This is Amendment 0001 to solicitation 697DCK-25-R-00074, issued by the Federal Aviation Administration's Regional Acquisitions office in College Park, GA. The amendment provides responses to two questions regarding Factor 1 (Past Performance) and Factor 2 (Corporate Experience) evaluation criteria.

The key changes revise the requirements to specify that a minimum of two projects (rather than all projects) must be for high-rise buildings as defined by IBC 2018. For both factors, offerors must provide 2-5 projects completed within the last 15 years that are similar in size, scope and complexity to the Statement of Work. Key project requirements include: at least one project with cold climate experience similar to Anchorage, LEED certification, and complex systems coordination; at least one project in a high seismic activity area (IBC 2018 category D or higher); and at least one project valued at $120 million or greater. The amendment clarifies that additional information may be added to CPARs submissions if they don't include all required criteria, and offerors may submit the same projects for both Factor 1 and Factor 2.

View the file

Other files

File Type Posted
QUESTIONS and RESPONES Jan 30 2025.pdf PDF
01 40 00_Contractor_Quality_Control_Rev 1_Amend 0003.pdf PDF
22 11 23.13_domestic-water_packaged_booster_pumps_Rev 1_Amend 0003.pdf PDF
697DCK-25-R-00074 Amend 0002.pdf PDF
01 31 00_Project_Management_and_Coordination_Rev 1_Amend 0003.pdf PDF
Zoom Meeting Attendence.pdf PDF
697DCK-25-R-00074 Amend 0003.pdf PDF
697DCK-25-R-00074 Amend 0002.pdf PDF
FINANICAL CAPABILITY FORM.pdf PDF
Zoom Meeting Attendence.pdf PDF
Attachment J-2d ANC ATCT TRACON Drawings Vol 5.pdf PDF
Attachment J-3a ANC ATCT and TRACON Final Specs Vol 2.pdf PDF
Attachment J-2b ANC ATCT TRACON Drawings Vol 3.pdf PDF
Attachment J-7 Price Proposal.xlsx XLSX spreadsheet
Attachment J-3c ANC ATCT TRACON Final Spec Vol 4.pdf PDF
Attachment J-6 Wage Determination.pdf PDF
Attachment J-4 ANC ATCT TRACON BOD Final.pdf PDF
Attachment J-1 ANC ATCT TRACON Statement of Work.pdf PDF
Attachment J-3b ANC ATCT TRACON Final Spec Vol 3.pdf PDF
697DCK-25-R-00074_Final.pdf PDF
Attachment J-2c ANC ATCT TRACON Drawings Vol 4.pdf PDF
Attachment J-2a ANC ATCT TRACON Drawings Vol 2.pdf PDF
PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
Attachment J-2 ANC ATCT TRACON Drawings Vol 1.pdf PDF
Attachment J-3 ANC ATCT TRACON Final Spec Vol 1.pdf PDF
Attachment J-2e ANC ATCT TRACON Drawings Vol 6.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 3

0001 12/04/2024

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

1701 COLUMBIA AVENUE

COLLEGE PARK GA 30337

AAQ510ATL-AFN

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ x x

697DCK-25-R-00074

copies to the issuing office.

12/04/2024

(x)

Amendment 0001 is issued to respond to questions

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Katherine Fogle

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

QUESTIONS & RESPONES

December 20, 2024

1. Question: Factor 1: Past Performance - Please remove the Item B Criteria 1-7 for this submission requirement. This appears to be a repeat from Factor 2 Corporate Experience, and is appropriate to the Factor 2 submission. When submitting a CPARs for this factor, the information listed in Criteria 1-7 may not necessarily be included. Additionally, the PPQ provided does not address all of these items.

Response: All of the information in Criteria 1-7 is required. Additional information may be added by the Offeror to the CPARs if not all of the information in Criteria 1-7 is included.

2. Question: Factor 1: Past Performance & Factor 2: Corporate Experience - Please revise the requirement to state that a minimum of two (2) of the projects must be for high-rise construction, rather than all projects. This will allow for a more robust portfolio of work (up to 5 projects) relevant to the Attachment J-1 Statement of Work.

Response: Factors 1 and 2 are revised accordingly. Revisions are in red text.

FACTOR 1 PAST PERFORMANCE

Offerors must provide a minimum of two (2) and up to five (5) Past Performance Questionnaires (PPQ) and/or Contractor Assessments Performance Reporting System (CPARs) as the prime that are similar in size, scope, and complexity as that in Attachment J-1 Statement of Work within the last fifteen (15) years from the date of this SIR.

Offerors must use the PPQ provided with the SIR.

A. Of the submitted PPQs or CPARs, the following must apply:

1. At least two (2) projects must be for high-rise buildings as defined by the IBC (2018).

2. At least one (1) PPQ must be for a project that includes the following: cold climate similar to Anchorage, Alaska; LEED certified High Performance or Sustainable Buildings;

performance-based seismic; coordination of complex electrical, mechanical, and control system installations and experience working on a compact site footprint and in congested locations.

3. At least one (1) PPQ must be for a project completed in areas of high seismic activity defined as IBC (2018) seismic design category D or higher.

4. At least one (1) PPQ must be for a project having a value of $120 million or greater.

FACTOR 2 CORPORATE EXPERIENCE

Offeror’s must provide a minimum of two (2) and up to five (5) projects as the prime contractor for projects similar in size, scope and complexity as that in Attachment J-1 Statement of Work within the last fifteen (15) years from the date of this SIR. Offerors may submit the same projects for Factors 1 and 2. Identify the type of construction work your company performs. Include any special qualifications of your company that would be a particular benefit to the FAA.

A. Of the projects submitted, the following must apply:

1. All least two (2) projects must be for high-rise buildings as defined by the IBC (2018).

2. At least one (1) project must: cold climate similar to Anchorage, Alaska; LEED certified High Performance or Sustainable Buildings; performance-based seismic;

coordination of complex electrical, mechanical, and control system installations and experience working on a compact site footprint and in congested locations.

3. At least one (1) project must be completed in areas of high seismic activity defined as IBC (2018) seismic design category D or higher.

4. At least project must have a value of $120 million or greater.