Attachment J. 21 Corrected CM Contract Requirements Matrix_CPFMD.xlsx

XLSX spreadsheet 74 KB Posted

Attached to
Construction Management (CMa) and Quality Assurance Services
Solicitation number
DCSC-24-RFP-0170
Issued by

About this file

This is a solicitation for construction management and quality assurance services. The District of Columbia Courts seeks a qualified contractor to provide program-wide construction management and quality assurance oversight for capital projects. The selected contractor will manage all project phases from planning through occupancy for projects delivered via design-bid-build, design-build, or other methods. Services include developing master schedules, budgets, and quality plans; coordinating design and construction; conducting inspections and audits; and managing schedules, costs, documentation, and closeout. The contractor will also support the Courts' facilities program management office by improving project performance, resolving issues, and promoting integration across all projects.

View the file

Other files

File Type Posted
Attachment J. 13 B Corrected DC Courts AV Standards - Audiovisual Systems Narrative and Equipment List.pdf PDF
Amendment 2 DCSC-24-RFP-0170.pdf PDF
Amendment 3 DCSC-24-RFP-0170 CPFMD Responses.pdf PDF
Amendment 1 PM DCSC-24-RFP-0170.pdf PDF
Attachment J.14 Strategic Plan of the DC Courts 2018-2022.pdf PDF
Attachment J.8 Past Performance Questionnaire.pdf PDF
Attachment J.13.A Cable & Management Procedures Manual.pdf PDF
Attachment J.6 Tax Certification Affidavit.pdf PDF
Attachment J.2 - Anti-Collusion Statement.pdf PDF
Attachment J.24 BioData Template.pdf PDF
Attachment J.13 DC Courts Design Standards.pdf PDF
Attachment J.1 DC Courts GENERAL-PROVISIONS_2017 rev0517.pdf PDF
Attachment J.4 - Non-Discrimination.pdf PDF
Attachment J.5 Certificate of Eligibility.pdf PDF
Attachment J.9- Supplier Information Form DCCSF.pdf PDF
Attachment J.20 CPFMD and DC Courts Org Chart.pdf PDF
Attachment J.10 A Pricing Breakdown Sheet.xlsx XLSX spreadsheet
Attachment J.23 QMP_Outline and Guide_USACE_ecb_2017_20.pdf PDF
Attachment J.19 DC Courts Preliminary FCA - All Buildings 210730 .pdf PDF
Attachment J.11 CPFMD Standard Operating Procedures (CPFMD SOP) to be provided upon award.pdf PDF
Attachment J.15 Strategic Plan of the D.C. Courts 2023-2027, PowerPoint preview.pdf PDF
Attachment J.22 PMO Maturity Model and Roadmap Concept Examples.pdf PDF
Attachment J.18A IPS Narrative Report Charts to be provided upon award.pdf PDF
Attachment J.25 IPT Concept_DC Courts.pdf PDF
Attachment J.18 CPFMD Integrated Program Schedule_Oct 2023.pdf PDF
Attachment J.12 District of Columbia Courts Facilities Master Plan 2019, Issued July 2020.pdf PDF
Attachment J.3 - Ethics in Public Contracting.pdf PDF
CM Services_RFP_2023-12-13 CPFMD release.pdf PDF
Attachment J.7 Cert Regarding Drug Free Workplace.pdf PDF
Attachment J.16 The Judiciary Square Master Plan.pdf PDF
Atttachment J.21 CM Contract Requirements Matrix_.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MATRIX

Contract DCSC-24-RFP-XXXX
Solicitation/RFPAttachment J.21 Contract DCSC-24-RFP-0170

Contract Requirements Matrix

*The contract requirements matrix is intended as a tool to be used by the COTR and the CMa team to track requirements and deliverables of the contract. The contractor shall further develop and update this matrix for this purpose.
CONTRACTCONTRACT DOCUMENTContract Section ReferenceCMAA
Section ReferenceCMAA/PMI RELATED GUIDELINESERVICESPERFORMANCE DOMAIN (CMAA)PROJECT PHASE
(CMAA)CMAA SECTION TITLEPROJECT PHASE - PMIRequirement TypeFREQUENCYCONTRACT REQUIREMENT DESCRIPTIONDELIVERABLE DUE DATEACCEPTANCE/APPROVAL/FIO
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.2CMAA Contract Administration GuidelinesCMaContract Administration01 Pre-DesignPMP/CMPTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.2CMAA Contract Administration GuidelinesCMaContract Administration01 Pre-DesignProject Procedures ManualTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.2CMAA Contract Administration GuidelinesCMaContract Administration01 Pre-DesignProject DeliveryTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.2CMAA Contract Administration GuidelinesCMaContract Administration01 Pre-DesignManagement Information System (MIS)TBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.2CMAA Contract Administration GuidelinesCMaContract Administration01 Pre-DesignSustainability PlanTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.2CMAA Contract Administration GuidelinesCMaContract Administration01 Pre-DesignOwner’s Project Requirements (OPR) DocumentTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.2CMAA Contract Administration GuidelinesCMaContract Administration01 Pre-DesignConceptual StudiesTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.2CMAA Contract Administration GuidelinesCMaContract Administration01 Pre-DesignPre-Design Cost InvestigationTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.2CMAA Contract Administration GuidelinesCMaContract Administration01 Pre-DesignMaster ScheduleTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.2CMAA Contract Administration GuidelinesCMaContract Administration01 Pre-DesignMilestone ScheduleTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.2CMAA Contract Administration GuidelinesCMaContract Administration01 Pre-DesignDesign Consultant ContractTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.3CMAA Contract Administration GuidelinesCMaContract Administration02 DesignAdministration and Coordination of Design ContractsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.3CMAA Contract Administration GuidelinesCMaContract Administration02 DesignMaster ScheduleTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.3CMAA Contract Administration GuidelinesCMaContract Administration02 DesignDesign Phase CommunicationTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.3CMAA Contract Administration GuidelinesCMaContract Administration02 DesignQuality Management System (QMS)TBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.3CMAA Contract Administration GuidelinesCMaContract Administration02 DesignDesign ReviewsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.3CMAA Contract Administration GuidelinesCMaContract Administration02 DesignSustainability ReviewsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.3CMAA Contract Administration GuidelinesCMaContract Administration02 DesignConstruction Contract Specifications and DrawingsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.3CMAA Contract Administration GuidelinesCMaContract Administration02 DesignTechnical Specification ReviewsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.3CMAA Contract Administration GuidelinesCMaContract Administration02 DesignScheduling SpecificationsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.3CMAA Contract Administration GuidelinesCMaContract Administration02 DesignConstructability ReviewsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.3CMAA Contract Administration GuidelinesCMaContract Administration02 DesignCommissioning (Cx) ReviewsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.3CMAA Contract Administration GuidelinesCMaContract Administration02 DesignDesign Phase ProgressTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.3CMAA Contract Administration GuidelinesCMaContract Administration02 DesignValue EngineeringTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.3CMAA Contract Administration GuidelinesCMaContract Administration02 DesignConstruction Contract PackagingTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.3CMAA Contract Administration GuidelinesCMaContract Administration02 DesignConstruction Base BudgetTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.3CMAA Contract Administration GuidelinesCMaContract Administration02 DesignPre-Bid Construction Phase ScheduleTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.3CMAA Contract Administration GuidelinesCMaContract Administration02 DesignAdditional Project-Specific TasksTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.4CMAA Contract Administration GuidelinesCMaContract Administration03 ProcurementDevelopment of Bidders ListTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.4CMAA Contract Administration GuidelinesCMaContract Administration03 ProcurementBidders Interest CampaignTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.4CMAA Contract Administration GuidelinesCMaContract Administration03 ProcurementBidder’s Pre-QualificationTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.4CMAA Contract Administration GuidelinesCMaContract Administration03 ProcurementBid AdvertisementTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.4CMAA Contract Administration GuidelinesCMaContract Administration03 ProcurementDistribution of Bidding DocumentsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.4CMAA Contract Administration GuidelinesCMaContract Administration03 ProcurementAddendaTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.4CMAA Contract Administration GuidelinesCMaContract Administration03 ProcurementPre-Bid ConferenceTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.4CMAA Contract Administration GuidelinesCMaContract Administration03 ProcurementInformation to BiddersTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.4CMAA Contract Administration GuidelinesCMaContract Administration03 ProcurementBid Opening and EvaluationTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.4CMAA Contract Administration GuidelinesCMaContract Administration03 ProcurementProcurement OptionsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.4CMAA Contract Administration GuidelinesCMaContract Administration03 ProcurementPre-Award ConferenceTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.4CMAA Contract Administration GuidelinesCMaContract Administration03 ProcurementNotice to Proceed (NTP)TBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.4CMAA Contract Administration GuidelinesCMaContract Administration03 ProcurementSchedule MaintenanceTBDTBDTBDTBDTBDCMAA Time Management Guidelines
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.4CMAA Contract Administration GuidelinesCMaContract Administration03 ProcurementCost ReportingTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionPre-Construction Conference/MeetingTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionContract and Specification RequirementsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionConstruction Management Plan (CMP)TBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionPartneringTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionDocumentation of Existing ConditionsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionAssignment of Owner Furnished ItemsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionPermits, Insurance, Labor Affidavits, and BondsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionCommunication ProceduresTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionMeetingsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionDocumentation ProceduresTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionComputerized Information ManagementTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionQuality ControlTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionQuality AssuranceTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionQA/QC MethodsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionQuality Control ManualTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionField ReportsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionSafetyTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionChange ManagementTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionCost ControlTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionSchedule MonitoringTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionProgress PaymentsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionStatus ReportsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionClaims Mitigation/EvaluationTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionEntitlement EvaluationTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionDamages AssessmentTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionAs-Built DrawingsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionPunch ListsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.5CMAA Contract Administration GuidelinesCMaContract Administration04 ConstructionCommissioning (CX) and Functional Performance TestingTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.6CMAA Contract Administration GuidelinesCMaContract Administration05 Post ConstructionChecklist and ScheduleTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.6CMAA Contract Administration GuidelinesCMaContract Administration05 Post ConstructionOperation and Maintenance (O&M) ManualsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.6CMAA Contract Administration GuidelinesCMaContract Administration05 Post ConstructionOperations Personnel TrainingTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.6CMAA Contract Administration GuidelinesCMaContract Administration05 Post ConstructionSpare Parts and WarrantiesTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.6CMAA Contract Administration GuidelinesCMaContract Administration05 Post ConstructionFinal PermitsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.6CMAA Contract Administration GuidelinesCMaContract Administration05 Post ConstructionSustainable Project DocumentationTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.6CMAA Contract Administration GuidelinesCMaContract Administration05 Post ConstructionAcceptance, Performance Testing, and Commissioning (Cx)TBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.6CMAA Contract Administration GuidelinesCMaContract Administration05 Post ConstructionBeneficial OccupancyTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.6CMAA Contract Administration GuidelinesCMaContract Administration05 Post ConstructionClaims ResolutionTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.6CMAA Contract Administration GuidelinesCMaContract Administration05 Post ConstructionContractor Closeout and Final PaymentTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.6CMAA Contract Administration GuidelinesCMaContract Administration05 Post ConstructionCloseout ReportTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.6CMAA Contract Administration GuidelinesCMaContract Administration05 Post ConstructionContractor Warranty ResponsibilitiesTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.6CMAA Contract Administration GuidelinesCMaContract Administration05 Post ConstructionPost-Occupancy Review for Energy Performance ContractsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.6CMAA Contract Administration GuidelinesCMaContract Administration05 Post ConstructionProject CloseoutTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.6CMAA Contract Administration GuidelinesCMaContract Administration05 Post ConstructionPre-Closeout MeetingTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.6CMAA Contract Administration GuidelinesCMaContract Administration05 Post ConstructionSubstantial CompletionTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.6CMAA Contract Administration GuidelinesCMaContract Administration05 Post ConstructionCloseout ProceduresTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD6.6CMAA Contract Administration GuidelinesCMaContract Administration05 Post ConstructionFinal Milestone CompletionTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.1CMAA Cost Management GuidelinesCMaCost Management - Project01 Pre-DesignPreliminary Cost InvestigationTBDTBDPrior to the Pre-Design Phase of every project, at each Project Handoff Meeting, the CMa shall review the approved CMa Cost/Financial Management Plan (within the CMaP) with the Owner and make project-specific adjustments as necessary to meet the project delivery objectives.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.1CMAA Cost Management GuidelinesCMaCost Management - Project01 Pre-DesignPreliminary Cost InvestigationTBDTBDConduct project site visits to investigate and document factors that might affect construction operations and project costs such as site anomalies, access constraints, existing structure or utility constraints, etc.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.1CMAA Cost Management GuidelinesCMaCost Management - Project01 Pre-DesignPreliminary Cost InvestigationTBDTBDAssess the market/conduct local market surveys to determine current project costs, availability of labor, materials and equipment, current and future bidding climates, local code requirements, and other factors that may affect project cost.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.1CMAA Cost Management GuidelinesCMaCost Management - Project01 Pre-DesignProject and Construction BudgetsTBDTBDSupport Annual Capital Budget development: Develop project scopes, construction phasing alternatives, acquisition strategies, and lifecycle cost studies to support the development of a total project cost.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.1CMAA Cost Management GuidelinesCMaCost Management - Project01 Pre-DesignProject and Construction BudgetsTBDTBDSupport Annual Capital Budget development: Provide Rough Order of Magnitude (ROM) estimates for budgeted projects to include all project hard and soft costs from conception to occupancy.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.1CMAA Cost Management GuidelinesCMaCost Management - Project01 Pre-DesignCost AnalysisTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.1CMAA Cost Management GuidelinesCMaCost Management - Project01 Pre-DesignPreliminary Design EstimateTBDTBDValidate and document total project budget with a breakdown of all costs in each project phase aligned with the WBS. The CMa shall include this in the PMP.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.1CMAA Cost Management GuidelinesCMaCost Management - Project01 Pre-DesignPreliminary Design EstimateTBDTBDDevelop Independent Government Estimates (IGEs) or Independent Cost Estimates (ICEs) with accompanying basis of estimate narrative for project (all project delivery types) utilizing parametric cost modeling, site-specific knowledge, and an understanding of local construction economics.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.1CMAA Cost Management GuidelinesCMaCost Management - Project01 Pre-DesignPreliminary Design EstimateTBDTBDWork with the PgMO to ensure that the total project budgets and IGE/ICEs are aligned with the cost-loaded CPFMD IPS and/or the funds appropriated for each project.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.3CMAA Cost Management GuidelinesCMaCost Management - Project02 DesignEstimatesTBDTBDEstablish and maintain a consistent cost estimating framework and process, from pre-design through post-construction for every project, that supports and encourages the avoidance of construction claims and supports construction claims resolution should they be unavoidable.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.3CMAA Cost Management GuidelinesCMaCost Management - Project02 DesignCost Verification StagesTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.3CMAA Cost Management GuidelinesCMaCost Management - Project02 DesignSchematic Design EstimateTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.3CMAA Cost Management GuidelinesCMaCost Management - Project02 DesignIn Progress and Final Design EstimatesTBDTBDReview all design documentation, addenda and cost estimates provided by the designer or D-B team with every design submission and proactively identify cost variances and mitigation ideas prior to design progressing and the subsequent design submission. As cost estimates begin as parametric during preliminary design phases and may be unit price level at final design stages, the CMa shall provide the estimating expertise to review at all stages of design.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.3CMAA Cost Management GuidelinesCMaCost Management - Project02 DesignValue Analysis/Value Engineering StudiesTBDTBDAt initial design stages, conduct and present value analysis/value engineering studies that consider the capital, operating, and maintenance costs to verify the design achieves the most cost-effective lifecycle solution. The CMa shall provide all independent experts required to complete value analysis/engineering tasks, such as a Certified Value Specialist (CVS).TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.3CMAA Cost Management GuidelinesCMaCost Management - Project02 DesignValue Analysis/Value Engineering StudiesTBDTBDWith every design submission, review D-B’s value analysis/value engineering solutions and proactively engage the D-B within the Owner review timelines to ensure the design is within the budgeted construction costs.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.3CMAA Cost Management GuidelinesCMaCost Management - Project02 DesignCost Monitoring and ReportingTBDTBDThe CMa shall proactively and constantly monitor the design to identify scope changes, evaluate time and cost impact of design changes, report cost impacts and cost information timely and work with the design and/or D-B team to reduce the need for redesign due to cost overruns.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.3CMAA Cost Management GuidelinesCMaCost Management - Project02 DesignCost Monitoring and ReportingTBDTBDCPFMD IPS alignmentTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.3CMAA Cost Management GuidelinesCMaCost Management - Project02 DesignCost Monitoring and ReportingTBDTBDLog, monitor, review design payment applications and report Design costs against project budget.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.3CMAA Cost Management GuidelinesCMaCost Management - Project02 DesignCost Monitoring and ReportingTBDTBDLog, monitor, review design change orders and report Design change costs against project budget and contingency draw-down.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.3CMAA Cost Management GuidelinesCMaCost Management - Project02 DesignCost Monitoring and ReportingTBDTBDGenerate all reports, presentations, project budget summaries, etc. necessary to communicate project cost-related design issues to project stakeholders.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.3CMAA Cost Management GuidelinesCMaCost Management - Project02 DesignCost Monitoring and ReportingTBDTBDCommunicate and align the project budget and project WBS to the D-B team.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.4CMAA Cost Management GuidelinesCMaCost Management - Project03 ProcurementEstimates for AddendaTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.5CMAA Cost Management GuidelinesCMaCost Management - Project04 ConstructionSchedule of ValuesTBDTBDReview Schedule of Values (SOV), submitted with D-B bid proposals or after award and provide feedback and coordination with D-B to eliminate “front-end loading” and reduce the occurrence of payment application disputes. Coordinate with CMa schedule team to ensure approved SOV in cost-loaded schedule for all progress payments through project completion and close-out.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.5CMAA Cost Management GuidelinesCMaCost Management - Project04 ConstructionSchedule of ValuesTBDTBDGenerate all reports, presentations, project budget summaries, etc. necessary to communicate project cost-related construction issues to project stakeholders.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.5CMAA Cost Management GuidelinesCMaCost Management - Project04 ConstructionChange Order ControlTBDTBDDevelop and implement a change order control system for cost/financial control during construction.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.5CMAA Cost Management GuidelinesCMaCost Management - Project04 ConstructionChange Order ControlTBDTBDLog, monitor, review GC and other vendors payment applications and report construction costs against project budget.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.5CMAA Cost Management GuidelinesCMaCost Management - Project04 ConstructionChange Order ControlTBDTBDReview D-B pay applications to ensure compliance with determined and agreed to SOV for all progress payments through project completion and closeout.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.5CMAA Cost Management GuidelinesCMaCost Management - Project04 ConstructionChange Order ControlTBDTBDLog, monitor, review construction change orders and report construction change costs against project budget, schedule, and contingency draw-down.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.5CMAA Cost Management GuidelinesCMaCost Management - Project04 ConstructionChange Order ControlTBDTBDDevelop estimates (IGE/ICEs) with organized data, clear scope narratives, and schedule-related cost impact descriptions for change orders prior to receiving estimates from the D-B.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.5CMAA Cost Management GuidelinesCMaCost Management - Project04 ConstructionTradeoff StudiesTBDTBDConduct, document and provide tradeoff studies to ensure budget compliance.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.5CMAA Cost Management GuidelinesCMaCost Management - Project04 ConstructionClaims for CostTBDTBDEstablish a detailed audit trail so that a complete record of all project-related financial transactions in order of activity is available in the event of subsequent audits, claims, or investigations.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD3.6CMAA Cost Management GuidelinesCMaCost Management - Project05 Post ConstructionFinal Log/Spreadsheet/ReportTBDTBDProvide a final log/spreadsheet and report that summarizes total project costs (to include all project change orders) and identifies any unresolved issues that may have a cost impact after construction, such as a claim or dispute.TBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.5TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Team Organizational Chart (Draft)30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.5TBDTBDCMaProgram Management00 Initial DeliverablesTBDPresentationOne TimeCMa Team Organizational Chart (Draft)within 2 calendar days of submissionAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.5TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Team Organizational Chart (Final)90 calendar days after Owner acceptance of DraftAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.5TBDTBDCMaProgram Management00 Initial DeliverablesTBDPresentationOne TimeCMa Team Organizational Chart (Final)within 2 calendar days of submissionAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.5TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentQuarterlyCMa Team Organizational Chart (Revision)Quarterly after Owner acceptance of Final versionAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.5TBDTBDCMaProgram Management00 Initial DeliverablesTBDPresentationQuarterlyCMa Team Organizational Chart (Revision)within 2 calendar days of submissionAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Draft) - CMa Strategy Alignment Plan30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Draft) - CMa Benefits Plan30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Draft) - CMa Stakehoder Engagement & Mgmt Plan30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Draft) - Stakehoder Register (Program)30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Draft) - CMa Governance Plan30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Draft) - CMa Change Mgmt Plan30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Draft) - CMa Communications Mgmt Plan30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.63.1TBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Draft) - CMa Cost/Financial Mgmt Plan30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Draft) - CMa Information Mgmt Plan30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Draft) - CMa Procurement Mgmt Plan30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Draft) - CMa Quality Mgmt Plan30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Draft) - CMa Integration Mgmt Plan30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Draft) - CMa Resource Mgmt Plan30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Draft) - CMa Risk Mgmt Plan30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Draft) - CMa Schedule Mgmt Plan30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Draft) - CMa Safety Mgmt Plan30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Draft) - CMa Scope Mgmt Plan30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Draft) - PMO Road Map & Maturity Model30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Draft) - CMa/PMO Activities WBS30 calendar days after contract awardAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDPresentationOne TimeCMa Plan (Draft)within 2 calendar days of submissionAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentOne TimeCMa Plan (Final)90 calendar days after Owner acceptance of Draft; coordinated w/PgMPAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDPresentationOne TimeCMa Plan (Final)within 2 calendar days of submissionAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDDocumentQuarterlyCMa Plan (Revision)Quarterly after Owner acceptance of Final version; coordinated w/PgMP; review at Project Handoff MtgAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)C.7.1.6TBDTBDCMaProgram Management00 Initial DeliverablesTBDPresentationQuarterlyCMa Plan (Revision)Quarterly after Owner acceptance of Final version; coordinated w/PgMP; review at Project Handoff MtgAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.2The Standard for Program Management, 4th EditionCMaProgram Management01 Pre-DesignThe Program Management (PgM) TeamTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.2The Standard for Program Management, 4th EditionCMaProgram Management01 Pre-DesignProgram Management Plan (PgMP)TBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.2The Standard for Program Management, 4th EditionCMaProgram Management01 Pre-DesignProgram Management (PgM) OfficeTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.2The Standard for Program Management, 4th EditionCMaProgram Management01 Pre-DesignManagement Information System (MIS)TBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.2The Standard for Program Management, 4th EditionCMaProgram Management01 Pre-DesignScope DefinitionTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.2The Standard for Program Management, 4th EditionCMaProgram Management01 Pre-DesignProgram EvaluationTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.3The Standard for Program Management, 4th EditionCMaProgram Management02 DesignDesign Organization StructureTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.3The Standard for Program Management, 4th EditionCMaProgram Management02 DesignDesign CriteriaTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.3The Standard for Program Management, 4th EditionCMaProgram Management02 DesignDesign DevelopmentTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.3The Standard for Program Management, 4th EditionCMaProgram Management02 DesignConstruction Contract PackagingTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.3The Standard for Program Management, 4th EditionCMaProgram Management02 DesignOwner-Purchased Equipment & MaterialsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.3The Standard for Program Management, 4th EditionCMaProgram Management02 DesignQuality ManagementTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.3The Standard for Program Management, 4th EditionCMaProgram Management02 DesignCost ManagementTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.3The Standard for Program Management, 4th EditionCMaProgram Management02 DesignTime ManagementTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.4The Standard for Program Management, 4th EditionCMaProgram Management03 ProcurementProcurement ScopeTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.4The Standard for Program Management, 4th EditionCMaProgram Management03 ProcurementProcurement StrategyTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.4The Standard for Program Management, 4th EditionCMaProgram Management03 ProcurementPgM Role in ProcurementTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.4The Standard for Program Management, 4th EditionCMaProgram Management03 ProcurementMarket Analysis/Bid Opportunity CommunicationsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.4The Standard for Program Management, 4th EditionCMaProgram Management03 ProcurementSchedule and Document ManagementTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.5The Standard for Program Management, 4th EditionCMaProgram Management04 ConstructionProvision of On-Site FacilitiesTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.5The Standard for Program Management, 4th EditionCMaProgram Management04 ConstructionCoordination and CommunicationTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.5The Standard for Program Management, 4th EditionCMaProgram Management04 ConstructionProgram Progress MeetingsTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.5The Standard for Program Management, 4th EditionCMaProgram Management04 ConstructionTime ManagementTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.5The Standard for Program Management, 4th EditionCMaProgram Management04 ConstructionBudget and Cost MonitoringTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.5The Standard for Program Management, 4th EditionCMaProgram Management04 ConstructionFunding/Cash FlowTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.5The Standard for Program Management, 4th EditionCMaProgram Management04 ConstructionChange OrdersTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.5The Standard for Program Management, 4th EditionCMaProgram Management04 ConstructionClaims ManagementTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.5The Standard for Program Management, 4th EditionCMaProgram Management04 ConstructionQuality ManagementTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.5The Standard for Program Management, 4th EditionCMaProgram Management04 ConstructionDocument ControlTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.5The Standard for Program Management, 4th EditionCMaProgram Management04 ConstructionManagement ReportingTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.6The Standard for Program Management, 4th EditionCMaProgram Management05 Post ConstructionProgram CompletionTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.6The Standard for Program Management, 4th EditionCMaProgram Management05 Post ConstructionProgram Projects InterfaceTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.6The Standard for Program Management, 4th EditionCMaProgram Management05 Post ConstructionOperation and Maintenance ManagementTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.6The Standard for Program Management, 4th EditionCMaProgram Management05 Post ConstructionTurnover (Activation or Start-Up)TBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.6The Standard for Program Management, 4th EditionCMaProgram Management05 Post ConstructionFacility ManagementTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD11.6The Standard for Program Management, 4th EditionCMaProgram Management05 Post ConstructionAdministrative CloseoutTBDTBDTBDTBDTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD2.2A Guide to the Project Management Body of Knowledge PMBOK Guide, Seventh EditionCMa/PMProject Management01 Pre-DesignProject OrganizationMeetingRecurring (per Project)Project Handoff MeetingWithin 14 calendar days of project assignment by Owner/PgMAttendance; Scheduled by PgMO
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD2.2A Guide to the Project Management Body of Knowledge PMBOK Guide, Seventh EditionCMa/PMProject Management01 Pre-DesignProject OrganizationDocumentRecurring (per Project)Project Team Assignment/Responsibility Matrix7 calendar days after Project Handoff Meeting with Owner/PgMAcceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD2.2A Guide to the Project Management Body of Knowledge PMBOK Guide, Seventh EditionCMa/PMProject Management01 Pre-DesignProject OrganizationDocument ReviewRecurring (per Project)CM Contract Requirements MatrixReview for CMa team compliance at Project Handoff MeetingFIO; CMa Lead document review
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD2.2A Guide to the Project Management Body of Knowledge PMBOK Guide, Seventh EditionCMa/PMProject Management01 Pre-DesignProject Management Plan (PMP)DocumentRecurring (per Project)Project Management Plan (PMP)30 calendar days after Project Handoff Meeting with Owner/PgM; coordinated w/CMaP and PgMP
(Occurs minimum 90 days prior to the award of Design contract for D-B-B or 60 days prior to the award of D-B contract)Acceptance (facilitate Owner review of each PMP to ensure acceptance)
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD2.2A Guide to the Project Management Body of Knowledge PMBOK Guide, Seventh EditionCMa/PMProject Management01 Pre-DesignProject Management Plan (PMP)PresentationRecurring (per Project)Project Management Plan (PMP)Present DRAFT PMP upon submission to Owner for review.Approval
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD2.2A Guide to the Project Management Body of Knowledge PMBOK Guide, Seventh EditionCMa/PMProject Management01 Pre-DesignProject Procedures ManualDocumentRecurring (per Project)Project Procedures Manual30 calendar days after Owner acceptance of PMP; coordinated w/CMaP, PgMP, Division 01 - General Requirements
(Occurs minimum 90 days prior to the award of Design contract for D-B-B or 60 days prior to the award of D-B contract)Acceptance
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD2.2A Guide to the Project Management Body of Knowledge PMBOK Guide, Seventh EditionCMa/PMProject Management01 Pre-DesignPre-Design Project ConferenceMeetingRecurring (per Project)Pre-Design Project ConferenceAfter Project Handoff Meeting; according to pre-design and design strategy & scheduleSchedule, Lead, Document/Record
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD2.2A Guide to the Project Management Body of Knowledge PMBOK Guide, Seventh EditionCMa/PMProject Management01 Pre-DesignManagement Information System (MIS)MeetingRecurring (per Project)Management Information System (MIS)After Project Handoff Meeting; to review project organization in Procore & other CMa-provided toolsSchedule, Lead, Document/Record
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD2.3A Guide to the Project Management Body of Knowledge PMBOK Guide, Seventh EditionCMa/PMProject Management02 DesignDesign Document ReviewDocument ReviewRecurring (per Design Submission)Constructability Reviews (5 C's)Upon each design submission; for all projectsTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD2.3A Guide to the Project Management Body of Knowledge PMBOK Guide, Seventh EditionCMa/PMProject Management02 DesignDocument DistributionServiceRecurring (per Design Submission)Distribute all Pre-Design and Design SubmissionsUpon each design submission; for all projectsTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD2.3A Guide to the Project Management Body of Knowledge PMBOK Guide, Seventh EditionCMa/PMProject Management02 DesignContract AgreementsServiceRecurring (per Project)RFP Development SupportUpon request of OwnerTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD2.3A Guide to the Project Management Body of Knowledge PMBOK Guide, Seventh EditionCMa/PMProject Management02 DesignGeneral and Supplementary General ConditionsServiceRecurring (per Project)General and Supplementary General ConditionsDevelop for each Project RFP and review all Project submissions for complianceTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD2.3A Guide to the Project Management Body of Knowledge PMBOK Guide, Seventh EditionCMa/PMProject Management02 DesignPublic RelationsServiceRecurring (per Project)Assist Owner w/Public Relations ActivitiesUpon request of OwnerTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD2.3A Guide to the Project Management Body of Knowledge PMBOK Guide, Seventh EditionCMa/PMProject Management02 DesignProject FundingServiceRecurring (per Project)Assist Owner w/Project Budget DevelopmentUpon request of OwnerTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD2.3A Guide to the Project Management Body of Knowledge PMBOK Guide, Seventh EditionCMa/PMProject Management02 DesignMeetings, Workshops, CharettesMeetingRecurring (per Design Submission)Meetings, Workshops, CharettesAfter each design submission; final prior to D-B-B RFP release for Construction; final prior to Construction NTP issuance to D-BSchedule, Lead, Document/Record
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD2.3A Guide to the Project Management Body of Knowledge PMBOK Guide, Seventh Edition; CMAA Cost Management GuidelinesCMa/PMProject Management02 DesignCost ManagementDocuments (multiple)Recurring (per Design Submission)cost estimates, value analysis/engineering studies, financial reports, etc.Upon each pre-design & design submission; for all projectsTBD
CM (DCSC-24-RFP-XXXX)Attachment X (Solicitation/RFP)TBD2.3A Guide to the Project Management Body of Knowledge PMBOK Guide, Seventh Edition; CMAA Time Management GuidelinesCMa/PMProject Management02 DesignTime ManagementDocuments (multiple)Recurring (per Design Submission)Develop & update master and milestone schedules; forecastingUpon each pre-design & design submission; for all projectsTBD