This is a bid schedule for the Kyle Health Center ASHRAE 170 Upgrades and Roof Replacement construction project. The base contract (CLIN 0001) encompasses roofing system design and replacement of approximately 20,000 square feet of membrane roofing including vapor barrier, insulation, impact board, PVC membrane, parapet flashing, vents, and roof drains. HVAC upgrades include design of miscellaneous HVAC systems, duct cleaning and sealing, demolition and installation of 40 VAV boxes with controls and DDC components, installation of 24 standard and 16 fan-powered VAV boxes, replacement of two air handling units with controls, piping, pipe insulation, humidification systems, UV-C systems, and bipolar ionization systems. Additional base scope includes lightning protection system installation, Metasys integration for all new equipment, pipe insulation, penthouse improvements (LED lighting upgrades, epoxy concrete flooring, and wall painting), general requirements, overhead and profit, and TERO and taxes.
The schedule includes nine optional CLINs (0002–0011) with separate pricing for suspended unit heater replacement (5 units), cabinet unit heater replacement (2 units), radiant floor heaters (5 units), boiler replacement (2 units), circulating pump replacement (3 units), chiller replacement (1 unit), additional pipe insulation, minisplit and condensing units (5 units), high plume exhaust fan (1 unit), and vaporizer and piping. Each optional CLIN includes separate line items for the specific equipment, general requirements, overhead and profit, and TERO and taxes. Bidders are required to provide unit prices and total prices for all line items. The solicitation is under FAR Part 36 for the Indian Health Service within the Department of Health and Human Services, with amendments B05 A00001 through A00009 issued and a post-closing amendment revising the bid schedule with a resubmission deadline of 30 January 2026.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BID SCHEDULE | ||||
| ASHRAE 170 UPGRADES AND ROOF REPLACEMENT | ||||
| KYLE HEALTH CENTER | ||||
| CLIN 0001 BID ITEM | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| DESIGN OF ROOFING SYSTEM | 1 | JOB | ||
| DESIGN OF MISC HVAC UPGRADES | 1 | JOB | ||
| DEMOLITION OF ALL ROOF SYSTEMS | 1 | JOB | ||
| ROOF REPLACEMENT - VAPOR BARRIER, INSULATION, IMPACT BOARD, PVC MEMBRANE, PARAPET FLASHING, VENTS, ROOF DRAINS, AND ASSOCIATED COMPONENTS | 20,000 | SF | ||
| LIGHTNING PROTECTION SYSTEM | 1 | JOB | ||
| DUCT CLEANING AND SEALING | 1 | JOB | ||
| DEMOLITION OF VAV BOXES, CONTROLS, AND PNEUMATIC PIPING | 40 | EA | ||
| INSTALLATION OF VAV BOXES, CONTROLS, AND DDC | 24 | EA | ||
| INSTALLATION OF FAN POWERED VAV BOXES, CONTROLS, AND DDC | 16 | EA | ||
| DEMOLITION OF AHU, CONTROLS, PIPING, AND ASSOCIATED COMPONENTS | 2 | JOB | ||
| INSTALLATION OF AHU, CONTROLS, PIPING, PIPE INSULATION, AND ASSOCIATED COMPONENTS | 2 | JOB | ||
| HUMIDIFICATION SYSTEM FOR AHUS | 1 | JOB | ||
| UV-C SYSTEM FOR AHUS | 1 | JOB | ||
| BIPOLAR IONIZATION SYSTEM FOR AHUS | 1 | JOB | ||
| LED LIGHTING UPGRADES - PENTHOUSE | 1 | JOB | ||
| EPOXY CONCRETE FLOORING - PENTHOUSE | 1 | JOB | ||
| PAINTING WALLS - PENTHOUSE | 1 | JOB | ||
| METASYS INTEGRATION FOR ALL NEW EQUIPMENT | 1 | JOB | ||
| PIPE INSULATION | 1 | JOB | ||
| GENERAL REQUIREMENTS | 1 | JOB | ||
| OVERHEAD AND PROFIT | 1 | JOB | ||
| TERO AND TAXES | 1 | JOB | ||
| BASE TOTAL |
| OPTIONS | ||
| CLIN 0002 SUSPENDED UNIT HEATER REPLACEMENT | 5 | EA |
| GENERAL REQUIREMENTS | 1 | JOB |
| OVERHEAD AND PROFIT | 1 | JOB |
| TERO AND TAXES | 1 | JOB |
| CLIN 0003 CABINET UNIT HEATER REPLACEMENT | 2 | EA |
| GENERAL REQUIREMENTS | 1 | JOB |
| OVERHEAD AND PROFIT | 1 | JOB |
| TERO AND TAXES | 1 | JOB |
| CLIN 0004 RADIANT FLOOR HEATERS | 5 | EA |
| GENERAL REQUIREMENTS | 1 | JOB |
| OVERHEAD AND PROFIT | 1 | JOB |
| TERO AND TAXES | 1 | JOB |
| CLIN 0005 BOILER REPLACEMENT | 2 | EA |
| GENERAL REQUIREMENTS | 1 | JOB |
| OVERHEAD AND PROFIT | 1 | JOB |
| TERO AND TAXES | 1 | JOB |
| CLIN 0006 CIRCULATING PUMP REPLACEMENT | 3 | EA |
| GENERAL REQUIREMENTS | 1 | JOB |
| OVERHEAD AND PROFIT | 1 | JOB |
| TERO AND TAXES | 1 | JOB |
| CLIN 0007 CHILLER REPLACEMENT | 1 | EA |
| GENERAL REQUIREMENTS | 1 | JOB |
| OVERHEAD AND PROFIT | 1 | JOB |
| TERO AND TAXES | 1 | JOB |
| CLIN 0008 PIPE INSULATION | 1 | JOB |
| GENERAL REQUIREMENTS | 1 | JOB |
| OVERHEAD AND PROFIT | 1 | JOB |
| TERO AND TAXES | 1 | JOB |
| CLIN 0009 MINISPLIT AND CONDENSING UNITS | 5 | EA |
| GENERAL REQUIREMENTS | 1 | JOB |
| OVERHEAD AND PROFIT | 1 | JOB |
| TERO AND TAXES | 1 | JOB |
| CLIN 0010 HIGH PLUME EXHAUST FAN | 1 | EA |
| GENERAL REQUIREMENTS | 1 | JOB |
| OVERHEAD AND PROFIT | 1 | JOB |
| TERO AND TAXES | 1 | JOB |
| CLIN 0011 VAPORIZER AND PIPING | 1 | JOB | |
| GENERAL REQUIREMENTS | 1 | JOB | |
| OVERHEAD AND PROFIT | 1 | JOB | |
| TERO AND TAXES | 1 | JOB | |
| OPTIONS TOTAL |
BASE + OPTIONS TOTAL
File details come from the government source that posted it. Updated .