B09_Amd_2_CRMO_323904_QA_3_12_25_0002.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
CRMO 323904 Rehab Ops Bldgs at Idaho Parks
Solicitation number
140P2025R0013
Issued by

About this file

This file is a Questions and Answers (Q&A) document for Solicitation 140P2025R0013, which involves rehabilitating operational buildings at Craters of the Moon National Monument and Preserve in Arco, Idaho. The document provides clarifications on proposal submission requirements, including a 5-page limit for Factor 2 with a minimum 11-point font, and confirms that CPARS and PPQs do not count toward the page limit.

Key details include an extended proposal due date of 3/31/2025, with questions due by 3/21/2025. The government has attached asbestos and materials surveys from July 2022 and December 2023, and clarified that participants must handle hazardous material abatement. The solicitation allows submission of responses in single PDF volumes for both technical and business proposals, and the National Park Service will not provide tax exemptions. No additional site visits will be conducted beyond the previous visit on 2/24.

View the file

Other files

File Type Posted
Sol_140P2025R0013_Amd_0005.pdf PDF
B09_Amd_4_CRMO323904_2-E101_0004.pdf PDF
B09__P2025R0013_Amd_4_CRMO_323904Clause_Updates_0004.pdf PDF
B09_Amd_4_Thermacore-door-systems-brochure_0004.pdf PDF
Sol_140P2025R0013_Amd_0004.pdf PDF
B09_Amd_4_EMON-DMON_Class5000-datasheet_0004.pdf PDF
B09_Amd_4_CRMO_323904_QA_4_1_25_Final_Questions_0004.pdf PDF
Sol_140P2025R0013_Amd_0003.pdf PDF
CRMO323904_232300-R1_Refrigerant_Piping_0002.pdf PDF
B09_Amd_2_02_CRMO_ACM_TCLP_Analysis_August_2022_0002.pdf PDF
CRMO323904_0-M001-R1_0002.pdf PDF
Sol_140P2025R0013_Amd_0002.pdf PDF
B09_Amd_2_SiteVisit_Registration2_25_0002.pdf PDF
B09_Amd_2_03_CRMO_Masonry_and_Paint_Analysis_December_2023_0002.pdf PDF
CRMO_323904_0-G000_R1_0001.pdf PDF
238126_-_Split-System_Air-Conditioners_0001.pdf PDF
CRMO_323904_ASI1_Refrigerant_Update_Cover_Sheet_0001.pdf PDF
Sol_140P2025R0013_Amd_0001.pdf PDF
B08_Atch_3_ButteCountyWD_1_3_2025.pdf PDF
B08_Atch_4_Solit_Vol1_PastPerfQ_-_CRMO.docx DOCX document
Sol_140P2025R0013.pdf PDF
B08_Atch_7_Brand_Name_J_A_FAR_6_302_-_CRMO.pdf PDF
B08_Atch_1_Specifications_CRMO_323904_Final_UPDATED.pdf PDF
B08_Atch_6_Solit_Vol2__SubLimitations_-_CRMO.xlsx XLSX spreadsheet
B08_Atch_2_Drawings_CRMO_323904_Final_UPDATED.pdf PDF
B08_RFP_140P2025R0013_-_CRMO_323904_Feb2025Rev.pdf PDF
B08_Atch_5_Solit_Vol2_ContractPriceSchedule_-_CRMO.xlsx XLSX spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CRMO 140P2025R0013 QuestionsGovernment Response
1Section L.E.3.Factor 2 – PPa.This factor has a 5-page limit. Please confirm if the CPARS or PPQs to be submitted are outside of this page count?
CPARS and PPQ do not count towards the 5 page limit
2b.Are there any font limits? That is a lot of information to pack into 5 pages.Please use no smaller than 11 point Font and the page limitation remains the same.
3Section L.E.3.Factor 2 – PP
a.Can recently filled out PPQ’s, that are the same form as yours, be submitted?Yes
4Has there been an asbestos/hazardous material test done? If so, can we have the findings.Please find attached the asbestos survey dated July, 28 2022 and masonry and paint analysis dated dec 11, 2023
5If the findings of the test are positive for Hazardous materials, do you have an abatement plan set or is that something we have done through a subcontractor.Please reference the attached asbestos survey dated July, 28 2022 and masonry and paint analysis dated dec 11, 2023
6Will NPS provide an exemption for any applicable sales tax or state tax.No
7RFIs: In order for our team (including subcontractors) to have adequate time to digest the proposal requirements and information gathered from the recent site visit on 2/24, would the government please consider extending the RFI due date till at least seven days prior to the bid date? This will allow for a more comprehensive proposal response.Proposals have been extended to be due 3/31/2025 and the questions are now due 3/21/2025.
8Section L, Part E, Item #.2: In Section L, Part E., Item #2, it is stated: "Include folders and files for electronic formats….". Can the government confirm that it is acceptable to provide our response to this section in one single PDF labeled Volume I - Technical Proposal? Or, can the government please explain what it means by "folders and files".yes it is acceptable to provide all sections in a single PDF
9Section L, Part F., Item #2: In Section L, Part F., Item #2, it is stated: "Include folders and files for electronic formats….". Can the government confirm that it is acceptable to provide our response to this section in one single PDF labeled Volume II - Business & Price Proposal? Or, can the government please explain what it means by "folders and files".Yes is it acceptable to submit a single PDF for Volume II - Buisness and Price Proposal.
10Has there been an asbestos/hazardous material test done? If so, can we have the findings.Please find attached the asbestos survey dated July, 28 2022 and masonry and paint analysis dated dec 11, 2023
11If the findings of the test are positive for Hazardous materials, do you have an abatement plan set or is that something we have done through a subcontractor.Please reference the attached asbestos survey dated July, 28 2022 and masonry and paint analysis dated dec 11, 2023
12Will NPS provide an exemption for any applicable sales tax or state tax.No
13Will another site visit be held?NoQuestions answered in Amendment 2, Posted 3/12/25