B08_Attachment_8_Submittal_Log_FOWA_251994_Lighthouse_102921.xls
XLS spreadsheet 651 KB Posted
- Solicitation number
- 140P3022R0030
About this file
This document contains a submittal list template and review estimate template for a federal construction project. The templates provide guidance on submittal requirements and estimated review times for the rehabilitation of the Lighthouse Road facility for the National Park Service. Specification sections and paragraph numbers are listed along with required submittal documentation including product data, shop drawings, samples, and certification reports. An estimate of anticipated review hours is also included for architectural, civil, structural, mechanical, electrical, and other disciplines. The total estimated review time for all submittals is one hundred twenty-nine hours. This level of detail will help coordinate submittal reviews between the construction manager and design firm they engage for construction administration services.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal List Template
SUBMITTAL LIST
Note: See tab below for Samples and Instructions. Attach to end of Specification Section 01 33 23 when complete.
| FOWA LIGHTHOUSE REHABILITATION 251994D | |||||||
| SUBMITTAL | REQUIREMENTS (indicate with an "X") | ||||||
| Spec. Sec. | Par. No. | Description | INFORMATIONAL | ACTION | |||
| CERT./LAB TEST | REPORT/CALC. | ||||||
| OR PLAN | Mfg. DATA | ||||||
| & INSTRUCTIONS | SHOP DRAWING | SAMPLE | Mfg. DATA |
& INSTRUCTIONS
| 01 11 00 | Summary of Work | |||||||
| 01 33 00 | Submittals | |||||||
| 1.4 | Staff Names, Subcontractors and Qualifications | X | ||||||
| 1.6 | Contractor's Construction Schedule | X | ||||||
| 01 33 10 | Submittal Form | |||||||
| 01 50 00 | Temporary Services, Facilities, and Controls | |||||||
| 01 70 00 | Execution and Closeout Requirements | |||||||
| 1.3 | Inspection Procedures | X | ||||||
| 1.4 | Project Record Document Submittals (As-Built Drawings) | X | ||||||
| 01 26 01 | Contract Modification Procedures | |||||||
| 01 31 00 | Project Management and Coordination | |||||||
| 1.2 | D. Construction Coordination - Division 1 documents | X | ||||||
| 01 32 33 | Photo Documentation | |||||||
| 1.2 | A. Construction images | X | ||||||
| 1.2 | B. Closeout | X | ||||||
| 01 35 91 | Historic Preservation Treatment Procedures | |||||||
| 1.3 | A. Historic Preservation Treatment Plan | X | ||||||
| 1.3 | B. Alternative Methods and Materials (if any) | X | ||||||
| 1.3 | C. Photographs or Videotape | X | ||||||
| 01 74 19 | Construction Waste Management and Disposal | |||||||
| 1.4 | A. Waste Management Plan | X | ||||||
| 1.4 | B. Progress Documentation | X | ||||||
| 1.4 | C. Waste Reduction Calculations | X | ||||||
| 1.4 | D. Records of Donations | X | ||||||
| 1.4 | E. Records of Sales | X | ||||||
| 1.4 | F. Recycling and Processing Facility Records | X | ||||||
| 1.4 | G. Landfill and Incinderator Disposal Records | X | ||||||
| 1.4 | H. Closeout | X | ||||||
| 02 42 96 | Historic Removal and Dismantling | |||||||
| 04 01 20.64 | Brick Masonry Repointing | |||||||
| 1.4 | A. Product Data | X | ||||||
| 1.4 | B. Samples | X | ||||||
| 1.5 | B. Mockups | X | ||||||
| 06 20 13 | Exterior Finish Carpentry | |||||||
| 1.5 | A. Product Data | X | ||||||
| 1.5 | B. Shop Drawings | X | ||||||
| 1.5 | C. Samples | X | ||||||
| 1.7 | A. Qualification Data: For Installer and fabricator | X | ||||||
| 1.7 | B. Qualification Data: For historic treatment specialist | X | ||||||
| 1.7 | C. Wood Historic Treatment Program | X | ||||||
| 1.7 | D. Woodwork Quality Standard Compliance Certificates | X | ||||||
| 07 62 00 | Sheet Metal Flashing and Trim | |||||||
| 1.2 | A. Product Data | X | ||||||
| 1.2 | B. Shop Drawings | X | ||||||
| 1.3 | B. Mockups | X | ||||||
| 08 01 52 | Wood Windows | |||||||
| 1.3 | A. Product Data | X | ||||||
| 1.3 | B. Shop Drawings | X | ||||||
| 1.3 | C. Samples | X | X | |||||
| 1.4 | B. Mockups | X | ||||||
| 08 14 16 | Flush Wood Doors | |||||||
| 1.3 | A. Product Data | X | ||||||
| 1.3 | B. Shop Drawings | X | ||||||
| 08 91 19 | Fixed Louvers | |||||||
| 1.2 | A. Product Data | X | ||||||
| 1.2 | B. Shop Drawings | X | ||||||
| 1.2 | C. Samples | X | ||||||
| 1.3 | A. Test Reports | X | ||||||
| 09 91 13 | Painting | |||||||
| 1.3 | A. Product Data | X | ||||||
| 1.3 | B. Shop Drawings | X | ||||||
| 1.4 | A. Mockups | X | ||||||
| DWG SHEET | ||||||||
| S.01 | GENERAL NOTE | |||||||
| 2 | Temp sheeting, shoring, bracing shop drawings as project conditions require | X | X | |||||
| CONCRETE | ||||||||
| 2 | A. Concrete mix design | X | ||||||
| 5 | Shop Drawings | X |
Review Estimate Template
| SUBMITTAL LIST AND REVIEW ESTIMATE | |||||
| SUBMITTALS LIST | ACTION SUBMITTAL REVIEW ESTIMATE | ||||
| Park/PMIS/Project Title | (Complete this portion for AE Const. Serv. task order negotiation.) | ||||
| SUBMITTAL | REQUIREMENTS | ||||
| (indicate with an "X") | A/E REVIEW TIME |
(indicate number of hours)
| Spec. Sec. | Par. No. | Description | INFORMATIONAL | ACTION | ARCH (hrs) | CE (hrs) | SE (hrs) | ME (hrs) | EE (hrs) | PM - Coor. (hrs) | LA (hrs) | |||
| CERT./LAB TEST | REPORT/CALC. | |||||||||||||
| OR PLAN | Mfg. DATA | |||||||||||||
| & INSTRUCTIONS | SHOP DRAWING | SAMPLE | Mfg. DATA |
& INSTRUCTIONS
Total 0 0 0 0 0 0 0
Template Instructions
SUBMITTAL LIST AND REVIEW ESTIMATE
INSTRUCTIONS
| PHASE OF WORK | RESPONSIBLE PARTY | DESCRIPTION OF TASKS | |
| DESIGN SERVICES | |||
| (CONSTRUCTION DOCUMENTS PHASE) | Design A/E | 1. Fill out Park/PMIS/Project Title cell with project reference information. | |
| 2. Use this form to record construction submittal requirements for the project. Fill out the Specification Section, Paragraph number, Description columns on the left side of the form. Insert Additional rows, as required for sections containing multiple submittals. | |||
| 3. In the columns designated "REQUIREMENTS", indicate the submittal requirement(s) by placing an "X" in the appropriate box(es). Insert additional columns as necessary under the headings of Informational or Action to correctly show the type of submittal. Refer to Specification Section 01 33 23 for clarification on what are Informational submittals or Action submittals. (Action submittals require Government responsive action and informational do not.) All Division 01 Specification Submittals should be shown as Informational Submittals. | |||
| 4. Attach a black and white version to the end of Specification Section 01 33 23 in the project manual. Delete instructional note on the top of the page. | |||
| CONSTRUCTION SERVICES | |||
| (CONSTRUCTION PHASE) | Construction COR | 1. Utilize the "Submittal List" form submitted with the Final Construction Documents. Copy/paste submittal information into the Submittal List and review estimate. If amendments have been issued, make adjustments to the submittal requirements if necessary. | |
| 2. Attach this form to the "A/E Construction Services" Scope of Services. | |||
| 3. Utilize this form to the generate the estimated time required for the A/E to accomplish the Action submittal reviews by inserting your estimated number of hours per discipline under corresponding column headings. | |||
| 4. Add discipline heading columns, as required. | |||
| 5. Use the total number of hours per discipline at the bottom of the form and apply the hourly rates listed in the IDIQ contract (using appropriate option period rates) to formulate the Government estimate for submittal reviews. Refer to the sample by selecting an appropriate tab below. | |||
| 6. Use the information contained within this form to negotiate the submittal review portion of the A/E Construction Services task order. | |||
| 7. Provide this form to the CMR so they have an understanding of which submittals they are responsible for and which are to be forwarded to the A/E. |
All Informational submittals will be reviewed by the CMR.
| A/E | 1. Indicate level of effort required for each Action submittal review by inserting the number of hours for each discipline under the "A/E Review Time (indicate number of hours)" column. |
| 2. All Informational submittals will be reviewed by the CMR. | |
| 3. Use the total number of hours indicated for each discipline and apply the appropriate rates from the IDIQ contract (using the appropriate option period rates) to formulate your estimate. Refer to the sample by selecting an appropriate tab below. | |
| 4. Use this estimate to negotiate the submittals review portion of the A/E Construction Services portion of the task order. |
Submittal List Sample
| SUBMITTAL LIST | |
| Death Valley National Park, PMIS 06660, Rehabilitate Maintenance Facilities | |
| SUBMITTAL | REQUIREMENTS |
(indicate with an "X")
| INFORMATIONAL | ACTION | |||||
| Spec. Sec. | Par. No. | Description | CERT./LAB TEST | REPORT/CALC. | ||
| OR PLAN | Mfg. DATA | |||||
| & INSTRUCTIONS | SHOP DRAWING | SAMPLE | Mfg. DATA |
& INSTRUCTIONS
| 2110 | 1.3 | Excavation safety plan | X | |||||
| 2120 | 1.4 | Signed copies of manifest | X | |||||
| 2320 | 1.2 | Procedures for trench dewatering | X | |||||
| 2501 | 1.3 | Water and sewer test accuracy cert. | X | |||||
| 2502 | 1.2 | Water line marking tape sample | X | |||||
| 2517 | 1.2 | Fire Hydrants | ||||||
| Manufactures information: x-section | X | |||||||
| Certification with AWWA C502-94 | X | |||||||
| 2725 | 1.2 | Aggregate base course | X | |||||
| 2778 | 1.2 | Walks, curbs and gutters, mix design | X | X | ||||
| 3300 | 1.3 | Cast in-Place Concrete | ||||||
| Steel placement shop drawing | X | |||||||
| Batching and hauling plan | X | |||||||
| Rebar certification | X | |||||||
| 4100 | 1.2 | Mortar | ||||||
| Cured mortar sample | X | |||||||
| Material certification & test reports | X | |||||||
| 4201 | 1.3 | Masonry Work | ||||||
| Shop drawings | X | |||||||
| Masonry unit sample | X | |||||||
| Mfg. information on admixtures | X | |||||||
| 5120 | 1.4 | Structural steel | X | |||||
| 5311 | 1.3 | Steel roof deck shop drawings | X | |||||
| 5400 | 1.3 | Cold Formed Metal Framing | ||||||
| Shop drawings and erection diagrams | X | |||||||
| Mill certificates | X | |||||||
| Welder certificates | X | |||||||
| 6402 | 1.3 | Interior architectural woodwork | X | X | X | |||
| 7100 | 1.4 | Cold Fluid Applied Waterproofing | ||||||
| Product data | X | |||||||
| Shop drawings | X | |||||||
| Installer certification | X | |||||||
| Product test reports | X | |||||||
| 7260 | 1.2 | Vapor retarder mfg. installation instructions | X | |||||
| 7610 | 1.3 | Sheet metal roofing | X | X | X | |||
| 8110 | 1.3 | Steel Doors and Frames | ||||||
| Shop drawings | X | |||||||
| Catalog cuts and install instructions | X | |||||||
| Door schedule | X | |||||||
| 8520 | 1.3 | Aluminum windows | X | X | ||||
| 8710 | 1.2 | Finish hardware schedule | X | |||||
| 9310 | 1.6 | Ceramic Tile | ||||||
| Sample | X | |||||||
| Mfg. literature | X | |||||||
| Certification | X | |||||||
| 9901 | 1.4 | Painting | ||||||
| Mfg. color chart | X | |||||||
| Paint sample applied to like material | X | |||||||
| Mfg. information | X | |||||||
| 10800 | 1.7 | Toilet and bath acc.mfg.info | X | |||||
| 11452 | 1.2 | Kitchen appliances, product data | X | |||||
| 12500 | 1.3 | Horizontal louver blinds | X | |||||
| 15060 | 1.4 | Piping and accessories | X | X | X | |||
| 15800 | 1.3 | Ductwork | X | X | ||||
| 16470 | 1.4 | Panel boards | X | X | X |
Review Estimate Sample
| SUBMITTAL LIST AND REVIEW ESTIMATE | |||||
| SUBMITTAL LIST | SUBMITTAL REVIEW ESTIMATE | ||||
| Death Valley National Park, PMIS 06660, Rehabilitate Maintenance Facilities | (Complete this portion for AE Const. Serv. task order negotiation) | ||||
| SUBMITTAL | REQUIREMENTS | ||||
| (indicate with an "X") | A/E REVIEW TIME |
(indicate number of hours)
| INFORMATIONAL | ACTION | ARCH (hrs) | CE (hrs) | SE (hrs) | ME (hrs) | EE (hrs) | PM - Coor. (hrs) | LA (hrs) | ||||||
| Spec. Sec. | Par. No. | Description | CERT./LAB TEST | REPORT/CALC. | ||||||||||
| OR PLAN | Mfg. DATA | |||||||||||||
| & INSTRUCTIONS | SAMPLE | SHOP DRAWING | Mfg. DATA |
& INSTRUCTIONS
| 2110 | 1.3 | Excavation safety plan | X | |||||||||||||
| 2120 | 1.4 | Signed copies of manifest | X | |||||||||||||
| 2320 | 1.2 | Procedures for trench dewatering | X | |||||||||||||
| 2501 | 1.3 | Water and sewer test accuracy cert. | X | |||||||||||||
| 2502 | 1.2 | Water line marking tape sample | X | 2 | ||||||||||||
| 2517 | 1.2 | Fire Hydrants | ||||||||||||||
| Manufactures information: x-section | X | |||||||||||||||
| Certification with AWWA C502-94 | X | |||||||||||||||
| 2725 | 1.2 | Aggregate base course | X | |||||||||||||
| 2778 | 1.2 | Walks, curbs and gutters, mix design | X | X | 3 | 2 | ||||||||||
| 3300 | 1.3 | Cast in-Place Concrete | ||||||||||||||
| Steel placement shop drawing | X | 1 | 2 | |||||||||||||
| Batching and hauling plan | X | 1 | ||||||||||||||
| Rebar certification | X | |||||||||||||||
| 4100 | 1.2 | Mortar | ||||||||||||||
| cured mortar sample | X | 1 | 1 | |||||||||||||
| Material certification & test reports | X | |||||||||||||||
| 4201 | 1.3 | Masonry Work | ||||||||||||||
| Shop drawings | X | 4 | ||||||||||||||
| Masonry unit sample | X | 1 | ||||||||||||||
| Mfg. information on admixtures | X | 1 | ||||||||||||||
| 5120 | 1.4 | Structural steel | X | 4 | ||||||||||||
| 5311 | 1.3 | Steel roof deck shop drawings | X | 4 | ||||||||||||
| 5400 | 1.3 | Cold Formed Metal Framing | ||||||||||||||
| Shop drawings and erection diagrams | X | 4 | ||||||||||||||
| Mill certificates | X | |||||||||||||||
| Welder certificates | X | |||||||||||||||
| 6402 | 1.3 | Interior architectural woodwork | X | X | X | 6 | ||||||||||
| 7100 | 1.4 | Cold Fluid Applied Waterproofing | ||||||||||||||
| Product data | X | |||||||||||||||
| Shop drawings | X | 2 | ||||||||||||||
| Installer certification | X | |||||||||||||||
| Product test reports | X | |||||||||||||||
| 7260 | 1.2 | Vapor retarder mfg. installation instructions | X | |||||||||||||
| 7610 | 1.3 | Sheet metal roofing | X | X | X | 3 | 2 | |||||||||
| 8110 | 1.3 | Steel Doors and Frames | ||||||||||||||
| Shop drawings | X | 3 | ||||||||||||||
| Catalog cuts and install instructions | X | |||||||||||||||
| Door schedule | X | |||||||||||||||
| 8520 | 1.3 | Aluminum windows | X | X | 6 | |||||||||||
| 8710 | 1.2 | Finish hardware schedule | X | |||||||||||||
| 9310 | 1.6 | Ceramic Tile | ||||||||||||||
| Sample | X | 2 | ||||||||||||||
| Mfg. literature | X | |||||||||||||||
| Certification | X | |||||||||||||||
| 9901 | 1.4 | Painting | ||||||||||||||
| Mfg. color chart | X | 3 | ||||||||||||||
| Paint sample applied to like material | X | 2 | ||||||||||||||
| Mfg. information | X | |||||||||||||||
| 10800 | 1.7 | Toilet and bath acc.mfg.info | X | |||||||||||||
| 11452 | 1.2 | Kitchen appliances, product data | X | |||||||||||||
| 12500 | 1.3 | Horizontal louver blinds | X | |||||||||||||
| 15060 | 1.4 | Piping and accessories | X | X | X | 3 | ||||||||||
| 15800 | 1.3 | Ductwork | X | X | 3 | |||||||||||
| 16470 | 1.4 | Panel boards | X | X | X | 3 | ||||||||||
| Total | 29 | 7 | 24 | 6 | 3 | 0 | 0 |
File details come from the government source that posted it. Updated .