Atttachment J.21 CM Contract Requirements Matrix_.pdf
PDF 86 KB Posted
- Solicitation number
- DCSC-24-RFP-0170
- Issued by
- District of Columbia Government
About this file
This document outlines requirements for construction management and quality assurance services for the District of Columbia Courts. The Courts seek an integrated construction project management office team to plan, fund, and execute capital projects on time, within budget and scope. Required services include project management from inception through occupancy and warranty periods across all project phases for various facilities. The selected provider must manage projects program-wide using a systematic and consistent approach to efficiently deliver multiple concurrent projects of varying scale and complexity across sites. The solicitation number is DCSC-24-RFP-0170 and seeks qualified sources to join the existing Courts project and facilities management division team in providing the outlined construction management and quality assurance role.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract
Section
Reference
CMAA
Section Reference
CMAA/PMI RELATED GUIDELINE PROJECT PHASE
(CMAA)
CMAA SECTION TITLE Requirement Type FREQUENCY CONTRACT
REQUIREMENT
DESCRIPTION
DELIVERABLE DUE
DATE
TBD 6.2 CMAA Contract Administration Guidelines 01 Pre-Design PMP/CMP TBD TBD TBD TBD
TBD 6.2 CMAA Contract Administration Guidelines 01 Pre-Design Project Procedures Manual TBD TBD TBD TBD
TBD 6.2 CMAA Contract Administration Guidelines 01 Pre-Design Project Delivery TBD TBD TBD TBD
TBD 6.2 CMAA Contract Administration Guidelines 01 Pre-Design Management Information System (MIS) TBD TBD TBD TBD
TBD 6.2 CMAA Contract Administration Guidelines 01 Pre-Design Sustainability Plan TBD TBD TBD TBD
TBD 6.2 CMAA Contract Administration Guidelines 01 Pre-Design Owner’s Project Requirements (OPR)
Document
TBD TBD TBD TBD
TBD 6.2 CMAA Contract Administration Guidelines 01 Pre-Design Conceptual Studies TBD TBD TBD TBD
TBD 6.2 CMAA Contract Administration Guidelines 01 Pre-Design Pre-Design Cost Investigation TBD TBD TBD TBD
TBD 6.2 CMAA Contract Administration Guidelines 01 Pre-Design Master Schedule TBD TBD TBD TBD
TBD 6.2 CMAA Contract Administration Guidelines 01 Pre-Design Milestone Schedule TBD TBD TBD TBD
TBD 6.2 CMAA Contract Administration Guidelines 01 Pre-Design Design Consultant Contract TBD TBD TBD TBD
TBD 6.3 CMAA Contract Administration Guidelines 02 Design Administration and Coordination of Design
Contracts
TBD TBD TBD TBD
TBD 6.3 CMAA Contract Administration Guidelines 02 Design Master Schedule TBD TBD TBD TBD
TBD 6.3 CMAA Contract Administration Guidelines 02 Design Design Phase Communication TBD TBD TBD TBD
TBD 6.3 CMAA Contract Administration Guidelines 02 Design Quality Management System (QMS) TBD TBD TBD TBD
TBD 6.3 CMAA Contract Administration Guidelines 02 Design Design Reviews TBD TBD TBD TBD
TBD 6.3 CMAA Contract Administration Guidelines 02 Design Sustainability Reviews TBD TBD TBD TBD
TBD 6.3 CMAA Contract Administration Guidelines 02 Design Construction Contract Specifications and
Drawings
TBD TBD TBD TBD
TBD 6.3 CMAA Contract Administration Guidelines 02 Design Technical Specification Reviews TBD TBD TBD TBD
TBD 6.3 CMAA Contract Administration Guidelines 02 Design Scheduling Specifications TBD TBD TBD TBD
TBD 6.3 CMAA Contract Administration Guidelines 02 Design Constructability Reviews TBD TBD TBD TBD
TBD 6.3 CMAA Contract Administration Guidelines 02 Design Commissioning (Cx) Reviews TBD TBD TBD TBD
TBD 6.3 CMAA Contract Administration Guidelines 02 Design Design Phase Progress TBD TBD TBD TBD
TBD 6.3 CMAA Contract Administration Guidelines 02 Design Value Engineering TBD TBD TBD TBD
TBD 6.3 CMAA Contract Administration Guidelines 02 Design Construction Contract Packaging TBD TBD TBD TBD
TBD 6.3 CMAA Contract Administration Guidelines 02 Design Construction Base Budget TBD TBD TBD TBD
TBD 6.3 CMAA Contract Administration Guidelines 02 Design Pre-Bid Construction Phase Schedule TBD TBD TBD TBD
TBD 6.3 CMAA Contract Administration Guidelines 02 Design Additional Project-Specific Tasks TBD TBD TBD TBD
TBD 6.4 CMAA Contract Administration Guidelines 03 Procurement Development of Bidders List TBD TBD TBD TBD
TBD 6.4 CMAA Contract Administration Guidelines 03 Procurement Bidders Interest Campaign TBD TBD TBD TBD
TBD 6.4 CMAA Contract Administration Guidelines 03 Procurement Bidder’s Pre-Qualification TBD TBD TBD TBD
File details come from the government source that posted it. Updated .