Attachment II Price Proposal Form.xlsx

XLSX spreadsheet 116 KB Posted

Attached to
USS HOWARD DDG-83 FY25 5C1 SRA BUNDL2 (Yokosuka Japan)
Solicitation number
N6264925RA009
Issued by

About this file

This is a pricing proposal form template (Attachment II) for USS HOWARD (DDG-83) FY25 5C1 SRA BUNDLE#2 solicitation N6264925RA001. The form requires contractors to provide detailed cost breakdowns for 12 Task Group Instructions (TGIs) related to fuel tank cleaning, inspection, repair, and preservation work. The template includes spaces to input in-house labor hours, subcontractor labor hours, material costs, and other direct costs (ODC) in Japanese Yen for each TGI.

The form covers work on various fuel tanks including fuel receiving tanks, service tanks, expansion tanks, and tank groups throughout the vessel. It includes a 7.55% growth CLIN and requires contractors to break down labor hours by trade (SFTR, INSL, WELD, SMTL, RGRS, PNTR, ELEC, PFTR, QA). The period of performance is April 7, 2025 through November 17, 2025, with work to be performed at Yokosuka Naval Base, Japan. Proposals are due by January 17, 2025 at 10:00 AM Japan Standard Time.

View the file

Other files

Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

OFFEROR/COMPANY NAME:

TABSUMMARYSUMMARYCLINTotal Labor (MH)Labor CostMaterial CostODC CostProposed Price
SOLICITATION NO:N6264925RA001CLIN 0001(12 TGIs)0¥0¥0¥0¥0
SHIP NAME:USS HOWARD (DDG-83)CLIN 0002 (Growth CLIN)0¥0¥0¥0¥0
AVAILABILITY:FY25 5C1 SRA BUNDLE#2Total for All CLIN0¥0¥0¥0¥0
Total TGIs (Specify Total)12Total Evaluated Price¥0
Growth CLIN %7.55%
Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary.
No.TGI No.DESCRIPTIONProposed LaborMaterial/ODCsProposed Price (JPY)
In-House Labor (MH)Sub-Contractor Labor (MH)Total Labor (MH)Overall Total Labor Cost (JPY)Material Cost (JPY)ODC (JPY)
138JC212311A01Clean, inspect, repair, and preserve Fuel Tank Group-6 (5-370-0-F)000¥0¥0¥0¥0
238JC212313A01Clean, assess, inspect, repair, and preserve Fuel Receiving Tank Group-1 (4-78-1-F) and Fuel Tank Group-1 (5-78-1-F)000¥0¥0¥0¥0
338JC212314A01Clean, assess, repair, and preserve Fuel Receiving Tank Group-2 (4-78-2-F) and Fuel Tank Group-2 (5-78-2-F)000¥0¥0¥0¥0
438JC212315A01Clean, assess, inspect, repair, and preserve Fuel Tank Group-1 (5-126-1-F)000¥0¥0¥0¥0
538JC212316A01Clean, assess, repair, and preserve Fuel Tank Group-2 (5-126-2-F)000¥0¥0¥0¥0
638JC212317A01Clean, assess, inspect, repair, and preserve Fuel Tank Group-1 (5-42-0-F)000¥0¥0¥0¥0
738JC212331A01Clean, assess, inspect, repair, and preserve Fuel Service Tank (4-300-1-F)000¥0¥0¥0¥0
838JC212332A01Clean, assess, inspect, repair, and preserve Fuel Tank Group-1 (5-174-1-F)000¥0¥0¥0¥0
938JC212333A01Clean, assess, repair, and preserve Fuel Tank Group-2 (5-174-4-F)000¥0¥0¥0¥0
1038JC212335A01Clean, assess, inspect, repair, and preserve Fuel Expansion Seawater Overflow Tank Group-1 (5-214-1-F)000¥0¥0¥0¥0
1138JC212342A01Clean, assess, repair, and preserve Fuel Service Tank (5-300-4-F)000¥0¥0¥0¥0
1238JC212343A01Clean, inspect, repair, and preserve Fuel Receiving Tank Group-6 (5-338-2-F)000¥0¥0¥0¥0
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100

1_38JC212311A01

SHIP NAME/AVAILABILITY:USS HOWARD (DDG-83) - FY25 5C1 SRA BUNDLE#2TGI 1_38JC212311A01 SUMMARY
SOLICITATION #:N6264925RA001
SRF-JRMC TGI #:1_38JC212311A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, inspect, repair, and preserve Fuel Tank Group-6 (5-370-0-F)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

2_38JC212313A01

SHIP NAME/AVAILABILITY:USS HOWARD (DDG-83) - FY25 5C1 SRA BUNDLE#2TGI 2_38JC212313A01 SUMMARY
SOLICITATION #:N6264925RA001
SRF-JRMC TGI #:2_38JC212313A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, assess, inspect, repair, and preserve Fuel Receiving Tank Group-1 (4-78-1-F) and Fuel Tank Group-1 (5-78-1-F)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0
5.90.0
5.100.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
5.9000
5.10000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

3_38JC212314A01

SHIP NAME/AVAILABILITY:USS HOWARD (DDG-83) - FY25 5C1 SRA BUNDLE#2TGI 3_38JC212314A01 SUMMARY
SOLICITATION #:N6264925RA001
SRF-JRMC TGI #:3_38JC212314A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, assess, repair, and preserve Fuel Receiving Tank Group-2 (4-78-2-F) and Fuel Tank Group-2 (5-78-2-F)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0
5.90.0
5.100.0
5.110.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
5.9000
5.10000
5.11000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

4_38JC212315A01

SHIP NAME/AVAILABILITY:USS HOWARD (DDG-83) - FY25 5C1 SRA BUNDLE#2TGI 4_38JC212315A01 SUMMARY
SOLICITATION #:N6264925RA001
SRF-JRMC TGI #:4_38JC212315A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, assess, inspect, repair, and preserve Fuel Tank Group-1 (5-126-1-F)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0
5.90.0
5.100.0
5.110.0
5.120.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
5.9000
5.10000
5.11000
5.12000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

5_38JC212316A01

SHIP NAME/AVAILABILITY:USS HOWARD (DDG-83) - FY25 5C1 SRA BUNDLE#2TGI 5_38JC212316A01 SUMMARY
SOLICITATION #:N6264925RA001
SRF-JRMC TGI #:5_38JC212316A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, assess, repair, and preserve Fuel Tank Group-2 (5-126-2-F)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0
5.90.0
5.100.0
5.110.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
5.9000
5.10000
5.11000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

6_38JC212317A01

SHIP NAME/AVAILABILITY:USS HOWARD (DDG-83) - FY25 5C1 SRA BUNDLE#2TGI 6_38JC212317A01 SUMMARY
SOLICITATION #:N6264925RA001
SRF-JRMC TGI #:6_38JC212317A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, assess, inspect, repair, and preserve Fuel Tank Group-1 (5-42-0-F)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0
5.90.0
5.100.0
5.110.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
5.9000
5.10000
5.11000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

7_38JC212331A01

SHIP NAME/AVAILABILITY:USS HOWARD (DDG-83) - FY25 5C1 SRA BUNDLE#2TGI 7_38JC212331A01 SUMMARY
SOLICITATION #:N6264925RA001
SRF-JRMC TGI #:7_38JC212331A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, assess, inspect, repair, and preserve Fuel Service Tank (4-300-1-F)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0
5.90.0
5.100.0
5.110.0
5.120.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
5.9000
5.10000
5.11000
5.12000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

8_38JC212332A01

SHIP NAME/AVAILABILITY:USS HOWARD (DDG-83) - FY25 5C1 SRA BUNDLE#2TGI 8_38JC212332A01 SUMMARY
SOLICITATION #:N6264925RA001
SRF-JRMC TGI #:8_38JC212332A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, assess, inspect, repair, and preserve Fuel Tank Group-1 (5-174-1-F)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0
5.90.0
5.100.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
5.9000
5.10000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

9_38JC212333A01

SHIP NAME/AVAILABILITY:USS HOWARD (DDG-83) - FY25 5C1 SRA BUNDLE#2TGI 9_38JC212333A01 SUMMARY
SOLICITATION #:N6264925RA001
SRF-JRMC TGI #:9_38JC212333A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, assess, repair, and preserve Fuel Tank Group-2 (5-174-4-F)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

10_38JC212335A01

SHIP NAME/AVAILABILITY:USS HOWARD (DDG-83) - FY25 5C1 SRA BUNDLE#2TGI 10_38JC212335A01 SUMMARY
SOLICITATION #:N6264925RA001
SRF-JRMC TGI #:10_38JC212335A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, assess, inspect, repair, and preserve Fuel Expansion Seawater Overflow Tank Group-1 (5-214-1-F)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0
5.90.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
5.9000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

11_38JC212342A01

SHIP NAME/AVAILABILITY:USS HOWARD (DDG-83) - FY25 5C1 SRA BUNDLE#2TGI 11_38JC212342A01 SUMMARY
SOLICITATION #:N6264925RA001
SRF-JRMC TGI #:11_38JC212342A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, assess, repair, and preserve Fuel Service Tank (5-300-4-F)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0
5.90.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
5.9000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

12_38JC212343A01

SHIP NAME/AVAILABILITY:USS HOWARD (DDG-83) - FY25 5C1 SRA BUNDLE#2TGI 12_38JC212343A01 SUMMARY
SOLICITATION #:N6264925RA001
SRF-JRMC TGI #:12_38JC212343A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, inspect, repair, and preserve Fuel Receiving Tank Group-6 (5-338-2-F)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

File details come from the government source that posted it. Updated .