98C3F6F7-A2E4-2584-EE8EB79AF1AA8052.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Site Security Cameras, LiDAR & Management System
- Solicitation number
- 2025-62-21
- Issued by
- Franklin County, Ohio
About this file
This is a Pricing Response Form (Appendix B) for a sewer lateral installation project in Columbus, Ohio, administered by the county. The project involves sewer line connections for nine residential properties located on North Hague Avenue and Britton Avenue in Columbus. The scope of work includes installation of sewer laterals from lateral stubs to the rear of each home, connection of gray and black water lines, clear water lines, sewer connections, system abandonment, and residential plumbing permits. Linear footage requirements for lateral installation range from 83 to 230 linear feet across the nine properties, with property owners identified for each location.
Bidders must provide a cost per linear foot for sewer lateral installation and itemized costs for all components including gray and black water line connections, clear water line connections, sewer connection permits and capacity fees, sewage system abandonment, septic tank system (STS) abandonment permits, residential plumbing permits (calculated at $60.00 plus $15.00 per fixture), and any miscellaneous costs with attached justification. The pricing form indicates a standardized cost of $3,433.00 per linear foot and $75.00 per property for certain components, though the county explicitly disclaims responsibility for calculation errors and requires bidders to verify all values independently. Pre-construction video and photo documentation is required, and costs must include all labor, equipment, and materials for pumping, disposing, crushing, and filling tank contents per Franklin County Public Health specifications.
View the file
Other files
Show 40 more
Latest 50 of 149 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hague Approved_Electronic
| APPENDIX B – PRICING RESPONSE FORM | |||||||||||||||
| No. | Address | Property Owner | Area | Estimate of Linear Feet from Lateral Stub to Rear of Home | Cost per Linear Foot for Sewer Lateral Installation(1) | Extended Cost to Install Sewer Lateral (Linear Feet x Cost per Foot) | Cost of Gray & Black Water Lines Connection | Cost of Clear Water Lines Connection | Cost of Sewer Connection Permit & Capacity Fees | Cost of Sewage System Abandonment(2) | Cost of STS Abandonment Permit | Cost of Residential Plumbing Permit ($60.00 plus $15.00 per Fixture) | Miscellaneous Costs (Attach Justification)(1) | TOTAL COST PER PROPERTY | |
| 1 | 1390 N. Hague Ave, Columbus, OH 43204 | Hubert Seifert | |||||||||||||
| Helga Seifert | Hague | 230 | $ 3,433.00 | $ 75.00 | |||||||||||
| 2 | 1487 N. Hague Ave, Columbus, OH 43204 | Kathryn Yazel | Hague | 165 | $ 3,433.00 | $ 75.00 | |||||||||
| 3 | 1580 N. Hague Ave, Columbus, OH 43204 | Jeff Nelson | Hague | 149 | $ 3,433.00 | $ 75.00 | |||||||||
| 4 | 1583 N. Hague Ave, Columbus, OH 43204 | Brian Truitt | |||||||||||||
| Karten Truitt | Hague | 152 | $ 3,433.00 | $ 75.00 | |||||||||||
| 5 | 1685 N. Hague Ave, Columbus, OH 43204 | Sue Turner | Hague | 136 | $ 3,433.00 | $ 75.00 | |||||||||
| 6 | 1763 N. Hague Ave, Columbus, OH 43204 | Bradford Thompson | |||||||||||||
| Linda Thompson | Hague | 132 | $ 3,433.00 | $ 75.00 | |||||||||||
| 7 | 3621 Britton Ave, Columbus, OH 43204 | Lisa Swank | Hague | 83 | $ 3,433.00 | $ 75.00 | |||||||||
| 8 | 3631 Britton Ave, Columbus, OH 43205 | Cheryl Launer | Hague | 84 | $ 3,433.00 | $ 75.00 | |||||||||
| 9 | 3641 Britton Ave, Columbus, OH 43206 | Shirley Skaggs | Hague | 142 | $ 3,433.00 | $ 75.00 | |||||||||
| THE COUNTY IS NOT RESPOSIBLE FOR ANY CALCULATION ERRORS AS A RESULT OF USING THIS SPREADSHEET. ALL VALUES SHOULD BE VERIFED BY THE BIDDER. | Pre-Construction Video/Photo Documentation | ||||||||||||||
| Notes: |
(1) Include total costs of labor, equipment, and materials.
(2) lnclude costs of labor, equipment, and materials to pump and dispose of contents of tank, crush, and fill tank per FCPH specifications.
TOTAL PROJECT COST