B09_Amendment_3_2017_Lighthouse_Eval_0003.pdf

PDF 556 KB Posted

Attached to
Lighthouse Road & Rehabilitation National Capital
Solicitation number
140P3022R0030
Issued by

About this file

This document outlines inspection findings and preliminary scope of work recommendations for the rehabilitation of Lighthouse 80 located in proximity to the Potomac River. The lighthouse structure supports deterioration primarily on the north and west elevations facing the water, including decayed sills, joists, wall studs and siding. Fungal growth within the wood structure is exacerbated by soil and air moisture. Paint applied in 2009 has reached the end of its useful life. Recommended repairs and replacements include high decay resistant wood materials for pier capitals, the northeast corner post, sills and structural frame. The exterior envelope also requires repair and replacement with rot-resistant wood, along with repainting using an optimal system for the high moisture environment. Relatedly, the federal contract opportunity from the National Park Service seeks contractors to perform lighthouse road rehabilitation and work for the National Capital Parks-East area.

View the file

Other files

File Type Posted
Sol_140P3022R0030_Amd_0005.pdf PDF
B09_Amendment_0005_Lead_Hazard_Control_Activities_0005.pdf PDF
Sol_140P3022R0030_Amd_0004.pdf PDF
B09_Amendment_3_Boring_Location_Plan_0003.pdf PDF
B09_Amendment_3_FOWA_852_141693_HPTC_Record_of_Treatment_2009_0003.pdf PDF
B09_Amendment_3_Q_A_FOWA_Lighthouse___Lighthouse_Road_Repair_0003.docx DOCX document
B09_Amendment_3_Structural_Investigaton_Fort_Washington_Lighthouse_021319_0003.pdf PDF
B09_Amendment_3_Boring_Logs_0003.pdf PDF
Sol_140P3022R0030_Amd_0003.pdf PDF
Sol_140P3022R0030_Amd_0002.pdf PDF
B09_Amendment_0002_Q_A_FOWA_Lighthouse_and_Lighthouse_Road_Repairs_8_29_22_0002.docx DOCX document
Sol_140P3022R0030_Amd_0001.pdf PDF
B08_Attachment_9_-_Biobased_Certification.docx DOCX document
B08_Attachment_12_Vaccination_Certification_Notification_to_DOI_Contractors_Template_082321_FINAL_-_signed.pdf PDF
B08_Attachment_3_FOWA_251994_Lighthouse_FINAL_CD_DRAWING_110421.pdf PDF
B08_Attachment_10_Subcontracting_Percentage_Worksheet_v1_2.docx DOCX document
B08_Attachment_5_FOWA_251994_Lighthouse_Rehab_Specs_rev1-051522.pdf PDF
B08_Attachment_4_FOWA_241555_FOWA_Resurface_Lighthouse_Rd_MDE17-SF-0104_APPROVED_PLANS_040822.pdf PDF
B08_Attachment_1_CAAC_Letter_2020-04_.pdf PDF
Sol_140P3022R0030.pdf PDF
B08_Attachment_8_Submittal_Log_FOWA_251994_Lighthouse_102921.xls XLS spreadsheet
B08_Attachment_7_FOWA_241555_Lighthouse_Rd_Submittal_Log_042922.xls XLS spreadsheet
B08_Attachment_11_Certification_of_Vaccination_Form_expires_2-28-25.pdf PDF
B08_Attachment_2_DOL_WD_MD20220109_PGco_Highway_2_25_22.pdf PDF
B08_Attachment_14_Site_Visit_FOWA_Lighthouse-VC_Aerial_Map.JPG JPG image
B08_Attachment_13_Site_Visit_Agenda_FOWA_Lighthouse_Rd___Lighthouse_Rehabilitation_8-31-22_11AM-ED.doc DOC document
B08_Attachment_6_FOWA_241555_Lighthouse_Rd_Specs_Rev-03-051522.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRIP REPORT

Craft Assistance

FY17_FOWA

Lighthouse 80; Inspection & Recommendations

The lighthouse sits in close proximity to the Potomac River, therefore the river moistening the soil forms an ideal place for fungus to grow in wood with high moisture content. Brick piers with wooden caps support the 42 foot tall timber-frame structure. Steel tie rods unite the four main corner posts. The lighthouse is clad in two different patterns of wood siding, dutch lap and tongue and groove. Preservation repairs were made to Lighthouse 80 by HPTC in the spring of 2009.

Inspection

The 2009 repairs are now deteriorating from moisture, poor ventilation and delayed cyclic painting.

Additionally, older and maybe original frame components have begun to deteriorate primarily on the north and west elevations which face the water. This includes sills, joists, wall studs and siding.

The northeast corner post was replaced with in-kind yellow pine material, although this specie is not highly rot-resistant and does not hold paint well. A good portion of this siding was replaced in

2009 with milled yellow pine matching the pattern of the historic siding. Fungal growth is spreading within the structure (wood) aided by moisture in the soil, on the building, and humid air.

Acrylic vinyl paint applied in 2009 has reached the end of its useful life cycle; moisture in the wood has caused it to loose adhesion and the wet climate requires more than ordinary painting cycles.

This Inspection was cursory and time constrained. Components of the lighthouse were not removed in order to see obscured areas and moisture readings were not taken. A more intensive inspection would be needed to clarify a full scope of work for repair.

Maintenance Overview

LIGHTHOUSE 80 PRELIMINARY SCOPE OF WORK

Pier capitals (wood) Replace with high decay resistant wood or explore replacing with other compliance approved materials such as concrete, metal or plastic

Northeast corner post Repair and replace with high decay resistant wood specie, with heartwood

Sills Repair and replace with high decay resistant wood specie, with heartwood

Structural frame (angle braces, joists, wall studs;

etc.)

Repair and replace with high decay resistant wood specie, with heartwood

Exterior envelope (siding, casings, windows, doors, vents)

Repair and replace with high decay resistant wood specie, with heartwood

Paint Determine if the entire structure requires re-painting. Research and procure the best paint system available for high moisture locality.

Photo D: Lighthouse 80 northeast corner pier and lower portion of the corner post replaced during the 2009 project. Also shown are decayed wood capital and sills.

Photo E: Interior view of the lower level northeast corner showing extensive fungal growth and wood decay.