B08_Attachment_13_Site_Visit_Agenda_FOWA_Lighthouse_Rd___Lighthouse_Rehabilitation_8-31-22_11AM-ED.doc
DOC document 398 KB Posted
- Solicitation number
- 140P3022R0030
About this file
This site visit agenda outlines requirements for the Lighthouse Road & Rehabilitation National Capital solicitation number 140P3022R0030 issued by the National Park Service National Office within the Department of the Interior. Key details include a 100% small business set-aside for on-site construction work requiring the prime contractor to perform at least 15% of the work. A pre-bid site visit will be held on August 31st, 2022 to survey the site and address offeror questions, which are due by September 9th. Quotes for rehabilitation of Fort Washington Lighthouse Road and the lighthouse are due by September 17th and will be evaluated using lowest price technically acceptable criteria. The prevailing Davis-Bacon wage determination MD20220109 applies to on-site labor. Offerors should carefully review site conditions as no adjustments will be granted for differing site conditions that could have been identified prior to award.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
NATIONAL PARK SERVICE
NATIONAL CAPITAL REGION
1100 Ohio Drive S.W.
Washington, D.C. 20024-2001
SITE VISIT AGENDA
Fort Washington (FOWA)
Lighthouse Road & Lighthouse Rehabilitation 13221 Fort Washington Road
Fort Washington, MD 20744 Solicitation #140P3022R0030
8/31/2022 11:00 AM ED
The purpose of the site visit is to survey the site and clarify any concerns quoters have with the solicitation documents, scope of work, and other detailed requirements.
Attendees: Please sign-in.
A. Introductions
COR:
Rene Senos
CS:
Brian Dankmeyer
CO:
Brian McCabe B. Solicitation changes and oral comments Any oral remarks given by Government personnel will not change the terms and conditions of the solicitation. Requirements of the solicitation remain unchanged unless a formal Solicitation Amendment is issued. There will be no direct oral questions. All questions and concerns must be put in writing and formally sent to brian_dankmeyer@nps.gov. There will be no discussion among offerors.
C. Offeror’s Questions All questions shall be addressed in writing to the Contract Specialist. Question Cutoff Date/Time is 9/9/2022 at 12:00 PM ED. All questions received by the due date will be answered and posted as an amendment to the solicitation shortly thereafter.
D. Solicitation and Amendments The Request for Proposal (RFP) and future amendments shall be available through e-mail solicitation distribution. Enter the solicitation number 140P3022R0030 and FOWA Lighthouse Road & Lighthouse Rehabilitation in the subject block of all e-mails.
E. Set-asides:
This acquisition is a 100% small business set-aside.
F. % of Work by the Prime Contractor:
The prime contractor must perform at least 15% of the work on site with his/her own organization.
G. Construction Contract Wage Determination (formerly Davis Bacon Act):
The solicitation specifies the minimum hourly rates and fringe benefits to be paid laborers and mechanics that perform on-site work. DOL WD MD20220109 PG Co Highway 2/25/2022 applies.
H. Site investigations and Differing Site Conditions:
Contractors are strongly urged to visit and review the project site to determine existing conditions that will affect the work. Contract modifications and price adjustments will not be granted based on conditions that could be determined prior to award.
I. Quotes:
1. Submission:
Quotes are currently due 9/17/2022 at 12:00 PM ED. Offerors shall only e-mail their quote to brian_dankmeyer@nps.gov.
2. Contents:
Refer to the solicitation. Consider using the Required Document Check List and make sure you understand the evaluation criteria for this requirement.
J. Quote Evaluations:
The Government will use a Lowest Price Technically Acceptable approach to evaluate quotes. Reference the evaluation criteria in Section M of the solicitation to see how proposals will be evaluated.
K. Subcontracting Plan:
Not applicable.
L. Project Description and Site Visit:
The NPS Park Project Manager/POC will give a brief overview of the project and park rules/restrictions and conduct a visit of the project site Sign-in Sheet Date / Time:
8/31/2022 11:00 AM ED
Project:
NACE FOWA Lighthouse Road & Lighthouse Rehabilitation Meeting:
Site Visit
| Name |
| Company |
| Phone |
File details come from the government source that posted it. Updated .