This is a Task Group Instruction (TGI) document for cleaning, assessment, repair and preservation work on fuel tanks aboard the USS HOWARD (DDG-83). The work focuses on Fuel Receiving Tank Group-2 (4-78-2-F) with 11,805 gallon capacity and Fuel Tank Group-2 (5-78-2-F) with 16,152 gallon capacity.
The work includes dewatering tanks, commercial blast cleaning, visual inspections for structural integrity and coating condition, welding repairs, installation of zinc anodes and studs, and application of new preservation coatings. Special requirements include Level III cleanliness standards and hot work safety protocols for magazine spaces. The contractor work period is scheduled from April 7, 2025 through July 14, 2025. The document specifies detailed material requirements including zinc anodes, welding studs, washers, and nuts for installation. Technical services to be provided by SRF-JRMC include crane operations, utilities, safety inspections, and quality assurance. This TGI reflects a change to correct a referenced page number and is part of a larger ship repair availability package for USS HOWARD at Yokosuka Naval Base.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: TK 4-78-2-F&5-78-2-F AY A 0 1
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
DDG-83 USS HOWARD JC2
CU PHASE TITLE:
F/O - CLEAN, ASSESS, RPR, & PSV FUEL RCVG TK GP-2(4-78-2-F) & FTK GP-2(5-78-2-F)
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
KOUKI YOSHIDA 231B. 315-243-0163 29-APR-2024
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B. 315-243-4502 29-APR-2024
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
Print required page number of reference 2.10 in paragraph 5.12.9 was incorrect.
CHANGE INSTRUCTIONS:
CH1: Correct print required page number of reference 2.10 in paragraph 5.12.9. (05/08/2024)
SPECIAL REQUIREMENTS:
SURFMEPP
This work Affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III
HOT WORK IN MAGAZINE AND ADJACENT SPACES IAW S6740-AA-SAF-010 AND NAVSEA OP 4
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: TK 4-78-2-F&5-78-2-F AY A 0
FOUO
SHIP: DDG-83 CHG/VER: 1/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-8 J1-2 M1-2 Sketch (1)
1. SCOPE/PURPOSE
1.1 Title: Fuel Receiving Tank Group-2 (4-78-2-F) and Fuel Tank Group-2 (5-78-2-F); clean, assess, repair, and preserve
1.2 Location of Work:
1.2.1 Fuel Receiving Tank Group-2 (4-78-2-F)
1.2.2 Fuel Tank Group-2 (5-78-2-F)
1.2.3 Void (3-78-0-V)
1.2.4 Fuel Tank Group-1 (5-42-0-F)
1.2.5 Fuel Receiving Tank Group-1 (4-78-1-F)
1.2.6 Fuel Tank Group-1 (5-78-1-F)
1.2.7 Fuel Tank Group-1 (5-126-1-F)
1.2.8 Fuel Tank Group-2 (5-126-2-F)
1.2.9 CPO Baggage Room (3-78-1-A)
1.2.10 Crew Baggage Room No. One (3-78-2-A)
1.2.11 Crew Living Space No. 2 (3-97-02-L)
1.2.12 Sonar Cooling Equipment Room (4-42-0-Q)
1.2.13 IC and Gyro Room No. One (4-94-0-C)
1.2.14 Vacuum Collection Holding Tank (VCHT) Room No. One (4-110-0-E)
1.2.15 Special Clothing Storeroom (4-110-3-A)
1.2.16 Auxiliary Machinery Room No. One (4-126-0-E)
1.2.17 Engine Room No. One (4-174-0-E)
1.3 Identification:
1.3.1 Fuel Receiving Tank Group-2
Tank No.: 4-78-2-F Capacity: 11,805 Gallons
FOUO
SHIP: DDG-83 CHG/VER: 1/0
1.3.2 Fuel Tank Group-2
Tank No.: 5-78-2-F Capacity: 16,152 Gallons
1.3.3 Quantity (One Lot/5 Tanks), Fuel Tank Group-2
Total Capacity: 70,684 Gallons Required amount of water to dewater: 38,000 Gallons
1.3.3.1 Fuel Receiving Tank Group-2
Tank No.: 4-78-2-F Capacity: 11,805 Gallons
1.3.3.2 Fuel Tank Group-2
Tank No.: 5-78-2-F Capacity: 16,152 Gallons
1.3.3.3 Fuel Tank Group-2
Tank No.: 5-126-2-F Capacity: 19,259 Gallons
1.3.3.4 Fuel Tank Group-2
Tank No.: 5-174-4-F Capacity: 21,271 Gallons
1.3.3.5 Fuel Expansion Seawater Overflow Tank Group-2
Tank No.: 5-212-4-F Capacity: 2,197 Gallons
1.3.4 Quantity (5 EA), Zinc Anode in 4-78-2-F
Type: ZEP Size: 6 Inches Dia x One Inch Thickness
1.3.4.1 Quantity (5 EA), Securing Stud
Material: Steel Size: 1/2-13UNC x 3 Inches Thread Length
1.3.5 Quantity (12 EA), Zinc Anode in 4-78-2-F
Type: ZHC-23 Size: 6 Inches x 12 Inches x 1-1/4 Inches Thickness
1.3.5.1 Quantity (24 EA), Securing Stud
Material: Steel Size: 1/2-13UNC x 1-1/4 Inches Thread Length
1.3.6 Quantity (87 EA), Zinc Anode in 5-78-2-F
Type: ZEP Size: 6 Inches Dia x One Inch Thickness
1.3.6.1 Quantity (87 EA), Securing Stud
Material: Steel Size: 1/2-13UNC x 3 Inches Thread Length
1.3.7 Quantity (34 EA), Zinc Anode in 5-78-2-F
Type: ZHC-23 Size: 6 Inches x 12 Inches x 1-1/4 Inches Thickness
FOUO
SHIP: DDG-83 CHG/VER: 1/0
1.3.7.1 Quantity (68 EA), Securing Stud
Material: Steel Size: 1/2-13UNC x 1-1/4 Inches Thread Length
1.3.8 Quantity (One EA), Bracket on Oil Tight Bulkhead in 4-78-1-F, Frame 94, Port Remarks: See Sketch Enclosure-01 for location detail.
1.3.9 Quantity (2 EA), Manhole Cover Plate(s) and Air Vent Hose Connection (AVHC) Cover Plate(s) for 4-78-2-F Manhole No(s).: 3-91-4 Size: 15 Inches x 23 Inches AVHC No.: 3-85-2 Size: 10 Inches Diameter Material: Steel
1.3.10 Quantity (2 EA), Manhole Cover Plate(s) for 5-78-2-F
Manhole No(s).: 4-98-2 and 4-115-2 Size: 15 Inches x 23 Inches Material: Steel
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 TM T-9630-
AB-MMD-
Corrosion Control Assessment and Maintenance Manual (CCAMM)
3 N
4 TM NAVSEA
4790/14
Tank and Void Structural and Coating Condition Survey (MRC G1N5)
- N
1.3.11 Quantity (1,950 SF), Entire Interior Surface of Fuel Receiving Tank Group-2 (4-78-2-F)
Remarks: The area includes tank side of manhole cover plate(s) and bolting ring.
1.3.12 Quantity (3,980 SF), Entire Interior Surface of Fuel Tank Group-2 (5-78-2-F)
Remarks: The area includes tank side of manhole cover plate(s) and bolting ring.
1.4 Security Classification:
1.4.1 Spaces - 1.2.13
1.5 Initial Condition:
1.5.1 Critical Coated Area: CCNY-DDG83-024-25 for the area listed in 1.3.11 and 1.3.12.
1.5.2 Potential Asbestos Hazard
1.5.3 Dry Dock Work
1.6 Contractor work start date: 4/7/2025
1.7 Contractor work completion date: 7/14/2025
2. REFERENCES:
FOUO
SHIP: DDG-83 CHG/VER: 1/0
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
5 DWG 633-
6567062
Installation of Cathodic Protection & Zinc Anode
AB Y SE
E N
OT
E
6 TM S9086-
CJ-STM-
010/CH-075
Fasteners 7 N
7 TM
SYSTEMS &
SPECIFICAT
IONS
SSPC Painting Manual Volume 2 - N
8 DWG 100-
7026672
UNIT STRL ARR DWG ASSY UNIT
E Y SE
E N
OT
E
9 DWG 100-
7026673
UNIT STRL ARR DWG ASSY UNIT
F Y SE
E N
OT
E
10 DWG 100-
7026677
UNIT STRL ARR DWG ASSY UNIT
H Y SE
E N
OT
E
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish the requirements of 099-902YO of 2.2 for each tank listed in 1.3.1 and 1.3.2.
5.1.1 Dewater each tank listed in 1.3.3.
5.1.2 Accomplish an assessment of each tank listed in 1.3.1 and 1.3.2 for existing preservation coating, structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, including sounding tubes, tank/void vents, overflows, piping and associated material, structural members, ladders, anodes, desiccant, tank level indicator (TLI), radar TLI, and their electric cables, stud, and tank top cable penetration, and manhole covers in accordance with 2.3 and 2.4, using 2.5 for guidance. Document the assessment on 2.4.
(I) “CCIMS ASSESSMENT”
5.1.2.1 Submit one legible copy, in hard copy, or approved transferrable media, of completed assessment form 2.4 to the SUPERVISOR.
5.1.3 Accomplish the requirements of 009-107 of 2.1.
C1209.3 Shimizu, 11120180, SS, 5/10/2024
Shinya.Shimizu.ja Line
FOUO
SHIP: DDG-83 CHG/VER: 1/0
5.1.3.1 Ensure General Cleaning must be Level III.
5.1.4 Accomplish installation of each manhole cover for each tank listed in 1.3.1 and 1.3.2 in accordance with Figure 075-4-1 of 2.6.
5.2 Pump out, clean, and dry the VCHT sump located in 1.2.14 free from oil, debris, and other foreign matter.
5.3 Commercial blast clean each tank listed 1.3.1 and 1.3.2. Accomplish each requirement of Surface Preparation Specification SSPC-SP 6 of 2.7.
5.4 Accomplish a visual inspection of each tank listed in 1.3.1 and 1.3.2 for existing preservation coating, structural integrity, deterioration, pitting, each crack, and area of damage or distortion, including each sounding tube, tank vent, overflow, piping, each structural member, and manhole cover, using 2.8 through 2.10 for guidance.
5.4.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 5.4 to the SUPERVISOR.
5.5 Repair each tank listed in 1.3.1 and 1.3.2, based on the report 5.1.2.1 and 5.4.1 as designated by the SUPERVISOR, using 2.8 through 2.10 for guidance. See 5.12.5 and 5.12.6.
5.5.1 Vee-out and weld a total of one linear foot of each deteriorated and damaged weld. Each area of repair may include deck, bulkhead, shell plating, and overhead.
5.5.2 Chip and grind each surface flush in way of each repair.
5.5.3 Base metal weld buildup a total of 31 square inches of each plate defect in the tank.
5.5.3.1 For bidding purposes the base metal weld buildup must be one quarter inch thick.
5.5.3.2 Surface must be ground to sound metal prior to base metal weld buildup.
5.5.3.3 Fill each local pit and groove with weld material prior to application of each principal buildup layer.
5.5.3.4 Grind each surface of completed base metal weld buildup smooth if greater than 1/8 inch above plate surface.
5.5.4 Remove existing, fabricate, and install new a total of one square foot of deteriorated plate.
5.5.5 Remove existing, fabricate and install new a total of one linear foot of defective stiffener.
5.5.6 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.5.6.1 Accomplish nondestructive testing in accordance with Line 11.
5.5.7 Accomplish the requirements of 009-25 of 2.1 for an air hose, water hose, or vacuum box test of each new insert weld seam. Allowable leakage: None.
5.6 Remove existing and install new each zinc anode and stud listed in 1.3.4 through 1.3.7, using 2.5 and 2.8 through 2.10 for guidance.
5.6.1 Chip and grind each surface flush in way of each removal.
5.6.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.7 Remove unused each existing bracket listed in 1.3.8, using 2.9 for guidance.
FOUO
SHIP: DDG-83 CHG/VER: 1/0
5.8 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line(s) 25, for crew baggage room side surface of each cover plate listed in 1.3.9, Table 3, Line(s) 25, for IC and Gyro room side surface of each cover plate listed in 1.3.10, and Table 3, Line(s) 12, for VCHT room side surface of each cover plate listed in 1.3.10.
5.9 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 11, for each area listed in 1.3.11 and 1.3.12.
5.9.1 Submit new coating data applied to the SUPERVISOR in accordance with 2.3 and 2.4.
5.10 Accomplish the requirements of 009-25 of 2.1 for a completion air test of each tank listed in 1.3.1 and 1.3.2.
Test pressure must be 2 PSIG. Allowable drop in pressure: None.
5.11 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.12 Notes:
5.12.1 Planner: Code 231B K. Yoshida, 243-0163
Planner: Code 233 M. Hosono, 080-9350-1455
5.12.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.12.3 2.4 is available on P:\C200\C225\Enclosures\C231\Tank and Void Structural and Coating Condition Survey
(MRC G1N5).
5.12.4 This TGI meets the intent of DDG CSWT File No. 123-133. 123-142, and 123-145.
5.12.5 Removal and installation of interferences, and gas free operation, preservation of boundary spaces relating to front loading structure repair are not included in this TGI. They will be covered by a DL in the future based on Contractor submitted condition report.
5.12.6 Materials for structure members relating to front loading repair will be provided in the future as a DL based on Contractor submitted condition report.
5.12.7 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.12.8 This TGI is in response to Condition Report No. NNR17044-16-01 from Sumitomo Heavy Industries, Ltd.
Dated 25-FEB-2022.
5.12.9 WPC will copy the following pages in reference.
REF. 2.5: Pages 4A, 3H, 7A11, and 8A11 REF. 2.8: Pages 3, 4, 5, 5A, 5B, 6, 6A, 6B, and 8 REF. 2.9: Pages 3, 4, 4A, 4B, 5, 5A, 5C, and 9 REF. 2.10: Pages 3, 4, 4A, 4C, 5, and 9-2
5.12.10 Opening, initial cleaning, and closing of each tank listed in 1.2.3 through 1.2.8 will be covered by the following TGI No(s).
Void (3-78-0-V): 38JC212306A01 (KTR TGI) Fuel Tank Group-1 (5-42-0-F): 38JC212317A01 (KTR TGI) Fuel Receiving Tank Group-1 (4-78-1-F): 38JC212313A01 (KTR TGI)
FOUO
SHIP: DDG-83 CHG/VER: 1/0
Fuel Tank Group-1 (5-78-1-F): 38JC212313A01 (KTR TGI) Fuel Tank Group-1 (5-126-1-F): 38JC212315A01 (KTR TGI) Fuel Tank Group-2 (5-126-2-F): 38JC212316A01 (KTR TGI)
5.12.11 JCNs EB14-ZBU2, EB14-ZBX2, EB14-ZBY5, ER01-ZAQ9, ES01-NNWQ, EB14-ZBU5, EB14-ZBX4, EB14- ZBY7, and ER01-ZAR1 are related to this TGI.
5.13 Government Furnished Material (GFM):
5.13.1 SRF-JRMC will provide GFM listed in Appendix “M”.
5.14 SRF-JRMC will provide the following service work: (TGI No. 38JC212314S02).
5.14.1 [C740] Crane and crane rigging service.
5.14.2 [X99E] Utility service, electrical.
5.14.3 [X99M] Utility service, including water supply, steam supply, and low pressure air supply except onboard blasting work.
5.14.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.14.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.14.6 [C133] QA inspection for (G) symbol(s), review of coating application data, and Surface Corrosion Control Information Management System (CCIMS) entry.
5.14.7 [C135] QA inspection for (G) symbol(s).
5.14.8 [C250] Technical support and process of the tank/void assessment results.
FOUO
M-1
SHIP: DDG-83 CHG/VER: 1/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
TK 4-78-2-F&5-78-2-F AY A 0 0
CU PHASE TITLE:
F/O - CLEAN, ASSESS, RPR, & PSV FUEL RCVG TK GP-2(4-78-2-F) & FTK GP-2(5-78-2-F)
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38JC212314 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M ANODE,CO, ORDERED FOR
KTR
ORIG: C231B K. YOSHIDA 243-
9B 5342 007021371 NA 4 N 41205057 92/EA
002 M ANODE,CORROSION PRE,
ORDERED FOR KTR
ORIG: C231B K. YOSHIDA 243-
9B 5342 008136058 NA 4 N 41205058 46/EA
003 M STUD, WE, STUD, WELDING,
SIZE: 1/2"-13 X 3"THD LG,
OVERALL LENGTH 6", MATL:
MILD STEEL, MIL-S-24149/1B,
TY II, CL I, BIW CAT# 53222-251
ORDERED FOR KTR
ORIG: C231B K. YOSHIDA 243-
9Z 5307 LL6999225 NA 4 N 41207405 92/EA
004 M STUD,WEL, ORDERED FOR
KTR
ORIG: C231B K. YOSHIDA 243-
9B 5307 012813886 NA 4 N 41205059 92/EA
005 M WASHER,L, ORDERED FOR
KTR
ORIG: C231B K. YOSHIDA 243-
9B 5310 015492705 NA 4 N 41205061
276/EA
NOTES:
FOUO
M-2
SHIP: DDG-83 CHG/VER: 1/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
006 M NUT, HEX, NUT, HEX, 1/2"-
13UNC-2B, ALLOY STEEL, GR
2H, ZINC-COATED,MIL-DTL-
1222 TY I
ORDERED FOR KTR
ORIG: C231B K. YOSHIDA 243-
9Z 5310 LL4653891 NA 4 N 41207402 92/EA
007 M NUT,SELF, ORDERED FOR
KTR
ORIG: C231B K. YOSHIDA 243-
9B 5310 005957421 NA 4 N 41205062
184/EA
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-83 TK 4-78-2-F&5-78-2-F AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38JC212314 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-83 TK 4-78-2-F&5-78-2-F AY A 0
38JC212314A01
SKETCH
ENCLOSURE-01 SHEET 1 OF 1
Kouki.Yoshida.ja Oval
Kouki.Yoshida.ja_1 Rectangle
Kouki.Yoshida.ja_2 Line
Kouki.Yoshida.ja_3 Text Box
FR 94
Kouki.Yoshida.ja_4 Line
Kouki.Yoshida.ja_5 Text Box
FWD
Kouki.Yoshida.ja_6 Text Box
FUEL RCVG TANK G-2 (4-78-2-F)
Kouki.Yoshida.ja_7 Rectangle
Kouki.Yoshida.ja_8 Rectangle
Kouki.Yoshida.ja_9 Text Box
UNUSED BRACKET
Kouki.Yoshida.ja_10 Text Box
LOCATION DETAIL OF UNUSED BRACKET
Kouki.Yoshida.ja_11 Text Box
CL
Kouki.Yoshida.ja_12 Text Box
PLAN VIEW
HOLD DK FR 70 - FR 105, PORT
File details come from the government source that posted it. Updated .