Revised B01 RFP Attachment J07 BID SCHEDULE.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- 75H70126R00004
About this file
The file is a Bid Schedule Excel spreadsheet for the Kyle Health Center ASHRAE 170 Upgrades and Roof Replacement project solicited by the Indian Health Service. The detailed bid schedule encompasses an extensive range of construction and mechanical upgrade services, including comprehensive roofing system design and replacement covering approximately 20,000 square feet, HVAC equipment upgrades, demolition and installation of air handling units, VAV boxes, controls, and associated components. The scope also includes replacing mechanical systems such as boilers, chillers, circulating pumps, unit heaters, and implementing additional improvements like LED lighting upgrades, epoxy flooring, wall painting, and advanced air treatment technologies like UV-C and bipolar ionization systems.
The project's bid schedule breaks down multiple line items with quantities and unit pricing, covering design work, demolition, equipment replacement, and infrastructure enhancements. Specific technical details include lightning protection system installation, duct cleaning and sealing, HVAC controls integration, and Metasys system integration for new equipment. The comprehensive upgrade aims to ensure compliance with ASHRAE 170 Standards and address facility deficiencies identified during previous inspections, with a focus on modernizing the mechanical and roofing systems of the Kyle Health Center.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BID SCHEDULE | ||||
| ASHRAE 170 UPGRADES AND ROOF REPLACEMENT | ||||
| KYLE HEALTH CENTER | ||||
| ITEM | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| DESIGN OF ROOFING SYSTEM | 1 | JOB | ||
| DESIGN OF MISC HVAC UPGRADES | 1 | JOB | ||
| DEMOLITION OF ALL ROOF SYSTEMS | 1 | JOB | ||
| ROOF REPLACEMENT - VAPOR BARRIER, INSULATION, IMPACT BOARD, PVC MEMBRANE, PARAPET FLASHING, VENTS, ROOF DRAINS, AND ASSOCIATED COMPONENTS | ~20,000 | SF | ||
| LIGHTNING PROTECTION SYSTEM | 1 | JOB | ||
| DUCT CLEANING AND SEALING | 1 | JOB | ||
| DEMOLITION OF VAV BOXES, CONTROLS, AND PNEUMATIC PIPING | 40 | EA | ||
| INSTALLATION OF VAV BOXES, CONTROLS, AND DDC | 24 | EA | ||
| INSTALLATION OF FAN POWERED VAV BOXES, CONTROLS, AND DDC | 16 | EA | ||
| DEMOLITION OF AHU, CONTROLS, PIPING, AND ASSOCIATED COMPONENTS | 2 | JOB | ||
| INSTALLATION OF AHU, CONTROLS, PIPING, PIPE INSULATION, AND ASSOCIATED COMPONENTS | 2 | JOB | ||
| HUMIDIFICATION SYSTEM FOR AHUS | 1 | JOB | ||
| UV-C SYSTEM FOR AHUS | 1 | JOB | ||
| BIPOLAR IONIZATION SYSTEM FOR AHUS | 1 | JOB | ||
| LED LIGHTING UPGRADES - PENTHOUSE | 1 | JOB | ||
| EPOXY CONCRETE FLOORING - PENTHOUSE | 1 | JOB | ||
| PAINTING WALLS - PENTHOUSE | 1 | JOB | ||
| METASYS INTEGRATION FOR ALL NEW EQUIPMENT | 1 | JOB | ||
| SUSPENDED UNIT HEATER REPLACEMENT | 5 | EA | ||
| CABINET UNIT HEATER REPLACEMENT | 2 | EA | ||
| RADIANT FLOOR HEATERS | 5 | EA | ||
| BOILER REPLACEMENT | 2 | EA | ||
| CIRCULATING PUMP REPLACEMENT | 3 | EA | ||
| CHILLER REPLACEMENT | 1 | EA | ||
| MECHANICAL ROOM PIPE INSULATION | 1 | JOB | ||
| MINISPLIT AND CONDENSING UNITS | 5 | EA | ||
| HIGH PLUME EXHAUST FAN | 1 | EA | ||
| VAPORIZER AND PIPING | 1 | JOB | ||
| GENERAL REQUIREMENTS | 1 | JOB | ||
| OVERHEAD AND PROFIT | 1 | JOB | ||
| TERO AND TAXES | 1 | JOB | ||
| GRAND TOTAL |
File details come from the government source that posted it. Updated .