This document contains boring logs from a site investigation and details for a federal contract opportunity for road rehabilitation work. The boring logs document soil conditions at depths of 0 to 10 feet, noting fill material from 0 to 0.5 feet underlain by sandy silt and silty sand soils. The related solicitation is for the Lighthouse Road Rehabilitation project within the National Capital Parks-East unit managed by the National Park Service of the Department of the Interior. The opportunity involves rehabilitation of roads and has a solicitation number of 140P3022R0030. No other details regarding response dates, award timing, or technical requirements are provided in this document.

View the file

Other files

File Type Posted
Sol_140P3022R0030_Amd_0005.pdf PDF
B09_Amendment_0005_Lead_Hazard_Control_Activities_0005.pdf PDF
Sol_140P3022R0030_Amd_0004.pdf PDF
B09_Amendment_3_Boring_Location_Plan_0003.pdf PDF
B09_Amendment_3_FOWA_852_141693_HPTC_Record_of_Treatment_2009_0003.pdf PDF
B09_Amendment_3_Q_A_FOWA_Lighthouse___Lighthouse_Road_Repair_0003.docx DOCX document
B09_Amendment_3_2017_Lighthouse_Eval_0003.pdf PDF
B09_Amendment_3_Structural_Investigaton_Fort_Washington_Lighthouse_021319_0003.pdf PDF
Sol_140P3022R0030_Amd_0003.pdf PDF
Sol_140P3022R0030_Amd_0002.pdf PDF
B09_Amendment_0002_Q_A_FOWA_Lighthouse_and_Lighthouse_Road_Repairs_8_29_22_0002.docx DOCX document
Sol_140P3022R0030_Amd_0001.pdf PDF
B08_Attachment_9_-_Biobased_Certification.docx DOCX document
B08_Attachment_12_Vaccination_Certification_Notification_to_DOI_Contractors_Template_082321_FINAL_-_signed.pdf PDF
B08_Attachment_3_FOWA_251994_Lighthouse_FINAL_CD_DRAWING_110421.pdf PDF
B08_Attachment_10_Subcontracting_Percentage_Worksheet_v1_2.docx DOCX document
B08_Attachment_5_FOWA_251994_Lighthouse_Rehab_Specs_rev1-051522.pdf PDF
B08_Attachment_4_FOWA_241555_FOWA_Resurface_Lighthouse_Rd_MDE17-SF-0104_APPROVED_PLANS_040822.pdf PDF
B08_Attachment_1_CAAC_Letter_2020-04_.pdf PDF
Sol_140P3022R0030.pdf PDF
B08_Attachment_8_Submittal_Log_FOWA_251994_Lighthouse_102921.xls XLS spreadsheet
B08_Attachment_7_FOWA_241555_Lighthouse_Rd_Submittal_Log_042922.xls XLS spreadsheet
B08_Attachment_11_Certification_of_Vaccination_Form_expires_2-28-25.pdf PDF
B08_Attachment_2_DOL_WD_MD20220109_PGco_Highway_2_25_22.pdf PDF
B08_Attachment_14_Site_Visit_FOWA_Lighthouse-VC_Aerial_Map.JPG JPG image
B08_Attachment_13_Site_Visit_Agenda_FOWA_Lighthouse_Rd___Lighthouse_Rehabilitation_8-31-22_11AM-ED.doc DOC document
B08_Attachment_6_FOWA_241555_Lighthouse_Rd_Specs_Rev-03-051522.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FILL

ML

SM

ML

0.3 0.5

2.5

6.5

9.0

10.0

Bottom of Boring at 10.0 ft.

S-1, SS

2+2+3+5

REC=5", 21%

S-2, SS

2+5+6+7

REC=24", 100%

S-3, SS

2+3+5+5

REC=14", 58%

S-4, SS

5+5+5+6

REC=9", 38%

S-5, SS

2+3+5

REC=18", 100%

0.0 - 0.3 ft: Asphalt

0.3 - 0.5 ft: Gravel sub-base

0.5 - 2.5 ft: PROBABLE FILL, sampled as silty sand; moist, brown, estimated 5 - 10% fine gravel

2.5 - 6.5 ft: SANDY SILT; moist, reddish brown, estimated 5 - 10% fine to medium gravel

6.5 - 9.0 ft: SILTY SAND, fine to coarse grained sand; moist, brown to greenish gray, estimated <5% rock fragments

9.0 - 10.0 ft: SILT; moist, dark gray, estimated 5 - 10% fine to coarse grained sand, estimated <5% fine gravel, and mica

Encountered

Completion

Casing Pulled

4/23

4/23

4/23

Dry

Dry

Dry

3.0'

Schnabel Representative: M. Ker

Total Depth: 10.0 ft

Method: 2-1/4" I.D. Hollow Stem Auger

Equipment: Geoprobe 7720DT

Ground Surface Elevation:

Contractor: Connelly and Associates, Inc.

Frederick, Maryland

Contractor Foreman: A. Dennis

Hammer Type: Auto Hammer (140 lb)

Dates Started: 4/23/14 Finished: 4/23/14

Location: See Location Plan

Date CavedDepthTime Casing Groundwater Observations

Project:

STRA

TUM

Fort Washington Lighthouse Road

SYMBOL

Contract Number: 14212003 Sheet: 1 of 1

DEPTH

(ft)

ELEV

(ft)

TEST

BORING

LOG

TESTS

Boring Number:

DATA

MATERIAL DESCRIPTION

B-1

REMARKS

SAMPLING

DEPTH

T E

S T

B O

R

IN

G L

O G

B O

R

IN

G L

O G

S

_0 2_

7.

G P

J S

C H

N A

B E

L D

A T

A T

E M

P

LA

T E

_0

7_

6.

G

D T

/3

/1

0.5 1.0

4.5

6.5

Bottom of Boring at 6.5 ft.

Sample S-2 terminated early due to spoon deflection.

Auger refusal at 4.5 ft.

S-1, SS

8+8+9

REC=0", 0%

S-2, SS

3+7+10+17

REC=14", 58%

S-3, SS

21+14+17+27

REC=8", 33%

0.0 - 0.5 ft: Asphalt

0.5 - 1.0 ft: Gravel sub-base

1.0 - 4.5 ft: FILL, sampled as silty sand;

moist, brown, estimated 5 - 10% gravel, estimated <5% brick

4.5 - 6.5 ft: FILL, sampled as sandy gravel; moist, light brown brown, estimated <5% brick

Encountered

Completion

Casing Pulled

4/23

4/23

4/23

Dry

Dry

Dry

1.0'

Schnabel Representative: M. Ker

Total Depth: 6.5 ft

Method: 2-1/4" I.D. Hollow Stem Auger

Equipment: Geoprobe 7720DT

Ground Surface Elevation:

Contractor: Connelly and Associates, Inc.

Frederick, Maryland

Contractor Foreman: A. Dennis

Hammer Type: Auto Hammer (140 lb)

Dates Started: 4/23/14 Finished: 4/23/14

Location: See Location Plan

Date CavedDepthTime Casing Groundwater Observations

Project:

STRA

TUM

Fort Washington Lighthouse Road

SYMBOL

Contract Number: 14212003 Sheet: 1 of 1

DEPTH

(ft)

ELEV

(ft)

TEST

BORING

LOG

TESTS

Boring Number:

DATA

MATERIAL DESCRIPTION

B-2

REMARKS

SAMPLING

DEPTH

T E

S T

B O

R

IN

G L

O G

B O

R

IN

G L

O G

S

_0 2_

7.

G P

J S

C H

N A

B E

L D

A T

A T

E M

P

LA

T E

_0

7_

6.

G

D T

/3

ML

CL

CL

0.3 0.5

2.0

6.0

8.0

10.0

Bottom of Boring at 10.0 ft.

S-1, SS

8+9+4

REC=6", 33%

S-2, SS

4+2+3+3

REC=10", 42%

S-3, SS

3+2+2+4

REC=2", 8%

S-4, SS

3+3+6+6

REC=6", 25%

S-5, SS

3+5+5+9

REC=24", 100%

0.0 - 0.3 ft: Asphalt

0.3 - 0.5 ft: Gravel sub-base

0.5 - 2.0 ft: PROBABLE FILL, sampled as silty sand; moist, dark brown

2.0 - 6.0 ft: SANDY SILT; moist, dark brown and dark gray, estimated 5 - 10% gravel

6.0 - 8.0 ft: LEAN CLAY; moist, light brown and greenish gray, estimated 5 - 10% fine grained sand, with mottles of reddish brown

8.0 - 10.0 ft: LEAN CLAY; moist, light brown and greenish gray, estimated <5% fine grained sand

Encountered

Completion

Casing Pulled

4/23

4/23

4/23

Dry

Dry

Dry

5.0'

Schnabel Representative: M. Ker

Total Depth: 10.0 ft

Method: 2-1/4" I.D. Hollow Stem Auger

Equipment: Geoprobe 7720DT

Ground Surface Elevation:

Contractor: Connelly and Associates, Inc.

Frederick, Maryland

Contractor Foreman: A. Dennis

Hammer Type: Auto Hammer (140 lb)

Dates Started: 4/23/14 Finished: 4/23/14

Location: See Location Plan

Date CavedDepthTime Casing Groundwater Observations

Project:

STRA

TUM

Fort Washington Lighthouse Road

SYMBOL

Contract Number: 14212003 Sheet: 1 of 1

DEPTH

(ft)

ELEV

(ft)

TEST

BORING

LOG

TESTS

Boring Number:

DATA

MATERIAL DESCRIPTION

B-3

REMARKS

SAMPLING

DEPTH

T E

S T

B O

R

IN

G L

O G

B O

R

IN

G L

O G

S

_0 2_

7.

G P

J S

C H

N A

B E

L D

A T

A T

E M

P

LA

T E

_0

7_

6.

G

D T

/3

CL

SP

0.3 0.5

4.0

6.0

10.0

Bottom of Boring at 10.0 ft.

S-1, SS

3+5+9

REC=7", 39%

S-2, SS

2+3+5+4

REC=2", 8%

S-3, SS

1+1+2+2

REC=8", 33%

S-4, SS

1+1+10+38

REC=10", 42%

S-5, SS

13+8+3+3

REC=10", 42%

0.0 - 0.3 ft: Asphalt

0.3 - 0.5 ft: Gravel sub-base

0.5 - 4.0 ft: PROBABLE FILL, sampled as silty sand; moist, brown, estimated 5 - 10% gravel

4.0 - 6.0 ft: SANDY CLAY; wet, greenish gray and dark gray, estimated <5% organics

6.0 - 10.0 ft: SAND; wet, brown and dark brown, estimated 30 - 45% silt, estimated 5 - 10% gravel, estimated <5% shell fragments, and organics

Encountered

Completion

Casing Pulled

4/23

4/23

4/23

4.0'

8.0'

Dry

3.0'

Schnabel Representative: M. Ker

Total Depth: 10.0 ft

Method: 2-1/4" I.D. Hollow Stem Auger

Equipment: Geoprobe 7720DT

Ground Surface Elevation:

Contractor: Connelly and Associates, Inc.

Frederick, Maryland

Contractor Foreman: A. Dennis

Hammer Type: Auto Hammer (140 lb)

Dates Started: 4/23/14 Finished: 4/23/14

Location: See Location Plan

Date CavedDepthTime Casing Groundwater Observations

Project:

STRA

TUM

Fort Washington Lighthouse Road

SYMBOL

Contract Number: 14212003 Sheet: 1 of 1

DEPTH

(ft)

ELEV

(ft)

TEST

BORING

LOG

TESTS

Boring Number:

DATA

MATERIAL DESCRIPTION

B-4

REMARKS

SAMPLING

DEPTH

T E

S T

B O

R

IN

G L

O G

B O

R

IN

G L

O G

S

_0 2_

7.

G P

J S

C H

N A

B E

L D

A T

A T

E M

P

LA

T E

_0

7_

6.

G

D T

/3

SM

CL

0.3 0.5

4.0

8.0

10.0

Bottom of Boring at 10.0 ft.

S-1, SS

2+3+4

REC=8", 44%

S-2, SS

1+1+2+1

REC=8", 33%

S-3, SS

4+1+1+1

REC=7", 29%

S-4, SS

WOH+1+1+1

REC=4", 17%

S-5, SS

1+1+1+WOH

REC=6", 25%

0.0 - 0.3 ft: Asphalt

0.3 - 0.5 ft: Gravel sub-base

0.5 - 4.0 ft: FILL, sampled as sand;

moist, light brown, estimated <5% brick, gravel, and silt

2.0 ft: Change: dark brown, contains layers of clay

4.0 - 8.0 ft: SILTY SAND, fine to coarse grained sand; wet, dark gray, estimated 5-10% fine to medium gravel

6.0 ft: Change: greenish gray

8.0 - 10.0 ft: CLAY; wet, dark gray, est 10 - 15% fine grained sand, estimated 5 - 10% shell fragments, and rock fragments

Encountered

Completion

Casing Pulled

4/23

4/23

4/23

4.0'

6.0'

4.0'

5.5'

Schnabel Representative: M. Ker

Total Depth: 10.0 ft

Method: 2-1/4" I.D. Hollow Stem Auger

Equipment: Geoprobe 7720DT

Ground Surface Elevation:

Contractor: Connelly and Associates, Inc.

Frederick, Maryland

Contractor Foreman: A. Dennis

Hammer Type: Auto Hammer (140 lb)

Dates Started: 4/23/14 Finished: 4/23/14

Location: See Location Plan

Date CavedDepthTime Casing Groundwater Observations

Project:

STRA

TUM

Fort Washington Lighthouse Road

SYMBOL

Contract Number: 14212003 Sheet: 1 of 1

DEPTH

(ft)

ELEV

(ft)

TEST

BORING

LOG

TESTS

Boring Number:

DATA

MATERIAL DESCRIPTION

B-5

REMARKS

SAMPLING

DEPTH

T E

S T

B O

R

IN

G L

O G

B O

R

IN

G L

O G

S

_0 2_

7.

G P

J S

C H

N A

B E

L D

A T

A T

E M

P

LA

T E

_0

7_

6.

G

D T

/3

File details come from the government source that posted it. Updated .