Pre-Construction Risk Assessment.docx

DOCX document 32 KB Posted

Attached to
Kyle Health Center ASHRAE 170 Upgrades and Roof Replacement
Solicitation number
75H70126R00004
Issued by

About this file

The document is a Pre-Construction Risk Assessment form for a construction project, specifically designed to evaluate potential risks across multiple operational domains before project initiation. The form covers comprehensive risk assessment categories including fire safety, utilities, confined spaces, environmental/occupational hazards, security, and infection control, with specific focus on classifying project risks into ICRA (Infection Control Risk Assessment) Classes I through IV.

The form requires signatures from multiple stakeholders including the Project Manager, Facility Manager, Safety Officer, IP (Infection Prevention), and Supervisor of the affected area, with sign-offs required at project initiation and closeout. The risk assessment matrix allows project teams to systematically identify potential negative impacts across areas such as fire detection systems, utility disruptions, medical gas systems, chemical hazards, security processes, patient care areas, and potential exposure to infectious agents or environmental risks.

View the file

Other files

File Type Posted
B05 Amend A00009.pdf PDF
REVISED Attachment J07 Bid Schedule.xlsx XLSX spreadsheet
REVISED Attachment J07 Bid Schedule.xlsx XLSX spreadsheet
B05 Amend A00008.pdf PDF
B01 Attachment J02 Wage Determination SD20260017.pdf PDF
B05 Amend A00007.pdf PDF
B05 Amend A00006.pdf PDF
B05 Amend A00005.pdf PDF
B05 Amend A00004.pdf PDF
B05 Amend A00003.pdf PDF
KYLE_ICRA MAP.pdf PDF
Infection Control Risk Assessment.docx DOCX document
Revised B01 RFP Attachment J07 BID SCHEDULE.xlsx XLSX spreadsheet
Kyle as built LPS.pdf PDF
KHC_STRUC ONLY.pdf PDF
KHC_ELEC ONLY.pdf PDF
Example Specification.pdf PDF
B05 Amend A00002.pdf PDF
KHC_FIRE SPRINKLER.pdf PDF
KHC_CIVIL ONLY.pdf PDF
KHC_ARCH ONLY.pdf PDF
KHC ADDITION.pdf PDF
Revised B01 RFP Attachment J02 SD20250017.pdf PDF
KHC_MECH ONLY.pdf PDF
Revised B01 RFP Attachment J07 Bid Schedule.xlsx XLSX spreadsheet
B05 Amend A00001.pdf PDF
B01 RFP 75H70126R00004.pdf PDF
B01 RFP Attachment J01a Drawings (3).pdf PDF
B01 RFP Attachment J01c ICRA MAP.pdf PDF
B01 RFP Attachment J03 Self Performed Calculation Sheet (Construction).docx DOCX document
B01 RFP Attachment J01a Drawings (2).pdf PDF
B01 RFP Attachment J05 PPQ.docx DOCX document
B01 RFP Attachment J06 IHS IEE Representation Form.pdf PDF
B01 RFP Attachment J01 Drawings (1).pdf PDF
B01 RFP Attachment J02 Wage Determination SD20250017.pdf PDF
B01 RFP Attachment J04 Company Specialized Experience Construction Form.pdf PDF
B01 RFP Attachment J07 BID SCHEDULE.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Construction Risk Assessment – Cover Page Project Title:

PRSU Coordinator:

PCRA Submit Date:

Project Conducted by:
☐ Fac. Mgmt. ☐ I.T. ☐ Telecom ☐ Clin. Eng.

☐ Contractor:

Proposed Start Date:

Staff/Cont. Name:

Est. Duration:

Supervisor Name:

Est. Complete Date:

Telephone:

Date Project Completed:

Email:

Project Description: (include specific sites and tasks)

ICRA Classification
Class I
☐Class II
☐Class III*
☐Class IV*
☐

Section 1. Initial Project Impact Review

Topic
Will the project negatively impact or involve…?
No
Yes
Responses (If YES to any)

Fire Safety Section 2A(1)

Ceiling tile removal (less than 4 hours total)
☐☐Complete Above the Ceiling Access Permit (ACAP)
Existing fire-stop; minor barrier penetrations
☐☐

Fire Safety Section 2A(2)

Fire detection/alarm/suppression systems
☐☐Complete Interim Life Safety Measure (ILSM) evaluation.
Exit paths or fire/smoke barriers
☐☐
Hot work practices
☐☐
Extra fire load or flammable materials
☐☐

Utilities Section 2B (1)

Water, sewer, electricity, steam, or HVAC (including outside air intakes)
☐☐Complete the Utility System Risk Assessment (USRA)
Medical gases or vacuum
☐☐
Call systems, telephones, or IT systems
☐☐
Confined Space Section 2B (2)
The area designated as a confined space
☐☐Confined Space Risk Assessment

Environmental/ Occupational Section 2C

Lead or asbestos-containing materials
☐☐Complete Env./Occ. Risk Assessment (EORA)
Chemical hazards (i.e. mercury, volatile organics)
☐☐
Exposure to infectious agents or mold
☐☐
Crushing or falling hazard
☐☐

Security Section 2D

Security systems (badge readers, cameras)
☐☐Complete Security Risk Assessment (SRA)
Security processes (tours, foot/vehicle traffic)
☐☐

Infection Control Section 2E

Patient care areas or critical utilities
☐☐Complete an Infection Control Risk Assessment (ICRA)
Moderate to high levels of dust, noise, vibration
☐☐
More than one work shift
☐☐

Project Approval

Version: September 18th, 2019
Project Manager Signature

Date:

Required for: All

Facility Manager Signature

Date:

Required for: All

Safety Officer Signature

Date:

Required for: All

IP Signature

Date:

Required for: USRA and ICRA

Supervisor (affected area)

Date:

Required for: All

Project Close-out Facility Manager Signature

Date:

Required for: All

Safety Officer Signature

Date:

Required for: All

IP Signature

Date:

Required for: ICRA-Class III & IV

Supervisor (affected area)

Date:

Required for: All