About this file

This is Amendment 0003 to solicitation 697DCK-25-R-00074, issued by the Federal Aviation Administration's Regional Acquisitions office in College Park, GA, to respond to questions and provide revised specification sections 01 31 00, 01 40 00, and 22 11 23.13.

The amendment addresses 16 technical questions related to piping diagrams, landscape specifications, Direct Digital Control (DDC) systems, and key personnel requirements. Key clarifications include: drawings for slat wall are not required until after award; requirements for Project Manager (10 years experience), Project Scheduler, BIM Specialist and QC Manager roles were aligned between RFP and specifications; chiller manufacturer will provide control of the entire chilled water plant; DDC system shall not be connected to the internet but will use a LAN server; and certain requirements around air handler unit controllers were removed. The amendment also notes that specification section 01 32 01 for scheduling will be revised and confirms the geotechnical report location in Attachment J-5-5b.

View the file

Other files

File Type Posted
QUESTIONS and RESPONES Jan 30 2025.pdf PDF
01 40 00_Contractor_Quality_Control_Rev 1_Amend 0003.pdf PDF
22 11 23.13_domestic-water_packaged_booster_pumps_Rev 1_Amend 0003.pdf PDF
697DCK-25-R-00074 Amend 0002.pdf PDF
01 31 00_Project_Management_and_Coordination_Rev 1_Amend 0003.pdf PDF
Zoom Meeting Attendence.pdf PDF
697DCK-25-R-00074 Amend 0002.pdf PDF
FINANICAL CAPABILITY FORM.pdf PDF
Zoom Meeting Attendence.pdf PDF
697DCK-25-R-00074 Amend 0001.pdf PDF
Attachment J-2d ANC ATCT TRACON Drawings Vol 5.pdf PDF
Attachment J-3a ANC ATCT and TRACON Final Specs Vol 2.pdf PDF
Attachment J-2b ANC ATCT TRACON Drawings Vol 3.pdf PDF
Attachment J-7 Price Proposal.xlsx XLSX spreadsheet
Attachment J-3c ANC ATCT TRACON Final Spec Vol 4.pdf PDF
Attachment J-6 Wage Determination.pdf PDF
Attachment J-4 ANC ATCT TRACON BOD Final.pdf PDF
Attachment J-1 ANC ATCT TRACON Statement of Work.pdf PDF
Attachment J-3b ANC ATCT TRACON Final Spec Vol 3.pdf PDF
697DCK-25-R-00074_Final.pdf PDF
Attachment J-2c ANC ATCT TRACON Drawings Vol 4.pdf PDF
Attachment J-2a ANC ATCT TRACON Drawings Vol 2.pdf PDF
PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
Attachment J-2 ANC ATCT TRACON Drawings Vol 1.pdf PDF
Attachment J-3 ANC ATCT TRACON Final Spec Vol 1.pdf PDF
Attachment J-2e ANC ATCT TRACON Drawings Vol 6.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 5

0003 12/04/2024

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

1701 COLUMBIA AVENUE

COLLEGE PARK GA 30337

AAQ510ATL-AFN

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ x x

697DCK-25-R-00074

copies to the issuing office.

12/04/2024

(x)

Amendment 0003 is issued to respond to questions and provide the following revised Spec

Sections: 01 31 00, 01 40 00, and 22 11 23.13.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Katherine Fogle

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

QUESTIONS & RESPONES

January 23, 2025

1. Question: Please clarify the limit of 70 pages for bid. Reasoning - If slatwall consoles are in scope, and if the FAA intends to see drawings from an approved slatwall vendor as part of the evaluation process, it is likely that any submission from a general contractor including slatwall console drawings will surpass the threshold of 70 pages.

Response: Drawings for the slat wall are not required until after award.

2. Question: General discrepancy between piping diagrams, details, and controls diagrams

a. Adiabatic cooler piping detail calls for a line size motorized isolation valve, while control diagrams show an Energy

Valve (EV). Which is correct?

b. AC Units piping detail calls for a line size motorized isolation valve, while control diagrams show an electronic pressure independent valve (ePIV). Which is correct?

c. HRC piping detail calls for line size isolation valve on load side, while controls diagram shows EVs on both sides. What is correct?

d. Similar to HRCs – HX piping diagram shows isolation valves on each side, whereas control diagrams do not. What is correct?

Response: a. Adiabatic Cooler has energy valve per ANC-D-ATCT-M907. Piping detail will be revised.

b. AC units have EPIVs per F8 / ANC-D-ATCT-M910. Piping detail will be revised.

c. HRC ha energy Valves on both sides per ANC-D-ATCT-M907.

d. HX have energy valve on one side and BTUH meter on the other side per ANC-D-ATCT-M907. HXs have manual isolation valves on both sides per E6 / ANC-D-ATCT-M803.

3. Question: Landscape specifications 32 93 00 page 11. 3.8 Section C subsection 3 states that mineral mulch should be 4 inches in thickness, however the L501 blueprints show 6 inches of thickness. Which is correct?

Response: The correct depth is 6 inches of mulch per Drawing ANC-D-ATCT-L501. Specification 32 93 00 3.8 subsection 3 will be revised with the correct depth.

4. Question: Landscape specifications 32 94 00 page 2. 2.1 Section A states that boulders should not be sharply fractured or shot-rock unless otherwise stated, however it also states that the boulders shall be angular. Will shot-rock be accepted?

Response: Shot-Rock is not acceptable. Angular rock references material with surface planes, with naturally eroded/worn corners and edges. The differentiation is that shot rock can produce sharp edges which could cause injury or damage, or similar from naturally occurring fractured rock with sharp corners/edges.

5. Question: I have a question regarding Specs - Section 22 11 23.13, Sub section J. The specs appear to be incomplete and do not show the required design criteria (see below image). – Can you please clarify.

Response: Refer to revised specification 22 11 23.13 for updated design criteria.

6. Question: Factor 3: Key Personnel & Team Organization

• Project Manager: There is an inconsistency in 01 31 00 as it notes the PM must have a minimum of “five (10) years” experience. The RFP calls out minimum of 10. Please confirm requirement.

• Project Scheduler: The RFP notes 5 years with projects 24 or more months. 01 31 00 notes 18 or more months.

Please clarify the requirement.

• BIM Specialist: The RFP notes experience with Autodesk Revisit 2022 and Navisworks 2022. 01 31 00 notes 2012 or equivalent. Please clarify the requirement.

• QC Manager: The QC Manager referenced in 01 31 00 matches RFP and must be employed by prime contractor.

However, this is not clear in 01 40 00 which references additional independent quality control (01 40 00-3.3). Please confirm that both a prime contractor and independent QC manager, along with specialists are required.

Additionally, if 3rd party specialists are required, clarify their onsite requirements.

Response: Offerors must meet the requirements of RFP Factor 3 for Key Personnel. Specification section 01 31 00 is revised to match the RFP requirements. Additionally, specification section 01 40 00 is revised to remove the requirement for a 3rd party QC systems manager and specialist. The QC manager and associated inspectors/specialists may be directly employed by the prime contractor. The prime contractor is still required to implement a QC plan in accordance with section 01 40 00.

7. Question: The specifications for the water-cooled, rotary-screw water chillers contain a lengthy portion that addresses chiller plant control (Section 23 64 26.16 - 2.2 Q thru W). Is the intent for the chiller manufacturer to provide control of the entire chilled water plant, including heat pump chillers HCR-1A and 1B, associated primary pumps B-CP-1A and 1B, dry coolers DC-1A and 1B, associated dry cooler pumps B-P-2A and 2B and the chiller and heat recovery energy valves to achieve the Chiller-Heating Plant sequence of operation listed on Mechanical Sheet ANC-D-ATCT-M908?

Response : Yes, the intent of Section 23 64 26.16 2.2 Q is for the chiller manufacturer to provide control of the entire chilled water plant, including heat pump chillers HCR-1A and 1B, associated primary pumps B-CP-1A and 1B, dry coolers DC-1A and 1B, associated dry cooler pumps B-P-2A and 2B and the chiller and heat recovery energy valves to achieve the Chiller- Heating Plant sequence of operation listed on Mechanical Sheet ANC-D-ATCT-M908.

8. Question: The specifications for the Direct Digital Control System state that the DDC System shall not be connected to the internet (Section 23 09 23 - 2.6 A 3). However, in other sections of the specifications it calls for connecting to a network with specific performance parameters including a rack-mounted “blade” server (2.11) and network installation (3.8, 3.9, 3.15). Please advise if the DDC Controls shall be connected to a network for remote accessibility, troubleshooting, reporting, and alarming.

Response : For security, DDC System shall not be connected to the internet per Section 23 09 23 - 2.6 A 3. Blade server used as a LAN server that houses the necessary Project specific graphics, trends, reports, logs, and historical database per 23 09 23 - 3.8.D.

9. Question: Please confirm that all secondary pumps and downstream chilled water system devices should be controlled by the building Direct Digital control System as described in Specification Section 23 03 23.

Response : Correct, all secondary pumps and chilled water pumps shall be controlled by the DDC system.

10. Question: Please confirm that the Heating Plant sequence of operation listed on Mechanical Sheet ANC-D-ATCT- M908 should be controlled by the building Direct Digital control System as described in Specification Section 23 03 23.

Please advise if the Chiller Plant controls should integrate to the building Direct Digital Control System referenced in Specification Section 23 03 23 for monitoring only?

Response : Correct, heating plant shall be controlled by the DDC system per Section 23 09 23. Chiller plant controls should integrate into the DDC system for monitoring per Section 23 09 23 and set points per ANC-D-ATCT-M908.

11. Question: The specifications for the Direct Digital Control System call out utility reports required for Electric, Natural Gas, and Service Water (Section 23 09 23 - 2.12 L). Please confirm this is a requirement for this project. If so, please advise if submeters for lighting and receptacles, gas meters, and water meters are included as part of this project required for this reporting. Also, please advise how this reporting is to be submitted, and to whom.

Response : This is a report requirement for the building meters D8, C8, & B8 on sheet ANC-ACTC-M910.

12. Question: The specifications for the Direct Digital Control System call out utility reports required for Electric, Natural Gas, and Service Water (Section 23 09 23 - 2.12 L). Please confirm this is a requirement for this project. If so, please advise if submeters for lighting and receptacles, gas meters, and water meters are included as part of this project required for this reporting. Also, please advise how this reporting is to be submitted, and to whom.

Response : This is a report requirement for the building meters D8, C8, & B8 on sheet ANC-ACTC-M910.

13. Question: The specifications for the Direct Digital Control System include a requirement to deliver unit level controllers to the air-handling unit manufacturer for factory installation (Section 23 09 23 - 3.4 A). The basis of design Air Handler Manufacturer has stated this is not an option. Please advise how to proceed or eliminate this section from the specifications.

Response : Disregard requirement, Specification will be revised to remove Paragraph 23 09 23 - 3.4 A from project..

14. Question: The specifications for the Direct Digital Control System include a requirement to deliver unit level controllers to the air-handling unit manufacturer for factory installation (Section 23 09 23 - 3.4 A). The basis of design Air Handler Manufacturer has stated this is not an option. Please advise how to proceed or eliminate this section from the specifications.

Response : Disregard requirement. Specification will be revised to remove Paragraph 23 09 23 - 3.4 C from project.

15. Question: Please confirm where we can find the 01 32 01 schedule specification, as it’s referenced in the specifications but omitted from the conformed specs.

Response : The FAA will revise Volume 1 of the specifications to include section 01 32 01 or address schedule requirements in a different section.

16. Question: We would like to request the subsurface soil investigation/geotechnical report for the Anchorage Airport Traffic Control Tower project.

Response : The Geotech report is located in the DDH (Attachment J-5 - 5b)