This is a price proposal template spreadsheet (Attachment J-7) for construction work related to an Anchorage Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) facility project. The template is divided into sections covering General Requirements, Site Work and Infrastructure, ATCT construction, TRACON/Base Building construction, and Fiber Optic Transmission System (FOTS), with detailed division breakdowns for each section including concrete, metals, finishes, HVAC, electrical, and other construction elements.
The template includes separate tabs for the prime contractor and three subcontractors to input material costs, labor costs, and overhead & profit rates. The only pre-filled amounts are allowances for Slat Wall Consoles: $438,000 for ATCT Cab Level, $390,000 for TRACON, and $180,000 for AT Coach, totaling $1,008,000. All other fields are blank for bidders to complete. The file serves as a standardized format for contractors to submit detailed construction cost estimates for this FAA facility project.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| Material | Labor | Overhead & Profit Rate | Overhead & Profit | Total Material and Labor | ||||
| A. | GENERAL REQUIREMENTS | |||||||
| DIVISION 01 | - | GENERAL REQUIREMENTS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - GENERAL REQUIREMENTS $ - 0 $ - 0 $ - 0
| B. | SITE WORK AND INFRASTRUCTURE | |||||||
| DIVISION 31 | - | EARTHWORK | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 32 | - | EXTERIOR IMPROVEMENTS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 33 | - | UTILITIES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - SITE WORK AND INFRASTRUCUTRE $ - 0 $ - 0 $ - 0
| C. | AIRPORT TRAFFIC CONTROL TOWER (ATCT) | |||||||
| DIVISION 03 | - | CONCRETE | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 05 | - | METALS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 07 | - | THERMAL AND MOISTURE PROTECTION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 08 | - | OPENINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 09 | - | FINISHES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 10 | - | SPECIALTIES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 11 | - | EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 12 | - | FURNISHINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 14 | - | CONVEYING EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 21 | - | FIRE SUPPRESSION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 22 | - | PLUMBING | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 23 | - | HVAC | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 25 | - | INTEGRATED AUTOMATION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 26 | - | ELECTRICAL | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 27 | - | COMMUNICATIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 28 | - | ELECTRONIC SAFETY AND SECURITY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - AIRPORT TRAFFIC CONTROL TOWER (ATCT) $ - 0 $ - 0 $ - 0
| D. | TRACON/BASE BUILDING | |||||||
| DIVISION 03 | - | CONCRETE | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 04 | - | MASONRY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 05 | - | METALS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 07 | - | THERMAL AND MOISTURE PROTECTION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 08 | - | OPENINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 09 | - | FINISHES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 10 | - | SPECIALTIES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 11 | - | EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 12 | - | FURNISHINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 14 | - | CONVEYING EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 21 | - | FIRE SUPPRESSION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 22 | - | PLUMBING | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 23 | - | HVAC | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 25 | - | INTEGRATED AUTOMATION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 26 | - | ELECTRICAL | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 27 | - | COMMUNICATIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 28 | - | ELECTRONIC SAFETY AND SECURITY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - TRACON/BASE BUILDING $ - 0 $ - 0 $ - 0
| E. | FIBER OPTIC TRANSMISSION SYSTEM (FOTS) | |||||||
| DIVISION 01 | - | GENERAL REQUIREMENTS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 02 | - | EXISTING CONDITIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 03 | - | CONCRETE | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 27 | - | COMMUNICATIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 28 | - | ELECTRONIC SAFETY AND SECURITY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 31 | - | EARTHWORK | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - FIBER OPTIC TRANSMISSION SYSTEM (FOTS) $ - 0 $ - 0 $ - 0
| F. | ALLOWANCES | - | SLAT WALL CONSOLES |
| ATCT Cab Level | - | $ 438,000.00 | |
| TRACON | - | $ 390,000.00 | |
| AT Coach | - | $ 180,000.00 |
SUBTOTAL - ALLOWANCES - SLATT WALL CONSOLES $ 1,008,000.00
G. TOTAL ESTIMATED CONSTRUCTION COST (INCLUDING FOTS) $ - 0
Prime
| Material | Labor | Overhead & Profit Rate | Overhead & Profit | Total Material and Labor | ||||
| A. | GENERAL REQUIREMENTS | |||||||
| DIVISION 01 | - | GENERAL REQUIREMENTS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - GENERAL REQUIREMENTS $ - 0 $ - 0 $ - 0
| B. | SITE WORK AND INFRASTRUCTURE | |||||||
| DIVISION 31 | - | EARTHWORK | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 32 | - | EXTERIOR IMPROVEMENTS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 33 | - | UTILITIES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - SITE WORK AND INFRASTRUCUTRE $ - 0 $ - 0 $ - 0
| C. | AIRPORT TRAFFIC CONTROL TOWER (ATCT) | |||||||
| DIVISION 03 | - | CONCRETE | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 05 | - | METALS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 07 | - | THERMAL AND MOISTURE PROTECTION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 08 | - | OPENINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 09 | - | FINISHES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 10 | - | SPECIALTIES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 11 | - | EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 12 | - | FURNISHINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 14 | - | CONVEYING EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 21 | - | FIRE SUPPRESSION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 22 | - | PLUMBING | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 23 | - | HVAC | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 25 | - | INTEGRATED AUTOMATION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 26 | - | ELECTRICAL | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 27 | - | COMMUNICATIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 28 | - | ELECTRONIC SAFETY AND SECURITY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - AIRPORT TRAFFIC CONTROL TOWER (ATCT) $ - 0 $ - 0 $ - 0
| D. | TRACON/BASE BUILDING | |||||||
| DIVISION 03 | - | CONCRETE | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 04 | - | MASONRY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 05 | - | METALS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 07 | - | THERMAL AND MOISTURE PROTECTION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 08 | - | OPENINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 09 | - | FINISHES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 10 | - | SPECIALTIES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 11 | - | EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 12 | - | FURNISHINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 14 | - | CONVEYING EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 21 | - | FIRE SUPPRESSION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 22 | - | PLUMBING | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 23 | - | HVAC | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 25 | - | INTEGRATED AUTOMATION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 26 | - | ELECTRICAL | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 27 | - | COMMUNICATIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 28 | - | ELECTRONIC SAFETY AND SECURITY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - TRACON/BASE BUILDING $ - 0 $ - 0 $ - 0
| E. | FIBER OPTIC TRANSMISSION SYSTEM (FOTS) | |||||||
| DIVISION 01 | - | GENERAL REQUIREMENTS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 02 | - | EXISTING CONDITIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 03 | - | CONCRETE | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 27 | - | COMMUNICATIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 28 | - | ELECTRONIC SAFETY AND SECURITY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 31 | - | EARTHWORK | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - FIBER OPTIC TRANSMISSION SYSTEM (FOTS) $ - 0 $ - 0 $ - 0
| F. | ALLOWANCES | - | SLAT WALL CONSOLES |
| ATCT Cab Level | - | $ 438,000.00 | |
| TRACON | - | $ 390,000.00 | |
| AT Coach | - | $ 180,000.00 |
SUBTOTAL - ALLOWANCES - SLATT WALL CONSOLES $ 1,008,000.00
G. TOTAL ESTIMATED CONSTRUCTION COST (INCLUDING FOTS) $ - 0
Subcontractor 1
| Material | Labor | Overhead & Profit Rate | Overhead & Profit | Total Material and Labor | ||||
| A. | GENERAL REQUIREMENTS | |||||||
| DIVISION 01 | - | GENERAL REQUIREMENTS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - GENERAL REQUIREMENTS $ - 0 $ - 0 $ - 0
| B. | SITE WORK AND INFRASTRUCTURE | |||||||
| DIVISION 31 | - | EARTHWORK | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 32 | - | EXTERIOR IMPROVEMENTS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 33 | - | UTILITIES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - SITE WORK AND INFRASTRUCUTRE $ - 0 $ - 0 $ - 0
| C. | AIRPORT TRAFFIC CONTROL TOWER (ATCT) | |||||||
| DIVISION 03 | - | CONCRETE | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 05 | - | METALS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 07 | - | THERMAL AND MOISTURE PROTECTION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 08 | - | OPENINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 09 | - | FINISHES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 10 | - | SPECIALTIES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 11 | - | EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 12 | - | FURNISHINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 14 | - | CONVEYING EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 21 | - | FIRE SUPPRESSION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 22 | - | PLUMBING | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 23 | - | HVAC | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 25 | - | INTEGRATED AUTOMATION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 26 | - | ELECTRICAL | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 27 | - | COMMUNICATIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 28 | - | ELECTRONIC SAFETY AND SECURITY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - AIRPORT TRAFFIC CONTROL TOWER (ATCT) $ - 0 $ - 0 $ - 0
| D. | TRACON/BASE BUILDING | |||||||
| DIVISION 03 | - | CONCRETE | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 04 | - | MASONRY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 05 | - | METALS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 07 | - | THERMAL AND MOISTURE PROTECTION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 08 | - | OPENINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 09 | - | FINISHES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 10 | - | SPECIALTIES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 11 | - | EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 12 | - | FURNISHINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 14 | - | CONVEYING EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 21 | - | FIRE SUPPRESSION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 22 | - | PLUMBING | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 23 | - | HVAC | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 25 | - | INTEGRATED AUTOMATION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 26 | - | ELECTRICAL | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 27 | - | COMMUNICATIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 28 | - | ELECTRONIC SAFETY AND SECURITY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - TRACON/BASE BUILDING $ - 0 $ - 0 $ - 0
| E. | FIBER OPTIC TRANSMISSION SYSTEM (FOTS) | |||||||
| DIVISION 01 | - | GENERAL REQUIREMENTS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 02 | - | EXISTING CONDITIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 03 | - | CONCRETE | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 27 | - | COMMUNICATIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 28 | - | ELECTRONIC SAFETY AND SECURITY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 31 | - | EARTHWORK | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - FIBER OPTIC TRANSMISSION SYSTEM (FOTS) $ - 0 $ - 0 $ - 0
| F. | ALLOWANCES | - | SLAT WALL CONSOLES |
| ATCT Cab Level | - | $ 438,000.00 | |
| TRACON | - | $ 390,000.00 | |
| AT Coach | - | $ 180,000.00 |
SUBTOTAL - ALLOWANCES - SLATT WALL CONSOLES $ 1,008,000.00
G. TOTAL ESTIMATED CONSTRUCTION COST (INCLUDING FOTS) $ - 0
Subcontractor 2
| Material | Labor | Overhead & Profit Rate | Overhead & Profit | Total Material and Labor | ||||
| A. | GENERAL REQUIREMENTS | |||||||
| DIVISION 01 | - | GENERAL REQUIREMENTS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - GENERAL REQUIREMENTS $ - 0 $ - 0 $ - 0
| B. | SITE WORK AND INFRASTRUCTURE | |||||||
| DIVISION 31 | - | EARTHWORK | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 32 | - | EXTERIOR IMPROVEMENTS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 33 | - | UTILITIES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - SITE WORK AND INFRASTRUCUTRE $ - 0 $ - 0 $ - 0
| C. | AIRPORT TRAFFIC CONTROL TOWER (ATCT) | |||||||
| DIVISION 03 | - | CONCRETE | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 05 | - | METALS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 07 | - | THERMAL AND MOISTURE PROTECTION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 08 | - | OPENINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 09 | - | FINISHES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 10 | - | SPECIALTIES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 11 | - | EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 12 | - | FURNISHINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 14 | - | CONVEYING EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 21 | - | FIRE SUPPRESSION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 22 | - | PLUMBING | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 23 | - | HVAC | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 25 | - | INTEGRATED AUTOMATION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 26 | - | ELECTRICAL | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 27 | - | COMMUNICATIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 28 | - | ELECTRONIC SAFETY AND SECURITY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - AIRPORT TRAFFIC CONTROL TOWER (ATCT) $ - 0 $ - 0 $ - 0
| D. | TRACON/BASE BUILDING | |||||||
| DIVISION 03 | - | CONCRETE | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 04 | - | MASONRY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 05 | - | METALS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 07 | - | THERMAL AND MOISTURE PROTECTION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 08 | - | OPENINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 09 | - | FINISHES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 10 | - | SPECIALTIES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 11 | - | EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 12 | - | FURNISHINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 14 | - | CONVEYING EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 21 | - | FIRE SUPPRESSION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 22 | - | PLUMBING | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 23 | - | HVAC | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 25 | - | INTEGRATED AUTOMATION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 26 | - | ELECTRICAL | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 27 | - | COMMUNICATIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 28 | - | ELECTRONIC SAFETY AND SECURITY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - TRACON/BASE BUILDING $ - 0 $ - 0 $ - 0
| E. | FIBER OPTIC TRANSMISSION SYSTEM (FOTS) | |||||||
| DIVISION 01 | - | GENERAL REQUIREMENTS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 02 | - | EXISTING CONDITIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 03 | - | CONCRETE | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 27 | - | COMMUNICATIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 28 | - | ELECTRONIC SAFETY AND SECURITY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 31 | - | EARTHWORK | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - FIBER OPTIC TRANSMISSION SYSTEM (FOTS) $ - 0 $ - 0 $ - 0
| F. | ALLOWANCES | - | SLAT WALL CONSOLES |
| ATCT Cab Level | - | $ 438,000.00 | |
| TRACON | - | $ 390,000.00 | |
| AT Coach | - | $ 180,000.00 |
SUBTOTAL - ALLOWANCES - SLATT WALL CONSOLES $ 1,008,000.00
G. TOTAL ESTIMATED CONSTRUCTION COST (INCLUDING FOTS) $ - 0
Subcontractor 3
| Material | Labor | Overhead & Profit Rate | Overhead & Profit | Total Material and Labor | ||||
| A. | GENERAL REQUIREMENTS | |||||||
| DIVISION 01 | - | GENERAL REQUIREMENTS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - GENERAL REQUIREMENTS $ - 0 $ - 0 $ - 0
| B. | SITE WORK AND INFRASTRUCTURE | |||||||
| DIVISION 31 | - | EARTHWORK | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 32 | - | EXTERIOR IMPROVEMENTS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 33 | - | UTILITIES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - SITE WORK AND INFRASTRUCUTRE $ - 0 $ - 0 $ - 0
| C. | AIRPORT TRAFFIC CONTROL TOWER (ATCT) | |||||||
| DIVISION 03 | - | CONCRETE | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 05 | - | METALS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 07 | - | THERMAL AND MOISTURE PROTECTION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 08 | - | OPENINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 09 | - | FINISHES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 10 | - | SPECIALTIES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 11 | - | EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 12 | - | FURNISHINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 14 | - | CONVEYING EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 21 | - | FIRE SUPPRESSION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 22 | - | PLUMBING | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 23 | - | HVAC | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 25 | - | INTEGRATED AUTOMATION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 26 | - | ELECTRICAL | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 27 | - | COMMUNICATIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 28 | - | ELECTRONIC SAFETY AND SECURITY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - AIRPORT TRAFFIC CONTROL TOWER (ATCT) $ - 0 $ - 0 $ - 0
| D. | TRACON/BASE BUILDING | |||||||
| DIVISION 03 | - | CONCRETE | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 04 | - | MASONRY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 05 | - | METALS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 07 | - | THERMAL AND MOISTURE PROTECTION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 08 | - | OPENINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 09 | - | FINISHES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 10 | - | SPECIALTIES | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 11 | - | EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 12 | - | FURNISHINGS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 14 | - | CONVEYING EQUIPMENT | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 21 | - | FIRE SUPPRESSION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 22 | - | PLUMBING | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 23 | - | HVAC | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 25 | - | INTEGRATED AUTOMATION | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 26 | - | ELECTRICAL | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 27 | - | COMMUNICATIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 28 | - | ELECTRONIC SAFETY AND SECURITY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - TRACON/BASE BUILDING $ - 0 $ - 0 $ - 0
| E. | FIBER OPTIC TRANSMISSION SYSTEM (FOTS) | |||||||
| DIVISION 01 | - | GENERAL REQUIREMENTS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 02 | - | EXISTING CONDITIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 03 | - | CONCRETE | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 27 | - | COMMUNICATIONS | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 28 | - | ELECTRONIC SAFETY AND SECURITY | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | |
| DIVISION 31 | - | EARTHWORK | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 |
SUBTOTAL - FIBER OPTIC TRANSMISSION SYSTEM (FOTS) $ - 0 $ - 0 $ - 0
| F. | ALLOWANCES | - | SLAT WALL CONSOLES |
| ATCT Cab Level | - | $ 438,000.00 | |
| TRACON | - | $ 390,000.00 | |
| AT Coach | - | $ 180,000.00 |
SUBTOTAL - ALLOWANCES - SLATT WALL CONSOLES $ 1,008,000.00
G. TOTAL ESTIMATED CONSTRUCTION COST (INCLUDING FOTS) $ - 0