This is a Contract Price Schedule template for the National Park Service Denver Service Center project to rehabilitate operational buildings at Craters of the Moon National Monument in Idaho (Solicitation #140P2025R0013). The schedule consists of two base Contract Line Items (CLINs) - a Utility Building (4,130 SF) and Snow Equipment Building (1,310 SF), plus six optional CLINs including an Open Office, Shop Casework, Castellated Steel Plates, Full Building Repointing, Archeology Monitoring, and a Snow Equipment Building Addition (290 SF).
The template requires offerors to submit pricing for both base items and all option items, with unit prices and extended totals for unit-priced items and lump sum pricing where specified. Offerors must submit rounded whole dollar amounts, and in cases of calculation errors, unit prices govern over extended prices. The pricing template is structured to show individual CLIN costs as well as subtotals for base items, optional items, and a total proposed price for base plus all options.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule Template | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | 140P2025R0013 | ||||
| PARK - PMIS: | CRMO - 323904 | ||||
| (Project Management Information System) | |||||
| Developed Area: | |||||
| Project Title: | Rehabilitate Operational Buildings at Idaho Parks | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Utility Building | 4130 | SF | ||
| 2 | Snow Equipment Building | 1310 | SF | ||
| TOTAL BASE PRICE (Contract Line Item Number 1 and 2 ) --------------------------------------------------------------------------------- | |||||
| 3 | OPTION 01: Open Office | 1 | LS | ||
| 4 | OPTION 02: Shop Casework | 1 | LS | ||
| 5 | OPTION 03: Castellated Steel Plates | 1 | LS | ||
| 6 | OPTION 04: Full Building Repointing | 1 | LS | ||
| 7 | OPTION 05: Archeology Monitoring | 1 | LS | ||
| 8 | OPTION 06: Snow Equipment Building Addition | 290 | SF | ||
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3 through 8) ----------------------------------------------------------- | |||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 8) -------------------------- | |||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
File details come from the government source that posted it. Updated .