Attachment J-7 Price Proposal.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)
Solicitation number
697DCK-25-R-00074
Issued by

About this file

This is a price proposal template spreadsheet (Attachment J-7) for construction work related to an Anchorage Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) facility project. The template is divided into sections covering General Requirements, Site Work and Infrastructure, ATCT construction, TRACON/Base Building construction, and Fiber Optic Transmission System (FOTS), with detailed division breakdowns for each section including concrete, metals, finishes, HVAC, electrical, and other construction elements.

The template includes separate tabs for the prime contractor and three subcontractors to input material costs, labor costs, and overhead & profit rates. The only pre-filled amounts are allowances for Slat Wall Consoles: $438,000 for ATCT Cab Level, $390,000 for TRACON, and $180,000 for AT Coach, totaling $1,008,000. All other fields are blank for bidders to complete. The file serves as a standardized format for contractors to submit detailed construction cost estimates for this FAA facility project.

View the file

Other files

File Type Posted
QUESTIONS and RESPONES Jan 30 2025.pdf PDF
01 40 00_Contractor_Quality_Control_Rev 1_Amend 0003.pdf PDF
22 11 23.13_domestic-water_packaged_booster_pumps_Rev 1_Amend 0003.pdf PDF
697DCK-25-R-00074 Amend 0002.pdf PDF
01 31 00_Project_Management_and_Coordination_Rev 1_Amend 0003.pdf PDF
Zoom Meeting Attendence.pdf PDF
697DCK-25-R-00074 Amend 0003.pdf PDF
697DCK-25-R-00074 Amend 0002.pdf PDF
FINANICAL CAPABILITY FORM.pdf PDF
Zoom Meeting Attendence.pdf PDF
697DCK-25-R-00074 Amend 0001.pdf PDF
Attachment J-2d ANC ATCT TRACON Drawings Vol 5.pdf PDF
Attachment J-3a ANC ATCT and TRACON Final Specs Vol 2.pdf PDF
Attachment J-2b ANC ATCT TRACON Drawings Vol 3.pdf PDF
Attachment J-3c ANC ATCT TRACON Final Spec Vol 4.pdf PDF
Attachment J-6 Wage Determination.pdf PDF
Attachment J-4 ANC ATCT TRACON BOD Final.pdf PDF
Attachment J-1 ANC ATCT TRACON Statement of Work.pdf PDF
Attachment J-3b ANC ATCT TRACON Final Spec Vol 3.pdf PDF
697DCK-25-R-00074_Final.pdf PDF
Attachment J-2c ANC ATCT TRACON Drawings Vol 4.pdf PDF
Attachment J-2a ANC ATCT TRACON Drawings Vol 2.pdf PDF
PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
Attachment J-2 ANC ATCT TRACON Drawings Vol 1.pdf PDF
Attachment J-3 ANC ATCT TRACON Final Spec Vol 1.pdf PDF
Attachment J-2e ANC ATCT TRACON Drawings Vol 6.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

MaterialLaborOverhead & Profit RateOverhead & ProfitTotal Material and Labor
A.GENERAL REQUIREMENTS
DIVISION 01-GENERAL REQUIREMENTS$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - GENERAL REQUIREMENTS $ - 0 $ - 0 $ - 0

B.SITE WORK AND INFRASTRUCTURE
DIVISION 31-EARTHWORK$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 32-EXTERIOR IMPROVEMENTS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 33-UTILITIES$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - SITE WORK AND INFRASTRUCUTRE $ - 0 $ - 0 $ - 0

C.AIRPORT TRAFFIC CONTROL TOWER (ATCT)
DIVISION 03-CONCRETE$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 05-METALS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 07-THERMAL AND MOISTURE PROTECTION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 08-OPENINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 09-FINISHES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 10-SPECIALTIES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 11-EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 12-FURNISHINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 14-CONVEYING EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 21-FIRE SUPPRESSION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 22-PLUMBING$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 23-HVAC$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 25-INTEGRATED AUTOMATION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 26-ELECTRICAL$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 27-COMMUNICATIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - AIRPORT TRAFFIC CONTROL TOWER (ATCT) $ - 0 $ - 0 $ - 0

D.TRACON/BASE BUILDING
DIVISION 03-CONCRETE$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 04-MASONRY$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 05-METALS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 07-THERMAL AND MOISTURE PROTECTION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 08-OPENINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 09-FINISHES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 10-SPECIALTIES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 11-EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 12-FURNISHINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 14-CONVEYING EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 21-FIRE SUPPRESSION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 22-PLUMBING$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 23-HVAC$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 25-INTEGRATED AUTOMATION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 26-ELECTRICAL$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 27-COMMUNICATIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - TRACON/BASE BUILDING $ - 0 $ - 0 $ - 0

E.FIBER OPTIC TRANSMISSION SYSTEM (FOTS)
DIVISION 01-GENERAL REQUIREMENTS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 02-EXISTING CONDITIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 03-CONCRETE$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 27-COMMUNICATIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 31-EARTHWORK$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - FIBER OPTIC TRANSMISSION SYSTEM (FOTS) $ - 0 $ - 0 $ - 0

F.ALLOWANCES-SLAT WALL CONSOLES
ATCT Cab Level-$ 438,000.00
TRACON-$ 390,000.00
AT Coach-$ 180,000.00

SUBTOTAL - ALLOWANCES - SLATT WALL CONSOLES $ 1,008,000.00

G. TOTAL ESTIMATED CONSTRUCTION COST (INCLUDING FOTS) $ - 0

Prime

MaterialLaborOverhead & Profit RateOverhead & ProfitTotal Material and Labor
A.GENERAL REQUIREMENTS
DIVISION 01-GENERAL REQUIREMENTS$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - GENERAL REQUIREMENTS $ - 0 $ - 0 $ - 0

B.SITE WORK AND INFRASTRUCTURE
DIVISION 31-EARTHWORK$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 32-EXTERIOR IMPROVEMENTS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 33-UTILITIES$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - SITE WORK AND INFRASTRUCUTRE $ - 0 $ - 0 $ - 0

C.AIRPORT TRAFFIC CONTROL TOWER (ATCT)
DIVISION 03-CONCRETE$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 05-METALS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 07-THERMAL AND MOISTURE PROTECTION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 08-OPENINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 09-FINISHES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 10-SPECIALTIES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 11-EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 12-FURNISHINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 14-CONVEYING EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 21-FIRE SUPPRESSION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 22-PLUMBING$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 23-HVAC$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 25-INTEGRATED AUTOMATION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 26-ELECTRICAL$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 27-COMMUNICATIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - AIRPORT TRAFFIC CONTROL TOWER (ATCT) $ - 0 $ - 0 $ - 0

D.TRACON/BASE BUILDING
DIVISION 03-CONCRETE$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 04-MASONRY$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 05-METALS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 07-THERMAL AND MOISTURE PROTECTION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 08-OPENINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 09-FINISHES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 10-SPECIALTIES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 11-EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 12-FURNISHINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 14-CONVEYING EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 21-FIRE SUPPRESSION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 22-PLUMBING$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 23-HVAC$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 25-INTEGRATED AUTOMATION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 26-ELECTRICAL$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 27-COMMUNICATIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - TRACON/BASE BUILDING $ - 0 $ - 0 $ - 0

E.FIBER OPTIC TRANSMISSION SYSTEM (FOTS)
DIVISION 01-GENERAL REQUIREMENTS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 02-EXISTING CONDITIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 03-CONCRETE$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 27-COMMUNICATIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 31-EARTHWORK$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - FIBER OPTIC TRANSMISSION SYSTEM (FOTS) $ - 0 $ - 0 $ - 0

F.ALLOWANCES-SLAT WALL CONSOLES
ATCT Cab Level-$ 438,000.00
TRACON-$ 390,000.00
AT Coach-$ 180,000.00

SUBTOTAL - ALLOWANCES - SLATT WALL CONSOLES $ 1,008,000.00

G. TOTAL ESTIMATED CONSTRUCTION COST (INCLUDING FOTS) $ - 0

Subcontractor 1

MaterialLaborOverhead & Profit RateOverhead & ProfitTotal Material and Labor
A.GENERAL REQUIREMENTS
DIVISION 01-GENERAL REQUIREMENTS$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - GENERAL REQUIREMENTS $ - 0 $ - 0 $ - 0

B.SITE WORK AND INFRASTRUCTURE
DIVISION 31-EARTHWORK$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 32-EXTERIOR IMPROVEMENTS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 33-UTILITIES$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - SITE WORK AND INFRASTRUCUTRE $ - 0 $ - 0 $ - 0

C.AIRPORT TRAFFIC CONTROL TOWER (ATCT)
DIVISION 03-CONCRETE$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 05-METALS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 07-THERMAL AND MOISTURE PROTECTION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 08-OPENINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 09-FINISHES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 10-SPECIALTIES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 11-EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 12-FURNISHINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 14-CONVEYING EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 21-FIRE SUPPRESSION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 22-PLUMBING$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 23-HVAC$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 25-INTEGRATED AUTOMATION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 26-ELECTRICAL$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 27-COMMUNICATIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - AIRPORT TRAFFIC CONTROL TOWER (ATCT) $ - 0 $ - 0 $ - 0

D.TRACON/BASE BUILDING
DIVISION 03-CONCRETE$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 04-MASONRY$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 05-METALS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 07-THERMAL AND MOISTURE PROTECTION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 08-OPENINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 09-FINISHES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 10-SPECIALTIES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 11-EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 12-FURNISHINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 14-CONVEYING EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 21-FIRE SUPPRESSION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 22-PLUMBING$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 23-HVAC$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 25-INTEGRATED AUTOMATION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 26-ELECTRICAL$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 27-COMMUNICATIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - TRACON/BASE BUILDING $ - 0 $ - 0 $ - 0

E.FIBER OPTIC TRANSMISSION SYSTEM (FOTS)
DIVISION 01-GENERAL REQUIREMENTS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 02-EXISTING CONDITIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 03-CONCRETE$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 27-COMMUNICATIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 31-EARTHWORK$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - FIBER OPTIC TRANSMISSION SYSTEM (FOTS) $ - 0 $ - 0 $ - 0

F.ALLOWANCES-SLAT WALL CONSOLES
ATCT Cab Level-$ 438,000.00
TRACON-$ 390,000.00
AT Coach-$ 180,000.00

SUBTOTAL - ALLOWANCES - SLATT WALL CONSOLES $ 1,008,000.00

G. TOTAL ESTIMATED CONSTRUCTION COST (INCLUDING FOTS) $ - 0

Subcontractor 2

MaterialLaborOverhead & Profit RateOverhead & ProfitTotal Material and Labor
A.GENERAL REQUIREMENTS
DIVISION 01-GENERAL REQUIREMENTS$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - GENERAL REQUIREMENTS $ - 0 $ - 0 $ - 0

B.SITE WORK AND INFRASTRUCTURE
DIVISION 31-EARTHWORK$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 32-EXTERIOR IMPROVEMENTS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 33-UTILITIES$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - SITE WORK AND INFRASTRUCUTRE $ - 0 $ - 0 $ - 0

C.AIRPORT TRAFFIC CONTROL TOWER (ATCT)
DIVISION 03-CONCRETE$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 05-METALS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 07-THERMAL AND MOISTURE PROTECTION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 08-OPENINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 09-FINISHES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 10-SPECIALTIES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 11-EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 12-FURNISHINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 14-CONVEYING EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 21-FIRE SUPPRESSION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 22-PLUMBING$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 23-HVAC$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 25-INTEGRATED AUTOMATION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 26-ELECTRICAL$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 27-COMMUNICATIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - AIRPORT TRAFFIC CONTROL TOWER (ATCT) $ - 0 $ - 0 $ - 0

D.TRACON/BASE BUILDING
DIVISION 03-CONCRETE$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 04-MASONRY$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 05-METALS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 07-THERMAL AND MOISTURE PROTECTION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 08-OPENINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 09-FINISHES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 10-SPECIALTIES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 11-EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 12-FURNISHINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 14-CONVEYING EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 21-FIRE SUPPRESSION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 22-PLUMBING$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 23-HVAC$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 25-INTEGRATED AUTOMATION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 26-ELECTRICAL$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 27-COMMUNICATIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - TRACON/BASE BUILDING $ - 0 $ - 0 $ - 0

E.FIBER OPTIC TRANSMISSION SYSTEM (FOTS)
DIVISION 01-GENERAL REQUIREMENTS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 02-EXISTING CONDITIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 03-CONCRETE$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 27-COMMUNICATIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 31-EARTHWORK$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - FIBER OPTIC TRANSMISSION SYSTEM (FOTS) $ - 0 $ - 0 $ - 0

F.ALLOWANCES-SLAT WALL CONSOLES
ATCT Cab Level-$ 438,000.00
TRACON-$ 390,000.00
AT Coach-$ 180,000.00

SUBTOTAL - ALLOWANCES - SLATT WALL CONSOLES $ 1,008,000.00

G. TOTAL ESTIMATED CONSTRUCTION COST (INCLUDING FOTS) $ - 0

Subcontractor 3

MaterialLaborOverhead & Profit RateOverhead & ProfitTotal Material and Labor
A.GENERAL REQUIREMENTS
DIVISION 01-GENERAL REQUIREMENTS$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - GENERAL REQUIREMENTS $ - 0 $ - 0 $ - 0

B.SITE WORK AND INFRASTRUCTURE
DIVISION 31-EARTHWORK$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 32-EXTERIOR IMPROVEMENTS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 33-UTILITIES$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - SITE WORK AND INFRASTRUCUTRE $ - 0 $ - 0 $ - 0

C.AIRPORT TRAFFIC CONTROL TOWER (ATCT)
DIVISION 03-CONCRETE$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 05-METALS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 07-THERMAL AND MOISTURE PROTECTION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 08-OPENINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 09-FINISHES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 10-SPECIALTIES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 11-EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 12-FURNISHINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 14-CONVEYING EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 21-FIRE SUPPRESSION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 22-PLUMBING$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 23-HVAC$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 25-INTEGRATED AUTOMATION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 26-ELECTRICAL$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 27-COMMUNICATIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - AIRPORT TRAFFIC CONTROL TOWER (ATCT) $ - 0 $ - 0 $ - 0

D.TRACON/BASE BUILDING
DIVISION 03-CONCRETE$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 04-MASONRY$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 05-METALS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 07-THERMAL AND MOISTURE PROTECTION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 08-OPENINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 09-FINISHES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 10-SPECIALTIES$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 11-EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 12-FURNISHINGS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 14-CONVEYING EQUIPMENT$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 21-FIRE SUPPRESSION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 22-PLUMBING$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 23-HVAC$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 25-INTEGRATED AUTOMATION$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 26-ELECTRICAL$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 27-COMMUNICATIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - TRACON/BASE BUILDING $ - 0 $ - 0 $ - 0

E.FIBER OPTIC TRANSMISSION SYSTEM (FOTS)
DIVISION 01-GENERAL REQUIREMENTS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 02-EXISTING CONDITIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 03-CONCRETE$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 27-COMMUNICATIONS$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0$ - 00.00%$ - 0$ - 0
DIVISION 31-EARTHWORK$ - 0$ - 00.00%$ - 0$ - 0

SUBTOTAL - FIBER OPTIC TRANSMISSION SYSTEM (FOTS) $ - 0 $ - 0 $ - 0

F.ALLOWANCES-SLAT WALL CONSOLES
ATCT Cab Level-$ 438,000.00
TRACON-$ 390,000.00
AT Coach-$ 180,000.00

SUBTOTAL - ALLOWANCES - SLATT WALL CONSOLES $ 1,008,000.00

G. TOTAL ESTIMATED CONSTRUCTION COST (INCLUDING FOTS) $ - 0