This is Addendum No. 3 to a Request for Qualifications issued by the Franklin County Board of Commissioners for professional engineering services related to the GEMS (S. Grener Avenue, Emmit Avenue, Mix Avenue, and Sullivant Avenue) Water Main Replacement Project in Columbus, Ohio. The RFQ seeks engineering design services for water main replacement across four streets with defined project limits: S. Grener from Sullivant to Stiles, Mix from Sullivant to Bunker, Emmit from Stiles to Bunker, and Sullivant from S. Grener to Emmit. The submittal deadline remains April 24, 2025, at 2:00 PM EST. The County anticipates design completion will require eight months from contract award, with project bidding anticipated to begin mid-February 2026 and take approximately three months, resulting in a construction award in late May 2026. The County intends to commence construction by the end of June 2026. Submittals should include single-sided PDFs on flash drives.

The construction phase of the GEMS Water Main Replacement Project will be jointly funded by the Water and Sewer Line Replacement Assistance Program (WSLRA) and the Ohio Public Works Commission (OPWC). Funding has been established for the construction phase with a constraint that construction must commence by the end of June 2026 per OPWC requirements. All addenda and updates related to this RFQ are available on the Franklin County Purchasing Department's website at https://bids.franklincountyohio.gov/.

View the file

Other files

File Type Posted
B130D82C-B69F-E211-5C113B664A13BDA1.pdf PDF
4ADB9154-92D0-FA39-8C51818579A9E699.pdf PDF
E99102BF-B146-146D-35DFAF9763C1170B.pdf PDF
5FEA932D-A443-F834-C369AEC7AD13A552.pdf PDF
D1C75C4E-ACBE-A700-94A3260C246A50BF.pdf PDF
1FF7D8D0-C608-E689-8D121B0F5CC22DA9.pdf PDF
9D5C4E27-A2A7-EBA2-2714B42F829186DC.pdf PDF
4ADBF0DE-FA15-F6CB-0B2B1FFF2D166DEF.pdf PDF
B867E43E-FCA2-ABC6-686473D3D551080B.docx DOCX document
600B382B-92C2-EE01-36E3171A1CE23381.pdf PDF
4ADC6B3E-009D-638E-F9834A3736C61F00.xlsx XLSX spreadsheet
4ADBDA30-A10A-65AC-2585EBF3396EC49F.pdf PDF
FAFB33F1-A49E-7354-6799AC07E5D29DA0.pdf PDF
48C544C3-FCC4-F4ED-99FB5E91E5744B30.pdf PDF
44F2E64B-E391-5EAC-DD33927813E7BE98.xlsx XLSX spreadsheet
F388F0B8-095B-81FD-4AB0A90CB30AE31F.pdf PDF
98C3F6F7-A2E4-2584-EE8EB79AF1AA8052.xlsx XLSX spreadsheet
260F9701-94BA-EFEA-FCAED968AC730EE0.docx DOCX document
ED338BF8-FCF8-7E6B-4327CDB3236D9A0A.pdf PDF
A3F924CA-A2E1-A38A-2E6F296BD4EAE5D4.pdf PDF
47647B12-EF69-CBAE-3877E615229CE346.pdf PDF
44F2A935-093F-1234-3F0F06EFB73CE154.xlsx XLSX spreadsheet
45745F40-E0BA-1577-1AE1A9CC2179CA13.pdf PDF
455CC78D-B78A-EC66-F7D6D71B8AF36042.pdf PDF
47A09361-9A16-2F9F-03970F0DC73EAB8D.pdf PDF
1FF6D412-D5CF-E3DA-42373990EB63A4DE.docx DOCX document
E9905CF7-C973-40FC-678D5FD85143E735.pdf PDF
477EEBB5-9B64-4073-39F4D92B43E61BB0.pdf PDF
47ADF7AD-983F-9719-2E5C720D20F03E5A.xlsx XLSX spreadsheet
BCDA75E7-EC2E-694E-CB30EC7B8D89F683.pdf PDF
8BE169B1-0EA5-67F3-FE8D32CD74B2BC3C.pdf PDF
D19B3093-A699-8107-EE175100DAB2A969.pdf PDF
4ADC244E-B24C-BEC2-4654E43F7ACFB8A4.xlsx XLSX spreadsheet
1FF79148-03D3-7B1B-77CF64FD687ECA4C.pdf PDF
A4692B9C-E659-F33F-532C87A025A11AC2.pdf PDF
9EDCD8B0-B36E-8610-B9A1060DE4F7BDD1.pdf PDF
E920A267-FB29-7597-A525F8234B855C09.pdf PDF
52DB9448-0DA4-58EC-7CC559390BFA917E.pdf PDF
451DAC14-D169-2A9F-1266443CD504A357.xlsx XLSX spreadsheet
36771012-968A-47BA-49FB1CC4DFFFEC63.pdf PDF
48C71F36-F14E-8501-2A85945F358C6068.xlsx XLSX spreadsheet
600AF88E-C800-4399-20BE9FDE4A50714B.docx DOCX document
3CA5BBE9-A618-9D6F-45A1FE1B6F58F0BF.pdf PDF
48FFA356-A619-FDBE-4B4D833D8E7B2589.pdf PDF
8BE999EA-C1F3-6CAA-1ED2B57E621612FB.pdf PDF
8CFF3838-EA7E-33CD-42D86D9937F5AFDB.pdf PDF
1FF7B35A-B067-E38B-5984FBC2B840ECE1.pdf PDF
8B0111A9-AB26-EF6C-1377B5BEC77C1480.pdf PDF
39A8A9E3-F569-C6B6-B9E7BF50CFDC4F51.pdf PDF
47A070EA-AA3B-485A-6C240303241C99D2.pdf PDF
Show 40 more

Latest 50 of 149 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

cleanwater.franklincountyohio.gov

April 18, 2025

FRANKLIN COUNTY BOARD OF COMMISSIONERS

REQUEST FOR QUALIFICATIONS 2025-09-03

PROVISION OF PROFESSIONAL ENGINEERING SERVICES FOR S.GRENER AVENUE, EMMIT

AVENUE, MIX AVENUE, AND SULLIVANT AVENUE (GEMS) WATER MAIN REPLACEMENT

PROJECT

373 South High Street, 25th Floor Purchasing Department Columbus, Ohio 43215

Franklin County

Addendum No. 3

TO ALL BIDDERS:

This Addendum supplements and amends the original Request for Qualifications and shall be taken into account in preparing submissions. When returning your statement of qualifications, please sign and return the signature page of the Addendum with your response.

Company name and signature of authorized company representative Date

Provision of Professional Engineering Services for S. Grener Avenue, Emmit Avenue, Mix Avenue, and

Sullivant Avenue (GEMS) Water Main Replacement Project

RFQ 2025-09-03

Addendum No. 3

April 18, 2025

1. The Submittal Deadline Date/Time shall remain the same: April 24, 2025, at 2:00 PM (EST).

2. Question 1: What is the anticipated schedule for bidding of this project?

Response 1: Per Response 2 (below), the project should be ready for bid around mid-February 2026.

Bidding is anticipated to take 3 months, which makes the award for construction in late-May 2026.

3. Question 2: What is FCSE’s desired date of design completion for this project?

Response 2: The County anticipates Design will take 8 months from the Award of Contract to Bidding.

4. Question 3: For the flash drives requested for the GEMS Project, do you want single-sided PDF for ease of copying, rather than the double-sided we are using for our spiral-bound submittals?

Response 3: Please submit single-sided PDFs on the flash drives.

5. Question 4: I had trouble with my audio for the meeting. It seems pretty short, so I assume there were no changes/addendums to the requirements originally published.

Response 4: Please see the Purchasing Department’s website (https://bids.franklincountyohio.gov/) for all addenda published related to this RFQ.

6. Question 5: We understand that this is funding dependent, but is the intent to begin construction in 2026?

Response 5: Yes. The County would like to start construction by end of June 2026.

7. Question 6: Could you please confirm the extents of the water main replacement for each street?

From the exhibit included in the RFQ it appears that the project limits are:

• S. Grener from Sullivant to Stiles

• Mix from Sullivant to Bunker

• Emmit from Stiles to Bunker

• Sullivant from S. Grener to Emmit

Response 6: The extents listed above are correct.

https://bids.franklincountyohio.gov/

8. Question 7: Has funding been established for the construction phase of this project? If so, are there any constraints placed on the construction schedule due the funding source(s)?

Response 7: The construction phase of this project will be jointly funded by WSLRA and OPWC. Per the requirements of OPWC, construction is to commence by the end of June 2026.

ATTACHMENTS:

None.

END OF ADDENDUM