Attachment H MPC-1 Pre-Operational Checklist
PACIFIC MISSILE RANGE FACILITY
DETACHMENT FAR EAST GUAM
FOR
OPERATION AND MAINTENANCE OF MULTI PURPOSE
CRAFT, HIGH-SPEED MANEUVERABLE SURFACE TARGETS,
SHIP-DEPLOYABLE SURFACE TARGETS AND SURFACE
TOWED TARGETS
MPC-1 PRE-OPERATIONAL CHECKLIST
25AUG 2020
MPC-1
PRE-OPERATIONAL CHECK LIST
OP NO: HULL NO: DATE:
The Boat Master assures that the following checks are completed prior to any operation. The Boat Master shall retain a copy of the checklist and any noted discrepancies. The original shall be turned in to COR.
1. Check all fluid levels.
2. Check condition of all strainers mains and generators.
3. Check fuel tanks for proper levels.
Port Center Stbd
4. Check hom, wipers, and all navigation lights for proper operation.
5. Check main engine and generator battery fluid levels.
6. Verify number of life preservers on board, one per person.
7. Check fire suppression systems. _____________
8. Check fire extinguishers onboard in proper position, seals intact, up-to-date. __
8. Check all safety equipment is intact and in good working order.
9. Check communications on all navigation channels.
I 0. Check all onboard e lect ronic equipment for proper operation.
11. Engine Hours: #1 #2 #3 #4
12. Generator Hours: Port Stbd
Boat Master: COR:
MPC-1
MAINTENANCE DISCREPANCY SHEET
OP NO Page of
Hull Number: Fuel: gals
DISCREPANCY NUMBER REMARKS NAME
Engine Hours: PRE OP: #1 #2 #4 #5
Generator Hours: PRE OP: Port Stbd
Form to filled out and submitted with Pre-Operational Checklist
Boat Master: COR: