Bid 6578 Addendum 003 - Hillcrest Middle School 144-0108N Phase 2.pdf
PDF 429 KB Posted
- Solicitation number
- 38699
- Issued by
- Fairfield County, Waterbury City, Connecticut
About this file
Bid 6578 Addendum 003 - Hillcrest Middle School 144-0108N Phase 2
This addendum document pertains to Phase 2 construction of the new Trumbull Hillcrest Middle School, a public works project under the Connecticut Department of Education (State project #144-0108N, Trumbull Bid #6578). The project encompasses the continued construction of a new middle school facility in Trumbull, Connecticut, with detailed technical standards and construction methodologies specified in the Project Manual Volume 1 dated May 19, 2026. Bids for Phase 2 were due on September 17, 2026, with the solicitation documents issued on September 1, 2026. Bidders were required to attend a mandatory bidders' conference and were permitted to conduct site visits to clarify project requirements prior to submitting proposals. The project is state-funded educational infrastructure subject to prevailing wage requirements and state construction standards, with all work governed by the Project Manual Volume 1 and applicable state procurement regulations for public education infrastructure projects.
This addendum (Addendum 003) serves as a modification to the original Phase 2 bid documents, providing clarifications, corrections, or additional requirements to the base construction specifications and terms. Bidders must comply with all applicable Connecticut public works procurement regulations and competitive bidding requirements. The work represents continuation of the new middle school facility construction, with award and contract commencement following the September 17, 2026 bid deadline. All contractors must adhere to prevailing wage requirements as mandated for state-funded public works projects in Connecticut.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 003 – Phase 2
Date: September 15th, 2026
Project: Trumbull Hillcrest Middle School
530 Daniels Farm Road Trumbull, Connecticut State Project No: 144-0108N
Architect: TSKP STUDIO
Construction Manager: Bismark Construction Company
Please use link below to Bismark Construction Co. Inc. Building Connected website to download all Addendum 003 Documents as listed below.
Link: https://rb.gy/wmyvq5
This Addendum 003 Includes the Following (not limited to):
Bid Extension – Bids due Wednesday, September 23rd, 2026, at 11:00 AM. All bids hand delivered in person to 5866 Main Street, Trumbull CT.
TSKP Studio Addendum 003 Documents
Pre-Bid RFIs #1-198
Revised 00 41 00 Bid Proposal Form
Bismark – LEED Consultant IAQ Specification
Phase 1 Sitework Bid Package 1.32A & Phase 1 Bid Set Drawings (For Reference)
END OF ADDENDUM NO. 003
File details come from the government source that posted it. Updated .