND UPLIFT & SNOW DRIFT No Yes Yes Yes

S-101 FOUNDATION PLAN No Yes Yes Yes

S-102 ENLARGED FOUNDATION PLANS No No No Yes

S-103 TUNNEL FRAMING PLAN Yes Yes

S-104 ALTERNATE FOUNDATION PLAN No No No Yes

S-105 FLOOR FRAMING & LOW ROOF FRAMING PLAN No Yes Yes Yes

S-106 FLOOR FRAMING & LOW ROOF FRAMING PLAN No No No Yes

S-107 ENLARGED FRAMING PLANS No Yes Yes Yes

S-108 ENLARGED FRAMING PLANS Yes Yes

S-109 PATIENT HOIST PLAN Yes Yes

S-110 ROOF FRAMING PLAN No Yes Yes Yes

S-111 ENLARGED FRAMING PLANS No

S-112 ISOMETRIC OF STRUCTURAL STEEL No No No No

S-201 FOUNDATION DETAILS No Yes Yes Yes

S-202 FOUNDATION DETAILS No Yes Yes Yes

S-203 FOUNDATION SECTIONS & DETAILS No Yes Yes Yes

S-204 FOUNDATION SECTIONS & DETAILS No No No Yes

S-205 FOUNDATION SECTIONS & DETAILS No No No Yes

S-301 FRAMING DETAILS No Yes Yes Yes

S-302 FRAMING DETAILS No Yes Yes Yes

S-303 FRAMING SECTIONS Yes Yes Yes

S-304 FRAMING SECTIONS No Yes Yes Yes

S-305 FRAMING SECTIONS No Yes Yes Yes

S-306 FRAMING SECTIONS No No No Yes

S-307 FRAMING SECTIONS No No No Yes

S-308 FRAMING SECTIONS Yes

S-309 FRAMING SECTIONS No

S-310 FRAMING SECTIONS

S-401 CONNECTION INFORMATION No Yes Yes Yes

S-501 LIGHT GAUGE STUD DETAILS No Yes Yes Yes

S-502 LIGHT GAUGE STUD DETAILS No Yes Yes Yes

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, & GENERAL NOTES Yes Yes Yes Yes

A-002 OVERALL ROOM PROGRAM PLAN - LEVEL 1 Yes No No Yes

AS101 ARCHITECTURAL SITE PLAN Yes Yes Yes Yes

AS901 ARCHITECTURAL SITE RENDERINGS- SINGLE HOME No Yes Yes

A-100 ARCHITECTURAL OVERALL BASEMENT & TUNNEL FLOOR PLAN Yes Yes Yes Yes

A-101 ARCHITECTURAL OVERALL FLOOR PLAN - LEVEL 1 Yes Yes Yes Yes

A-101A ARCHITECTURAL FLOOR PLAN - LEVEL 1 - AREA A Yes Yes Yes Yes

A-101B ARCHITECTURAL FLOOR PLAN - LEVEL 1 - AREA B Yes Yes Yes Yes

A-101C BUILDING 6 HALLWAY RENOVATION - DEDUCT ALT. 4 No No No Yes

A-102 ARCHITECTURAL OVERALL FLOOR PLAN - PENTHOUSE Yes Yes Yes Yes

A-103 ARCHITECTURAL OVERALL ROOF PLAN Yes Yes Yes Yes

A-111A DIMENSIONAL FLOOR PLAN - LEVEL 1 - AREA A Yes Yes

A-111B DIMENSIONAL FLOOR PLAN - LEVEL 1 - AREA B Yes Yes

AC101 ARCHITECTURAL OVERALL REFLECTED CEILING PLAN - LEVEL 1 Yes Yes Yes Yes

AC101A ARCHITECTURAL CEILING PLAN - LEVEL 1 - AREA A Yes Yes Yes Yes

AC101B ARCHITECTURAL CEILING PLAN - LEVEL 1 - AREA B Yes Yes Yes Yes

AC102 ARCHITECTURAL OVERALL CEILING PLAN - PENTHOUSE Yes Yes Yes Yes

A-201 ARCHITECTURAL EXTERIOR ELEVATIONS Yes Yes Yes Yes

A-202 ARCHITECTURAL EXTERIOR ELEVATIONS Yes Yes Yes Yes

A-203 ARCHITECTURAL EXTERIOR ELEVATIONS - PORTE COCHERE AND ENTRY DETAILING No Yes Yes Yes

A-301 ARCHITECTURAL BUILDING SECTIONS Yes Yes Yes Yes

A-302 WALL SECTIONS No Yes Yes Yes

A-303 WALL SECTIONS Yes Yes Yes

A-304 WALL SECTIONS Yes Yes

A-305 WALL SECTIONS Yes Yes

A-306 WALL SECTIONS No No Yes Yes

A-401 ARCHITECTURAL ENLARGED VIEWS Yes Yes Yes Yes

A-402 ARCHITECTURAL ENLARGED VIEWS Yes Yes Yes Yes

A-403 ARCHITECTURAL ENLARGED VIEWS Yes Yes Yes Yes

A-404 ARCHITECTURAL ENLARGED VIEWS No Yes Yes Yes

A-405 ARCHITECTURAL ENLARGED VIEWS No No Yes Yes

A-406 ARCHITECTURAL ENLARGED VIEWS No No Yes Yes

A-407 ARCHITECTURAL ENLARGED VIEWS No No Yes Yes

A-408 ARCHITECTURAL ENLARGED VIEWS No No Yes Yes

A-410 ARCHITECTURAL ENLARGED VIEWS Yes Yes

A-430 ARCHITECTURAL ENLARGED STAIRS No No Yes Yes

A-501 EXTERIOR DETAILS No No Yes Yes

A-502 EXTERIOR DETAILS Yes Yes

A-503 EXTERIOR DETAILS No No Yes Yes

A-504 EXTERIOR DETAILS No No Yes Yes

A-551 ARCHITECTURAL CEILING DETAILS Yes Yes Yes Yes

A-552 ARCHITECTURAL CEILING DETAILS No No Yes Yes

A-553 ARCHITECTURAL INTERIOR DETAILS No No Yes Yes

Revisions: Date:

SS-1 PREREQUISITE: CONSTRUCTION ACTIVITY POLLUTION

PREVENTION

Required

ESTABLISHMENT

To reduce pollution from construction activities by controlling soil erosion, waterway sedimentation, and airborne dust.

REF SITE PLAN

PERFORMANCE

Create and implement an erosion and sedimentation control plan for all construction activities associated with the project. The plan must conform to the erosion and sedimentation requirements of the 2017 U.S. Environmental Protection Agency (EPA) Construction General Permit (CGP) or local equivalent, whichever is more stringent. Projects must apply the CGP regardless of size. The plan must describe the measures implemented.

INTEGRATIVE PROCESS (IP)

LEED v4 BD+C: HEALTHCARE

SS-5 CREDIT: LIGHT POLLUTION REDUCTION

ESTABLISHMENT

Option 1. Fixture Shielding To increase night sky access, improve nighttime visibility, and reduce the consequences of development for wildlife and people.

REF NARRATIVE AND SITE PLAN

PERFORMANCE

Meet uplight and light trespass requirements, using either the backlight-uplight-glare (BUG) method (Option 1) or the calculation method (Option 2). Projects may use different options for uplight and light trespass.

1 point of 1 possible

WE-1 PREREQUISITE: INDOOR WATER USE REDUCTION

Required

ESTABLISHMENT

To reduce indoor water consumption.

REF NARRATIVE

PERFORMANCE

For the fixtures and fittings listed in Table 1, as applicable to the project scope, reduce aggregate water consumption by 20% from the baseline. Base calculations on the volumes and flow rates shown in Table 1.

All newly installed toilets, urinals, private lavatory faucets, and showerheads that are eligible for labeling must be WaterSense labeled (or a local equivalent for projects outside the U.S.).

Projects located where standard supply pressure is different than the LEED baseline supply pressure may calculate the water consumption of flow fixtures and fittings at the local standard supply pressure; the supply pressure must be consistent in the baseline and proposed case.

Install appliances, equipment, and processes within the project scope that meet the requirements listed in the tables below.

Existing appliances intended for reuse in the project are not required to meet the requirements in Table 2.

In addition, water-consuming appliances, equipment, and processes must meet the requirements listed in Tables 4 and 5.

WATER EFFICIENCY (WE)

WE-2 PREREQUISITE: BUILDING-LEVEL WATER METERING

Required

ESTABLISHMENT

To support water management and identify opportunities for additional water savings by tracking water consumption.

REF NARRATIVE

PERFORMANCE

Install permanent water meters that measure the total potable water use for the building and associated grounds. Meter data must be compiled into monthly and annual summaries; meter readings can be manual or automated.

Commit to sharing with USGBC the resulting whole-project water usage data for a five-year period beginning on the date the project accepts LEED certification or typical occupancy, whichever comes first. This commitment must carry forward for five years or until the building changes ownership or lessee.

WE-4 CREDIT: INDOOR WATER USE REDUCTION

ESTABLISHMENT

To support water management and identify opportunities for additional water savings by tracking water consumption.

REF PLUMBING SCHEDULES AND NARRATIVE

PERFORMANCE

Install permanent water meters that measure the total potable water use for the building and associated grounds. Meter data must be compiled into monthly and annual summaries; meter readings can be manual or automated.

Commit to sharing with USGBC the resulting whole-project water usage data for a five-year period beginning on the date the project accepts LEED certification or typical occupancy, whichever comes first. This commitment must carry forward for five years or until the building changes ownership or lessee.

4 point of 7 possible

ENERGY AND ATMOSPHERE

EA-1 PREREQUISITE: FUNDAMENTAL COMMISSIONING

AND VERIFICATION Required

ESTABLISHMENT

• To support the design, construction, and eventual operation of a project that meets the owner’s project requirements for energy, water, indoor environmental quality, and durability.

PERFORMANCE

Complete the following commissioning (Cx) process activities for mechanical, electrical, plumbing, and renewable energy systems and assemblies, in accordance with ASHRAE Guideline 0-2013 and ASHRAE Guideline 1.1–2007 for HVAC&R Systems, as they relate to energy, water, indoor environmental quality, and durability.

• Develop the OPR.

• Develop a BOD.

The commissioning authority (CxA) must do the following:

• Review the OPR, BOD, and project design.

• Develop and implement a Cx plan.

• Confirm incorporation of Cx requirements into the construction documents.

• Develop construction checklists.

• Develop a system test procedure.

• Verify system test execution.

• Maintain an issues and benefits log throughout the Cx process.

• Prepare a final Cx process report.

• Document all findings and recommendations and report directly to the owner throughout the process.

EA-2 PREREQUISITE: MINIMUM ENERGY PERFORMANCE

Required

ESTABLISHMENT

Calibrate meters within the manufacturer’s recommended interval if the building owner, management organization, or tenant owns the meter. Meters owned by third parties (e.g., utilities or governments) are exempt.

PERFORMANCE

Comply with ANSI/ASHRAE/IESNA Standard 90.1–2016, with errata or a USGBC-approved equivalent standard.

EA-3 PREREQUISITE: BUILDING-LEVEL ENERGY METERING

Required

ESTABLISHMENT

To support energy management and identify opportunities for additional energy savings by tracking building-level energy use.

PERFORMANCE

Install new or use existing building-level energy meters, or submeters that can be aggregated to provide building-level data representing total building energy consumption (electricity, natural gas, chilled water, steam, fuel oil, propane, biomass, etc). Utility-owned meters capable of aggregating building-level resource use are acceptable.

Commit to sharing with USGBC the resulting energy consumption data and electrical demand data (if metered) for a five-year period beginning on the date the project accepts LEED certification. At a minimum, energy consumption must be tracked at one-month intervals.

This commitment must carry forward for five years or until the building changes ownership or lessee.

EA-4 PREREQUISITE: FUNDAMENTAL REFRIGERANT

MANAGEMENT Required

ESTABLISHMENT

To reduce stratospheric ozone depletion.

PERFORMANCE

Do not use chlorofluorocarbon (CFC)-based refrigerants in new heating, ventilating, air-conditioning, and refrigeration (HVAC&R) systems. When reusing existing HVAC&R equipment, complete a comprehensive CFC phase-out conversion before project completion. Phase-out plans extending beyond the project completion date will be considered on their merits.

Existing small HVAC&R units (defined as containing less than 0.5 pound [225 grams] of refrigerant) and other equipment, such as standard refrigerators, small water coolers, and any other equipment that contains less than 0.5 pound (225 grams) of refrigerant, are exempt.

EA CREDIT: ENHANCED COMMISSIONING

ESTABLISHMENT

To further support the design, construction, and eventual operation of a project that meets the owner’s project requirements for energy, water, indoor environmental quality, and durability. REF NARRATIVE AND MEP PLANS

PERFORMANCE

Implement, or have in place a contract to implement, the following commissioning process activities in addition to those required under EA Prerequisite Fundamental Commissioning and Verification.

Commissioning Authority Qualifications:

• The CxA must have documented commissioning process experience on at least two building projects with a similar scope of work.

The experience must extend from early design phase through at least 10 months of occupancy;

• The CxA may be a qualified employee of the owner, an independent consultant, or a disinterested subcontractor of the design team.

3 points of 6 possible

EA CREDIT: OPTIMIZE ENERGY PERFORMANCE

ESTABLISHMENT

To achieve increasing levels of energy performance beyond the prerequisite standard to reduce environmental and economic harms associated with excessive energy use. "VA RESPONSE"

PERFORMANCE

Establish an energy performance target no later than the schematic design phase. The target must be established using one of the following metrics:

• kBtu per square foot-year (kWh per square meter-year) of site energy use

• kBtu per square foot-year (kWh per square meter-year) of source energy use

• pounds per square foot-year (Kg per square meter-year) of greenhouse gas emissions

• energy cost per square foot-year (cost per square meter-year)

Analyze efficiency measures during the design process and account for the results in design decision making. Use energy simulation of efficiency opportunities, past energy simulation analyses for similar buildings, or published data (e.g., Advanced Energy Design Guides) from analyses for similar buildings.

Analyze efficiency measures, focusing on load reduction and HVAC-related strategies (passive measures are acceptable) appropriate for the facility. Project potential energy savings and holistic project cost implications related to all affected systems.

10 points of 20 possible

MATERIALS AND RESOURCES (MR)

MR-1 PREREQUISITE: STORAGE AND COLLECTION OF

RECYCLABLES Required

ESTABLISHMENT

To reduce the waste that is generated by building occupants and hauled to and disposed of in landfills.

"VA RESPONSE" AND LEVEL 1 PLAN

PERFORMANCE

Provide dedicated areas accessible to waste haulers and building occupants for the collection and storage of recyclable materials for the entire building. Collection and storage areas may be separate locations. Recyclable materials must include mixed paper, corrugated cardboard, glass, plastics, and metals. Take appropriate measures for the safe collection, storage, and disposal of two of the following:

batteries, mercury-containing lamps, and electronic waste.

ESTABLISHMENT

To reduce construction and demolition waste disposed of in landfills and incineration facilities by recovering, reusing, and recycling materials.

"VA RESPONSE" AND LEVEL 1 PLAN

PERFORMANCE

Develop and implement a construction and demolition waste management plan:

• Establish waste diversion goals for the project by identifying at least five materials (both structural and nonstructural) targeted for diversion.

• Specify whether materials will be separated or comingled and describe the diversion strategies planned for the project. Describe where the material will be taken and how the recycling facility will process the material including expected diversion rates for each material stream.

Provide a final report detailing all major waste streams generated, including disposal and diversion rates.

Alternative daily cover (ADC) does not qualify as material diverted from disposal. Include materials destined for ADC in the calculations as waste. Land-clearing debris is not considered construction, demolition, or renovation waste that can contribute to waste diversion.

MR-2 PREREQUISITE: CONSTRUCTION AND DEMOLITION

WASTE MANAGEMENT PLANNING Required

MR-3 PREREQUISITE: PBT SOURCE REDUCTION—

MERCURY Required

ESTABLISHMENT

To reduce mercury-containing products and devices and mercury release through product substitution, capture, and recycling.

"VA RESPONSE"

PERFORMANCE

As part of the project’s recycling collection system, identify the following:

• types of mercury-containing products and devices to be collected;

• criteria governing how they are to be handled by a recycling program; and

• disposal methods for captured mercury.

Applicable mercury-containing products and devices include, but are not limited to, lamps (such as linear and circular fluorescents, integrally ballasted and nonintegrally ballasted compact fluorescents and HIDs) and dental wastes (such as scrap amalgam, chair side traps, and separator wastes).

In facilities delivering dental care, specify and install amalgam separation devices that meet or exceed the ISO-11143 standard.

Comply with the mercury elimination requirements outlined below, from the 2010 FGI Guidelines for Design and Construction of Health Care Facilities, Section A1.3- 4b, Mercury Elimination.

• 4.2.1.1. New construction: healthcare facilities may not use mercury-containing equipment, including thermostats, switching devices, and other building system sources. Lamps are excluded.

• 4.2.1.2. Renovation: healthcare facilities must develop a plan to phase out mercury-containing products and upgrade current mercury-containing lamps to high-efficiency, low-mercury, or mercury-free lamp technology.

Do not specify or install preheat, T-9, T-10, or T-12 fluorescents or mercury vapor high-intensity discharge (HID) lamps in the project.

Do not specify probe-start metal halide HID lamps in any interior spaces.

Specify and install illuminated exit signs that do not contain mercury and use less than 5 watts of electricity.

Fluorescent and high-pressure sodium lamps must meet the criteria in Table 1.

MR CREDIT: BUILDING PRODUCT DISCLOSURE AND

OPTIMIZATION—ENVIRONMENTAL PRODUCT

DECLARATIONS

ESTABLISHMENT

To encourage the use of products and materials for which life-cycle information is available and that have environmentally, economically, and socially preferable life-cycle impacts. To reward project teams for selecting products from manufacturers who have verified improved environmental life-cycle impacts. REF NARRATIVE

PERFORMANCE

Achieve one or more of the options below, for a maximum of 2 points.

1 points of 2 possible

PREREQUISITE: INTEGRATIVE PROJECT PLANNING AND DESIGN

Required This prerequisite applies to:

• Healthcare

ESTABLISHMENT

Maximize opportunities for integrated, cost-effective adoption of green design and construction strategies, emphasizing human health as a fundamental evaluative criterion for building design, construction and operational strategies. Utilize innovative approaches and techniques for green design and construction.

SUSTAINABLE SITES

CREDIT: INTEGRATIVE PROCESS

ESTABLISHMENT

To support high-performance, cost-effective project outcomes through an early analysis of the interrelationships among systems.

REFERENCE NARRATIVE

PERFORMANCE

Develop a Project Team Letter. Provide a dated letter on the letterhead of the Integrative Process Facilitator that summarizes the team’s integrative process approach and describes the difference that this integrative approach made in terms of improving project team interaction and project performance.

SS-2 PREREQUISITE: ENVIRONMENTAL SITE ASSESSMENT

Required

ESTABLISHMENT

To protect the health of vulnerable populations by ensuring that the site is assessed for environmental contamination and that any environmental contamination has been remediated.

REF SITE PLAN

PERFORMANCE

Conduct a Phase I Environmental Site Assessment as described in ASTM E1527-13 (or a local equivalent) to determine whether environmental contamination exists at the site. If contamination is suspected, conduct a Phase II Environmental Site Assessment as described in ASTM E1903–11 (or a local equivalent).

If a site is contaminated, remediate the site to meet local, state, or national environmental protection agency region residential (unrestricted) standards, whichever are most stringent.

WE-1 PREREQUISITE: OUTDOOR WATER USE REDUCTION

Required

ESTABLISHMENT

To reduce outdoor water consumption.

REF NARRATIVE AND SITE PLAN

PERFORMANCE

Reduce outdoor water use through one of the following options. Nonvegetated surfaces, such as permeable or impermeable pavement, should be excluded from the landscape area calculations. Athletic fields and playgrounds (if vegetated) and food gardens may be included or excluded at the project team’s discretion.

Option 1. No Irrigation Required Show that the landscape does not require a permanent irrigation system beyond a maximum two-year establishment period.

OR

Option 2. Reduced Irrigation Reduce the project’s landscape water requirement by at least 30% from the calculated baseline for the site’s peak watering month.

Reductions must be achieved through plant species selection and irrigation system efficiency, as calculated by the Environmental Protection Agency (EPA) WaterSense Water Budget Tool.

MR CREDIT: BUILDING PRODUCT DISCLOSURE AND

OPTIMIZATION – SOURCING OF RAW MATERIALS

ESTABLISHMENT

To encourage the use of products and materials for which life cycle information is available and that have environmentally, economically, and socially preferable life cycle impacts. To reward project teams for selecting products verified to have been extracted or sourced in a responsible manner.

REF NARRATIVE AND INTERIOR FINISHES AND MATERIAL PALETTE, SEE ENTIRE IN-SERIES

PERFORMANCEUse products sourced from at least three different manufacturers that meet at least one of the responsible sourcing and extraction criteria below for at least 20%, by cost, of the total value of permanently installed building products in the project (1 point).

Use products sourced from at least five different manufacturers that meet at least one of the responsible sourcing and extraction criteria below for at least 40%, by cost, of the total value of permanently installed building products in the project (2 points).

• Extended producer responsibility. Products purchased from a manufacturer (producer) that participates in an extended producer responsibility program or is directly responsible for extended producer responsibility. Products meeting extended producer responsibility criteria are valued at 50% of their cost for the purposes of credit achievement calculation.

• Bio-based materials. Bio-based raw materials other than wood must be tested using ASTM Test Method D6866 and be legally harvested, as defined by the exporting and receiving country. Exclude hide products, such as leather and other animal skin material.

• Bio-based products that meet the criteria above: value at 50% of cost multiplied by the biobased content of the product for the purposes of credit achievement calculation.

• Bio-based products that meet the Sustainable Agriculture Network’s Sustainable Agriculture Standard: value at 100% of cost multiplied by the biobased content of the product for the purposes of credit achievement calculation.

• Wood products. Wood products must be certified by the Forest Stewardship Council or USGBC-approved equivalent. Products meeting wood products criteria are valued at 100% of their cost for the purposes of credit achievement calculation.

• Materials reuse. Reuse includes salvaged, refurbished, or reused products. Products meeting materials reuse criteria are valued at 200% of their cost for the purposes of credit achievement calculation.

• Recycled content. Products meeting recycled content criteria are valued at 100% of their cost for the purposes of credit achievement calculation.

• Recycled content is the sum of postconsumer recycled content plus one-half the preconsumer recycled content, based on weight.

• The recycled fraction of the assembly is then multiplied by the cost of assembly to determine the recycled content value.

• USGBC approved program. Other USGBC approved programs meeting responsible sourcing and extraction criteria.

For credit achievement calculation, products sourced (extracted, manufactured and purchased) within 100 miles (160 km) of the project site are valued at twice their base contributing cost, up to a maximum of 200% of cost or 2 products.

1 points of 2 possible

MR CREDIT: BUILDING PRODUCT DISCLOSURE AND

OPTIMIZATION – MATERIAL INGREDIENTS

ESTABLISHMENT

To encourage the use of products and materials for which life-cycle information is available and that have environmentally, economically, and socially preferable life-cycle impacts. To reward project teams for selecting products for which the chemicalingredients in the product are inventoried using an accepted methodology and for selecting products verified to minimize the use and generation of harmful substances. To reward raw material manufacturers who produce products verified to have improved life-cycle impacts. "VA RESPONSE" AND REF NARRATIVE AND LEVEL 1 PLAN

PERFORMANCE

Option 1. Material Ingredient Reporting (1 point) Use at least 20 different permanently installed products from at least five different manufacturers that use any of the following programs to demonstrate the chemical inventory of the product to at least 0.1% (1000 ppm). (10 different permanently installed products from at least three different manufacturers for CS and Warehouses & Distribution Centers

AND/OR

Option 2: Material Ingredient Optimization (1 point) Use permanently installed products from at least three different manufacturers that document their material ingredient optimization using the paths below. Choose either 10 compliant products, or select products that constitute at least 10%, by cost, of the total value of permanently installed products in the project.

1 points of 2 possible

LT CREDIT: ACCESS TO QUALITY TRANSIT

ESTABLISHMENT

To encourage development in locations shown to have multimodal transportation choices or otherwise reduced motor vehicle use, thereby reducing greenhouse gas emissions, air pollution, and other environmental and public health harms associated with motor vehicle use. REF SITE PLAN

PERFORMANCE

Locate any functional entry of the project within a ¼-mile (400-meter) walking distance of existing or planned bus, streetcar, or informal transit stops, or within a ½-mile (800-meter) walking distance of existing or planned bus rapid transit stops, passenger rail stations or commuter ferry terminals. The transit service at those stops and stations in aggregate must meet the minimums listed in Tables 1 and 2.

Planned stops and stations may count if they are sited, funded, and under construction by the date of the certificate of occupancy and are complete within 24 months of that date.

Both weekday and weekend trip minimums must be met.

• For each qualifying transit route, only trips in one direction are counted towards the threshold.

• If a qualifying transit route has multiple stops within the required walking distance, only trips from one stop are counted towards the threshold.

Table 1. Minimum daily transit service for projects with multiple transit types (bus, streetcar, rail, or ferry).

Weekday trips Weekend trips Points 72 30 1 144 108 2

Projects served by two or more transit routes such that no one route provides more than 60% of the prescribed levels may earn one additional point, up to the maximum number of points.

If existing transit service is temporarily rerouted outside the required distances for less than two years, the project may meet the requirements, provided the local transit agency has committed to restoring the routes with service at or above the prior level.

LOCATION AND TRANSPORATION (LT)

1 point of 2 possible

LT CREDIT: BICYCLE FACILITIES

ESTABLISHMENT

To promote bicycling and transportation efficiency and reduce vehicle distance traveled. To improve public health by encouraging utilitarian and recreational physical activity. REF SITE PLAN

PERFORMANCE

Bicycle Network Design or locate the project such that a functional entry or bicycle storage is within a 200-yard (180-meter)walking distance or bicycling distance from a bicycle network that connects to at least one of the following:

• at least 10 diverse uses (see Appendix 1);

• a school or employment center, if the project total floor area is 50% or more residential; or

• a bus rapid transit stop, passenger rail station, or ferry terminal.

All destinations must be within a 3-mile (4800-meter) bicycling distance of the project boundary.

Planned bicycle trails or lanes may be counted if they are fully funded by the date of the certificate of occupancy and are scheduled for completion within one year of that date.

Bicycle Storage and Shower Rooms Case 1. Commercial or Institutional Projects Provide short-term bicycle storage for at least 2.5% of all peak visitors, but no fewer than four storage spaces per building.

Provide long-term bicycle storage for at least 5% of all regular building occupants, but no fewer than four storage spaces per building in addition to the short-term bicycle storage spaces.

Provide at least one on-site shower with changing facility for the first 100 regular building occupants and one additional shower for every 150 regular building occupants thereafter.

Bicycle Network Meet Bicycle Network requirements for all projects.

Bicycle Storage and Shower Rooms Meet storage and shower requirements for all projects and provide short-term bicycle storage for at least 2.5% of all peak visitors, but no fewer than four storage spaces per building.

Provide long-term bicycle storage for at least 5% of regular building occupants (excluding patients), but no fewer than four storage spaces per building in addition to the short-term bicycle storage spaces.

1 point of 1 possible

SS CREDIT: RAINWATER MANAGEMENT

ESTABLISHMENT

To reduce runoff volume and improve water quality by replicating the natural hydrology and water balance of the site, based on historical conditions and undeveloped ecosystems in the region. REF NARRATIVE

PERFORMANCE

Treat run-off from pollutant-generating impervious surfaces (i.e. vehicle pavement, service courts, trash enclosures) using low-impact development (LID) practice.

Percentile of Rainfall Events (1-3 points)

In a manner best replicating natural site hydrology processes, retain (i.e. infiltrate, evapotranspirate, or collect and reuse) on site the runoff from the developed site for, at minimum, the 80th percentile of regional or local rainfall events using low-impact development (LID) and greeninfrastructure (GI) practices. GI and LID strategies can be either structural or non-structural. Points are awarded according to Table 1.

For all projects, the use of coal tar sealants shall be prohibited in any application exposed to stormwater, wash waters, condensates, irrigation water, snowmelt, or icemelt.

Examples of acceptable techniques include the following:

• planting rain gardens with native or adapted plant material (e.g. trees shrubs);

• installing a vegetated roof;

• using permeable paving, consisting of porous above-ground materials (e.g., open pavers, engineered products), a base layer designed to drain water away from the building, and (often) a 6-inch-deep (150 millimeters) subbase; and installing permanent infiltration or collection features (e.g., vegetated swale, rain garden, rainwater cistern) that can retain 100% of the runoff from at minimum, the 80th percentile of regional or local rainfall events.

A combination of LID approaches are recommended (but not required) as they are holistic measures which maximize benefits. In contrast to LID, conventional stormwater techniques include grey infrastructure, such as detention or retention ponds, pipes, and vaults. Conventional grey infrastructure devices may be accepted only if integrated within a holistic LID system (ie. a combination of

LID

techniques).

Use daily rainfall data and the methodology in the U.S. Environmental Protection Agency (EPA) Technical Guidance on Implementing the Stormwater Runoff Requirements for Federal Projects under Section 438 of the Energy Independence and Security Act to determine the percentile amount to be retained.

Table 1. Points for percentile of rainfall retained

Percentile of Rainfall Retained Points 80th Percentile 1 85th Percentile 2 90th Percentile 3

1 point of 2 possible

1 point of 1 possible

SS CREDIT: PLACES OF RESPITE

ESTABLISHMENT

Option 1. Fixture Shielding To provide patients, staff, and visitors with the health benefits of the natural environment by creating outdoor places of respite on the healthcare campus. REF NARRATIVE AND SITE PLAN

PERFORMANCE

Provide places of respite that are accessible to patients and visitors, equal to 5% of the net usable program area of the building.

Provide additional dedicated places of respite for staff, equal to 2% of the net usable program area of the building.

Places of respite must be outdoors, or be located in interior atria, greenhouses, solaria, or conditioned spaces; such interior spaces may be used to meet up to 30% of the required area if 90% of each qualifying space’s gross floor area achieves a direct line of sight to unobstructed views of nature.

All areas must meet the following requirements.

• The area is accessible from within the building or located within 200 feet (60 meters) of a building entrance or access point.

• The area is located where no medical intervention or direct medical care is delivered.

• Options for shade or indirect sun are provided, with at least one seating space per 200 square feet (18.5 square meters) of each respite area, with one wheelchair space per five seating spaces.

• Horticulture therapy and other specific clinical or special-use gardens unavailable to all building occupants may account for no more than 50% of the required area.

• Universal-access natural trails that are available to visitors, staff, or patients may account for no more than 30% of the required area, provided the trailhead is within 200 feet (60 meters) of a building entrance.

Additionally, outdoor areas must meet the following requirements.

• A minimum of 25% of the total outdoor area must be planted with two or more adapted or native vegetation types, or have overhead vegetated canopy. Monocultures, such as conventional grass lawns or turfgrass, do not count towards this requirement.

• The area is open to fresh air, the sky, and the natural elements.

• Signage must meet the 2010 FGI Guidelines for Design and Construction of Health Care Facilities (Section 1.2-6.3 and Appendix

A1.2-6.3:Wayfinding).

• Places of respite may not be within 25 feet (7.6 meters) of a smoking area (see EQ Prerequisite Environmental Tobacco Smoke

Control).

Existing places of respite on the hospital campus may qualify if they otherwise meet the credit requirements.

1 point of 1 possible

LT CREDIT: SENSITIVE LAND PROTECTION

ESTABLISHMENT

To avoid the development of environmentally sensitive lands and reduce the environmental impact from the location of a building on a site. REF SITE PLAN

PERFORMANCE

Option 1. Previously Developed Land

Locate the development footprint on land that has been previously developed.

1 point of 1 possible

LT CREDIT: REDUCED PARKING FOOTPRINT

ESTABLISHMENT

To minimize the environmental harms associated with parking facilities, including automobile dependence, land consumption, and rainwater runoff. REF SITE PLAN

PERFORMANCE

Option 2. Reduce Parking (1 point) Do not exceed the minimum local code requirements for parking capacity.

Provide parking capacity that is a 30% reduction below the base ratios recommended by the Parking Consultants Council, as shown in the Institute of Transportation Engineers’ Transportation Planning Handbook, 4th edition, Table 11-12.

1 point of 1 possible

SS CREDIT: OPEN SPACE

ESTABLISHMENT

To create exterior open space that encourages interaction with the environment, social interaction, passive recreation, and physical activities. REF SITE PLAN

PERFORMANCE

Provide outdoor space greater than or equal to 30% of the total site area (including building footprint). 25% of the minimum 30% total outdoor space requirement must be planted with a diversity of vegetation or have overhead vegetated canopy. The outdoor space must be physically accessible and be one or more of the following:

• a pedestrian-oriented paving or landscape area that accommodate outdoor social activities

• a recreation-oriented paving or landscape area that encourage physical activity;

• a landscape area with a diversity of vegetation types and species that provide opportunities for year-round visual interest;

• a garden space dedicated to community gardens or urban food production;

• preserved or created habitat that meets the criteria of SS Credit Protect or Restore Habitat and also includes elements of human interaction.

Extensive or intensive vegetated roofs that are physically accessible can be used toward the minimum 25% vegetation requirement, and qualifying roof-based physically accessible paving areas can be used toward credit compliance. Wetlands or naturally designed ponds may count as open space if the side slope gradients average 1:4 (vertical:horizontal) or less and are vegetated.

1 point of 1 possible

WE-3 CREDIT: OUTDOOR WATER USE REDUCTION

ESTABLISHMENT

To reduce outdoor water consumption.

REF SITE PLAN

PERFORMANCE

educe outdoor…