Sol_140P2025R0013_Amd_0004.pdf

PDF 89 KB Posted

Attached to
CRMO 323904 Rehab Ops Bldgs at Idaho Parks
Solicitation number
140P2025R0013
Issued by

About this file

This document is a contract amendment (Amendment 0004) for solicitation 140P2025R0013, covering the rehabilitation of operational buildings at Craters of the Moon National Monument and Preserve in Arco, Idaho. The amendment's key modifications include incorporating contractor questions and answers, adding drawing 2-E101, and including Basis of Design product descriptions. Significant updates involve modifications to various sections, particularly Section K and Section I, which involve changes to clauses related to biobased products, sustainable products, and waste reduction. Several provisions and clauses were removed, including sections related to apprentices, equal opportunity, and affirmative action compliance requirements from Sections I, K, and L of the original solicitation. The amendment was issued by the NPS, DSC Contracting Services Division in Denver, Colorado, with an effective date of 03/12/2025.

View the file

Other files

File Type Posted
Sol_140P2025R0013_Amd_0005.pdf PDF
B09_Amd_4_CRMO323904_2-E101_0004.pdf PDF
B09__P2025R0013_Amd_4_CRMO_323904Clause_Updates_0004.pdf PDF
B09_Amd_4_Thermacore-door-systems-brochure_0004.pdf PDF
B09_Amd_4_EMON-DMON_Class5000-datasheet_0004.pdf PDF
B09_Amd_4_CRMO_323904_QA_4_1_25_Final_Questions_0004.pdf PDF
Sol_140P2025R0013_Amd_0003.pdf PDF
B09_Amd_2_CRMO_323904_QA_3_12_25_0002.xlsx XLSX spreadsheet
CRMO323904_232300-R1_Refrigerant_Piping_0002.pdf PDF
B09_Amd_2_02_CRMO_ACM_TCLP_Analysis_August_2022_0002.pdf PDF
CRMO323904_0-M001-R1_0002.pdf PDF
Sol_140P2025R0013_Amd_0002.pdf PDF
B09_Amd_2_SiteVisit_Registration2_25_0002.pdf PDF
B09_Amd_2_03_CRMO_Masonry_and_Paint_Analysis_December_2023_0002.pdf PDF
CRMO_323904_0-G000_R1_0001.pdf PDF
238126_-_Split-System_Air-Conditioners_0001.pdf PDF
CRMO_323904_ASI1_Refrigerant_Update_Cover_Sheet_0001.pdf PDF
Sol_140P2025R0013_Amd_0001.pdf PDF
B08_Atch_3_ButteCountyWD_1_3_2025.pdf PDF
B08_Atch_4_Solit_Vol1_PastPerfQ_-_CRMO.docx DOCX document
Sol_140P2025R0013.pdf PDF
B08_Atch_7_Brand_Name_J_A_FAR_6_302_-_CRMO.pdf PDF
B08_Atch_1_Specifications_CRMO_323904_Final_UPDATED.pdf PDF
B08_Atch_6_Solit_Vol2__SubLimitations_-_CRMO.xlsx XLSX spreadsheet
B08_Atch_2_Drawings_CRMO_323904_Final_UPDATED.pdf PDF
B08_RFP_140P2025R0013_-_CRMO_323904_Feb2025Rev.pdf PDF
B08_Atch_5_Solit_Vol2_ContractPriceSchedule_-_CRMO.xlsx XLSX spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2025R0013 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

CRMO 32390403/12/20250004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/07/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

CRMO 323904 - "Rehabilitate Operational Buildings at Idaho Parks," at Craters of the Moon

National Monument and Preserve in Arco, ID

The purpose of this amendment is to:

A. Incorporate contractor questions and answers.

B. Add drawing 2-E101

C. Add Basis of Design product descriptions as per 52.211-6 Brand Name or Equal

c. Update the clauses as follows:

Section K - Modified 52.223-1 Biobased Product Certification (MAY 2024) (DEVIATION FEB

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Paula Teague

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2025R0013/0004

2025).

Section I - Modified 52.223-2 Reporting of Biobased Products Under Service and

Construction Contracts (MAY 2024) (DEVIATION FEB 2025) from incorporated by reference to full text.

Modified 52.223-10 WASTE REDUCTION PROGRAM (MAY 2024) (DEVIATION FEB 2025) from IBR to FT.

Modified 52.223-23 SUSTAINABLE PRODUCTS AND SERVICES (MAY 2024) (DEVIATION FEB 2025) from incorporated by reference to full text.

Modified 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS removed (xix) 52.223-22;

stated Reserved.

Add 52.211-6 Brand Name or Equal (Aug 1999)

The following provisions and clauses have been removed.

Section I

52.222-9, Apprentices and Trainees (JULY 2005), 52.222-21, Prohibition of Segregated Facilities (APR 2015), 52.222-26, Equal Opportunity (SEP 2016), 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015).

Section K

52.204-8 Annual Representations and Certifications (JAN 2025), (C)(1)(xiv)

52.222-22 Previous Contracts and Compliance Reports, 52.222-25 (C)(1)(xv) Affirmative Action Compliance.

Section L

52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment

Opportunity for Construction (FEB 1999).

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .