Attachment I MPC Post-Operational Checklist
PACIFIC MISSILE RANGE FACILITY
DETACHMENT FAR EAST GUAM
FOR
OPERATION AND MAINTENANCE OF MULTI-PURPOSE
CRAFT, HIGH-SPEED MANEUVERABLE SURFACE TARGETS,
SHIP-DEPLOYABLE SURFACE TARGETS AND SURFACE
TOWED TARGETS
MPC POST-OPERATIONAL CHECKLIST
25 AUGUST 2020
MPC
POST-OPERATIONAL CHECK LIST
OP NO HULL NO DATE
The Boat Master assures that all checks are completed after each operation. The Boat Master Shall retain a copy of the checklist and any noted discrepancies. The original shall be turned in to
COR.
1. Check for any visible signs of damage to craft and target.
2. Check engine for fuel, oil and water leaks, including lines and expansion tanks.
3. Check transmission for oil leaks, including lines & cooler.
4. Check fuel tanks and lines for leaks.
5. Check fuel tanks for proper levels.
Port gals Center gals Stbd gals
6. Check generators for fuel, oil and water leaks, including lines and expansion tanks.
7. Check bilge pumps for proper operation.
8. Check horn, wipers and all navigation lights for proper operation.
9. Check fire suppression systems and fire extinguishers in proper position, seals intact.
10. Check 12 VDC battery switches in the off position.
11. Total fuel used this operation. Gallons:
12. Engine Hours: #1 #2 #3 #4
13. Generator Hours: Port Stbd
Boat Master: COR:
MPC
POST-OPERATIONAL DISCREPANCY SHEET
OP NO
Hull Number:
Page: of
Fuel: gals
DISCREPANCY NUMBER REMARKS NAME
Engine Hours: PRE OP: #1 #2 #4 #5
Generator Hours: PRE OP: Port Stbd
Form to filled out and submitted with Post-Operational Checklist
Boat Master:
COR: