This is a Bid Schedule for the Kyle Health Center ASHRAE 170 Upgrades and Roof Replacement project, structured as an Excel spreadsheet containing line items with quantities, units, and pricing columns for contractor cost proposals.

The base contract (CLIN 0001) encompasses 21 line items including design services for roofing and HVAC systems, roof replacement (20,000 SF with vapor barrier, insulation, PVC membrane, and associated components), lightning protection, ductwork cleaning and sealing, replacement of 40 VAV boxes with controls and 24 fan-powered VAV boxes, installation of two air handling units with DDC controls and pipe insulation, humidification systems, UV-C and bipolar ionization systems for AHUs, LED lighting upgrades for penthouse, epoxy concrete flooring, wall painting, Metasys integration, pipe insulation, general requirements, overhead and profit, and TERO and taxes. Nine optional CLINs (0002–0011) address follow-on work including replacement of five suspended unit heaters, two cabinet unit heaters, five radiant floor heaters, two boilers, three circulating pumps, one chiller, pipe insulation, five minisplit and condensing units, and one high plume exhaust fan with vaporizer and piping. Each optional CLIN includes line items for general requirements, overhead and profit, and TERO and taxes. The schedule provides the framework for bidders to enter unit prices and calculate total prices for all work items, with final subtotals for base contract and options, and a combined total.

View the file

Other files

File Type Posted
B05 Amend A00009.pdf PDF
REVISED Attachment J07 Bid Schedule.xlsx XLSX spreadsheet
B05 Amend A00008.pdf PDF
B05 Amend A00007.pdf PDF
B01 Attachment J02 Wage Determination SD20260017.pdf PDF
B05 Amend A00006.pdf PDF
B05 Amend A00005.pdf PDF
B05 Amend A00004.pdf PDF
Pre-Construction Risk Assessment.docx DOCX document
B05 Amend A00003.pdf PDF
KYLE_ICRA MAP.pdf PDF
Infection Control Risk Assessment.docx DOCX document
Revised B01 RFP Attachment J07 BID SCHEDULE.xlsx XLSX spreadsheet
KHC_MECH ONLY.pdf PDF
Kyle as built LPS.pdf PDF
KHC_STRUC ONLY.pdf PDF
KHC_ELEC ONLY.pdf PDF
Example Specification.pdf PDF
B05 Amend A00002.pdf PDF
KHC_FIRE SPRINKLER.pdf PDF
KHC_CIVIL ONLY.pdf PDF
KHC_ARCH ONLY.pdf PDF
KHC ADDITION.pdf PDF
Revised B01 RFP Attachment J02 SD20250017.pdf PDF
Revised B01 RFP Attachment J07 Bid Schedule.xlsx XLSX spreadsheet
B05 Amend A00001.pdf PDF
B01 RFP 75H70126R00004.pdf PDF
B01 RFP Attachment J01a Drawings (3).pdf PDF
B01 RFP Attachment J01c ICRA MAP.pdf PDF
B01 RFP Attachment J03 Self Performed Calculation Sheet (Construction).docx DOCX document
B01 RFP Attachment J02 Wage Determination SD20250017.pdf PDF
B01 RFP Attachment J04 Company Specialized Experience Construction Form.pdf PDF
B01 RFP Attachment J07 BID SCHEDULE.xlsx XLSX spreadsheet
B01 RFP Attachment J01a Drawings (2).pdf PDF
B01 RFP Attachment J05 PPQ.docx DOCX document
B01 RFP Attachment J06 IHS IEE Representation Form.pdf PDF
B01 RFP Attachment J01 Drawings (1).pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BID SCHEDULE
ASHRAE 170 UPGRADES AND ROOF REPLACEMENT
KYLE HEALTH CENTER
CLIN 0001 BID ITEMQUANTITYUNITUNIT PRICETOTAL PRICE
DESIGN OF ROOFING SYSTEM1JOB
DESIGN OF MISC HVAC UPGRADES1JOB
DEMOLITION OF ALL ROOF SYSTEMS1JOB
ROOF REPLACEMENT - VAPOR BARRIER, INSULATION, IMPACT BOARD, PVC MEMBRANE, PARAPET FLASHING, VENTS, ROOF DRAINS, AND ASSOCIATED COMPONENTS20,000SF
LIGHTNING PROTECTION SYSTEM1JOB
DUCT CLEANING AND SEALING1JOB
DEMOLITION OF VAV BOXES, CONTROLS, AND PNEUMATIC PIPING40EA
INSTALLATION OF VAV BOXES, CONTROLS, AND DDC24EA
INSTALLATION OF FAN POWERED VAV BOXES, CONTROLS, AND DDC16EA
DEMOLITION OF AHU, CONTROLS, PIPING, AND ASSOCIATED COMPONENTS2JOB
INSTALLATION OF AHU, CONTROLS, PIPING, PIPE INSULATION, AND ASSOCIATED COMPONENTS2JOB
HUMIDIFICATION SYSTEM FOR AHUS1JOB
UV-C SYSTEM FOR AHUS1JOB
BIPOLAR IONIZATION SYSTEM FOR AHUS1JOB
LED LIGHTING UPGRADES - PENTHOUSE1JOB
EPOXY CONCRETE FLOORING - PENTHOUSE1JOB
PAINTING WALLS - PENTHOUSE1JOB
METASYS INTEGRATION FOR ALL NEW EQUIPMENT1JOB
PIPE INSULATION1JOB
GENERAL REQUIREMENTS1JOB
OVERHEAD AND PROFIT1JOB
TERO AND TAXES1JOB
BASE TOTAL
OPTIONS
CLIN 0002 SUSPENDED UNIT HEATER REPLACEMENT5EA
GENERAL REQUIREMENTS1JOB
OVERHEAD AND PROFIT1JOB
TERO AND TAXES1JOB
CLIN 0003 CABINET UNIT HEATER REPLACEMENT2EA
GENERAL REQUIREMENTS1JOB
OVERHEAD AND PROFIT1JOB
TERO AND TAXES1JOB
CLIN 0004 RADIANT FLOOR HEATERS5EA
GENERAL REQUIREMENTS1JOB
OVERHEAD AND PROFIT1JOB
TERO AND TAXES1JOB
CLIN 0005 BOILER REPLACEMENT2EA
GENERAL REQUIREMENTS1JOB
OVERHEAD AND PROFIT1JOB
TERO AND TAXES1JOB
CLIN 0006 CIRCULATING PUMP REPLACEMENT3EA
GENERAL REQUIREMENTS1JOB
OVERHEAD AND PROFIT1JOB
TERO AND TAXES1JOB
CLIN 0007 CHILLER REPLACEMENT1EA
GENERAL REQUIREMENTS1JOB
OVERHEAD AND PROFIT1JOB
TERO AND TAXES1JOB
CLIN 0008 PIPE INSULATION1JOB
GENERAL REQUIREMENTS1JOB
OVERHEAD AND PROFIT1JOB
TERO AND TAXES1JOB
CLIN 0009 MINISPLIT AND CONDENSING UNITS5EA
GENERAL REQUIREMENTS1JOB
OVERHEAD AND PROFIT1JOB
TERO AND TAXES1JOB
CLIN 0010 HIGH PLUME EXHAUST FAN1EA
GENERAL REQUIREMENTS1JOB
OVERHEAD AND PROFIT1JOB
TERO AND TAXES1JOB
CLIN 0011 VAPORIZER AND PIPING1JOB
GENERAL REQUIREMENTS1JOB
OVERHEAD AND PROFIT1JOB
TERO AND TAXES1JOB
OPTIONS TOTAL

BASE + OPTIONS TOTAL