Attachment L - (HSMST Pre-Operational Checklist 20200825).pdf

PDF 98 KB Posted

Attached to
Operation, Maintenance, and Repair Services of Multi Purpose Craft (MPC), HSMST, SDST, and SST for PMRF, Guam
Solicitation number
N4019220R4010
Issued by

View the file

Other files

File Type Posted
Amendment 0008_08Jan2021.pdf PDF
Amendment 0007_24Dec2020.pdf PDF
Amendment 0006_11Dec2020.pdf PDF
Amendment 0005_25Nov2020.pdf PDF
Amendment 0004_19Nov2020.pdf PDF
N4019220R4010_RFI Responses_19NOV2020.pdf PDF
ELINs_Attachment X - Blank - 19Nov2020.xlsx XLSX spreadsheet
Exhibit M (MPC-1 OM PWS HSMST Post-Operational Checklist 20200825).pdf PDF
Amendment 0003_10Nov2020.pdf PDF
Amendment 0002_Site Images_23Oct2020.pdf PDF
Attachment F - (MPC1 Preventive Maintenance Plan 20200825).xls XLS spreadsheet
Attachment U - (MPC-1 OM EW Equipment Maintenance 20200825).pdf PDF
Amendment 01_16Oct2020.pdf PDF
Attachment C - (MPC-1 OM PWS Maps and Charts 20200825).pdf PDF
Attachment W - WD 15-5693 Rev.-11.pdf PDF
Attachment J - NAVFAC Project Data Sheet.pdf PDF
Attachment A - PWS 24Sep2020.pdf PDF
Attachment E - (MPC-1 OM Publications and Directives 20200825).pdf PDF
Attachment M - (MPC-1 OM HSMST Post-Operational Checklist 20200825).pdf PDF
Attachment B - NAVFAC PPQ.pdf PDF
Attachment D - (MPC-1 OM PWS Government Furnished Equipment 20200826).pdf PDF
Attachment T - (MPC OM MPC-1 IDIQ Log 20200825).pdf PDF
Attachment G - (MPC-1 OM HSMST Maintenance Checklist 20200825).pdf PDF
Attachment N - Maritime Deck Log.pdf PDF
Attachment I - (MPC-1 OM MPC Post Operational Check List Checklist 20200825).pdf PDF
Attachment L - (MPC-1 OM HSMST Pre-Operational Checklist 20200825).pdf PDF
Attachment S - (MPC-1 OM MPC- Discrepancy Log 20200825).pdf PDF
Attachment Q - (MPC-1 OM MPC Weight Handling Equipment 20200825).pdf PDF
Solicitation_N4019220R4010_16Oct2020.pdf PDF
Attachment V - Base Access Request Form.pdf PDF
Attachment P - (MPC-1 OM Customer Satisfaction Survey 20200825).pdf PDF
Attachment H - (MPC-1 OM MPC Pre-Operational Checklist 20200825).pdf PDF
Attachment R - (MPC-1 OM RSC Critical Spares 20200825).pdf PDF
Attachment K - (MPC-1 OM Movement Report 20200825).pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment L HSMST Pre-Operational Checklist

PACIFIC MISSILE RANGE FACILITY

DETACHMENT FAR EAST GUAM

OPERATION AND MAINTENANCE OF MULTI-PURPOSE

CRAFT, HIGH-SPEED MANEUVERABLE SURFACE

TARGETS, SHIP-DEPLOYABLE SURFACE TARGETS AND

SURFACE TOWED TARGETS

HSMST PRE-OPERATIONAL CHECKLIST

25 AUGUST 2020

OP NO HULL NO DATE

The Boat Master assures that the following checks are completed prior to any operation. The Boat Master shall retain a copy of the checklist and any noted discrepancies. The original shall be turned in to QAP.

1. Ensure boat drain plug is installed.

2. Strip fuel tank.

3. Fill fuel tank. Gallons

4. Drain water from fuel I water separator.

5. Check seawater strainer and open seacock.

6. Ensure the fuel supply and return valves are OPEN.

7. Check all lights, bilge pump (electric and manual) and horn.

8. Check engine oil and fresh water cooling system for proper levels.

9. Check condition of all belts.

10. Check outdrive oil for proper level and propeller for damage.

11. Check hydraulic fluid level in proper trim unit.

12. Check hydraulic fluid level in Reservoir (Steering) and that the Resservoir is properly charged to 30 PSI

13. Check fire extinguishers aboard in proper position, and up-to date.

14. Check all safety equipment intact & in good condition.

15. Check proper number of life jackets on board, one per person.

16. Check inflatable collar for proper inflation (3 PSI).

17. Remote radio control certification I receiver sensitivity check.

18. Beacon check. Code: Eats Add:

19. Engine Hours:

(NA Not applicable items)

Boat Master: COR:

PRE-OPERATIONAL DISCREPANCY SHEET

Target Type: _____

Hull No:

Page: of

OP NO:

Pre Op: _ Target Time: Fuel: gals

DISCREPANCY NUMBER REMARKS NAME

Engine Hours: PRE OP: #1 #2 #4 #5

Generator Hours: PRE OP: Port ______________ Stbd ______________

Form to filled out and submitted with Pre-Operational Checklist

Boat Master:

COR:

File details come from the government source that posted it. Updated .