B08_Atch_7_Brand_Name_J_A_FAR_6_302_-_CRMO.pdf

PDF 495 KB Posted

Attached to
CRMO 323904 Rehab Ops Bldgs at Idaho Parks
Solicitation number
140P2025R0013
Issued by

About this file

This is a Brand Name Justification and Approval document for solicitation #140P2025R0013 issued by the National Park Service Denver Service Center for the rehabilitation of operational buildings at Craters of the Moon National Monument and Preserve in Idaho.

The document justifies the sole-source procurement of Silent Knight fire alarm system components valued at $11,910 to ensure compatibility with the existing Silent Knight 5700 fire alarm control panel. The justification explains that new power supplies, modules, remote annunciators, addressable devices, and notification appliances must be compatible with the existing panel that will be relocated within the maintenance building. Using a different manufacturer would require replacing the entire fire alarm system in the visitor center, which is outside the project scope. The document is signed by key personnel including the Project Manager, Contracting Officer, Contracting Branch Chief, and Chief of Contracting Office, with the justification citing FAR 6.302-1 as the authority for other than full and open competition.

View the file

Other files

File Type Posted
Sol_140P2025R0013_Amd_0005.pdf PDF
B09_Amd_4_CRMO323904_2-E101_0004.pdf PDF
B09__P2025R0013_Amd_4_CRMO_323904Clause_Updates_0004.pdf PDF
B09_Amd_4_Thermacore-door-systems-brochure_0004.pdf PDF
Sol_140P2025R0013_Amd_0004.pdf PDF
B09_Amd_4_EMON-DMON_Class5000-datasheet_0004.pdf PDF
B09_Amd_4_CRMO_323904_QA_4_1_25_Final_Questions_0004.pdf PDF
Sol_140P2025R0013_Amd_0003.pdf PDF
B09_Amd_2_CRMO_323904_QA_3_12_25_0002.xlsx XLSX spreadsheet
CRMO323904_232300-R1_Refrigerant_Piping_0002.pdf PDF
B09_Amd_2_02_CRMO_ACM_TCLP_Analysis_August_2022_0002.pdf PDF
CRMO323904_0-M001-R1_0002.pdf PDF
Sol_140P2025R0013_Amd_0002.pdf PDF
B09_Amd_2_SiteVisit_Registration2_25_0002.pdf PDF
B09_Amd_2_03_CRMO_Masonry_and_Paint_Analysis_December_2023_0002.pdf PDF
CRMO_323904_0-G000_R1_0001.pdf PDF
238126_-_Split-System_Air-Conditioners_0001.pdf PDF
CRMO_323904_ASI1_Refrigerant_Update_Cover_Sheet_0001.pdf PDF
Sol_140P2025R0013_Amd_0001.pdf PDF
B08_Atch_3_ButteCountyWD_1_3_2025.pdf PDF
B08_Atch_4_Solit_Vol1_PastPerfQ_-_CRMO.docx DOCX document
Sol_140P2025R0013.pdf PDF
B08_Atch_1_Specifications_CRMO_323904_Final_UPDATED.pdf PDF
B08_Atch_6_Solit_Vol2__SubLimitations_-_CRMO.xlsx XLSX spreadsheet
B08_Atch_2_Drawings_CRMO_323904_Final_UPDATED.pdf PDF
B08_RFP_140P2025R0013_-_CRMO_323904_Feb2025Rev.pdf PDF
B08_Atch_5_Solit_Vol2_ContractPriceSchedule_-_CRMO.xlsx XLSX spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

P.O. BOX 25287

DENVER, COLORADO 80225-0287

CRMO 323904 - “Rehabilitate Operational Buildings at Idaho Parks;

Craters of The Moon National Monument and Preserve.”

Solicitation No. 140P2025R0013

BRAND NAME JUSTIFICATION & APPROVAL

1. Identification of the agency and the contracting activity, and specific identification of the document.

This document is justification for a portion of the acquisition to procure construction services in support of the CRMO 323904 project at Craters of the Moon National Monument and Preserve in Idaho that is being solicited by the Department of the Interior (DOI), National Park Service (NPS), Denver Service Center (DSC) under Request for Proposal (RFP) No. 140P2025R0013.

2. Nature and/or description of the action being approved.

The action being approved is for use of brand name [only] product(s) that are peculiar to one manufacture and required for a portion of the acquisition identified above. Specifically, that of the fire alarm system that will be reconfigured and need to be compatible with the existing Silent Knight 5700 fire alarm control panel that will be relocated with new devices connected.

3. A description of the supplies or services required to meet the agency’s needs (including the estimated value).

New power supplies, modules, remote annunciators, addressable devices, and notification appliances shall be provided to properly support the reconfigured fire alarm system of the rehabilitated maintenance building and new snow equipment building; therefore, must be compatible with the existing [Silent Knight 5700] fire alarm control panel that will be relocated within the maintenance building.

The value of this brand name [only] requirement is estimated to be $11,910.00.

4. An Identification of the statutory authority permitting other than full and open competition.

FAR 6.302-1 – “Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency

Requirements,” 41 U.S.C. 3304(a)(1).

5. A demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited.

At completion of the project, the reconfigured fire alarm system within the maintenance building and snow equipment building must be compatible with the existing fire alarm infrastructure at CRMO. The maintenance building and snow equipment building both transmit fire alarm notifications back to the visitor center head-end equipment, which is not included in the scope of this project to be upgraded or changed. The existing [Silent Knight 5700] fire alarm control panel is in good working condition and will be re-used to maintain compatibility.

All new power supplies, modules, remote annunciators, addressable devices, and notification appliances will be provided throughout the rehabilitated maintenance building and snow equipment building. These individual items must be compatible with the existing [Silent Knight 5700] fire alarm control panel to ensure proper functionality.

6. A description of efforts made to ensure that offers are solicited from as many potential sources as is practicable, including whether a notice was or will be publicized as required by Subpart 5.2 and, if not, which exception under 5.202 applies.

This Brand Name justification and approval is for only a portion of the acquisition being solicited; and will be posted with issuance of RFP 140P2025R0013, in accordance with FAR 6.302-l(c)(l)(ii)(C) and 5.102(a)(6). Additionally, the Government will continue to assess the market to ensure competition is sought if fire alarm system components are developed to meet or exceed the minimum requirements.

7. A determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.

The CO anticipates competition on this construction project requirement and will ensure that pricing is determined fair and reasonable prior to making award.

8. A description of the market research conducted (see FAR Part 10) and the results or a statement of the reason market research was not conducted.

Additional market research was not conducted by the Contracting team, as the Architect-Engineer (AE)

Designer of Record (DOR) and Project team have provided technical expertise regarding the compatibility of the existing systems/components with that of systems/components from other manufacturers. Initial market research efforts included internet research, correspondence with manufacturers, and recommendations based on professional knowledge.

9. Any other facts supporting the use of other than full and open competition.

The installation of a competing brand of fire alarm manufacturer would require the replacement of the fire alarm control panel and all associated devices within the CRMO visitor center, which is outside the scope of this project.

10. A listing of the sources, if any, that expressed, in writing, an interest in the acquisition.

N/A

11. A statement of any actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required.

The Government team has determined that the salient characteristics can only be met by Silent Knight products as discussed above. The Government will continue to monitor the market for compatible systems with salient characteristics that meet the Government’s minimum needs and ensure specifications are written to allow the use of those systems if identified.

12. Requirements Personnel certification.

I certify that the technical data which forms a basis for this justification is complete and accurate and meets the government’s minimum needs.

Mike Quinn - Project Manager, NPS DSC D&C Division

13. Contracting Officer certification.

I certify that this justification is accurate and complete to the best of my knowledge and belief.

Amber Hughes - Contracting Officer, NPS DSC CS Division

14. Reviews and Approvals.

Sharon Miner Contracting Branch Chief, NPS DSC CS Division

15. Reviews and Approvals.

Shannon Blackburn Chief of Contracting Office, NPS DSC CS Division

Mike Quinn - Project Manager, NPS DSC D&C Division
Amber Hughes - Contracting Officer, NPS DSC CS Division
Sharon Miner
Contracting Branch Chief, NPS DSC CS Division
Shannon Blackburn
Chief of Contracting Office, NPS DSC CS Division
2025-01-28T13:47:28-0700
MICHAEL QUINN
2025-01-29T08:21:17-0700
AMBER HUGHES
2025-01-29T09:09:37-0700
SHARON MINER
2025-01-30T07:24:10-0500
SHANNON BLACKBURN