About this file
This Project Manual Volume 1 document is prepared by the State of Connecticut for the Phase 2 bid for the new Trumbull Hillcrest Middle School, identified as State project #144-0108N and Trumbull Bid #6578. The document establishes comprehensive project requirements and specifications for the construction of a new middle school facility. The manual outlines detailed technical standards, performance requirements, and construction methodologies that bidders must follow. Specific response deadlines, site visit opportunities, and a bidder's conference are referenced to allow contractors to clarify project requirements and submit competitive proposals. The document serves as the authoritative reference for all construction work, materials, and workmanship standards required for this educational infrastructure project.
The Project Manual Volume 1 establishes the contractual and technical foundation for competitive bidding on the new school construction project. The document contains standardized specifications and conditions that apply uniformly to all bidders, ensuring fair competition and consistent project delivery. As a state-funded educational infrastructure project in Connecticut, the work is subject to prevailing wage requirements and other state construction regulations. The manual provides the detailed specifications necessary for bidders to develop accurate cost estimates and submit compliant proposals for the construction of the new Trumbull Hillcrest Middle School facility.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .