B08_Attach4_-_DetailedContractPriceSchedule.xlsx
XLSX spreadsheet 27 KB Posted
- Solicitation number
- 140P2025R0082
About this file
This document is a Detailed Contract Price Schedule Worksheet for Solicitation 140P2025R0082, issued by the Department of the Interior National Park Service for the rehabilitation of water and wastewater treatment systems at Furnace Creek and Cow Creek. The pricing schedule includes 18 base Contract Line Item Numbers (CLINs) and 9 optional CLINs, covering various infrastructure components such as RO buildings, pipe vaults, lift stations, water systems, wastewater systems, and site work across multiple locations.
The price schedule is structured with lump sum pricing for each CLIN, with all current unit prices and extended totals set to $0.00, suggesting this is a preliminary or template pricing document. The project involves extensive piping work, including water and wastewater piping in trenches, directional drilling, and CIPP (Cured-In-Place Pipe) rehabilitation, with detailed quantities specified for different segments. The total scope encompasses infrastructure improvements at Furnace Creek, Cow Creek, Coyote Loop, Texas Springs, and Old Ghost Road, with specific focus on water and wastewater system rehabilitation and associated sitework.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B DEVA 318717 - RFP No. 140P2025R0082 Attachment 4 - Detailed Contract Price Schedule Worksheet
Contract Line Item Number
| (CLIN) | CLIN Description | Quantity | Unit of Measure | Unit Price | Extended Total | |
| 1 | Furnace Creek RO Building | 1 | Lump Sum | $0.00 | ||
| 2 | Furnace Creek Pipe Vault | 1 | Lump Sum | $0.00 | ||
| 3 | Furnace Creek Lagoon & Headworks | 1 | Lump Sum | $0.00 | ||
| 4 | Furnace Creek Sitework | 1 | Lump Sum | $0.00 | ||
| 5 | Furnace Creek Demolition | 1 | Lump Sum | $0.00 | ||
| 6 | Furance Creek - Water Systems | 1 | Lump Sum | $0.00 | ||
| 7 | Furance Creek - Wastewater Systems | 1 | Lump Sum | $0.00 | ||
| 8 | Cow Creek RO Treatment Building | 1 | Lump Sum | $0.00 | ||
| 9 | Cow Creek Lift Station | 1 | Lump Sum | $0.00 | ||
| 10 | Cow Creek Pool Filtration | 1 | Lump Sum | $0.00 | ||
| 11 | Cow Creek Sitework | 1 | Lump Sum | $0.00 | ||
| 12 | Cow Creek Demolition | 1 | Lump Sum | $0.00 | ||
| 13 | Cow Creek - Water Systems | 1 | Lump Sum | $0.00 | ||
| 14 | Cow Creek - Wastewater Systems | 1 | Lump Sum | $0.00 | ||
| 15 | Coyote Loop Wastewater Gravity Line | 1 | Lump Sum | $0.00 | ||
| 16 | Texas Springs Drainage Channel | 1 | Lump Sum | $0.00 | ||
| 17 | Old Ghost Road Wastewater | 1 | Lump Sum | $0.00 | ||
| 18 | Wastewater Force Main from Cow Creek Lift Station to Furnace Creek System at HWY 190 | 1 | Lump Sum | $0.00 | ||
| TOTAL BASE PRICE (CLINS 1-18) | $0.00 | |||||
| 19 | OPTION A - Cow Creek Water Piping Coyote Loop | 1 | Lump Sum | $0.00 | ||
| 20 | OPTION B - Furnace Creek Water Piping at Furnace Creek Camp Ground | 1 | Lump Sum | $0.00 | ||
| 21 | OPTION C - Furnace Creek Water Piping RO to Texas Springs Camp Ground | 1 | Lump Sum | $0.00 | ||
| 22 | OPTION D - Wastewater from Cow Creek RO Building to Upper Housing | 1 | Lump Sum | $0.00 | ||
| 23 | OPTION E - Furnace Creek Wastewater at Sunset Camp Ground | 1 | Lump Sum | $0.00 | ||
| 24 | OPTION F - Furnace Creek Water Piping at Sunset Camp Ground | 1 | Lump Sum | $0.00 | ||
| 25 | OPTION G - Furnace Creek Water Piping from FC Wells to RO Building | 1 | Lump Sum | $0.00 | ||
| 26 | OPTION H - Water Reservoir Improvements | 1 | Lump Sum | $0.00 | ||
| 27 | OPTION I - Cow Creek Wastewater at Cow Creek Administration | 1 | Lump Sum | $0.00 | ||
| TOTAL OPTIONS PRICE (CLINS 19-27) | $0.00 | |||||
| OVERALL TOTAL PRICE (BASE CLINS 1-18 + OPTION CLINS 19-27) | $0.00 |
CLIN Breakout DEVA 318717 - RFP No. 140P2025R0082 Attachment 4 - Detailed Contract Price Schedule Worksheet
Contract Line Item Number
| (CLIN) | CLIN Description | Total Labor | Total Equipment | Total Materials | Extended Total | ||
| 1 | Furnace Creek RO Building | ||||||
| 2 | Furnace Creek Pipe Vault | ||||||
| 3 | Furnace Creek Lagoon & Headworks | ||||||
| 4 | Furnace Creek Sitework | ||||||
| 5 | Furnace Creek Demolition | ||||||
| 6 | Furance Creek - Water Systems | ||||||
| 7 | Furance Creek - Wastewater Systems | ||||||
| 8 | Cow Creek RO Treatment Building | ||||||
| 9 | Cow Creek Lift Station | ||||||
| 10 | Cow Creek Pool Filtration | ||||||
| 11 | Cow Creek Sitework | ||||||
| 12 | Cow Creek Demolition | ||||||
| 13 | Cow Creek - Water Systems | ||||||
| 14 | Cow Creek - Wastewater Systems | ||||||
| 15 | Coyote Loop Wastewater Gravity Line | ||||||
| 16 | Texas Springs Drainage Channel | ||||||
| 17 | Old Ghost Road Wastewater | ||||||
| 18 | Wastewater Force Main from Cow Creek Lift Station to Furnace Creek System at HWY 190 | ||||||
| TOTAL BASE PRICE (CLINS 1-18) | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 19 | OPTION A - Cow Creek Water Piping Coyote Loop | ||||||
| 20 | OPTION B - Furnace Creek Water Piping at Furnace Creek Camp Ground | ||||||
| 21 | OPTION C - Furnace Creek Water Piping RO to Texas Springs Camp Ground | ||||||
| 22 | OPTION D - Wastewater from Cow Creek RO Building to Upper Housing | ||||||
| 23 | OPTION E - Furnace Creek Wastewater at Sunset Camp Ground | ||||||
| 24 | OPTION F - Furnace Creek Water Piping at Sunset Camp Ground | ||||||
| 25 | OPTION G - Furnace Creek Water Piping from FC Wells to RO Building | ||||||
| 26 | OPTION H - Water Reservoir Improvements | ||||||
| 27 | OPTION I - Cow Creek Wastewater at Cow Creek Administration | ||||||
| TOTAL OPTIONS PRICE (CLINS 19-27) | $0.00 | $0.00 | $0.00 | $0.00 | |||
| OVERALL TOTAL PRICE (BASE CLINS 1-18 + OPTION CLINS 19-27) | $0.00 | $0.00 | $0.00 | $0.00 |
Additional Pricing Info
| CLIN | Description | Estimated Quantity | Unit of Measure | Unit Rate | Extended Total |
| 6 | Furnace Creek Water - Piping in Trenches | 18430 | LF | $0.00 | |
| Furnace Creek Water - Directional Drilling | 291 | LF | $0.00 | ||
| Furnace Creek Water - Appurtenances | 52 | Each | $0.00 | ||
| Furnace Creek Water Piping at CA 190 | 6062 | LF | $0.00 | ||
| 7 | Furnace Creek Wastewater - Piping in Trenches | 9772 | LF | $0.00 | |
| Furnace Creek Wastewater - CIPP | 2531 | LF | $0.00 | ||
| Furnace Creek Wastewater - Appurtenances | 60 | Each | $0.00 | ||
| Wastewater at Furnace Creek Camp Ground | 3058 | LF | $0.00 | ||
| 13 | Cow Creek Water - Piping in Trenches | 33605 | LF | $0.00 | |
| Cow Creek Water - Appurtenances | 96 | Each | $0.00 | ||
| 14 | Cow Creek Wastewater - Piping in Trenches | 2020 | LF | $0.00 | |
| Cow Creek Wastewater - CIPP | 716 | LF | $0.00 | ||
| Cow Creek Wastewater - Appurtenances | 21 | Each | $0.00 | ||
| 15 | Coyote Loop Wastewater Gravity Line | 1364 | LF | $0.00 | |
| 16 | Texas Springs Drainage Channel | 2977 | LF | $0.00 | |
| 17 | Old Ghost Road Wastewater | 7089 | LF | $0.00 | |
| 18 | Wastewater Force Main from Cow Creek Lift Station to Furnace Creek System at HWY 190 | 15598 | LF | $0.00 | |
| 19 | OPTION A - Cow Creek Water Piping Coyote Loop | 2268 | LF | $0.00 | |
| 20 | OPTION B - Furnace Creek Water Piping at Furnace Creek Camp Ground | 6895 | LF | $0.00 | |
| 21 | OPTION C - Furnace Creek Water Piping RO to Texas Springs Camp Ground | 3878 | LF | $0.00 | |
| 22 | OPTION D - Wastewater from Cow Creek RO Building to Upper Housing | 3045 | LF | $0.00 | |
| 23 | OPTION E - Furnace Creek Wastewater at Sunset Camp Ground | 1547 | LF | $0.00 | |
| 24 | OPTION F - Furnace Creek Water Piping at Sunset Camp Ground | 1611 | LF | $0.00 | |
| 25 | OPTION G - Furnace Creek Water Piping from FC Wells to RO Building | 7416 | LF | $0.00 | |
| 27 | OPTION I - Cow Creek Wastewater at Cow Creek Administration | 7467 | LF | $0.00 |