This document is a Bid Schedule Excel spreadsheet for the Kyle Health Center ASHRAE 170 Upgrades and Roof Replacement project. The comprehensive scope includes multiple construction and mechanical system upgrades, with line items covering roofing system design, HVAC equipment replacement, and associated infrastructure improvements. Key elements include roof replacement (approximately 20,000 square feet), demolition and installation of VAV boxes and air handling units, replacement of mechanical components like boilers, chillers, and circulating pumps, and additional upgrades such as LED lighting, epoxy flooring, and wall painting in the penthouse area.
The project is solicited by the Indian Health Service (IHS) under Solicitation Number 75H70126R00004, focusing on facility modernization and ASHRAE 170 standards compliance. The bid schedule itemizes 24 distinct line items with quantities ranging from individual jobs to multiple equipment replacements, suggesting a complex renovation project. Each line item includes a quantity and unit, though specific unit prices are not visible in the provided document. The comprehensive nature of the upgrades indicates a significant infrastructure improvement initiative for the Kyle Health Center.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BID SCHEDULE | |||
| ASHRAE 170 UPGRADES AND ROOF REPLACEMENT | |||
| KYLE HEALTH CENTER | |||
| ITEM | QUANTITY | UNIT | UNIT PRICE |
| DESIGN OF ROOFING SYSTEM | 1 | JOB | |
| DESIGN OF MISC HVAC UPGRADES | 1 | JOB | |
| DEMOLITION OF ALL ROOF SYSTEMS | 1 | JOB | |
| ROOF REPLACEMENT - VAPOR BARRIER, INSULATION, IMPACT BOARD, PVC MEMBRANE, PARAPET FLASHING, VENTS, ROOF DRAINS, AND ASSOCIATED COMPONENTS | ~20,000 | SF | |
| LIGHTNING PROTECTION SYSTEM | 1 | JOB | |
| DUCT CLEANING AND SEALING | 1 | JOB | |
| DEMOLITION OF VAV BOXES, CONTROLS, AND PNEUMATIC PIPING | 40 | EA | |
| INSTALLATION OF VAV BOXES, CONTROLS, AND DDC | 24 | EA | |
| INSTALLATION OF FAN POWERED VAV BOXES, CONTROLS, AND DDC | 16 | EA | |
| DEMOLITION OF AHU, CONTROLS, PIPING, AND ASSOCIATED COMPONENTS | 2 | JOB | |
| INSTALLATION OF AHU, CONTROLS, PIPING, PIPE INSULATION, AND ASSOCIATED COMPONENTS | 2 | JOB | |
| HUMIDIFICATION SYSTEM FOR AHUS | 1 | JOB | |
| UV-C SYSTEM FOR AHUS | 1 | JOB | |
| BIPOLAR IONIZATION SYSTEM FOR AHUS | 1 | JOB | |
| LED LIGHTING UPGRADES - PENTHOUSE | 1 | JOB | |
| EPOXY CONCRETE FLOORING - PENTHOUSE | 1 | JOB | |
| PAINTING WALLS - PENTHOUSE | 1 | JOB | |
| METASYS INTEGRATION FOR ALL NEW EQUIPMENT | 1 | JOB | |
| SUSPENDED UNIT HEATER REPLACEMENT | 5 | EA | |
| CABINET UNIT HEATER REPLACEMENT | 2 | EA | |
| RADIANT FLOOR HEATERS | 5 | EA | |
| BOILER REPLACEMENT | 2 | EA | |
| CIRCULATING PUMP REPLACEMENT | 3 | EA | |
| CHILLER REPLACEMENT | 1 | EA | |
| MECHANICAL ROOM PIPE INSULATION | 1 | JOB | |
| GRAND TOTAL |