B08_Attachment_4_FOWA_241555_FOWA_Resurface_Lighthouse_Rd_MDE17-SF-0104_APPROVED_PLANS_040822.pdf
PDF 9 MB Posted
- Solicitation number
- 140P3022R0030
About this file
This document package includes plans and specifications for a road resurfacing and rehabilitation project at Lighthouse Road in Fort Washington Park. The project involves demolishing the existing asphalt pavement, grading, installing new storm drains and underdrains, constructing a new gravel base and asphalt surface, landscaping, and installing erosion controls. The National Park Service is the contracting agency. The plans provide construction details for grading, drainage, pavement sections, landscaping including bioretention areas, and sediment and stormwater controls. Specifications cover soil preparation, seeding and mulching, sod installation, planting, fertilization, and maintenance requirements.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B-5
EXISTING GRADE
PROPOSED GRADE
SPOT GRADE
PROP. ACCESS ROAD
EX. TREE
PROP. STORM DRAIN
PROP. GRAVEL
TRANSITION NEW WORK/EX. WORK
EX. TREE LINE
+475
SOIL BORING LOCATION
STA. <REF>
LIMIT OF DISTURBANCE
SILT FENCE
EXISTING GRADE
STABILIZED CONSTRUCTION ENTRANCES
X X X X
PEDESTRIAN BARRIER
EARTH DIKE
BLAZE ORANGE CONSTRUCTION FENCE
AT GRADE INLET PROTECTION
SF SF SF
SUB-SHEET SHEET TITLE
CS-1
REGIONAL DIRECTOR, NATIONAL CAPITAL REGION
RECOMMENDED
SUPERINTENDENT, PARK
APPROVED
INDEX OF DRAWINGS
VICINITY MAP
DATE
COVER SHEET
CS-1
DEMOLITION PLAN
GRADING PLAN
C2
C3
GENERAL NOTES
C4
UNITED STATES DEPARTMENT OF INTERIOR
NATIONAL PARK SERVICE
SHEET #
COVER SHEET
FORT WASHINGTON
FORT WASHINGTON PARK
FORT WASHINGTON, MARYLAND
P K
W Y
G W
M E
M O
R
IA
L
FORT
W
AS
H
IN
GTO
N
R O
A D
CREEK
PISCATAWAY
SWAN C
REEK
P O
T O
M A
C
R
IV
E R
PARK
WASHINGTON
FORT
VIRGINIA
PARK
PISCATAWAY
HUNT
FORT
SWAN
CREEK ROAD
CHIEF, DIVISION OF LANDS, PLANNING & DESIGN
SITE DETAILS
LOCATION
PROJECT
SCALE: 1"=2000'
C5
C6
SEDIMENT CONTROL NOTES8 OF 13 C8
C9
C77 OF 13
10 OF 13 C10
C11
RESURFACE LIGHTHOUSE ROAD
LIGHTHOUSE
AREA MAP
SCALE: 1"=1000'SCALE OF FEET
01000 1000 2000
ABBREVIATIONS
UNDERGROUNDUG
STRUCTURESTR.
STATIONSTA.
STORM DRAINSD
SCHEDULESCH
PAVEMENTPVMT
POLYVINAL CHLORIDEPVC
PROPOSEDPROP.
LIMITS OF DISTURBANCELOD
HIGH DENSITY POLYETHYLENEHDPE
CONCRETECONC.
CORRUGATED METAL PIPECMP
PMIS No. 158054
LEGEND
REMOVE EXISTING PAVEMENT
X X X X X XREMOVE EXISTING UTILITY
SWM DRAINAGE DIVIDE
FINAL
NO. 17-SF-0104.
BY MDE AS DOCUMENTED IN A LETTER DATED OCTOBER 5, 2017, REFERENCE
4. THE STORMWATER MANAGEMENT CONCEPTUAL DESIGN WAS APPROVED
DATED JANUARY 5, 2018, REFERENCE NO. 2018 00346.
HISTORIC PROPERTIES AS STAMPED 2/7/2018 ON THE SUBMITTAL LETTER
3. THIS PROJECT HAS BEEN FOUND TO HAVE NO ADVERSE EFFECT ON
SAFETY AND HEALTH ADMINISTRATION (OSHA) GUIDELINES AND REGULATIONS.
2. ALL WORK SHALL BE IN ACCORDANCE WITH STANDARD OCCUPATIONAL
TEST PITS, PROBES, ETC. ARE ANTICIPATED. 1-800-252-7777 OR 811.
OF ALL UNDERGROUND UTILITIES WITHIN WORK ZONES WHERE DIGGING,
UTILITY AND PRIVATE UTILITY LOCATING SERVICE, IN ADVANCE, FOR MARKING
WORK. CONTRACTOR(S) SHALL BE RESPONSIBLE FOR CONTACTING MISS
LOCATING SERVICE 48 HOURS PRIOR TO COMMENCEMENT OF ON-SITE
1. UTILITY MARKING: NOTIFY MISS UTILITY AND OTHER QUALIFIED UTILITY
12 OF 13 C12 STORMWATER NOTES
STORMWATER DETAIL SHEET
STORMWATER PLAN
SEDIMENT CONTROL NOTES
SEDIMENT CONTROL DETAILS
SEDIMENT CONTROL PLAN
SITE DETAILS
CONTRACT No. 140P3020D0013
13 OF 13 C13 PLANTING PLAN
PROFESSIONAL CERTIFICATION
No. 25768, expiration date: 06/23/2023 engineer under the laws of the State of Maryland, license approved by me, and that I am a duly licensed professional I hereby certify that these documents were prepared or
KWCENGINEER:
KCY
SAR
NATIONAL PARK SERVICE - NATIONAL CAPITAL REGION
UNITED STATES
OF
SHEET
DWG. NO.
DATE
DEPARTMENT OF THE INTERIOR
SUB SHEET NUMBERTITLE OF DRAWING
Mark Sheet InitialDateREVISION
DESIGNED
DRAWN
CHECKED
FORT WASHINGTON
FORT WASHINGTON PARK
STANTEC
CONSULTING, INC.
DIVISION OF LANDS, PLANNING & DESIGN
RESURFACE LIGHTHOUSE ROAD
02/09/2022
852-123412
20879
GAITHERSBURG, MD
SUITE 620
VILLAGE AVENUE
6 MONTGOMERY
2/14/2022
REVIEWED AND APPROVED FOR SEDIMENT
CONTROL AND STORMWATER MANAGEMENT
UNDER SECTIONS 4-106 AND 4-205
BY: COLLIN HILTNER
DATE:
MAYLAND DEPARTMENT OF THE ENVIRONMENT
SEDIMENT & STORMWATER PLAN REVIEW DIVISION
APRIL 8, 2022
ABBREVIATIONS
UNDERGROUNDUG
STRUCTURESTR.
STATIONSTA.
STORM DRAINSD
SCHEDULESCH
PAVEMENTPVMT
POLYVINAL CHLORIDEPVC
PROPOSEDPROP.
LIMITS OF DISTURBANCELOD
HIGH DENSITY POLYETHYLENEHDPE
CONCRETECONC.
CORRUGATED METAL PIPECMP
SCALE OF FEET
40040
C2
LEGEND
GRADING NOTES
REMOVE EXISTING PAVEMENT
X X X X X X REMOVE EXISTING UTILITY
DEMOLITION PLAN
1928 NGS MONUMENT 5.71
900 REBAR & CAP 104.53
901 REBAR & CAP 30.12
902 REBAR & CAP 6.55
DURING CONSTRUCTION
TO REMAIN. PROTECT
SEWER PUMP HOUSE
EX. TRANSFORMER AND
EASTINGNORTHINGID TYPE ELEV.
1302868.5700
1302358.8880
1301855.6207
1301796.0319
380547.3760
380975.0710
380694.5516
380799.0410
E: 1302023.99 N: 380817.86
E: 1302371.17 N: 380975.11
E: 1302835.04 N: 380576.01
SEE SHEET C9 FOR COMPLETE BORING LOGS.6.
TO NEW PIPES.
BE INSPECTED AND CLEARED PRIOR TO CONNECTION
EXISTING CULVERTS AND STORM DRAIN INLETS TO5.
END OF PROJECT.
WILL BE RE-INSTALLED BY CONTRACTOR AT
FEATURES DURING CONSTRUCTION. ALL ITEMS
SITE FURNITURE, SIGNS AND OTHER EXISTING
CONTRACTOR TO SALVAGE AND STORE ALL4.
FROM DRIPLINE.
TO PROVIDE TREE PROTECTION FENCING MIN. 5'
CANOPY AND ON TOP OF TREE ROOTS. CONTRACTOR
TREES AND TO AVOID STOCKPILING UNDER TREE
TO USE CAUTION WHEN WORKING AROUND EXISTING
ALL EXISTING TREES TO REMAIN. CONTRACTOR3.
ENGINEER IMMEDIATELY IF CONFLICT ARISES.
DAMAGE DONE TO EXISTING UTILITIES. CONTACT
THE CONTRACTOR IS RESPONSIBLE TO REPAIR ANY
UNDERGROUND UTILITIES WITHIN THE WORK AREA.
THE CONTRACTOR SHALL TEST PIT FOR EXISTING2.
AND SUPPLEMENTED WITH AVAILABLE GIS INFO.
PERFORMED BY STANTEC DATED APRIL 2014
TOPOGRAPHY OBTAINED FROM FIELD SURVEY1.
TO REMAIN
EX. BENCH
EDGE
EX. STREAM
PROFESSIONAL CERTIFICATION
No. 25768, expiration date: 06/23/2023 engineer under the laws of the State of Maryland, license approved by me, and that I am a duly licensed professional I hereby certify that these documents were prepared or
KWCENGINEER:
KCY
SAR
NATIONAL PARK SERVICE - NATIONAL CAPITAL REGION
UNITED STATES
OF
SHEET
DWG. NO.
DATE
DEPARTMENT OF THE INTERIOR
SUB SHEET NUMBERTITLE OF DRAWING
Mark Sheet InitialDateREVISION
DESIGNED
DRAWN
CHECKED
FORT WASHINGTON
FORT WASHINGTON PARK
STANTEC
CONSULTING, INC.
DIVISION OF LANDS, PLANNING & DESIGN
RESURFACE LIGHTHOUSE ROAD
02/09/2022
FINAL 3/2018 KWC
852-123412
20879
GAITHERSBURG, MD
SUITE 620
VILLAGE AVENUE
6 MONTGOMERY
W W
EX. DIRT PATH
EX.
GRAVEL
RI
VER
TR
AI
L
E X
G R
A V
L
T
A
IL
EX. CONC. WALK
EX. CO
N C.
W A
LK
SD
TO REMAIN
STATION
COMFORT
TO REMAIN
GATE
REMOVE 8"CMP
TO REMAIN
CONCRETE PAVING
REMAIN (TYP.)
EX. TREE TO
EQUIPMENT IN CIRCLE
CONSTRUCTION FENCE. NO
TO PROTECT STRUCTURE WITH
TO REMAIN. CONTRACTOR
EX. HISTORIC LIGHTHOUSE
TO REMAIN
CONCRETE DITCH
W W
G A
TE
EX. DIRT PATH
EX. CONC. WALK
EX. CO
N C.
W A
LK
S
S
S
S
S
C O
S
S
C O
SD
SD
MH
M E
E
BM
B-4
B-3
B-2
BM
B-1
SD
S
E
C O
C O
TE
SD
X
X
S
S
S
MH
CONTROL POINT ELEVATION TABLE
2/14/2022
1928 NGS MONUMENT 5.71
900 REBAR & CAP 104.53
901 REBAR & CAP 30.12
902 REBAR & CAP 6.55
EASTINGNORTHINGID TYPE ELEV.
1302868.5700
1302358.8880
1301855.6207
1301796.0319
380547.3760
380975.0710
380694.5516
380799.0410
B-5
SCALE OF FEET
40040
GRADING PLAN
C3
LEGEND
EXISTING GRADE
GRADING NOTES
PROPOSED GRADE
SPOT GRADE
PROP. ACCESS ROAD
EX. TREE
EX OUTFALL
TO EX GRADE AT
MATCH PIPE INVERT
PROP. STORM DRAIN
OF ROAD
EX. EDGE
PROP. GRAVEL
PROP. GRAVEL
IN LINE, TYPE, AND GRADE
PAVEMENT TO MATCH EX CONCRETE
TRANSITION NEW WORK/EX. WORK
EX. TREE LINE
STA. <REF>
DURING CONSTRUCTION
AND SEWER PUMP HOUSE
PROTECT EX. TRANSFORMER
CONCRETE DITCH
PORTION OF EX.
PROTECT REMAINING
STA. 0+00
+475
SOIL BORING LOCATION
PROP. BIOSWALE
CONSTRUCTION
RELOCATED DURING
EX. BENCH TO BE
EX. UG ELECTRIC
AT EX. ROAD
MATCH EX. GRADE
PAVEMENT TO
EX. OUTFALL
TO EX. GRADE AT
MATCH PIPE INVERT
E X
IN LINE AND GRADE
MATCH EX. ASPHALT
PAVEMENT TO
TO NEW PIPES.
BE INSPECTED AND CLEARED PRIOR TO CONNECTION
EXISTING CULVERTS AND STORM DRAIN INLETS TO4.
ENGINEER IMMEDIATELY IF CONFLICT ARISES.
DAMAGE DONE TO EXISTING UTILITIES. CONTACT
THE CONTRACTOR IS RESPONSIBLE TO REPAIR ANY
UNDERGROUND UTILITIES WITHIN THE WORK AREA.
THE CONTRACTOR SHALL TEST PIT FOR EXISTING3.
1991, VERTICAL CONTROLS: NAVD 1929
HORIZONTAL CONTROLS: MARYLAND STATE PLANE2.
AND SUPPLEMENTED WITH AVAILABLE GIS INFO.
PERFORMED BY STANTEC DATED APRIL 2014
TOPOGRAPHY OBTAINED FROM FIELD SURVEY1.
SEE DETAIL SHEET C12
PROP. D-2 INLET
PROFESSIONAL CERTIFICATION
No. 25768, expiration date: 06/23/2023 engineer under the laws of the State of Maryland, license approved by me, and that I am a duly licensed professional I hereby certify that these documents were prepared or
KWCENGINEER:
KCY
SAR
NATIONAL PARK SERVICE - NATIONAL CAPITAL REGION
UNITED STATES
OF
SHEET
DWG. NO.
DATE
DEPARTMENT OF THE INTERIOR
SUB SHEET NUMBERTITLE OF DRAWING
Mark Sheet InitialDateREVISION
DESIGNED
DRAWN
CHECKED
FORT WASHINGTON
FORT WASHINGTON PARK
STANTEC
CONSULTING, INC.
DIVISION OF LANDS, PLANNING & DESIGN
RESURFACE LIGHTHOUSE ROAD
02/09/2022
FINAL 3/2018 KWC
852-123412
20879
GAITHERSBURG, MD
SUITE 620
VILLAGE AVENUE
6 MONTGOMERY
056 +
207 +
+062
303+3
1+
0+00
2+00
3+00
4+00
5+00
6+00
7+
8+0
9+00
10+00
11+00
11+50.76
N 381,137 E 1,302,547
N 380,576
E 1,302,835
EX100
R
' R
INV = 12.0
PROP. 18" HDPE
SD
HW-1
C4
C4
C10
SD
HW-2
C4
C1
C2
C3
C4
C5
C6
C7 C8
C9
SD
I-2
DA=98691 sqft
DA=129175 sqft
H D P E
P R
O P
SD
I-1
EX. STREAM EDGEEX. STREAM EDGE
W W
G A
TE
EX. DIRT PATH
EX. CONC. WALK
EX. CO
N C.
W A
LK
S
S
S
S
S
C O
S
S
C O
SD
SD
MH
M E
E
BM
C4
C4
6" HDPE
PROP
SCH 40 PVC
PERFORATED
PROP 6" HDPE
CONTROL POINT ELEVATION TABLE
2/14/2022
APPROVED
BY: COLLIN HILTNER
MD DEPT ENVIRONMENT
SEDIMENT & STORMWATER
PLAN REVIEW DIVISION
4REGIONAL DIRECTOR, NATIONAL CAPITAL REGION
CHIEF, BRANCH DESIGN AND CONSTRUCTION
RECOMMENDED
SUPERINTENDENT, PARK
APPROVED
DATE
SITE DETAILS
C4
5"MIN.
C4
1 ROAD CROSS SECTION-1
ROAD CROSS SECTION-2
EX. GRADE
SLOPE TO
3:1 MAX.
C4
2 C4
4 CONNECT TO EX. CONCRETE PVMT
NOT TO SCALE
AGGREGATE CONC. DRIVE
EX. EXPOSED
JOINT MATERIAL
EXPANSION
INSTALL
TYPE AND GRADE
DRIVE IN LINE,
CONNECT TO EX.
ASPHALT JOINTS.
EXPANSION JOINT MATERIAL AT ALL CONCRETE TO
ELASTOMERIC TYPE SEALANT OR EQUIVALENT. INSTALL
CORK, TRIMMED AND SEALED WITH POLYURETHANE
2. EXPANSION JOINTS SHALL BE 1/2" PREFORMED
METHODS OF CONSTRUCTION.
SPECS FOR CONCRETE MATERIAL AND
1. CONTRACTOR SHALL REFER TO PROJECT
NOTES:
EX. GRADE
SLOPE TO
3:1 MAX.
C4
5 GRAVEL PAD CROSS SECTION
5% MAX SLOPE
2% MIN.
OF STONE
4" MIN DEPTH
4" OF #57 STONE
d =1" d =1/2" min95% MAX. DRY DENSITY
COMPACTED SUBGRADE TO
C4
95% MAX. DRY DENSITY
COMPACTED SUBGRADE TO
EXPOSED AGGREGATE PAVING SECTION
CONCRETE SURFACE COURSE
6" EXPOSED AGGREGATE
6"
AGGREGATE PAVEMENT
EX. ASPHALT w/ EXPOSED
REMOVE AND REPLACE
SEE DETAIL 21 ON SHEET C10
SWM BIO SWALE
3' WIDE
DIA. MATERIAL LENGTH
ROAD GEOTEXTILE
6"X6" #10 WELDED WIRE MESH
MIN. 2" BELOW SURFACE
6"X6" #10 WELDED WIRE MESH
SEE GRADING PLAN C3.
INSTALL EXPANSION JOINTS SPACED EVERY 25'.7.
2" BELOW SURFACE, 6"X6" #10 EPOXY COATED WIRE.
WELDED WIRE MESH TO BE INSTALLED A MINIMUM OF 6.
AREAS ARE SUPERELEVATED.
0+00 TO 2+00 AND 9+75 TO 11+50. ALL OTHER
PROVIDE CROWNED ROAD SURFACE STA.5.
TO EXISTING SWALES AND EXISTING DRAINAGE.
GRADE SHOULDERS TO DIRECT RUNOFF4.
"2 1 D50 =
CONCRETE BASE COURSE TO BE #57 STONE3.
AROUND VISITOR'S CENTER.
EXPOSED AGGREGATE PATH TO MATCH EXISTING ROAD 2.
CONCRETE MATERIAL AND METHODS OF CONSTRUCTION.
CONTRACTOR SHALL REFER TO PROJECT SPECS FOR 1.
NOTES:
5" MIN. CONCRETE BASE COURSE
I-1
IN
V
O U
.0
GROUND
EXISITING
T O
P
.0
HW-1
T
.2
STORM DRAIN PROFILE
VERT: 1" = 4'
SCALE HORIZ: 1"=20'
18" HDPE SOIL TIGHT 50 LF
6" HDPE PERFORATED 112 LF
18" HDPE @ 8.00%
IN
V
IN
.0
END WALL
PROP. TYPE C
GROUND
PROP.
EDGE
EX. STREAM
.5
6" HDPE SOIL TIGHT 36 LF
PROFESSIONAL CERTIFICATION
No. 25768, expiration date: 06/23/2023 engineer under the laws of the State of Maryland, license approved by me, and that I am a duly licensed professional I hereby certify that these documents were prepared or
KWCENGINEER:
KCY
SAR
NATIONAL PARK SERVICE - NATIONAL CAPITAL REGION
UNITED STATES
OF
SHEET
DWG. NO.
DATE
DEPARTMENT OF THE INTERIOR
SUB SHEET NUMBERTITLE OF DRAWING
Mark Sheet InitialDateREVISION
DESIGNED
DRAWN
CHECKED
FORT WASHINGTON
FORT WASHINGTON PARK
STANTEC
CONSULTING, INC.
DIVISION OF LANDS, PLANNING & DESIGN
RESURFACE LIGHTHOUSE ROAD
02/09/2022
FINAL 3/2018 KWC
852-123412
20879
GAITHERSBURG, MD
SUITE 620
VILLAGE AVENUE
6 MONTGOMERY
PIPE SCHEDULE
9' PAVEMENT
2%
(TYP)
SHOULDER
12" GRASSED
EX. GRADE
SLOPE TO
3:1 MAX.
9' PAVEMENT
2%
(TYP)
SHOULDER
12" GRASSED
MAX. CUT 6"
GRASS SWALE
1' WIDE
SECTION, SEE DETAIL 10 THIS SHEET
FOR EXPOSED AGGREGATE PVMT
SECTION, SEE DETAIL 10 THIS SHEET
FOR EXPOSED AGGREGATE PVMT
SWALE
EX. GRASS
2%
2/14/2022
APPROVED
BY: COLLIN HILTNER
MD DEPT ENVIRONMENT
SEDIMENT & STORMWATER
C5
SITE DETAILS
C5
NOT TO SCALE
EXPANSION JOINT
1/2" CORK
JOINT FILLER
REMOVABLE TOP STRIP ON
1/2" SEALANT JOINT, FORM WITH
1/2"
SLAB TO SLAB REINFORCEMENT
CONCRETE JOINTS.
EXPANSION JOINT MATERIAL AT ALL CONCRETE TO
ELASTOMERIC TYPE SEALANT OR EQUIVALENT. INSTALL
CORK, TRIMMED AND SEALED WITH POLYURETHANE
2. EXPANSION JOINTS SHALL BE 1/2" PREFORMED
INSTALL #4 REBAR DOWEL. FILL VOID WITH EPOXY.
FOR DOWEL INSTALLATION. REMOVE ALL DUST AND
1. CONTRACTOR SHALL DRILL INTO EX. CONC. SLAB
NOTES:
WITH PREFORMED SLEEVE.
INSTALLED 12" O.C. PROVIDE
18" #4 SMOOTH DOWEL,
C5
NOT TO SCALE
EXPANSION JOINT
1/2" CORK
JOINT FILLER
REMOVABLE TOP STRIP ON
1/2" SEALANT JOINT, FORM WITH
1/2"
CONC. DRIVE
EXPOSED AGGREGATE
EXPANSION JOINT
CONC. DRIVE
EX. EXPOSED AGGREGATE
PROP. CONC. DRIVE
CONCRETE JOINTS.
EXPANSION JOINT MATERIAL AT ALL CONCRETE TO
ELASTOMERIC TYPE SEALANT OR EQUIVALENT. INSTALL
CORK, TRIMMED AND SEALED WITH POLYURETHANE
2. EXPANSION JOINTS SHALL BE 1/2" PREFORMED
MATCH EXISTING ROADS ONSITE.
EXPOSED AGGREGATE CONCRETE AT 25' O.C. TO
1. CONTRACTOR SHALL INSTALL EXPANSION JOINTS IN
NOTES:
PROFESSIONAL CERTIFICATION
No. 25768, expiration date: 06/23/2023 engineer under the laws of the State of Maryland, license approved by me, and that I am a duly licensed professional I hereby certify that these documents were prepared or
KWCENGINEER:
KCY
SAR
NATIONAL PARK SERVICE - NATIONAL CAPITAL REGION
UNITED STATES
OF
SHEET
DWG. NO.
DATE
DEPARTMENT OF THE INTERIOR
SUB SHEET NUMBERTITLE OF DRAWING
Mark Sheet InitialDateREVISION
DESIGNED
DRAWN
CHECKED
FORT WASHINGTON
FORT WASHINGTON PARK
STANTEC
CONSULTING, INC.
DIVISION OF LANDS, PLANNING & DESIGN
RESURFACE LIGHTHOUSE ROAD
02/09/2022
FINAL 3/2018 KWC
852-123412
20879
GAITHERSBURG, MD
SUITE 620
VILLAGE AVENUE
6 MONTGOMERY
2/14/2022
APPROVED
BY: COLLIN HILTNER
MD DEPT ENVIRONMENT
SEDIMENT & STORMWATER
1928 NGS MONUMENT 5.71
900 REBAR & CAP 104.53
901 REBAR & CAP 30.12
902 REBAR & CAP 6.55
EASTINGNORTHINGID TYPE ELEV.
1302868.5700
1302358.8880
1301855.6207
1301796.0319
380547.3760
380975.0710
380694.5516
380799.0410
SHEET C7.
I-1. SEE DETAIL
PROTECTION AT
PROVIDE INLET
ONCE INSTALLED,
SCALE OF FEET
40040
C6
DURING CONSTRUCTION
TO REMAIN. PROTECT
SEWER PUMP HOUSE
EX. TRANSFORMER AND
LIMIT OF DISTURBANCE
SILT FENCE
LEGEND
EXISTING GRADE
STABILIZED CONSTRUCTION ENTRANCES
X X X X
SEDIMENT CONTROL NOTES
PEDESTRIAN BARRIER
EARTH DIKE
SEDIMENT CONTROL PLAN
LIMIT OF DISTURBANCE = 39,207 SQ.FT. OR 0.90 AC.
SEQUENCE OF CONSTRUCTION
BLAZE ORANGE CONSTRUCTION FENCE
AT GRADE INLET PROTECTION
PEDESTRIAN SAFETY NOTES
EQUAL AT THE DISCRETION OF THE PARK.
CONTRACTOR MAY INSTALL OWNER APPROVED
2. TYPICAL PEDESTRIAN BARRIER SHOWN BELOW.
NATIONAL PARK DURING CONSTRUCTION.
TO ENSURE THE SAFETY OF VISITORS TO THIS
PEDESTRIAN BARRIERS AND TEMPORARY FENCING
CONTRACTOR'S RESPONSIBILITY TO MAINTAIN
CENTER AND UPPER PARKING LOT. IT IS THE
ABLE TO ACCESS THE FORT GROUNDS, VISITOR
1. DURING CONSTRUCTION, VISITORS WILL STILL BE
SF SF SF
3. EROSION AND SEDIMENT CONTROLS WILL BE STRICTLY ENFORCED.
PRIOR TO AND AFTER A RAIN EVENT.
CONTROLS SHALL BE INSPECTED AND REPAIRED AS NECESSARY
DEVICES PRIOR TO COMMENCING EXCAVATION. SEDIMENT
2. THE CONTRACTOR SHALL INSTALL ALL SEDIMENT CONTROL
GIS INFORMATION.
STANTEC DATED APRIL 2014 AND SUPPLEMENTED WITH AVAILABLE
1. TOPOGRAPHY OBTAINED FROM FIELD SURVEY PERFORMED BY5
(1 DAY)
10.COMPLETE AS BUILT SURVEY WITH PHOTOS AND SUBMIT TO MDE.
DISTURBED BY THEIR REMOVAL. (3 DAYS)
9. REMOVE SEDIMENT CONTROL DEVICES AND STABILIZE ALL AREAS
8. STABILIZE ALL REMAINING DISTURBED AREA. (1 WEEK)
INSPECTOR, COMMENCE INSTALLATION OF STORMWATER. (1 WEEK)
FACILITIES. WITH PERMISSION FROM SEDIMENT CONTROL
7. STABILIZE ALL AREAS DRAINING TO PROPOSED STORMWATER
(3 MONTHS)
6. COMMENCE FINE GRADING, ROAD AND STORM DRAIN INSTALLATION.
AND CLEARED PRIOR TO CONNECTION TO NEW PIPES. (1 DAY)
5. EXISTING CULVERTS AND STORM DRAIN INLETS TO BE INSPECTED
4. COMMENCE DEMOLITION OF ROAD. (1 WEEK)
THE WORK AREA. (3 DAYS)
AND PEDESTRIAN BARRIERS TO BAR VISITORS FROM ENTERING
3. INSTALL SEDIMENT CONTROL DEVICES. USE ORANGE SAFETY FENCE
REPRESENTATIVE AND THE SITE ENGINEER. (1 DAY)
WITH THE MDE SEDIMENT CONTROL INSPECTOR, THE OWNER'S
A PRE-CONSTRUCTION MEETING MUST BE CONDUCTED ON-SITE
2. PRIOR TO INSTALLING SEDIMENT CONTROL MEASURES OR GRADING,
ACTIVITY TO SCHEDULE A PRE-CONSTRUCTION MEETING.
A MINIMUM OF 7 DAYS IN ADVANCE OF ANY EARTH DISTURBANCE
1. NOTIFICATION OF MDE'S COMPLIANCE PROGRAM AT 410-537-3510
I
HW
I
SD
Ex
Ex
DA=24,442 sqft
DA=104,732 sqft
DA=179,903 sqft
PROFESSIONAL CERTIFICATION
No. 25768, expiration date: 06/23/2023 engineer under the laws of the State of Maryland, license approved by me, and that I am a duly licensed professional I hereby certify that these documents were prepared or
KWCENGINEER:
KCY
SAR
NATIONAL PARK SERVICE - NATIONAL CAPITAL REGION
UNITED STATES
OF
SHEET
DWG. NO.
DATE
DEPARTMENT OF THE INTERIOR
SUB SHEET NUMBERTITLE OF DRAWING
Mark Sheet InitialDateREVISION
DESIGNED
DRAWN
CHECKED
FORT WASHINGTON
FORT WASHINGTON PARK
STANTEC
CONSULTING, INC.
DIVISION OF LANDS, PLANNING & DESIGN
RESURFACE LIGHTHOUSE ROAD
02/09/2022
FINAL 3/2018 KWC
852-123412
20879
GAITHERSBURG, MD
SUITE 620
VILLAGE AVENUE
6 MONTGOMERY
W W
EX. DIRT PATH
EX.
GRAVEL
RI
VER
TR
AI
L
E X
G R
A V
A
IL
EX. CONC. WALK
EX. CO
N C.
W A
LK
B-4
B-3
B-2
SD
X
X
X
X
X
LIMIT OF DISTURBANCE
LIM
IT
OF
DIS
TURBANCE
LIM
IT O
F DISTU
RBAN
CE
LI
IT
F
D
IS
TU
R B
A N C E
SHEET C7.
SEE DETAIL
EARTH DIKE TYPE A-2.
CLEANWATER
SHEET C7.
EX-100. SEE DETAIL
PROTECTION AT
PROVIDE INLET
X
X
X
X
X X
X
X
X
X
XX
X
X X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
D
X
X
X
X
X
X
X D
D
D
D
D
D
X
D
D
D
D
D
D
D
D D
D
D
D
X
X
X
X
X
D
D
D
D
D
D
X X
X
X X
X
TO REMAIN
EX. GATE
SEE DETAIL THIS SHEET
PEDESTRIAN BARRIER (TYP.)
E N
F
E A
H
K
Y
A
S T
B E
R E
M O
V E D
F R
K
E A
B
Y
TH
E
E R
O D
IB
TE
R
IA
Y
T
B E
S
TO
C K P
IL
E D
F O R
C
O N S
TR
U C
TI
C E S S
S
TA
G
IN
D
L A Y D
O W
N
C O
N
TR
A C
TO
TO
E
E X
L O
W E R
P
A R
K
IN
G
L O T
X
X X
SHEET C7.
SEE DETAIL
DIVERSION FENCE.
CLEANWATER
SHEET C7.
SEE DETAIL
EARTH DIKE TYPE A-2
CLEARWATER
W W
G A
TE
EX. DIRT PATH
EX. CONC. WALK
EX. CO
N C.
W A
LK
S
S
S
S
S
C O
S
S
C O
SD
SD
MH
M E
E
BM
056 +
207 +
+062
303+3
1+
0+00
2+00
3+00
4+00
5+00
6+00
7+
8+0
9+00
10+00
11+00
11+50.76R
' R
H D P E
P R
O P
EX. STREAM EDGE
BM
6" HDPE
PROP
SCH 40 PVC
PERFORATED
PROP 6" HDPE
C/O
B-1
E
C O
C O
TE
D
SHEET C7.
PER DETAIL ON
WITH 'J-HOOKS'
INSTALL SILT FENCE
SD
S
S
S
MH
CONTROL POINT ELEVATION TABLE
2/14/2022
APPROVED
BY: COLLIN HILTNER
MD DEPT ENVIRONMENT
SEDIMENT & STORMWATER
CROSS SECTION
INLET GRATE
WIRE TIES
6 IN
6 IN
6 IN
OVERLAP
6 IN
6 IN
6 IN
PLAN / CUT AWAY VIEW
AGIP
IN STONE2
1 TO 14
IN STONE2
1 TO 14
NONWOVEN GEOTEXTILE
NONWOVEN GEOTEXTILE
GEOTEXTILE AND STONE.
CLOGGED. WHEN THIS OCCURS, REMOVE ACCUMULATED SEDIMENT AND CLEAN, OR REPLACE
INLET PROTECTION DOES NOT COMPLETELY DRAIN WITHIN 24 HOURS AFTER A STORM EVENT, IT IS
SEDIMENT AFTER EACH RAIN EVENT TO MAINTAIN FUNCTION AND AVOID PREMATURE CLOGGING. IF
STORM DRAIN INLET PROTECTION REQUIRES FREQUENT MAINTENANCE. REMOVE ACCUMULATED 4.
THE GRATE.
INCH STONE OR EQUIVALENT RECYCLED CONCRETE 6 INCHES THICK ON 2
1 TO 14
3PLACE CLEAN 3.
SECURE WITH WIRE TIES AND SET GRATE BACK IN PLACE.
LIFT GRATE AND WRAP WITH NONWOVEN GEOTEXTILE TO COMPLETELY COVER ALL OPENINGS. 2.
USE NONWOVEN GEOTEXTILE AS SPECIFIED IN SECTION H-1 MATERIALS.1.
CONSTRUCTION SPECIFICATIONS
MAXIMUM DRAINAGE AREA = 1 ACRE
STANDARD SYMBOL
PROTECTION
AT-GRADE INLET2-9DETAIL E-
WATER MANAGEMENT ADMINISTRATION
MARYLAND DEPARTMENT OF ENVIRONMENT
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL
NATURAL RESOURCES CONSERVATION SERVICE
U.S. DEPARTMENT OF AGRICULTURE
IN HARDWARE CLOTH4
CLOTH
HARDWARE
IN GALVANIZED4
b c
FLOW
A-1
CROSS SECTION
2:1 SLOPE OR FLATTER
2:1 SLOPE OR FLATTER
PLAN VIEW
FLOW CHANNEL STABILIZATION
AND FLOW DEPTH
REQUIRED FLOW WIDTH
GRADE TO PROVIDE
a d
0.5% MIN. TO 10% MAX. SLOPE
CONTINUOUS GRADE
ON FLOW CHANNEL SIDE OF DIKE.
PLACE DESIGNATION (e.g. A-1)
A MINIMUM OF 7 INCHES AND FLUSH WITH GROUND.
4 TO 7 INCH STONE OR EQUIVALENT RECYCLED CONCRETE PRESSED INTO SOIL A-3/B-3
SEED WITH SOIL STABILIZATION MATTING OR LINE WITH SOD.A-2/B-2
DIVERSION.)
SEED WITH STRAW MULCH AND TACK. (NOT ALLOWED FOR CLEAR WATER A-1
WITH SECTION B-4 VEGETATIVE STABILIZATION.
CONTINUOUSLY MEET REQUIREMENTS FOR ADEQUATE VEGETATIVE ESTABLISHMENT IN ACCORDANCE
MAINTAIN POSITIVE DRAINAGE. KEEP EARTH DIKE AND POINT OF DISCHARGE FREE OF EROSION, AND
MAINTAIN LINE, GRADE, AND CROSS SECTION. REMOVE ACCUMULATED SEDIMENT AND DEBRIS, AND 7.
APPROVED PLAN.
OF REMOVAL STABILIZE DISTURBED AREA WITH TOPSOIL, SEED, AND MULCH, OR AS SPECIFIED ON
UPON REMOVAL OF EARTH DIKE, GRADE AREA FLUSH WITH EXISTING GROUND. WITHIN 24 HOURS 8.
WATER DIVERSION WITHIN 24 HOURS OF INSTALLATION.
STABILIZE EARTH DIKE WITHIN THREE DAYS OF INSTALLATION. STABILIZE FLOW CHANNEL FOR CLEAR 6.
PROVIDE OUTLET PROTECTION AS REQUIRED ON APPROVED PLAN.5.
DUE TO FIELD CONDITIONS AS NECESSARY TO MAINTAIN POSITIVE DRAINAGE.
CONSTRUCT FLOW CHANNEL ON AN UNINTERRUPTED, CONTINUOUS GRADE, ADJUSTING THE LOCATION 4.
COMPACT FILL.3.
PROJECTIONS OR OTHER IRREGULARITIES ARE NOT ALLOWED.
EXCAVATE OR SHAPE EARTH DIKE TO LINE, GRADE, AND CROSS SECTION AS SPECIFIED. BANK 2.
MATERIAL SO AS NOT TO INTERFERE WITH PROPER FUNCTION OF EARTHDIKE.
REMOVE AND DISPOSE OF ALL TREES, BRUSH, STUMPS, OBSTRUCTIONS, AND OTHER OBJECTIONABLE 1.
CONSTRUCTION SPECIFICATIONS
DIKE TYPE
A B d - FLOW DEPTH c - FLOW WIDTH b - DIKE WIDTH a - DIKE HEIGHT
12 IN MIN.
4 FT MIN.
24 IN MIN.
18 IN MIN.
24 IN MIN.
6 FT MIN.
36 IN MIN.
30 IN MIN.
GROUND
EXISTING
STANDARD SYMBOL
EARTH DIKEDETAIL C-1
WATER MANAGEMENT ADMINISTRATION
MARYLAND DEPARTMENT OF ENVIRONMENT
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL
NATURAL RESOURCES CONSERVATION SERVICE
U.S. DEPARTMENT OF AGRICULTURE
FLOW
POSTS
CROSS SECTION
ELEVATION
STEP 1 STEP 2
GROUND
UNDISTURBED
INTO GROUND
8 IN MIN. DEPTH
THE GROUND
A MIN. OF 16 IN INTO
FENCE POST DRIVEN
FENCE SECTIONS (TOP VIEW)
JOINING TWO ADJACENT SILT
CENTER TO CENTER
6 FT MAX.
DRIVEN MIN. 16 IN INTO GROUND
36 IN MIN. FENCE POST LENGTH
POST LENGTH
36 IN MIN. FENCE
STEP 3
STAPLE
1 OF 2 2 OF 2
SF
ABOVE GROUND
FENCE POST 18 IN MIN.
TWIST POSTS TOGETHERSTAPLE
STAPLE STAPLE
STAPLE STAPLE
STAPLESTAPLE
WOVEN SLIT FILM GEOTEXTILE
16 IN MIN. HEIGHT OF
GEOTEXTILE
WOVEN SLIT FILM
OF GEOTEXTILE.
THE SOIL ON BOTH SIDES
BACKFILL AND COMPACT
INTO THE GROUND.
MIN. OF 8 IN VERTICALLY
EMBED GEOTEXTILE
IN SILT FENCE
OF THE SILT FENCE.
45 DEGREES TO THE MAIN FENCE ALIGNMENT TO PREVENT RUNOFF FROM GOING AROUND THE ENDS
EXTEND BOTH ENDS OF THE SILT FENCE A MINIMUM OF FIVE HORIZONTAL FEET UPSLOPE AT7.
ACCORDANCE WITH THIS DETAIL.
WHERE TWO SECTIONS OF GEOTEXTILE ADJOIN: OVERLAP, TWIST, AND STAPLE TO POST IN 6.
COMPACT THE SOIL ON BOTH SIDES OF FABRIC.
EMBED GEOTEXTILE A MINIMUM OF 8 INCHES VERTICALLY INTO THE GROUND. BACKFILL AND 5.
REQUIREMENTS IN SECTION H-1 MATERIALS.
INSPECTION/ENFORCEMENT AUTHORITY SHOWING THAT THE GEOTEXTILE USED MEETS THE
PROVIDE MANUFACTURER CERTIFICATION TO THE AUTHORIZED REPRESENTATIVE OF THE 4.
AND MID-SECTION.
GEOTEXTILE SECURELY TO UPSLOPE SIDE OF FENCE POSTS WITH WIRE TIES OR STAPLES AT TOP
USE WOVEN SLIT FILM GEOTEXTILE AS SPECIFIED IN SECTION H-1 MATERIALS AND FASTEN 3.
APART.
USE 36 INCH MINIMUM POSTS DRIVEN 16 INCH MINIMUM INTO GROUND NO MORE THAN 6 FEET 2.
NOT LESS THAN 1 POUND PER LINEAR FOOT.
AN ALTERNATIVE TO WOODEN POST USE STANDARD "T" OR "U" SECTION STEEL POSTS WEIGHING
INCH (MINIMUM) SQUARE CUT OF SOUND QUALITY HARDWOOD. AS 16
3 X 14
3USE WOOD POSTS 11.
CONSTRUCTION SPECIFICATIONS
OCCURS, REINSTALL FENCE.
SEDIMENT REACHES 25% OF FENCE HEIGHT. REPLACE GEOTEXTILE IF TORN. IF UNDERMINING
OR WHEN REMOVE ACCUMULATED SEDIMENT AND DEBRIS WHEN BULGES DEVELOP 8.
B A
A
A
B
B
B
A
STANDARD SYMBOL
SILT FENCEDETAIL E-1SF
STANDARD SYMBOL
SILT FENCEDETAIL E-1
WATER MANAGEMENT ADMINISTRATION
MARYLAND DEPARTMENT OF ENVIRONMENT
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL
NATURAL RESOURCES CONSERVATION SERVICE
U.S. DEPARTMENT OF AGRICULTURE
WATER MANAGEMENT ADMINISTRATION
MARYLAND DEPARTMENT OF ENVIRONMENT
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL
NATURAL RESOURCES CONSERVATION SERVICE
U.S. DEPARTMENT OF AGRICULTURE
CONFIGURATION
FINAL
FE
ET
M
IN
IM
U M
STANDARD SYMBOL
X
NOTES:
1. Root damage should be avoided.
2. Protective signage is required.
3. Device should be maintained throughout construction.
ANCHOR POSTS MUST BE
INSTALLED TO A DEPTH OF
NO LESS THAN 1/3 OF THE
TOTAL HEIGHT OF POST
USE 8" WIRE 'U'
TO SECURE FENCE
BOTTOM
MAXIMUM 8 FEET
USE 2"x4" LUMBER
FOR CROSS BRACING
HIGHLY VISABLE
FLAGGING
ANCHOR POSTS SHOULD BE
MINIMUM 2" STEEL 'u' CHANNEL
OR 2"x2" TIMBER, 6' IN LENGTH
BLAZE ORANGE PLASTIC MESH
C7
SD I-1
INLET EX-100 AND
TO BE USED AT
BLAZE ORANGE CONSTRUCTION FENCE
SEDIMENT CONTROL DETAILS
*MDE APPROVED SEDIMENT CONTROL PLAN
Flow
Surface Ground
DF
Sheeting on Both Sides of Fence UV Resistant Impermeable
MAXIMUM DRAINAGE AREA = 2 ACRES
STANDARD SYMBOL
U.S. DEPARTMENT OF AGRICULTURE
NATURAL RESOURCES CONSERVATION SERVICE
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL
MARYLAND DEPARTMENT OF ENVIRONMENT
WATER MANAGEMENT ADMINISTRATION
ELEVATION
SECTION
CONSTRUCTION SPECIFICATIONS
DETAIL C-9 DIVERSION FENCE
10 Feet Max.
4 Feet Min. Along Flow Surface or Provide Soil Stabilization Matting
Extend Impermeable Sheeting
Impermeable Sheeting Covered with
Chain Link Fence
Aluminum Posts Galvanized Steel or
Inch Diameter 8
Aluminum Posts Galvanized Steel or
Inch Diameter 8
Secure With Wire Ties Top of Fence and
Fold Sheeting Over
34 Inches Min.
36 Inches Min.
Min.
8 Inches
34 Inches Min.
into Ground Sheeting 8 Inches Min.
Embed Impermeable occurs, reinstall fence.
sediment and debris. Maintain positive drainage. Replace impermeable sheeting if torn. If undermining
7. Keep flow surface along diversion fence and point of discharge free of erosion. Remove accumulated downgrade.
6. When two sections of sheeting adjoin each other, overlap by 6 inches and fold with seam facing
Soil stabilization matting may be used in lieu of impermeable sheeting along flow surface.
5. Extend sheeting a minimum of 4 feet along flow surface and embed end a minimum of 8 inches into ground.
inches at top, mid section, and below ground surface.
4. Secure 10 mil or thicker UV resistant, impermeable sheeting to chain link fence with ties spaced every 24
3. Fasten chain link fence securely to the fence posts with wire ties.
further than 10 feet apart. The posts do not need to be set in concrete.
2. Use 2-3/8 inch diameter galvanized steel posts of 0.095 inch wall thickness and six foot length spaced no
1. Use 42 inch high, 9 gauge or thicker chain link fencing (2-3/8 inch maximum opening).
PROFESSIONAL CERTIFICATION
No. 25768, expiration date: 06/23/2023 engineer under the laws of the State of Maryland, license approved by me, and that I am a duly licensed professional I hereby certify that these documents were prepared or
KWCENGINEER:
KCY
SAR
NATIONAL PARK SERVICE - NATIONAL CAPITAL REGION
UNITED STATES
OF
SHEET
DWG. NO.
DATE
DEPARTMENT OF THE INTERIOR
SUB SHEET NUMBERTITLE OF DRAWING
Mark Sheet InitialDateREVISION
DESIGNED
DRAWN
CHECKED
FORT WASHINGTON
FORT WASHINGTON PARK
STANTEC
CONSULTING, INC.
DIVISION OF LANDS, PLANNING & DESIGN
RESURFACE LIGHTHOUSE ROAD
02/09/2022
FINAL 3/2018 KWC
852-123412
20879
GAITHERSBURG, MD
SUITE 620
VILLAGE AVENUE
6 MONTGOMERY
2/14/2022
APPROVED
BY: COLLIN HILTNER
MD DEPT ENVIRONMENT
SEDIMENT & STORMWATER
EROSION AND SEDIMENT CONTROi NOTES 1 . The con tra ctor sha l l not ify M D E at ( 4 1 0) 537 -35 1 0 seven (7) d ays before co m me nc i ng a ny lan d d isturb i ng a ct ivity an d , un less waived by M D E , s h a l l be req u i red to ho l d a pre- construct ion meet i ng betwee n project representat ives a n d a rep resentat ive of M D E .
2 . T h e con tra ctor s h a l l not ify M D E i n writ i ng a n d b y te lephone at the fol low i ng po i nts :
A. The req u i red pre-constru ct ion meet i ng .
B . Fo l l ow i ng in sta l l a t ion of sed iment con!ro l measures.
C. D u r i n g fhe insta l l a t ion of se d i ment basins (to be converted i nto permanent stormwater m o n o g_ement stru ctu res.) at the req u i red i nspect ion po i nts (see I n spect ion "Chec kl ist on p l an) . Not ificat ion pr ior to commen c i ng constru ct ion of ea c h step is man d atory.
D . P-rior to remova l or mod if i cat ion of a ny sed i ment contro l stru ct u re(s) .
E . P rior to remova l of a l l se d i ment contro l d ev i ces.
F. P rior to f ina l a c ceptan ce .
3 . Th e p lan a pp rova l l ette r, a p p roved e rosion an d se d i m e nt con trol p l a ns , d a i ly log books , a n d test re ports s h a l l be ava i l ab le at the s ite for i nspect ion -by d u ly a u thorized off i c ia l s of M D E a n d the agen cy respons i b le for th e project .
4 . The con tra ctor sha l l constru ct a l l eros ion and sed iment contro l measures per th e ap proved p lan a nd constru ct ion sequen ce a n d s h a l l have them i nspected an d a pproved by the M D E i nspector p rior to beg i nn i ng a ny other l a n d d isturban ces. M i nor sed i ment contro l d evi ce locat ion a djustm e nts may be ma d e i n the f ie ld w ith the a pprova l of the M D E i n s pector . The contra ctor sha l l ensure that a l l runoff from d isturbed a reas is d i rected to the sed i ment contro l d ev i ces a n d s h a l l n o t rem ove a ny erosion o r sed i ment contro l m easure w ithout p rior perm iss ion f rom M DE i nspector. The contra ctor s h a l l obta i n p rio r agen cy an d M D E a p p rova l for mod if icatio ns to the e rosion a n d sed i ment con trol p l a n an d/or seq uen ce of constru ct ion .
5 . The M DE inspector has th e option of req u i ri ng a d d it iona l safety or sed iment contro l mea s ures, if d eemed necessary.
6 . The con tra ctor s h a l l prote ct a l l po i nts of constru ct ion inqres s a n d egress to preve nt the d epos it ion of mater ia ls on to pub l i c roa as . Al l mater ia ls depos ited onto p u b l ic roa d s sha l l be removed i m m ed iately.
7. The con tra ctor sha l l i n s pect d a i ly an d ma i ntain cont i nu ous ly i n a n effect ive operat i ng con d it ion a l l e ros ion a n d sed iment con trol measu res u n t i l s u c h t ime a s they a re removed with prior pe rm i s s ion from the M DE i nspector.
constru ct ion sha l l be U t i l ity constru ct ion s h a l l o f d i stu rbance . Ca l l *M iss to the sta rt of work. When
8. Eros ion a n d sed i ment contro l for ut i l i ty prov id ed i n accord a n ce w ith a p p roved p lans .
on ly be for a reas w ith i n the de l i neated l i m it U t i lity* at 1 - 800-257-7777 48 hours p rior same d ay sta b i l izat ion is a pproved :
A. Excavated trenc h materia l s h a l l be p la ced on the h ig h s i d e of the t re n c h .
B . Tren c hes f o r u t i l ity i nsta l l a t ion sha l l b e ba c kf i l l ed , compa cted , a n d sta b i l i zed at the en d of ea c h work i ng d ay. No mo re trenc h s h a l l be opened t h a n ca n be comp leted the same d ay.
9 . Al l water rem oved from ex cavated a reas s h a l l be passed th rough an M D E a p p roved d ewater i n g p ract i ce or p u m ped to a sed i ment t ra p o r bas i n p rior t o d isc h a rge t o a fun ct iona l storm d ra i n system or to sta b le g ro u n d s u rfa c e .
1 0 . Con c rete washout stru ct u res sha l l be used when conc rete truc ks, d rums, pu mps , c h utes, o r oth e r eq u i pment is rin sed or c l ea ned o n - s ite.
1 1 . Construct ion a ct ivit ies p rodu c i ng d ust sha l l i mpl e ment contro l m easures to avo i d the s u s pen s ion of d ust part ic les a n d/or prevent d ust from b low i ng off -s ite or to a reas w ithout treatment .
1 2 . Fo l l ow i ng in itia l so i l d i sturbance or re - d i st u rbance , permanent o r tem pora ry sta b i l izat ion sha l l be com pleted w ith i n :
A . Th ree (3) ca l e n d a r d ays as t o t h e s u rface o f a l l per i meter cont ro ls , d i kes, swa les , d itc hes , peri meter s lopes, a n d a l l s l opes steeper t h a n 3 horizonta l t o 1 ve rti ca l (3 : 1 ) ; a n d
B . Seven (7) ca l e n d a r d ays as to a l l otlie r d istu rbed or g ra d ed areas on the proJect s ite not u n d er a ctive g ra d in g .
1 3 . Vegetat ive sta b i l ization sh a l l b e perfo rmed i n accord a n ce w ith t h e 20 1 1 M a ry la nd Sta n d a rd s a n d Spec if i cat ions f o r Soi l Erosion a n d Se d i ment Contro l . Refer t o a p p ropr iate spec if icat ions for te m pora ry seed i ng , permanent seed i n g , m u l c h ing , sod d i n g , a n d g roun d cove rs.
1 4 . Wh e n seed i n g , a l l d istu rbed a reas with s lopes f la tter than 2: 1 sha l l be stab i l ized" w ith 4 i n c hes of topso i l , seed , a n d m u l c h . Al l d isturbed a reas w ith s lopes 2 : 1 o r steeper s h a l l be stab i l ized w ith matt i ng ove r 2 i n c h es o f topsoi l a n d seed .
1 5 . Al l sed iment bas i n s , t ra p emban kments a nd s lopes , peri meter d ikes, swa les a n d al l d isturbed s lopes stee pe r or eq u a l to 3 : 1 sha l l be sta b i l i zed w ith seed an d a n c hored straw m u l c h , sod , or other approved sta b i l i zat ion measures , a s soon a s poss i b le but no l a ter t h a n t h ree (3) ca l e n d a r d ays after esta bl is h m e nt . Al l a reas d isturbed outs i d e of th e per i meter sed i ment control system s h a l l be m i n i mized . Ma i ntenan ce sha l l be performed a s n ecessa ry to e n s u re cont i n u ed sta b i l i zat ion .
1 6. Perma nent swa l es or o ther po i nts o f con centrated water f l ow s h a l l b e sta b i l ized w ith seed a n d a n a p p roved eros ion control matt i n g , sod , ri p - ra p , o r other a pproved sta b i l ization m ea s ures.
1 7 . For stoc kp i l e s lopes steeper t h a n 3 horizonta l to 1 vert i ca l (3 : 1 ) , t h e contra ctor s h a l l a pply see d a n d a n c hored straw m u l c h , sod , o r other approved sta b i l izat ion measu res t o t h e fa ce o f t h e stoc kp i l e w ith i n t h ree (3) ca len d a r d ays of a ct ivity havi ng cease d on the respect ive face . For s lopes 3 : 1 o r f la tter , the cont ra ctor s h a l l O RPlY sta b i l i zat ion measures to the fa ce of the stoc kp i l e w ith i n seven (7 J c a len d a r d ays of a ct iv ity havi ng ceased on the respect ive fa ce .
Ma i ntenan ce sha l l be perfo rmed as necessary to ensure cont i n u ed sta b i l i zat ion .
1 8 . For f i n is hed g ra d i ng , the con tra ctor sha l l provid e a d equate g ra d ients to p reve nt water fro m pon d i ng for mo re than twenty-four \24) h o u rs after the end of a ra infa l l event . D ra i nage courses a n d swa le f low a reas may take as long as forty-e ight (48) h o u rs after the en d of a rainfa l l event to d ra i n . Areas d es igned" to have sta n d i ng water sha l l not be req u i re d to m eet th is req u i rement .
1 9 . Where d eemed a ppropriate by the eng i neer o r i nspector, sed iment bas i ns a n d t raps may n eed to be s u rrou nd ed w ith an a p p roved safety fence. The fen ce mu st conform to l oca l ord i nan ces a n d reg u lat ions . The d eve loper or owner sha l l c hec k w ith loca l bu i l d i ng offic ia l s on a pp l ica b l e safety req u i reme nts . Where safety fen ce is d eemed a ppropriate an d l oca l ord i nan ces d o not spec ify fen c i ng s izes and types , the fol low i ng s h a l l be used as a m i n i m u m sta n d a rd : The safety fe n ce s h a l l be ma d e of we l d e d w i re a n d at l east 42 inches h ig h , have posts spa ced no fa rther a p a rt than 8 feet, have mesh open ings no greater than 2 i n c hes i n w i d th and 4 i nc hes i n he ig ht w ith a m i n i m u m 01 1 4 g a u g e w i re. Safety fe n ce s h a l l be ma i nta i n ed a n d i n goad con d it ion at a l l t imes .
20 . Al l sed iment tra p d epth d i mens ions a re re lat ive to th e out l et e levat io n . Al l traps s h a l l have a sta b le ou tfa l l . Al l traps a n d bas i ns sha l l h ave sta b le i nf low po i nts.
2 1 . Sed i ment s h a l l be removed a n d the t ra p or bas i n restored to its o rig ina l d imens ions when the sed im e nt has a c c u m u l ated to one q u a rter of the tota l d epth of the trap or bas i n . Tota l d epth s h a l l be measured from the tra p or bas i n bottom ta the c rest of the out let .
22 . Sed i ment re moved from tra ps (a nd bas i ns) sha l l be p la ced a n d sta b i l ized i n approved a reas, but not w ith i n a f lood p la i n , wet l a n d or t ree- save area . When p u m p ing sed i ment la d en water, the d isc h a rge sha l l be d i rected ta a n MDE approved sed i m e nt t ra p p i ng d ev ice pr ior to re lease from the s ite. A s u m p p it may be used if sed iment tra ps th e m se lves are be i n g p u m ped out .
2 3 . Prior to remova l of sed i ment contro l measures, the contra ctor s h a l l sta b i l ize a n d have estab l ishe d perma nent stab i l izat ion for a l l contr ibutory d isturbed a reas us i ng sod or a n a p p roved permanent seed m ixture w ith req u i red so i l amen d me nts an d a n a pp roved an c hored m u l c h . Wood f ibe r m u l c h ma)/ on ly be used in seed i ng season where the s lope d oes not exceed 1 0% a nd g ra d i ng has been d one to p romote sheet f low d ra inage . Areas b ro u g h t to f i n ished g ra d e d ur i ng the seed i ng season s h a l l 15e permanent ly sta b i l ized a s soon as possib l e , but not lafer than th ree (3) ca len d a r d ays after esta b l i shment for s lopes steeper than 3 horizonta l to 1 vertica l (3 : 1 ) a n d seven (7) ca lend a r d ays for f l a tte r s lopes . When p roperty is b rought to f i n ish ed g ra d e d u ring the months of Novembe r thro u g n Febru a ry, an d perma nent stab i l i zat ion is foun d to be i m p ra ctica l , tempora r_y seed a n d a n c hored straw m u l c h s h a l l be app l ied to d isturbed areas . Th e fi na l perma nent sta b i l izat ion of su c h property s h a l l be app l ied by M a rch 1 5 or earl ie r if g roun d a n d weather con d it ions a l low.
24 . Tem pora ry sed i ment con trol d evices s h a l l be re moved w ith perm iss ion of the M D E i n s pector w ith i n th i rty (30) ca lend ar d ays fol l ow i ng estab l ishment of pe rma nent sta b i l i zat ion i n a l l contri butory d ra i nage a reas . Upon rem ova l of sed i ment contro l d evi ces , the a rea d isturbed b)I remova l s h a l l be sta b i l ized w ith to pso i l , seed , a n d m u l c h , o r as s pec i f i e d , w ith in 2 4 h o u rs o f sa id rem ova l . Stormwate r management stru ct u res used tem pora ri ly for sed i ment contro l sha l l be converted to the permanent conf ig u rat ion w ith i n th is t ime period as w e l l .
2 5 . Off- site spo i l or borrow a reas on State o r federa l p roperty sha l l have prior a p p rova l by M D E a nd other app l i cab le State, fed era l , an d lo ca l agen c ies ; otherw ise a p p rova l s h a l l be g ra nted by the lo ca l a u thorit ies . Al l wa ste a n d borrow a reas off- s ite sha l l b e protected by sed i ment con trol measures a n d sta b i l ized .
2 6 . S ite I n format ion :
A. Area D istu rbed : 0 . 9 Ac res B . Tota l Cut : 280 C u b i c Ya rd s C . Tota l Fi l l : 37 C u bic Ya rd s D . Off -S ite Waste / Borrow Area Locat ion : TBD
STANDARD STABII IZATION NOTE
Fo l l owing i n it ia l soi l d i sturban ce or red i sturbance, perm a n e n t or tempora ry sta b i l i zat ion s h a l l be comp leted w ith i n t h ree (3) ca lend a r d ays as to the s u rface of a l l pe r imeter con tro ls , d i kes, swa les , d itches, peri meter s lopes , a n d a l l s l opes steeper than 3 horizonta l to 1 vertica l (3 : 1 ) ; a nd seven (7) days as to a l l other d istu_rbed or g ra d ed a reas on the project s i te not u n d er a ct ive g ra d i n g .
B-4 STANDARDS AND SPECIEICATIONS EOR VEGETATIVE STABII IZATION
Def i n it io n : Us i ng vegetat ion as cover to prote ct exposed so i l f rom eros ion .
P u rpose: To promote the estab l ishment af vegetat ion on exposed so i l .
Con d it ions Where Pra ct i ce Appl ies :
On a l l d i sturbed a reas not sta b i l i ze d by other method s . Th is spec if icat ion is d ivid e d into se ct ions on i n c rementa l sta b i l izat ion ; so i l preparatio n , so i l a m e n dments an d topsoi l i ng ; see d i n g a n d m u l c h i n g ; tempora ry sta b i l izat io n ;
a n d permanent stabi l izat ion .
Effects on Water Q u a l ity a n d Quant ity Sta b i l izat ion pra ct i ces a re used to promote the estab l ishment of vegetat ion on expose d so i l . Wh e n so i l is sta b i l ize d w ith vegetat io n , the so i l is fess l i ke ly to erod e an d more l i kely to a l l ow i nf i l t rat ion of ra i nfa l l , t hereby red u c i ng sed i ment loads and runoff to d ownstrea m a reas.
P l a n t i ng vegetat ion i n d istu rbed a reas w i l l have a n effect on the water bu d get, espe c ia l ly on vol u mes and rates of runoff, i nf i l t rat io n , eva porat ion , tra nsp i rat io n , perco lat ion , a n d g roun d wate r rec h a rg e . Over t i me, vegetation w i l l i n c rease o rg a n i c matter content a n d i m p rove the water ho l d i n g ca pa c ity o f t h e soi l a n d s u bseq uent p l an t g rowt h .
Vegetat ion w i l l h e l p red u ce t h e movement o f sed i ment , nu t rients , a n d other c hem ica l s ca rried by runoff to rece iv i ng wate rs. P la nts wi l l a l so h e l p protect g roun d water supp l ies by a ss i mi la1 ing those s u bsta nces present w ith i n the root zone.
Sed iment con trol pract ices mu st re main i n p lace d u ri ng g ra d i ng , seed bed preparation , seed i n g , m u l c h i n g , a n d vegetat ive esta bl is h ment .
Ad eq uate Vegetat ive Esta bl is h me nt
I nspect seed ed a rea s for veg etat ive estab l is hment a nd m a ke n e c essary repa i rs, rep la cements, a n d resee d ings with i n the p lan t i ng season .
1 . Ad equate vegetat ive sta b i l izat ion req u i res 9 5 percent g ro u n d cover.
2. I f an a rea h a s l ess than 40 percent g roun d cove r , restab i l ize fo l low i ng the orig ina l recommen d at ions for l ime , fert i l izer , seed bed prepa ra-t io n , and seed i n g .
3 . I f a n a rea h a s betw een 40 an d 94 pe rce nt g ro u nd cove r, ove r-s eed a n d fert i l ize us i ng h a lf of the rates or ig i nany specif ied .
4. Ma i ntenance fert i l izer rates for permanent seeil i ng a re shown i n Ta b le
B . 6 .
B-4- 1 STANDARDS AND 5PECIEICATIO�IS FOR INCREME�ITAI SIABII IZATION
D ef i n it io n : Esta bl ish ment of veg etat ive cove r on cut a n d f i l l s lo pes.
P u rpose: To provide t i mely vegetative cover on c ut and f i l l s lopes as work p rogresses.
Cond it ions Where Pra ct i ce Appl ies Any cut or f i l l s lope g reater than 1 5 feet i n h e ig h t . This pract i ce a l so a p p l ies to stoc kp i l es .
Criteria A. I n c rementa l Sta b i l izat ion - Cut S l o pes 1 . Excavate a n d sta bi l i ze c ut s lopes i n i nc re m e nts not to exceed 1 5 feet i n he ig h t . P repare seed bed a n d app ly seed a n d m u lch on a l l c ut s l opes as the work prog resses.
2 . Construct ion sequ e n ce examp l e (Refer to Fig u re B . 1 ) :
a . Constru ct a n d sta b i l ize a l l tempora ry swales or d i kes that w i l l be used to convey ru noff a roun d the ex cavat io n .
b . Perform Phase 1 ex cavat io n , p re pare seed bed , a n d sta b i l i ze .
c . Perform Phase 2 excavatio n , prepare seed bed , an d sta b i l i ze .
Overseed Phase 1 a reas as ne cessary.
d . Perform f i n a l pha s e excavat io n , pre p a re seed bed , an d sta b i l iz e .
Overseed previously seed ed a reas a s necessary.
N ote : On ce excavat ion has beg u n the ope rat ion s hou l d be cont i n u o u s f ro m g r u b b i ng_ th ro u g h the comp let ion of g ra d i n g a n d p la cement of topso i l ( if req u i red) a n d permanent seed a n d m u l c h . Any i nterrupt ions i n the operat ion or comp let ing th e operat ion out of th e seed i ng season wi l l necess itate the a p p l ication of tem porary sta bi l izat ion .
7 5 FT MAY/
EX ISTING
GROUN�
B-4- 1 INCREMENTAi STABII IZATION (cant ) B . I n c rementa l Sta b i l izat ion - Fi l l S l opes 1 . Constru ct a n d sta bi l ize f i l l s lopes ,n i n c reme nts not to exc eed 1 5 feet i n he ig h t . P repare seed bed a n d a pply seed a n d mu lch on a l l s lopes as the work prog resses.
2. Sta b i l ize s l opes i mm e d iately when the vert i ca l h eig ht of a l i ft reac hes 1 5 feet, o r when the g ra d i ng operation ceases as presc ri bed i n the p l ans .
3. At the en d of ea c h d ay, i nsta l l tempora ry water conveya n ce p ra ct i ce (s) , as necessary, to i ntercept s u rface ru noff a nd convey it d own the s lope i n a n o n - e ros ive man ner .
4. Construction seq u e nce exa m p le (Refer to Fig u re B . 2 ) :
a . Constru ct an d sta bi l ize a l l le m porar_y swa l es or d ikes t h a t w i l l b e used t o d ivert runoff a roun d the f i l l . Constru ct s i l t fen ce on l o w s i d e of f i l l u n less other method s shown an th e p l a n s a d d ressthis area .
b . At the en d of ea c h d ay, insta l l tempora ry wate r conveya n ce pra ct ice(s) , as necessa ry, to i ntercept s u rfa ce runoff a n d convey it d own the s lope i n a non- eros ive m a n n e r.
c . P lace Pha se 1 fi l l , p repare seed bed , a nd sta b i l i ze .
d . P la ce Phase 2 fi l l , p repare seedbed , a n d sta b i l ize.
e . P lace f i na l phase fi l l , pre pare see d bed , a n d sta b i l ize . Ove rs eed prev ious ly seeded a reas as necessa ry.
Note: On ce the p la cem e nt of fi l l has beg u n the o pera t ion s hou l d be cont i nuous f rom g ru b b i n g t h rough the comp let ion of g ra d i n g a n d p la cement of topso i l ( if req u i red) a n d permanent seed a n d m u l c h . Any i n te rru ptions in the operat ion or co m plet ing the operation out of the seed i ng season w i l l ne cess itate thea pp l i cat ion of tempora ry sta b i l izat io n .
PHASE 3
EXC..,VATION
PH.I.SE 2
[)(CAV ... TIDN
PHASE 1
E.'CA\iAllON
DIKE/SWALE
\ TEMPOR,W Dlt::E/SWALE TO 8[
PLACED I\ T THE mo OF EACH I \ WORK DAY TO BE: USED UNllL
1 I\ SlOPE IS CO�tPLE:TELY STAlllLIZEO
_'_,--,_ _ _ -_ _ _ -_ _ -_ _ _ -_ _ -_ _ _ -_ _ -A _ _ i
Fig ure B . 2 : I n c rementa l Sta b i l izat ion - Fi l l
B-4-2 SOIi PREPARATION TOPSOIi ING AND SOIi AMENDMENTS Def i n it io n : Th e process of prepari n g the so i l s to susta i n ad equ ate vegetative stab i l izat ion .
Pu rpos e : To provid e a su itab le so i l m e d i u m for veg etat ive g rowth.
Cond it ions Where Pra ct ice Appl ies : Wh ere vegetat ive sta b i l izat ion is to be esta b l ish ed .
Criteria A. Soi l Preparation 1 . Tem porary Sta b i l izat ion
a. Seedbed prepa rat ion cons ists of l oosen i ng so i l to a d epth of 3 to 5 i n c hes by m ea ns of suita b l e a g ri c u l t u ra l o r constru ct ion equ i pm e nt , such as d isc ha rrows or c h isel p lows or ri ppers mou nted on constru ct ion eq u ipment . Afte r the so i l is loosened , it m ust not be ro l l ed or d ragg ed smooth but l eft i n the ro ug hened con d it ion . S l o pes 3 : 1 o r f l atter a re to be tracked w ith ri d ges ru n n ing para l l e l to the contour of the s lope.
b . Apply fe rti l iz e r a n d l im e as pres c ri bed on the p l a n s .
c . I n corporate l i m e a n d fert i l izer i nto the t o p 3 t o 5 i n c h es of so i l by d isk i n g or other su itab le means .
2 . Pe rmanent Sta b i l i zat ion a . A soi l test is req u i red for a ny earth d istu rban ce of 5 acres or mo re.
The min i m u m so i l con d it ions req u i red for permanent vegetat ive esta b l i shment are :
i . Soi l pH between 6 .0 a n d 7 .0 .
i i . Sol u b le sa l ts l ess than 500 parts per m i l l ion ( p p m l .
i i i . So i l conta i n s less t h a n 4 0 percent c lay but enough f i n e g ra i ned mater ia l ( g reater than 30 percent s i l t p l u s c l ay) to provi d e th e capa c ity to ho l d a moderate a m o u n t of mo istu re . An except ion : i f lovegrass w i l l be p la nted , th e n a sa ndy sa i l ( less than 30 perc ent s i l t _plus c l ay) wou l d be a cce pta b le .
iv. So i l conta i ns 1 .5 percent m in i m u m organ i c matter by we ight .
v. So i l conta ins suff i c ient pore spa ce to pe rm it a d equ ate root pen etratio n .
b. Appl i cat ion of a men d ments or topsoi l is req u i red i f o n - s ite so i l s d o not meet the a bove con d it ions .
c . Gra d ed a reas m ust be ma i nta i ned i n a t rue a n d even g ra d e as spe c i f ied on the a_p proved p l a n , then sca rif ied or otherw ise loosen ed to a depth of 3 to 5 i n c hes .
d . App ly so i l amen d ments a s spec ified on the a p p roved p lan or as i n d i cated by the resu lts of a soi l test.
e. M i x so i l amen d ments into the top 3 to 5 i n c hes of so i l by d isk i ng or other su itab le means . Rake lawn a reas to smooth the s urface , remove l a rg e objects l ike stones an d bran c hes , and rea dy the a rea for seed app l i cat ion . Loosen s u rfa c e so i l bx d ragg ing w ith a heavy c ha i n or other equ i pment to ro ughen the s u rfa ce wh e re s ite con d it ions w i l l not perm it norma l seed bed" preparat io n . Tra c k s lopes 3 : 1 or f l atter w ith tra c ked equ ipment l eav i ng the so i l i n an i rreg u l a r con d i t ion w ith ri d g es ru nn i ng para l l e l to the contour of the s lope . Leave the top 1 to 3 i n c hes of so i l loose and fria b le . Seed bed loosen i n g may be u n nec essa ry on newly d istu rbed a rea s .
B . Topso i l i ng 1 . Topsoi l i s p la c e d over prepared su bso i l p rior to esta b l is h me nt of permanent vegetat ion . The pu rpose is to provi d e a su ita b l e so i l me d i u m f a r vegetat ive growt h . So i l s o f con c ern have l o w mois\u re content , low nu t rien1 l evel s , l ow pH, mater ia ls tox ic to p lants , an d/or un a c cepta b le so i l g ra d at io n .
2 . Topsai l sa lvaged f rom an ex ist i ng s ite m a y b e used Qrovided it meets th e sta n d a rd s a s set forth i n 1h ese s pec ifi cat ions . Typica l ly , the d e pth of topso i l to be sa lvaged for a g iven so i l type ca n be foun d i n the representat ive so i l p rofi l e se ct ion i n the So i l S u rvey p u b l ished by USDA
N RCS.
3 . Topsoi l i ng is l i m ited to a reas hav i ng 2 : 1 o r f latter s lopes where :
a . The textu re of the exposed suoso i ljparent materia l is not a d eq uate ta f rod u c e veg etative g rowth .
b. he so i l mater ia l is so sha l low that the root i n g zone is not d eep enough to s u pport p la nts or fu rn ish cont i n u ing supp l ies of mo istu re a n d p lant n u tr ients .
c . The or ig i n a l so i l to be vegetated conta i ns materia l tox i c ta p lant g rowt h .
a . T h e so i l is s o a c i d i c t h a t treatment with l i meston e i s n o t fea s i bl e .
4. Areas havi ng s l opes steeper than 2 : 1 req u i re spec ia l cons i d erat ion an d d es ig n .
5 . Topsoir Spec if ications : So i l t o b e used as topso i l m u st m eet the fo l l ow i n g c riter ia :
a . Topso i l m u st b e a loa m , sa ndy loa m , c l ay loa m , s i l t loa m…
This is the start of the file's text. The full file is on GovTribe.