About this file

BAA 10-RD-03 High Power Microwave Technology and Electromagnetic Laboratory Applications (HPMTESLA) CALL 0006 Questions Answers (Q A) 2 This Q A includes responses to questions received as of 25 June 2012.

View the file

Other files for this federal contract opportunity

Other files attached to High Power Microwave Technology and Electromagnetic Susceptibility with Laboratory Applications (HPMTESLA), newest first.
File Type Posted
Call_Announcement.doc DOC document
BAA_10-RD-03 _Amendment_4_ _Attachment.docx DOCX document
CALL_0011 _Q A__1.docx DOCX document
BAA_10-RD-03 _CALL_0011_ _Attachments.pdf PDF
CALL_0009 _Q A__1.pdf PDF
BAA_10-RD-03 _CALL_0009_ _Attachments.pdf PDF
BAA_10-RD-03 _Amendment_3_ _Attachments.docx DOCX document
CALL_0008_Q A__1.pdf PDF
BAA_10-RD-03 _CALL_0008_ _Attachments.pdf PDF
CALL_0007_Q A__1.pdf PDF
CALL_0007_ _Attachments.pdf PDF
BAA 10-RD-03 CALL 0006 AMENDMENT 02.pdf PDF
CALL 0006 Q A 1.pdf PDF
CALL 0006 Amendment 01 Revised SOO 1.pdf PDF
CALL0006 Attachments.pdf PDF
BAA 10-RD-03 Amendment 02 Attachments.pdf PDF
CALL 0005 Q A 2.pdf PDF
CALL 0005 Q A 1.doc DOC document
Q A.doc DOC document
Q A.doc DOC document
BAA 10-RD-03 CALL 0005 Attachments.pdf PDF
BAA 10-RD-03 CALL 0004 Attachments.pdf PDF
BAA 10-RD-03 CALL 0003 Attachments.pdf PDF
BAA 10-RD-03 CALL 0002 Attachment.pdf PDF
BAA 10-RD-03 Amendment 01 Attachments.pdf PDF
BAA 10-RD-03 CALL 0001 Attachments.pdf PDF
BAA 10-RD-03 Attachments.pdf PDF
HPMTESLA PresolicitationNotice.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HPMTESLA BAA 10-RD-03, CALL 0006 Q&A#2

High Power Microwave Technological Electromagnetic Susceptibility with Laboratory Applications (HPMTESLA)

BAA 10-RD-03

CALL 0006

Questions and Answers #2

Q1: SOO #3 – Please confirm for me that the POP for SOO # 3 of BAA 10-RD-03 CALL 6 is 12 months duration. The CALL shows end of tech work @ 9 mos. and also the Scientific and Technical Final report @ 9 mos. Amendment 2 advised that POP durations run from 12 mos to 36 mos. So, I’m thinking the final report is the 3 mos period after the end of the technical period? So it will be for 12 months. Please confirm.

A1: Confirmed. The technical period of performance (PoP) for SOO #3 is nine (9) months. Three (3) months will be allowed for Final Report preparation, beginning ten (10) months after the Date of Award (DOA +10 Months).

Q2: Referring to Q&A #1, A10: Are your interests mentioned in order of importance in items a, b, and c?

A2: Item a) is the general area of interest. Items b) and c) (in no particular order) are additional areas of interest.

Q3: SOO #3 – Are you expecting a first principle model or are you expecting an empirical model based on the experimental data ?

A3: The overarching objective is to build a predictive model - the work defined in the SOO could be either a first-principles or empirical model that feeds into that overall predictive model.

Q4: SOO #3 – As in CALL 0001 the experiments (TA1) were the one which established data and provide the path for the modeling and simulation (TA2). In CALL 0006 are the experiments to drive the model or vice versa?

A4: The SOO should be read in the context of an overall objective of developing a predictive model for upset of a digital system. The Government is interested in any approach that furthers that overall objective.

Q5: SOO #3 – Does the government expect that this model must work with the government's existing engagement models and/or probability of effects model. In that case, we would then have to develop the model such that it integrates into those existing models ?

A5: Ultimately any model developed will have to fit into other AFRL models, but accomplishing that is beyond the scope of this SOO.

Q6: SOO #3 – Are you interested in Level 4 effects only?

A6: The Government is primarily interested in upset.

HPMTESLA BAA 10-RD-03, CALL 0006 Q&A#2

Q7: SOO #2 - Regarding the requested narrowband source system described for each of the four increments by frequency band, is AFRL requesting a separate integrated system be delivered for each of these band/increments, or is AFRL requesting a single integrated system which can be employed with a different set of magnetrons for each band/increment?

A7: The Government is not asking for unique, complete systems for each frequency band coverage. The purpose is to take advantage of commonality, like power supply/modulator that can interchange sources to cover more frequency bands. Not “X number of integrated systems”, but interchangeable sources for common sub systems.