CRMO_323904_ASI1_Refrigerant_Update_Cover_Sheet_0001.pdf

PDF 74 KB Posted

Attached to
CRMO 323904 Rehab Ops Bldgs at Idaho Parks
Solicitation number
140P2025R0013
Issued by

About this file

This is an Architect's Supplemental Information (ASI #01) document issued on January 24, 2025, for the CRMO Rehabilitate Operational Buildings at Idaho Parks project (PMIS: 323904). The document details changes to refrigerant specifications for the National Park Service project, specifically updating refrigerant requirements from R-410A to R-454B and R-32.

The document outlines changes to both drawings and specifications. Drawing changes include adding a revision to the title block on Sheet 1 and incorporating ASHRAE 15 Refrigerant Calculations on Sheet 70. Specification changes affect two sections: 23 23 00 Refrigerant Piping and 23 81 26 Split System Air Conditioners, where all references to R-410A are being replaced with R-454B and R-32. The document is addressed to NPS Project Manager Michael Quinn, with copies to two Contracting Officers and a Project Specialist from NPS, and is issued by Beth Cook, Project Architect from Anderson Hallas Architects.

View the file

Other files

File Type Posted
Sol_140P2025R0013_Amd_0005.pdf PDF
B09_Amd_4_CRMO323904_2-E101_0004.pdf PDF
B09__P2025R0013_Amd_4_CRMO_323904Clause_Updates_0004.pdf PDF
B09_Amd_4_Thermacore-door-systems-brochure_0004.pdf PDF
Sol_140P2025R0013_Amd_0004.pdf PDF
B09_Amd_4_EMON-DMON_Class5000-datasheet_0004.pdf PDF
B09_Amd_4_CRMO_323904_QA_4_1_25_Final_Questions_0004.pdf PDF
Sol_140P2025R0013_Amd_0003.pdf PDF
B09_Amd_2_CRMO_323904_QA_3_12_25_0002.xlsx XLSX spreadsheet
CRMO323904_232300-R1_Refrigerant_Piping_0002.pdf PDF
B09_Amd_2_02_CRMO_ACM_TCLP_Analysis_August_2022_0002.pdf PDF
CRMO323904_0-M001-R1_0002.pdf PDF
Sol_140P2025R0013_Amd_0002.pdf PDF
B09_Amd_2_SiteVisit_Registration2_25_0002.pdf PDF
B09_Amd_2_03_CRMO_Masonry_and_Paint_Analysis_December_2023_0002.pdf PDF
CRMO_323904_0-G000_R1_0001.pdf PDF
238126_-_Split-System_Air-Conditioners_0001.pdf PDF
Sol_140P2025R0013_Amd_0001.pdf PDF
B08_Atch_3_ButteCountyWD_1_3_2025.pdf PDF
B08_Atch_4_Solit_Vol1_PastPerfQ_-_CRMO.docx DOCX document
Sol_140P2025R0013.pdf PDF
B08_Atch_7_Brand_Name_J_A_FAR_6_302_-_CRMO.pdf PDF
B08_Atch_1_Specifications_CRMO_323904_Final_UPDATED.pdf PDF
B08_Atch_6_Solit_Vol2__SubLimitations_-_CRMO.xlsx XLSX spreadsheet
B08_Atch_2_Drawings_CRMO_323904_Final_UPDATED.pdf PDF
B08_RFP_140P2025R0013_-_CRMO_323904_Feb2025Rev.pdf PDF
B08_Atch_5_Solit_Vol2_ContractPriceSchedule_-_CRMO.xlsx XLSX spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W A

S H

IN

G

TO

N

A V

E , G

O

LD

E N

, C O

C R

A

FT

B

A

LA

N C

E

W

H

IM

S Y

A N

D A

R C

H .C

O M

Architect’s Supplemental Information

ASI # 01

Date: 2025.01.24

To: Michael Quinn, Project Manager, NPS

Cc: Amber Hughes, Contracting Officer, NPS Paula Teague, Contracting Officer, NPS Kristen Rowe, Project Specialist, NPS

From: Beth Cook, Project Architect, Anderson Hallas Architects

Re: Refrigerant Update

CRMO Rehabilitate Operational Buildings at Idaho Parks

PMIS: 323904

Please see enclosed for revised drawings and specifications to address updates to refrigerant requirements.

Summary of Drawing Changes

Sheet 1 (Cover)

• Revision added to title block.

Sheet 70 (0-M001)

• Added ASHRAE 15 Refrigerant Calculations

Summary of Specification Changes

23 23 00 Refrigerant Piping

• 2.1.A: Changed "R-410A" to "R-454B and R-32"

• 2.4.A & 2.4.B: Removed refrigerant R-410A, added Refrigerants R-454B and R-32

• 3.1: Changed "R-410A" to "R-454B and R-32"

23 81 26 Split System Air Conditioners

• 2.2.A.2.c: Changed "R-410A" to "R-454B or R-32"