This document is a Mechanical Cover Sheet for a renovation project at Craters of the Moon National Monument and Preserve in Idaho. The mechanical drawing provides detailed specifications for ventilation, air conditioning, and outside air calculations for multiple rooms including storage, shipping and receiving, offices, and shops. The project involves installing and configuring HVAC systems with specific technical requirements, including:
Key technical specifications include refrigerant systems (using R-454B and R-32) for multiple air handling units (CU-1, FCU-1, CU-2, FCU-2, CU-3, FCU-3), with refrigerant charges ranging from 7.72 to 14.55 pounds. The HVAC design covers approximately 2,590 square feet across various rooms, with ceiling heights of 12 feet. The contractor must follow SMACNA standards, coordinate with other trades, comply with manufacturer instructions, and ensure all mechanical work meets the National Park Service's specifications. Thermostat placement, ductwork insulation, and penetration sealing are among the specific installation requirements.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
F/S
S
F
ABBREVIATIONS VENTILATION AND AIR CONDITIONING SYMBOLS
12x20
SECOND FIGURE, SIDE NOT SHOWN)
ALL DUCTS DIMENSIONS SHALL BE
SUPPLY DUCT UP
RETURN DUCT UP
SUPPLY DUCT DOWN
RETURN DUCT DOWN
AIR FLOW
AIR FLOW
R
D
TRANSITIONS
MANUAL VOLUME DAMPER
FLEXIBLE CONNECTION
SUPPLY OR RETURN
RECTANGULAR DUCT ELBOW WITH
TURNING VANES
SHOWN IN INCHES.
DUCT (FIRST FIGURE, SIDE SHOWN AND
RECTANGULAR TO ROUND TRANSITION
STANDARD RECTANGULAR BRANCH FOR
INCLINED DROP (D), ARROW IN DIRECTION OF
INCLINED RISE (R), ARROW IN DIRECTION OF
T
S
D
THERMOSTAT
ZONE SENSOR
DUCT MOUNTED SMOKE DETECTOR
ACCESS PANEL
FIRE DAMPER
SMOKE DAMPER
COMBINATION FIRE/SMOKE DAMPER
EXHAUST DUCT DOWN
EXHAUST DUCT UP
M MOTORIZED DAMPER
RL REFRIGERANT LIQUID LINE
RS REFRIGERANT SUCTION LINE
TEMPERATURE AND PRESSURE
TYPICAL
VENT, VOLTS
T&P
TYP.
V
MSB MOP SERVICE BASIN
FT FEET
FPM FEET PER MINUTE
FAHRENHEITF
AVG AVERAGE
WET BULBWB
DRY BULBDB
LEAVING AIR TEMPERATURELAT
ENTERING AIR TEMPERATUREEAT
W WATT, WASTE
REVOLUTIONS PER MINUTERPM
KILOWATTKW
CFM
BTUH
VOLUME DAMPERVD
(E)
EA
EXISTING
EXHAUST AIR
CUBIC FEET PER MINUTE
FULL LOAD AMPSFLA
DRAIND
VENT THROUGH ROOF
PRV PRESSURE REDUCING VALVE
INSIDE DIAMETERID
WATER HAMMER ARRESTORWHA
WCO
WC
VTR
SA
WALL CLEANOUT
WATER CLOSET, WATER COLUMN
SUPPLY AIR
OAT
OA
M
L
IN
FD
FCO
OUTSIDE AIR TEMPERATURE
OUTSIDE AIR
MOTORIZED DAMPER
LAVATORY
INCHES
FLOOR DRAIN, FIRE DAMPER
FLOOR CLEANOUT
DN
CW
CO
BDD
AUX.
AP
AFF
AD
DOWN
COLD WATER
CLEANOUT
BACKDRAFT DAMPER
AUXILIARY
ACCESS PANEL
ABOVE FINISHED FLOOR
ACCESS DOOR
SHEET WHERE SHOWN
DETAIL IDENTIFIER
SHEET WHERE SHOWN
SECTION LETTER
NOT APPLICABLENA
SP STATIC PRESSURE
FS FLOW SWITCH
ELECTRICAL CONTRACTORE.C.
G.C. GENERAL CONTRACTOR
M.C. MECHANICAL CONTRACTOR
BRITISH THERMAL UNIT PER HOUR
M1
EXTERNAL STATIC PRESSUREESP
REFRIGERANT LIQUIDRL
REFRIGERANT SUCTIONRS
EFFICIENCYEFF
ENERGY EFFICIENCY RATIOEER
SEASONAL ENERGY EFFICIENCY RATIOSEER
HEATING SEASONAL PERFORMANCE FACTORHSPF
UNDER CUT DOORUC
(F) FUTURE
NATURAL VENTILATION CALCULATION (CALCULATIONS BASED ON IMC TABLE 402.2)
ROOM NAME
Storage
Storage
Shipping and Receiving
B & U Shop
Metal Shop
ROOM #
SQUARE FEET
OPERABLE OPENING
REQUIRED [SF]
OPERABLE OPENING
PROVIDED [SF]
MECHANICAL NOTES
I. GENERAL
· ALL WORK SHALL BE IN ACCORDANCE WITH SMACNA STANDARDS AND SPECIFICATIONS, AND LOCAL AUTHORITY
HAVING JURISDICTION.
· THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND NOT INTENDED TO SHOW ALL TRANSITIONS, OFFSETS, ETC.
CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND PROVIDE ALL NECESSARY FITTINGS TO COMPLETE THE INTENT OF THE DRAWINGS. ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS SHALL BE REPORTED TO THE CONTRACTING OFFICER FOR RESOLUTION. CONTRACTOR MAY LOCATE MECHANICAL EQUIPMENT DIFFERENTLY THAN SHOWN ON DRAWINGS DUE TO CONFLICTS, AS LONG AS FUNCTION AND/OR APPEARANCE ARE NOT
· COORDINATE SPACE REQUIREMENTS, SUPPORTS, AND INSTALLATION OF MECHANICAL WORK, WHICH ARE INDICATED DIAGRAMMATICALLY ON THE DRAWINGS. FOLLOW ROUTING SHOWN FOR PIPES AND DUCTS AS CLOSELY AS PRACTICABLE; PLACE RUNS PARALLEL WITH LINES OF BUILDING. UTILIZE SPACES EFFICIENTLY TO MAXIMIZE
ACCESSIBILITY FOR OTHER INSTALLATIONS, FOR MAINTENANCE, AND FOR REPAIRS.
· COMPLY WITH MANUFACTURER'S INSTRUCTIONS INCLUDING EACH STEP IN SEQUENCE. SHOULD MANUFACTURERS' INSTRUCTIONS CONFLICT WITH THE DRAWINGS REQUEST CLARIFICATION FROM THE CONTRACTING OFFICER BEFORE
PROCEEDING.
· DUCT SIZES ARE INSIDE DIMENSION.
· CONTRACTOR SHALL REVIEW THESE DOCUMENTS CAREFULLY. CONTRACTOR SHALL CONTACT THE CONTRACTING
OFFICER, FOR RESOLUTION OF ANY DISCREPANCIES, OMISSIONS, OR CLARIFICATIONS.
IN THE EVENT THAT AN INTERPRETATION OF DOCUMENTS IS NECESSARY AFTER THE PROPOSAL DATE, THE DECISION OF THE CONTRACTING OFFICER SHALL BE FINAL AND BINDING.
· PRODUCT DELIVERY, STORAGE, AND HANDLING: PROVIDE EQUIPMENT AND PERSONNEL TO HANDLE PRODUCTS BY METHODS TO PREVENT DAMAGE. PROMPTLY INSPECT SHIPMENTS TO ENSURE THAT PRODUCTS ARE UNDAMAGED.
STORE AND PROTECT PRODUCTS IN ACCORDANCE WITH MANUFACTURERS' INSTRUCTIONS.
· ALL REMOVED EQUIPMENT SHALL REMAIN THE PROPERTY OF THE GOVERNMENT AND SHALL BE STORED PER
CONTRACTING OFFICER DIRECTION.
· THE CONTRACTOR IS RESPONSIBLE FOR THE COSTS OF ALL CHANGE ORDERS, WHICH THE CONTRACTING OFFICER
HAS NOT APPROVED IN WRITING PRIOR TO THE EXECUTION OF THE ASSOCIATED WORK.
· IN THE CASE OF A CONFLICT, UNLESS OTHERWISE NOTED, KEYNOTES ON MECHANICAL PLANS SHALL SUPERCEDE
ANY GENERAL NOTES ON THE PLANS.
· CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES AND NOTIFY THE CONTRACTING OFFICER IF ANY
CONFLICTS OCCUR.
· THERMOSTAT LOCATIONS TO BE COORDINATED WITH BUILDING MANAGEMENT, VERIFIED BY THE CONTRACTING OFFICER.
THERMOSTAT HEIGHTS SHALL BE A MAXIMUM OF 48" AFF TO MATCH LIGHTSWITCH HEIGHTS AND INSTALLED TO MEET ICC
A117.1. CONTRACTOR TO CALIBRATE ALL THERMOSTATS SHOWN ON THIS PLAN.
· PROVIDE VOLUME DAMPERS AT ALL DIFFUSER TAKEOFFS.
· ALL TAKEOFFS, RUNOUTS, AND FLEX DUCTWORK TO DIFFUSERS SHALL BE THE SAME SIZE AS DIFFUSER INLET
UNLESS OTHERWISE NOTED.
· THERMOSTAT CONTROL LINES SHALL BE SUPPORTED AT INTERVALS NOT TO EXCEED 4'-0".
· PROVIDE EXTERNAL INSULATION ON ALL NEW RIGID ROUND DUCTWORK.
· PROVIDE ACCESS DOORS IN DUCTWORK AS REQUIRED FOR ACCESS TO FIRE DAMPERS, FIRE/SMOKE DAMPERS, OR
ANY OTHER MECHANICAL EQUIPMENT REQUIRING MAINTENANCE OF SERVICE.
· ALL PIPE AND DUCT PENETRATIONS THOUGH RATED WALLS SHALL BE SEALED PER 2021 IBC.
AFFECTED.
BASE SCOPE OUTSIDE AIR CALCULATION (CALCULATIONS BASED ON IMC TABLE 403.3)
ROOM NAME
Flex Space
Open Office
Storage
ROOM #
ROOM TYPE
PER TABLE 6-1
Office spaces
Office spaces
Office spaces
SQUARE FEET
OCCUPANT LOAD
#/1000 SF
OA CFM/
PERSON
OA
CFM/SF
0.06
0.06
0.06
AIR DIST.
EFFECTIVENESS
0.8
0.8
0.8
OA
PERCENTAGE
17%
7%
7%
SA PROVIDED
CFM
OA PROVIDED
CFM
OA REQUIRED
CFM
27.8
106.0
34.5
168.4
OPTION 01 OUTSIDE AIR CALCULATION (CALCULATIONS BASED ON IMC TABLE 403.3)
ROOM NAME
Flex Space
Open Office
Office
Office
Office
Office
Storage
ROOM #
106B
ROOM TYPE
PER TABLE 6-1
Office spaces
Office spaces
Office spaces
Office spaces
Office spaces
Office spaces
Office spaces
SQUARE FEET
OCCUPANT LOAD
#/1000 SF
OA CFM/
PERSON
OA
CFM/SF
0.06
0.06
0.06
0.06
0.06
0.06
0.06
AIR DIST.
EFFECTIVENESS
0.8
0.8
0.8
0.8
0.8
0.8
0.8
OA
PERCENTAGE
17%
8%
18%
18%
18%
18%
5%
SA PROVIDED
CFM
OA PROVIDED
CFM
OA REQUIRED
CFM
27.8
69.9
9.0
9.2
9.2
9.0
34.5
168.8
ASHRAE 15 REFRIGERANT CALCULATIONS
SYSTEM
CU-1 & FCU-1
CU-1 & FCU-1
CU-2 & FCU-2
CU-2 & FCU-2
CU-3 & FCU-3
CU-3 & FCU-3
UNIT
(TONS)
3.5
3.5
REFRIGERANT
R-454B
R-32
R-454B
R-32
R-454B
R-32
CHARGE
(LBS)
8.49
7.72
14.55
13.23
8.49
7.72
REQ'S LFL
EDVC CALC?
YES
YES
YES
YES
YES
YES
FLOOR AREA
(SQ FT)
SPACE CEILING
HEIGHT (FT)
EFFECTIVE DISPERSAL
VOLUME (FT3)
11976
11976
MAX ALLOWABLE CHARGE
EDVC (RCL) - (LBS)
9.7
15.1
37.1
57.5
12.1
18.7
ALTITUDE ADJUSTMENT
FOR 5,280 FT
8.5
8.5
32.3
32.3
10.5
10.5
MAX ALLOWABLE CHARGE
EDVC (LFL) - (LBS)
34.6
29.9
131.7
113.8
42.9
37.1
ASHRAE 15
COMPLIANT?
YES
YES
YES
YES
YES
YES
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF1/
/2
:5 0:
A
M A ut od es k
D oc s:
//2
3-
N P
S C
R M
O R eh ab
D D
-C D
/2
3-
N
P S
C R
M O
R eh ab D
D -C
D v
B
IM
M P
.r vt
0-M001
AT/MK
CRATERS OF THE MOON
NATIONAL MONUMENT AND PRESERVE
187123
323904
MK
LZ
05/09/2024 70 135
MECHANICAL COVER
SHEET
File details come from the government source that posted it. Updated .