REVISED Attachment J07 Bid Schedule.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 75H70126R00004
About this file
This is a Bid Schedule for the Kyle Health Center ASHRAE 170 Upgrades and Roof Replacement project, structured as an Excel spreadsheet containing line items with quantities, units, and pricing columns for contractor cost proposals.
The base contract (CLIN 0001) encompasses 21 line items including design services for roofing and HVAC systems, roof replacement (20,000 SF with vapor barrier, insulation, PVC membrane, and associated components), lightning protection, ductwork cleaning and sealing, replacement of 40 VAV boxes with controls and 24 fan-powered VAV boxes, installation of two air handling units with DDC controls and pipe insulation, humidification systems, UV-C and bipolar ionization systems for AHUs, LED lighting upgrades for penthouse, epoxy concrete flooring, wall painting, Metasys integration, pipe insulation, general requirements, overhead and profit, and TERO and taxes. Nine optional CLINs (0002–0011) address follow-on work including replacement of five suspended unit heaters, two cabinet unit heaters, five radiant floor heaters, two boilers, three circulating pumps, one chiller, pipe insulation, five minisplit and condensing units, and one high plume exhaust fan with vaporizer and piping. Each optional CLIN includes line items for general requirements, overhead and profit, and TERO and taxes. The schedule provides the framework for bidders to enter unit prices and calculate total prices for all work items, with final subtotals for base contract and options, and a combined total.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BID SCHEDULE | ||||
| ASHRAE 170 UPGRADES AND ROOF REPLACEMENT | ||||
| KYLE HEALTH CENTER | ||||
| CLIN 0001 BID ITEM | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| DESIGN OF ROOFING SYSTEM | 1 | JOB | ||
| DESIGN OF MISC HVAC UPGRADES | 1 | JOB | ||
| DEMOLITION OF ALL ROOF SYSTEMS | 1 | JOB | ||
| ROOF REPLACEMENT - VAPOR BARRIER, INSULATION, IMPACT BOARD, PVC MEMBRANE, PARAPET FLASHING, VENTS, ROOF DRAINS, AND ASSOCIATED COMPONENTS | 20,000 | SF | ||
| LIGHTNING PROTECTION SYSTEM | 1 | JOB | ||
| DUCT CLEANING AND SEALING | 1 | JOB | ||
| DEMOLITION OF VAV BOXES, CONTROLS, AND PNEUMATIC PIPING | 40 | EA | ||
| INSTALLATION OF VAV BOXES, CONTROLS, AND DDC | 24 | EA | ||
| INSTALLATION OF FAN POWERED VAV BOXES, CONTROLS, AND DDC | 16 | EA | ||
| DEMOLITION OF AHU, CONTROLS, PIPING, AND ASSOCIATED COMPONENTS | 2 | JOB | ||
| INSTALLATION OF AHU, CONTROLS, PIPING, PIPE INSULATION, AND ASSOCIATED COMPONENTS | 2 | JOB | ||
| HUMIDIFICATION SYSTEM FOR AHUS | 1 | JOB | ||
| UV-C SYSTEM FOR AHUS | 1 | JOB | ||
| BIPOLAR IONIZATION SYSTEM FOR AHUS | 1 | JOB | ||
| LED LIGHTING UPGRADES - PENTHOUSE | 1 | JOB | ||
| EPOXY CONCRETE FLOORING - PENTHOUSE | 1 | JOB | ||
| PAINTING WALLS - PENTHOUSE | 1 | JOB | ||
| METASYS INTEGRATION FOR ALL NEW EQUIPMENT | 1 | JOB | ||
| PIPE INSULATION | 1 | JOB | ||
| GENERAL REQUIREMENTS | 1 | JOB | ||
| OVERHEAD AND PROFIT | 1 | JOB | ||
| TERO AND TAXES | 1 | JOB | ||
| BASE TOTAL |
| OPTIONS | ||
| CLIN 0002 SUSPENDED UNIT HEATER REPLACEMENT | 5 | EA |
| GENERAL REQUIREMENTS | 1 | JOB |
| OVERHEAD AND PROFIT | 1 | JOB |
| TERO AND TAXES | 1 | JOB |
| CLIN 0003 CABINET UNIT HEATER REPLACEMENT | 2 | EA |
| GENERAL REQUIREMENTS | 1 | JOB |
| OVERHEAD AND PROFIT | 1 | JOB |
| TERO AND TAXES | 1 | JOB |
| CLIN 0004 RADIANT FLOOR HEATERS | 5 | EA |
| GENERAL REQUIREMENTS | 1 | JOB |
| OVERHEAD AND PROFIT | 1 | JOB |
| TERO AND TAXES | 1 | JOB |
| CLIN 0005 BOILER REPLACEMENT | 2 | EA |
| GENERAL REQUIREMENTS | 1 | JOB |
| OVERHEAD AND PROFIT | 1 | JOB |
| TERO AND TAXES | 1 | JOB |
| CLIN 0006 CIRCULATING PUMP REPLACEMENT | 3 | EA |
| GENERAL REQUIREMENTS | 1 | JOB |
| OVERHEAD AND PROFIT | 1 | JOB |
| TERO AND TAXES | 1 | JOB |
| CLIN 0007 CHILLER REPLACEMENT | 1 | EA |
| GENERAL REQUIREMENTS | 1 | JOB |
| OVERHEAD AND PROFIT | 1 | JOB |
| TERO AND TAXES | 1 | JOB |
| CLIN 0008 PIPE INSULATION | 1 | JOB |
| GENERAL REQUIREMENTS | 1 | JOB |
| OVERHEAD AND PROFIT | 1 | JOB |
| TERO AND TAXES | 1 | JOB |
| CLIN 0009 MINISPLIT AND CONDENSING UNITS | 5 | EA |
| GENERAL REQUIREMENTS | 1 | JOB |
| OVERHEAD AND PROFIT | 1 | JOB |
| TERO AND TAXES | 1 | JOB |
| CLIN 0010 HIGH PLUME EXHAUST FAN | 1 | EA |
| GENERAL REQUIREMENTS | 1 | JOB |
| OVERHEAD AND PROFIT | 1 | JOB |
| TERO AND TAXES | 1 | JOB |
| CLIN 0011 VAPORIZER AND PIPING | 1 | JOB | |
| GENERAL REQUIREMENTS | 1 | JOB | |
| OVERHEAD AND PROFIT | 1 | JOB | |
| TERO AND TAXES | 1 | JOB | |
| OPTIONS TOTAL |
BASE + OPTIONS TOTAL
File details come from the government source that posted it. Updated .