Attachment J-2a ANC ATCT TRACON Drawings Vol 2.pdf
PDF 104 MB Posted
- Solicitation number
- 697DCK-25-R-00074
About this file
This file appears to be a volume of technical drawings (Volume 2) for the Anchorage Airport Traffic Control Tower (ANC ATCT) and TRACON facility project at Ted Stevens International Airport. As an attachment (J-2a), it contains architectural and engineering drawings that support the construction requirements for the new facility. This file is referenced as part of a larger solicitation package (697DCK-25-R-00074) issued by the FAA Southwestern Region, but the actual drawings are not visible in the provided excerpt.
The related solicitation information indicates this is a two-phase procurement, with Phase I proposals due January 31, 2025 at 15:00 PT. A pre-proposal Zoom meeting is scheduled for January 10, 2025, with questions due by January 17, 2025. A site visit will be conducted for offerors down-selected to Phase II. The contracting officer is Katie Fogle, and interested vendors must have active SAM registration to be considered for award.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .