This document provides questions and answers regarding Solicitation Number 140P3022R0030 for the Lighthouse Road & Rehabilitation project at National Capital Parks-East. The solicitation seeks rehabilitation of the Fort Washington Park Lighthouse and Lighthouse Road including historic carpentry and wood repair, masonry work, road grading and paving, and stormwater management. Questions were accepted until September 9th and responses are provided in this amendment. The anticipated award date is by the end of the current fiscal year in late September 2022. The scope of work includes installation of precast plinths, repointing of brick piers, wood siding and window repairs, interior sheathing removal, and resurfacing of the lighthouse road. Contractors should provide temporary shoring and bracing as well as a 6-foot chain link security fence around the lighthouse during construction.

View the file

Other files

File Type Posted
Sol_140P3022R0030_Amd_0005.pdf PDF
B09_Amendment_0005_Lead_Hazard_Control_Activities_0005.pdf PDF
Sol_140P3022R0030_Amd_0004.pdf PDF
B09_Amendment_3_Boring_Location_Plan_0003.pdf PDF
B09_Amendment_3_FOWA_852_141693_HPTC_Record_of_Treatment_2009_0003.pdf PDF
B09_Amendment_3_2017_Lighthouse_Eval_0003.pdf PDF
B09_Amendment_3_Structural_Investigaton_Fort_Washington_Lighthouse_021319_0003.pdf PDF
B09_Amendment_3_Boring_Logs_0003.pdf PDF
Sol_140P3022R0030_Amd_0003.pdf PDF
Sol_140P3022R0030_Amd_0002.pdf PDF
B09_Amendment_0002_Q_A_FOWA_Lighthouse_and_Lighthouse_Road_Repairs_8_29_22_0002.docx DOCX document
Sol_140P3022R0030_Amd_0001.pdf PDF
B08_Attachment_9_-_Biobased_Certification.docx DOCX document
B08_Attachment_12_Vaccination_Certification_Notification_to_DOI_Contractors_Template_082321_FINAL_-_signed.pdf PDF
B08_Attachment_3_FOWA_251994_Lighthouse_FINAL_CD_DRAWING_110421.pdf PDF
B08_Attachment_10_Subcontracting_Percentage_Worksheet_v1_2.docx DOCX document
B08_Attachment_5_FOWA_251994_Lighthouse_Rehab_Specs_rev1-051522.pdf PDF
B08_Attachment_4_FOWA_241555_FOWA_Resurface_Lighthouse_Rd_MDE17-SF-0104_APPROVED_PLANS_040822.pdf PDF
B08_Attachment_1_CAAC_Letter_2020-04_.pdf PDF
Sol_140P3022R0030.pdf PDF
B08_Attachment_8_Submittal_Log_FOWA_251994_Lighthouse_102921.xls XLS spreadsheet
B08_Attachment_7_FOWA_241555_Lighthouse_Rd_Submittal_Log_042922.xls XLS spreadsheet
B08_Attachment_11_Certification_of_Vaccination_Form_expires_2-28-25.pdf PDF
B08_Attachment_2_DOL_WD_MD20220109_PGco_Highway_2_25_22.pdf PDF
B08_Attachment_14_Site_Visit_FOWA_Lighthouse-VC_Aerial_Map.JPG JPG image
B08_Attachment_13_Site_Visit_Agenda_FOWA_Lighthouse_Rd___Lighthouse_Rehabilitation_8-31-22_11AM-ED.doc DOC document
B08_Attachment_6_FOWA_241555_Lighthouse_Rd_Specs_Rev-03-051522.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Capital Parks-East (NACE) Fort Washington Park (FOWA) RFQ 140P3022R0030 FOWA Lighthouse & Lighthouse Road Rehabilitation Amendment 2 – Questions & Answers Issued: 9/13/22 The last date for contractor to submit any technical questions was 9/9/2022 at 12:00 PM ED. All questions received by the due date and time will be answered in an amendment to the solicitation as soon as practicable after the due date and time. Any questions received after the due date and time will not be addressed through any Amendment.

This document represents answers to all technical question that were received on or before 9/9/2022 at 12:00 PM ED.

1. Can the due date for proposals be extended?

a. The due date for proposals cannot be extended – they are due 9/17/2022 at 12:00 PM ED.

2. Please confirm NPS intends to award this project by the end of FY 2022 or late September 2022.

a. The intentions are to award this project by the end of FY22.

3. Within the Lighthouse Specifications we recognize that the Historic Removal and Dismantling specification section 1.5.B states there is not expected that hazardous materials will be encountered. Please confirm the existing paint does not contain lead.

a. The Government provides with this amendment 2017 Evaluation Report – Record of Treatment, and Structural Investigation.

4. Please confirm we are to assume that there are no contaminated or hazardous soils to be removed from the project.

a. The Government does not confirm that contractors are to assume that there are no contaminated or hazardous soils to be removed from the project.

5. Sheet CS.1 General Note #6 references 01010 for a list of permits the Contractor needs to obtain. We did not see a specific list or permit provided. Please provide

a. General Note #6 should reference section 011100 rather than 01010; this is a typographic error only and does not otherwise change the requirement. Section 011100 establishes the responsibility of the Contractor to obtain and maintain permits where required. No permits are required of the Construction Contractor at the time of this solicitation to complete the work as designed. The requirements remain in effect should unforeseen or differing site conditions arise that encumber different permitting requirements in the future.

6. Is the lighthouse currently leaning out of plumb?

a. The lighthouse was not surveyed for lean or plumbness during the design phase and therefore NPS has no objective metric by which to evaluate or respond to this question. At this time there is no requirement in the contract documents to alter the alignment of the lighthouse.

7. Please confirm an owner’s office is not required.

a. No, an owner’s office is not required.

8. Where is the location of water and 120v electric per C.12 in the Solicitation (page 9/64).

a. The solicitation, part C.12 article (c) states the following (emphasis added by NPS in this response): “WATER, AND ELECTRICITY: Water and 120V electricity may be available at no cost to the contractor, depending on the location. Should water and electricity not be readily available, the contractor shall provide these services as needed to perform the required work.” Water (potable and non-potable) and 120V electricity are not readily available on-site. The Offeror must provide these services as needed to perform the required work.

9. Specification 040120.64 Brick Masonry Repointing calls for the brick pier masonry joints (Bid Item 7) to be measured and paid by the LF instead of SF. Please correct on bid form.

a. The bid form is corrected for bid item 7.

10. Do the brick masonry piers require general cleaning and paint removal? Please confirm they do not require new paint.

a. Yes, brick masonry piers require general cleaning and paint removal This requirement is established on Sheets D3.1 and D3.2; the demolition note in legend states to “remove existing paint at masonry piers” where indicated by diagonal hatch. NPS confirms no new paint shall be applied.

11. Please confirm extent of masonry work is the installation of the (4) new precast plinths per detail 3/S5.1 and repointing of the brick piers.

a. The extent of masonry in this project includes the installation of the four (4) new precast plinths per detail 3/S5.1; repointing of the brick piers; and paint removal per sheets D3.1 and D3.2.

12. Please confirm the only Mahogany wood is the siding and the remainder of lumber follows the notes on S0.1.

a. All requirements for wood species are clearly stated on both drawings AND in the specifications. Please refer to each instance for specific requirements.

Sheet S0.1, Framing Lumber notes, establishes the requirement that Framing Lumber shall be: “DOUGLAS FIRLARCH #1, SPRUCE PINE FIR #1, OR HEM FIR #1.”

Section 06 20 13, part 2.2 REPLICATED WOOD ITEMS establishes the requirements for other wood members.

2.2.A Shiplap Siding, article c: Wood Species: Mahogany 2.2.B. Exterior Wood Trim, article c: Wood Species: Mahogany Section 08 01 52 WOOD WINDOWS, part 2.2 REPLICATED WOOD ITEMS establishes the species requirements for other wood members.

See 2.2 REPLICATED WOOD WINDOW UNITS, A.1 Wood Species: Mahogany Section 08 01 52 WOOD WINDOWS, part 2.3 WOOD-REPLACEMENT MATERIALS the species requirements for other wood members.

See 2.2 REPLICATED WOOD WINDOW UNITS, A “Wood, General: Clear fine-grained mahogany lumber”

13. Specification 32 1313, 2.4.B calls for Slip Resistive Aggregate Finish materials. Please clarify the intention of this material note.

a. Refer to sheet C4 Resurface lighthouse road drawing.

14. Is all paint required to be removed from the interior and exterior surfaces prior to repainting or just to sound paint (i.e. not flaking)?

a. Sheets A1.1 and A3.1 keynote <PT-2> establishes the requirement to “PREP SURFACE, PRIME, AND PAINT.” There is no absolute requirement to remove all existing paint down to bare wood; the performance requirement is to prepare the wood for successful priming and subsequent top-coating.

15. Please clarify the unit of measure for the following items (Bid Schedule Unit of Measures conflicts with Specifications Unit of Measures

a. CLIN 5 Wood Siding Repair: The Bid Schedule lists the unit of measure as SF. Part 3.1.A.2 of Section 01 27 00 states that measurement for payment will be per each 1 linear foot of replacement board siding. Part 1.3.E.1 of Section 06 20 13 states the unit of measure is 1 linear foot of wood board siding replaced.

a. The unit of measure is SF per the bid sheet.

b. CLIN 6 Interior Sheathing Removal for Mold Investigation: The Bid Schedule lists the unit of measure as EA. Section 06 20 13 Part 1.3.G states the unit of measure is 1 square foot of plywood sheathing replaced.

a. The unit of measure is EA = 2 boards = 1

c. CLIN Option 1 Deep Penetrating Wood Repairs: The Bid Schedule lists the unit of measure as LS. Section 01 27 00 36 square inches of wood repaired.

a. Lump Sum Quantities (LS): These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured. 1 lump sum = 36 square inches.

d. CLIN Option 2 Wood Compound Repairs: The Bid Schedule lists the unit of measure as LS. Section 01 27 00 states the unit of measure is per each location measuring 6 inches x 6 inches x ½ inches.

a. Lump Sum Quantities (LS): These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured. 1 lump sum = 18 cubic inches.

16. Please confirm the following:

a. Item 5 of the Bid Schedule is the same as Unit Price #2 in Section 06 20 13.

b. Item 6 of the Bid Schedule is the same as Unit Price #3 in Section 06 20 13 Part 1.3.F.

c. Option 1 of the Bid Schedule is the same as Unit Price #1 in Section 06 20 13.

d. Option 2 of the Bid Schedule is the same as Unit Price #3 in Section 06 20 13 Part 1.3.D.

a. Refer to question 15.

17. Please confirm any mold remediation and work beyond the 2 boards in CLIN 2 would be handled via a modification.

a. The base contract includes removing two (2) boards for the purposes of observing conditions; it does not include any treatment of any yet-to-be-revealed conditions.

18. Spec Section 012700; Part 3.1; A, B, C, D. These contract line items do not match with the line items on the Section B – Bid Schedule. Please clarify. (This is minor but thought we should have them clarify)

a. Refer to question 15

19. Spec Section 062013; Part 1.3; C; Unit Prices. The unit prices listed in this section are not shown on the Section B – Bid Schedule, please clarify where we are to carry these unit costs.

a. Refer to question 15

20. The structural repairs on the lighthouse require replacement of some of the main structural members at the base of the lighthouse.

1. Is the contractor required to provide temporary shoring/bracing?

a. Yes - This requirement is established on CS-1; see general notes numbers 8 and 9.

2. If yes, is this considered delegated design where a structural engineer has to approve means/methods for supporting/bracing the structure?

a. Yes - This requirement is established on Sheet S0.1, General Note #2

20. Please provide how long this concrete ditch is along the pavement.

a. Refer to Lighthouse Road construction drawings that are drawn to scale for dimensions and measurements.

21. Existing condition during the site walk shows another pavement about 8” under the visible pavement near Roadway Curve C4. Please provide if this condition is for the entire length of the pavement and if both layers need to be removed before the new construction.

a. Contractor shall perform work according to Government’s Final 100% “Resurface Lighthouse Road” construction drawings and specifications. Final Demolition Plan C2 shows the extents of existing pavement to be removed, and Specifications Sections Section Division 2 Existing Conditions 02 4113 Site Demolition and Division 31 Earthwork and Division 32 Exterior Improvements provide specifications for this road demolition and construction work. Refer to Sheet C4 Site Details, showing Road Cross Sections and Exposed Aggregate Paving Section.

22. The existing pavement appears to have been surfaced multiple times creating a layer approximately 12” thick. Is there a report showing the existing asphalt and subbase thickness to be removed? If not, to what depth should we assume for the bid?

a. Refer to the answer to question 21. A boring test of Lighthouse Road in 2014 was conducted. See Boring Log and Boring Location documents attached as part of amendment 3.

23. The RFP includes Attachment 10 Subcontracting Percentage. If this is a required bid submission document, which factor and subfactor should this item be located in the proposal?

a. The Subcontracting Percentage worksheet is a required bid submission document. It has been added to Factor 1 - subfactor 1c.

24. The RFP does not include past performance and project experience forms. If these are required for the response to Subfactor 2b, please supply forms.

a. No past experience form is provided for this requirement, the offeror may format their response in any manner that illustrates a minimum of 10-years of experience in each of the four trades listed. For each of the four trades (Historic Carpentry and Wood Repair, Historic Masonry, Road Grading and Paving, and Stormwater Management), provide three (3) relevant projects successfully completed similar in nature to the solicited requirement in terms of scope of work, type (rehabilitation) and dollar value need to be completed on a maximum of three pages per project. The key data enumerated in 1-5 is the minimum that must be present. An illustrative example to what is needed for evaluation may look like this:

1. Historic Carpentry and Wood Repair (3 pages max for each relevant project) - For the historic carpentry and wood repair a minimum of two of the three relevant projects MUST have been on buildings individually listed in the National Register, contributors to a National Register district, or National Historic Landmarks.

a. A list of previous jobs that show a minimum of 10-year trade experience in Historic Carpentry and wood repair.

b. Relevant project 1 (3 pages max) - summary that includes a minimum of the following data

i. Name of Project and contract number, if available.

ii. Name and address of customer or government agency

iii. Name and telephone number of customer contact and/or Contracting Officer and Contracting Officer’s Representative.

iv. Dollar value and period of performance.

v. Description of work performed and what aspects of the contracts are deemed relevant to the proposed work.

vi. Listing on the National Register, contributors to a National Register district, or National Historic Landmarks

c. Relevant project 2 (3-pages max) - summary that includes a minimum of the following data

i. Name of Project and contract number, if available.

ii. Name and address of customer or government agency

iii. Name and telephone number of customer contact and/or Contracting Officer and Contracting Officer’s Representative.

iv. Dollar value and period of performance.

v. Description of work performed and what aspects of the contracts are deemed relevant to the proposed work.

vi. Listing on the National Register, contributors to a National Register district, or National Historic Landmarks

d. Relevant project 3 (3-pages max) - summary that includes a minimum of the following data

i. Name of Project and contract number, if available.

ii. Name and address of customer or government agency

iii. Name and telephone number of customer contact and/or Contracting Officer and Contracting Officer’s Representative.

iv. Dollar value and period of performance.

v. Description of work performed and what aspects of the contracts are deemed relevant to the proposed work.

2. Historic Masonry (3 pages max for each relevant project) - For the historic masonry a minimum of two of the three relevant projects MUST have been on buildings individually listed in the National Register, contributors to a National Register district, or National Historic Landmarks.

a. A list of previous jobs that show a minimum of 10-year trade experience in Historic Masonry.

b. Relevant project 1 (3-pages max) - summary that includes a minimum of the following data

i. Name of Project and contract number, if available.

ii. Name and address of customer or government agency

iii. Name and telephone number of customer contact and/or Contracting Officer and Contracting Officer’s Representative.

iv. Dollar value and period of performance.

v. Description of work performed and what aspects of the contracts are deemed relevant to the proposed work.

vi. Listing on the National Register, contributors to a National Register district, or National Historic Landmarks

c. Relevant project 2 (3-pages max) - summary that includes a minimum of the following data

i. Name of Project and contract number, if available.

ii. Name and address of customer or government agency

iii. Name and telephone number of customer contact and/or Contracting Officer and Contracting Officer’s Representative.

iv. Dollar value and period of performance.

v. Description of work performed and what aspects of the contracts are deemed relevant to the proposed work.

vi. Listing on the National Register, contributors to a National Register district, or National Historic Landmarks

d. Relevant project 3 (3-pages max) - summary that includes a minimum of the following data

i. Name of Project and contract number, if available.

ii. Name and address of customer or government agency

iii. Name and telephone number of customer contact and/or Contracting Officer and Contracting Officer’s Representative.

iv. Dollar value and period of performance.

v. Description of work performed and what aspects of the contracts are deemed relevant to the proposed work.

3. Road Grading and Paving (3 pages max for each relevant project)

a. A list of previous jobs that show a minimum of 10-year trade experience in Historic Masonry.

b. Relevant project 1 (3-pages max) - summary that includes a minimum of the following data

i. Name of Project and contract number, if available.

ii. Name and address of customer or government agency

iii. Name and telephone number of customer contact and/or Contracting Officer and Contracting Officer’s Representative.

iv. Dollar value and period of performance.

v. Description of work performed and what aspects of the contracts are deemed relevant to the proposed work.

c. Relevant project 2 (3-pages max) - summary that includes a minimum of the following data

i. Name of Project and contract number, if available.

ii. Name and address of customer or government agency

iii. Name and telephone number of customer contact and/or Contracting Officer and Contracting Officer’s Representative.

iv. Dollar value and period of performance.

v. Description of work performed and what aspects of the contracts are deemed relevant to the proposed work.

d. Relevant project 3 (3-pages max) - summary that includes a minimum of the following data

i. Name of Project and contract number, if available.

ii. Name and address of customer or government agency

iii. Name and telephone number of customer contact and/or Contracting Officer and Contracting Officer’s Representative.

iv. Dollar value and period of performance.

v. Description of work performed and what aspects of the contracts are deemed relevant to the proposed work.

4. Stormwater Management & Landscaping (3 pages max for each relevant project)

a. A list of previous jobs that show a minimum of 10-year trade experience in Historic Masonry.

b. Relevant project 1 (3-pages max) - summary that includes a minimum of the following data

i. Name of Project and contract number, if available.

ii. Name and address of customer or government agency

iii. Name and telephone number of customer contact and/or Contracting Officer and Contracting Officer’s Representative.

iv. Dollar value and period of performance.

v. Description of work performed and what aspects of the contracts are deemed relevant to the proposed work.

c. Relevant project 2 (3-pages max) - summary that includes a minimum of the following data

i. Name of Project and contract number, if available.

ii. Name and address of customer or government agency

iii. Name and telephone number of customer contact and/or Contracting Officer and Contracting Officer’s Representative.

iv. Dollar value and period of performance.

v. Description of work performed and what aspects of the contracts are deemed relevant to the proposed work.

d. Relevant project 3 (3-pages max) - summary that includes a minimum of the following data

i. Name of Project and contract number, if available.

ii. Name and address of customer or government agency

iii. Name and telephone number of customer contact and/or Contracting Officer and Contracting Officer’s Representative.

iv. Dollar value and period of performance.

v. Description of work performed and what aspects of the contracts are deemed relevant to the proposed work.

25. What type of construction fence should be used to encircle the lighthouse to protect the construction site and visitors?

a. The contractor shall provide 6’ high chain-link fence using above surface anchors to completely encircle the lighthouse to protect the construction site and the public.