Attachment H - 2W for IR-CATH-EP CDs Drawings 4 of 5.pdf
PDF 10 MB Posted
- Solicitation number
- 36C26323R0002
About this file
This attachment file is related to a federal contract solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23. The solicitation, numbered 36C26323R0002, is for a remodel of the 2nd floor for interventional radiology, cath lab, and electrophysiology services at facility 636A8. The solicitation type is listed as a request for proposals. The description provided indicates the solicitation is for a remodel of the 2nd floor areas used for interventional radiology, cath lab, and electrophysiology procedures at the specified VA facility. No further details are included regarding response dates, pricing terms, or other requirements.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T T
T
TT
T
T
T
T
T
T
T
T
T H
H
T
A BA' C D D1 E F
0.9
G
14 M
FF
H
7'
CIRCULATION
2C07A
MED PREP/ NOURISH
2W178
TOILET
2W176
NURSE STATION
2W177
CIRCULATION
2C07
EP LAB
2W151
CONTROL
2W151A
CATH LAB
2W153
CONTROL
2W153A
IR LAB
2W154
CONTROL
2W154A
HAC
2W158
CORRIDOR
2C03A
SEMI RESTRICTED CORRIDOR
2C03B
EQUIPMENT PARK
2W181
MEN'S LOCKER
2W156
WOMEN'S LOCKER
2W157
WOMEN'S SHOWER
2W157A
RECOVERY
2W175
CLEAN LINEN
2W174
CLEAN UTILITY ROOM
2W173
ULTRASOUND
2W132
RADIOLOGY/ MULTI-PURPOSE
2W131
TOILET
2W130A
RADIOLOGY/ FLUOROSCOPY
2W130
IR MANAGER OFFICE
2W129D
NURSE MANAGER OFFICE
2W129C
OPEN OFFICE CUBICLES
2W129
ELEVATOR LOBBY
2C02
EP EQUIPMENT ROOM
2W179
PRE/POST BAY
2W175E
PRE/POST BAY
2W175D
PRE/POST BAY
2W175C
ALCOVE
2W175F
PRE/POST BAY
2W175B
PRE/POST BAY
2W175A
SHAFT
2W103
SHAFT
2W104
CORRIDOR
2C06
ELEC
2W180
STAIR
2ST07
MEN'S SHOWER
2W156A
CIRCULATION
2C05
CATH EQUIPMENT ROOM
2W134
UTILITY SOILED ROOM
2W133
STERILE SUPPLY
2W155
IR EQUIPMENT ROOM
2W150
OFFICE
2W129B
ALCOVE
2W129E
ELEC
2W152
TAB-E
TAB-E
TAB-E
TAB-E
TAB-E
TAB-E
TAB-E
TAB-E
TAB-E
TAB-E
TAB-E
TAB-E
TAB-E
TAB-E
3"HWS
3"HWR
3/4"HWS
2"HWR
2"HWS
1 1/2"HWS
"H
W S
"H
W R
2 1/2"HWR
1 1/4"HWS
1 1/4"HWR
/4
"H W
R /4
"H W
S
1 1/2"HWS
3/4"HWR
3/4"HWS
3/4"HWS
3/4"HWR
1 1/4"HWS
1 1/4"HWR
1 1/4"HWS
1 1/4"HWR
3/4"HWS
3/4" HWS/HWR UP
1 1/2"HWS
1 1/2"HWR
CUH-E
1"HWR
1"HWS
1"HWR
1"HWS
CUH-E
RAD-E
RAD-E
RAD-E
RAD-E
RAD-E
RAD-E
RAD-E
RAD-E
RAD-E
RAD-E
CAP
1"HWS
1"HWR
CAP CAP
CAP CAP
CAP
CAP
/4
"H W
S
3"LPC
CONNECT TO
EXISTING 3" LPC
SUC/LIQ UP
S U
C L
IQ
CRU-2W179
CRU-2W150
CRU-2W134
GCU-2W134
1 1/4"GWR
1 1/4"GWS
1-1/2" GWS/
GWR UP
1-1/2" LPC UP
TAB-2W175
TAB-2W175A
TAB-2W175B TAB-2W175C
TAB-2W175D TAB-2W175E
TAB-2W173
TAB-2W157
TAB-2W158A
RTAB-2W158A
RTAB-2W151A
TAB-2W152A
RTAB-2W152A
RTAB-2W153A
TAB-2W153A
TAB-2W156
TAB-2W183
TAB-2W151A
RTAB-2W175
TAB-2W135
TAB-2W131
TAB-2W130
TAB-2W129D
TAB-2W129C
TAB-2C02
TAB-2W129E
TAB-2W129A
TAB-2W129B
3/4"HWR
3/4"HWS
1"HWR
1"HWS
1"HWS
1"HWR
1 1/2"HWS
1 1/2"HWR
1 1/2"HWS
1 1/2"HWR
1"HWS
1"HWR
3/4"HWR
3/4"HWS
1-1/4" HWS/
HWR UP
1-1/4" HWS/
HWR UP
1-1/4" HWS/
HWR UP
2 1/2"HWR
2 1/2"HWS
1"GWS
1"GWR
2 1/2"HWS
2 1/2"HWR
1 1/4"LPC
3/4"GWS
3/4"GWR
RAD-E
RAD-E
RAD-E
RAD-E
RAD-E
RAD-E
RAD-E
RAD-E
RAD-E
RAD-E
/4
"L P
C
3/4" LPC UP
1 1/4"HWS
1 1/4"HWR
/4 "H
W R
/4 "H
W S
KEY PLAN - SECOND FLOOR
I O W A
S E
D
PROFESS IO NA
20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C R e v it L o c a l F ile s \M
E P
T .0
V
A -V
IS
N
-I o w a C it y -R e m o d e l
IR
-C a th
-E P
C
D e lla n .J
.L le w e lly n .r v t
/8
/2
:2 :3
P
M
1-MP4
SECOND FLOOR PLAN - PIPING REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
BUILDING 1
04/08/2022 DAVING DELLLE16133
N O R
HT
1/8" = 1'-0"
SECOND FLOOR PLAN - PIPING
KEYNOTES:
1. REFERENCE 7/1-MP7 FOR HEAT PUMP PIPING
DIAGRAM.
2. COMPUTER ROOM UNIT CONSISTS OF SPLIT
WATER-COOLED CONDENSING UNIT AND
EVAPORATOR. CONTRACTOR SHALL INSTALL
BOTH COMPONENTS AND MANUFACTURER
PROVIDED REFRIGERANT PIPING CONNECTING
COMPONENTS. INSTALL ACCORDING TO
MANUFACTURER’S RECOMMENDATIONS.
3. TAP INTO EXISTING HEATING WATER MAINS
ABOVE EXISTING IR CONTROL ROOM DURING
PHASE II AND EXTEND NEW PIPING TO PHASE II
AS SHOWN. COORDINATE SCHEDULING OF
THIS WORK WITH OWNER AS IT MAY NEED TO
BE COMPLETED DURING OFF HOURS.
GENERAL PIPING NOTES:
1. REFERENCE 1-MP0 PIPING COVERSHEET FOR
PIPING SYMBOLS LIST, ABBREVIATIONS LIST,
AND GENERAL NOTES.
2. PROJECT IS SPLIT INTO FOUR PHASES.
REFERENCE ARCHITECTURAL PHASING
DIAGRAM FOR ADDITIONAL INFORMATION.
WORK IN EACH PHASE SHALL BE COMPLETED
WITH MINIMAL IMPACT ON AREAS OF PROJECT
IN OTHER PHASES OR AREAS OF THE BUILDING
OUTSIDE THE PROJECT BOUNDARIES. ANY
WORK WHICH WILL NEED TO BE COMPLETED
OUT OF PHASE MUST BE COORDINATED AND
SCHEDULED WITH THE OWNER AND MAY NEED
TO BE COMPLETED DURING OFF HOURS.
3. COORDINATE AND CONFIRM ALL
ARCHITECTURALLY EXPOSED DEVICE
LOCATIONS WITH ARCHITECT PRIOR TO
ROUGH-IN.
4. NEW PENETRATIONS IN EXISTING SLABS SHALL
BE COORDINATED WITH THE STRUCTURAL
ENGINEER AND GENERAL CONTRACTOR PRIOR
TO CORE DRILLING. VERIFY PENETRATIONS DO
NOT IMPINGE ON STRUCTURAL BEAMS OR
TEES.
5. THE SIZE OF BRANCH PIPING TO TERMINAL
HEATING DEVICES AND COILS SHALL BE ¾”
UNLESS NOTED OTHERWISE.
6. REFERENCE 1/1-MP7 FOR PIPE HANGERS AND
SUPPORTS DETAIL.
7. REFERENCE 4/1-MP7 FOR PIPE THROUGH NON-
FIRE RATED WALL DETAIL.
8. REFERENCE 5/1-MP7 FOR RATED FIRE
BARRIER PENETRATION.
9. REFERENCE 6/1-MP7 FOR HOT WATER REHEAT
COIL PIPING DIAGRAM.
Revisions: Date:
3W103B
3ST07
3W103
3W105
MECH SHAFT
3W103A
3W104
3ST06
3W101
3W09
3S01
3C01
3CW01A
3W100
3W07
DW-2
3W102A
3W102
3CO1A
3C03
MECH SHAFT
3W19A3W11
3CW02A
3C02
3W17A
3W101A
CL-1
3W17
3W17B
3W101B
3W17C
3S08D
3W19B
B1
S H A F T
S H A F T
3W103D
3W19C
SHAFT
3W223
B3
C1
C2
3W103C
3W222
B2
3W101C
T
T
T
T
T
T
T T
TT
A BA' C D D1 E F
0.9
G
14 M
FF
H
7'
EQUIPMENT ELECTRICAL ROOM
3W136
HWR
1 1/4" MPR(60)
UP
1 1/4" MPR(60)
UP
C H
W S
C H
W R
UH-E
4"CHWR
4"CHWS
3"HPS
2"PC
2"MPS
3/4"MPR1 1/4" MPR(60)
UP
2"PC
C H
W S
C H
W R
C H
W S
C H
W R
CHWS
CHWR
1"MPC
2" STM RELIEF VENT
UP THROUGH ROOF
6" STM RELIEF VENT
UP THROUGH ROOF
3" STM RELIEF VENT
UP THROUGH ROOF
STEAM PRV
PRV1-33A & B
STEAM PRV
PRV1-32A & B
3" LPR UP
V V
PC
LPR (10)
RELOCATE EXISTING
LIEBERT DX
CONDENSER FOR ROOM
2W144. RECONNECT
CHILLED WATER AND
REFRIGERANT PIPING
CUH-E
3"
3/4" MPR (60)
MPS
UP3/4" MPR
3" HWS/R
UP
3" HWS
3" HWR
2" MPS
3/4" MPR
2 1/2" LPS
4" CHWS
4" CHWR
"C
H W
S "C
H W
R
3"HPS
VAV-E VAV-E
HWH-E
HWS
HOT WATER
CABINET
HEATER
1-CUH-A4
3/4"
3/4" 3/4"
VAV-E VAV-E
VAV-E
VAV-E VAV-E
UH-E
3/4"
3/4"
3/4"
4" MPR
2 1/2" MPR
EXISTING
HWH
EXISTING 2" DN
TO LEVEL 2
2"CHR
3"CHS
AH1-36
CWP-E
CWP-E
HV-E
(TYP.)
/2
/2
1" LPS (10)
1 1/2" MPR (60)
2" MPS (60)
1" PC
3" HPS (125)
MPS (60)
LPS (10)
CHWR
UH-E
3/4" 3/4"
EX.STEAM TO
HOT WATER
CONVERTERS
EXISTING 1" DN
TO LEVEL 2
CP-E
4" VENT
THRU
ROOF
1 1/4" MPR(60) UP
EXISTING 25
EXISTING 1-TCAC-1
TEMP. CONTROL
COMPRESSORS
DDE-E
EXISTING LTCP FOR EF
ON 3RD FLOOR
ROOF
EX.DDC
CONTROL
LTCP-E
EX. 1" CONDENSATE
TO NEAREST FLOOR
DRAIN
UH-E
HWH-E
ET-E
AS-E
M P
S T
O L
P S
8" VENT UP
H P
S T
O M
P S
EXISTING PRESSURE
REDUCTING STATION
HWS
HWR
AH1-38AH1-37
EXISTING DDC
CONTROL
LTCP-E
FLOW METER
/4
/4
6" 3"
H
/4
/4
FLOW METER
LTCP-E
EXISTING DDC
CONTROL
UH-E
H
1" 1"
"C
H W
S "C
H W
R
3"CWS
3"CWR
"C
W S
"C
W R
"L
P S
3"LPS
1 1/2" LPC DN
CONNECT TO
EXISTING
CHILLED
WATER.
TCU-2W151
TCU-2W152A
TCU-2W152B
TCU-2W153
AH1-31
TAB-2W151
TAB-2W153
RTAB-2W153
RTAB-2W151
RTAB-2W154
TAB-2W153
SUC/LIQ UP
SUC/LIQ DN
LIQ
SUC
AH1-39
RAD-E
CAP
CUH-E
CRU-3W136
4" VV UP THROUGH
ROOF
2"GWR
2"GWS
2" GWS/GWR UP
1 1/2"GWS
1 1/2"GWR
1-1/4" HWS/
HWR DN
1-1/4" HWS/
HWR DN
1-1/4" HWS/
HWR DN
CWP-1
CONNECT 3" LPS TO
EXISTING LPS HEADER AT
THIS LOCATION
T-4
3/4" LPC DN
KEY PLAN - THIRD FLOOR
I O W A
S E
D
PROFESS IO NA
20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C R e v it L o c a l F ile s \M
E P
T .0
V
A -V
IS
N
-I o w a C it y -R e m o d e l
IR
-C a th
-E P
C
D e lla n .J
.L le w e lly n .r v t
/8
/2
:2 :3
P
M
1-MP5
THIRD FLOOR PLAN - PIPING REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
BUILDING 1
04/08/2022 DAVING DELLLE16133
N O R
HT
1/8" = 1'-0"
THIRD FLOOR PLAN - PIPING
KEYNOTES:
1. REFERENCE 7/1-MP7 FOR HEAT PUMP PIPING
DIAGRAM.
2. OFFSET STEAM DOWN BELOW LARGE
DUCTWORK. PROVIDE MAIN DRIP TRAP AT
OFFSET. REFERENCE 9/1-MP7 FOR STEAM
MAIN DRIP CONNECTION DETAIL.
3. REFERENCE 10/1-MP7 FOR STEAM HEATING
COIL PIPING DIAGRAM.
4. REFERENCE 11/1-MP7 FOR STEAM
HUMIDIFICATION COIL PIPING DIAGRAM.
5. REFERENCE 12/1-MP7 FOR CHILLED WATER
COIL PIPING DIAGRAM.
GENERAL PIPING NOTES:
1. REFERENCE 1-MP0 PIPING COVERSHEET FOR
PIPING SYMBOLS LIST, ABBREVIATIONS LIST,
AND GENERAL NOTES.
2. PROJECT IS SPLIT INTO FOUR PHASES.
REFERENCE ARCHITECTURAL PHASING
DIAGRAM FOR ADDITIONAL INFORMATION.
WORK IN EACH PHASE SHALL BE COMPLETED
WITH MINIMAL IMPACT ON AREAS OF PROJECT
IN OTHER PHASES OR AREAS OF THE BUILDING
OUTSIDE THE PROJECT BOUNDARIES. ANY
WORK WHICH WILL NEED TO BE COMPLETED
OUT OF PHASE MUST BE COORDINATED AND
SCHEDULED WITH THE OWNER AND MAY NEED
TO BE COMPLETED DURING OFF HOURS.
3. COORDINATE AND CONFIRM ALL
ARCHITECTURALLY EXPOSED DEVICE
LOCATIONS WITH ARCHITECT PRIOR TO
ROUGH-IN.
4. NEW PENETRATIONS IN EXISTING SLABS SHALL
BE COORDINATED WITH THE STRUCTURAL
ENGINEER AND GENERAL CONTRACTOR PRIOR
TO CORE DRILLING. VERIFY PENETRATIONS DO
NOT IMPINGE ON STRUCTURAL BEAMS OR
TEES.
5. THE SIZE OF BRANCH PIPING TO TERMINAL
HEATING DEVICES AND COILS SHALL BE ¾”
UNLESS NOTED OTHERWISE.
6. REFERENCE 1/1-MP7 FOR PIPE HANGERS AND
SUPPORTS DETAIL.
7. REFERENCE 4/1-MP7 FOR PIPE THROUGH NON-
FIRE RATED WALL DETAIL.
8. REFERENCE 5/1-MP7 FOR RATED FIRE
BARRIER PENETRATION.
9. REFERENCE 6/1-MP7 FOR HOT WATER REHEAT
A BA' C D D1 E F
0.9
G
14 M
FF
H
SUC/LIQ DN
SUC
LIQ
EXISTING AIR COOLED
CONDENSING UNIT
SERVING 1AH-39 TO
REMAIN.
EXISTING AIR COOLED
CONDENSING UNIT SERVING
COMPUTER ROOM UNITS TO
REMAIN
DC-3W136
2"GWR
2"GWS
2" GWS/GWR DN
EXISTING 6", 3", AND 2" STEAM RELIEF
AND 4" VAPOR VENT TERMINATIONS
KEY PLAN - ROOF
I O W A
S E
D
PROFESS IO NA
20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C R e v it L o c a l F ile s \M
E P
T .0
V
A -V
IS
N
-I o w a C it y -R e m o d e l
IR
-C a th
-E P
C
D e lla n .J
.L le w e lly n .r v t
/8
/2
:2 :3
P
M
1-MP6
ROOF PLAN - PIPING REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
BUILDING 1
04/08/2022 DAVING DELLLE16133
N O R
HT
1/8" = 1'-0"
ROOF PLAN - PIPING
KEYNOTES:
1. REFERENCE 2/1-MP7 FOR ROOF SUPPORT –
EXPOSED PIPING RAIL DETAIL.
2. REFERENCE 3/1-MP7 FOR ROOF PENTRATION –
INSULATED PIPE CURB.
3. REFERENCE 8/1-MP7 FOR EQUIPMENT ROOF
SUPPORT DETAIL.
GENERAL PIPING NOTES:
1. REFERENCE 1-MP0 PIPING COVERSHEET FOR
PIPING SYMBOLS LIST, ABBREVIATIONS LIST,
AND GENERAL NOTES.
2. PROJECT IS SPLIT INTO FOUR PHASES.
REFERENCE ARCHITECTURAL PHASING
DIAGRAM FOR ADDITIONAL INFORMATION.
WORK IN EACH PHASE SHALL BE COMPLETED
WITH MINIMAL IMPACT ON AREAS OF PROJECT
IN OTHER PHASES OR AREAS OF THE BUILDING
OUTSIDE THE PROJECT BOUNDARIES. ANY
WORK WHICH WILL NEED TO BE COMPLETED
OUT OF PHASE MUST BE COORDINATED AND
SCHEDULED WITH THE OWNER AND MAY NEED
TO BE COMPLETED DURING OFF HOURS.
3. COORDINATE AND CONFIRM ALL
ARCHITECTURALLY EXPOSED DEVICE
LOCATIONS WITH ARCHITECT PRIOR TO
ROUGH-IN.
4. NEW PENETRATIONS IN EXISTING SLABS SHALL
BE COORDINATED WITH THE STRUCTURAL
ENGINEER AND GENERAL CONTRACTOR PRIOR
TO CORE DRILLING. VERIFY PENETRATIONS DO
NOT IMPINGE ON STRUCTURAL BEAMS OR
TEES.
5. THE SIZE OF BRANCH PIPING TO TERMINAL
HEATING DEVICES AND COILS SHALL BE ¾”
UNLESS NOTED OTHERWISE.
6. REFERENCE 1/1-MP7 FOR PIPE HANGERS AND
SUPPORTS DETAIL.
7. REFERENCE 4/1-MP7 FOR PIPE THROUGH NON-
FIRE RATED WALL DETAIL.
8. REFERENCE 5/1-MP7 FOR RATED FIRE
BARRIER PENETRATION.
9. REFERENCE 6/1-MP7 FOR HOT WATER REHEAT
INSTALL AN ESCUTCHEON AROUND PIPES
EXPOSED IN FINISHED ROOMS. IN SUCH
INSTANCES WHERE AN ESCUTCHEON IS
REQUIRED AND THE PIPING IS INSULATED,
INSTALL A PLASTIC JACKET EXTENDING 6"
BEYOND THE WALL TO PROTECT INSULATION
FROM DAMAGE FROM THE ESCUTCHEON.
MAKE A SMOOTH ROUND OPENING IN
WALL SLIGHTLY LARGER THAN OUTSIDE
DIAMETER OF THE PIPE AND INSULATION.
ADD A BEAD OF NON-HARDENING
CAULK IN THE ANNULAR SPACE.
NOTES:
1. THIS DETAIL APPLIES TO ALL PIPES. THE INTENTION IS TO CONTINUE THE INSULATION AND VAPOR
BARRIER THROUGH ALL PENETRATIONS. PERMIT THERMAL EXPANSION WITHOUT DAMAGING
INSULATION, AND TO SEAL AIRTIGHT AROUND INSULATED AND UNINSULATED PIPES FOR NOISE
TRANSMISSION CONTROL.
2. FLOOR OPENINGS ARE SIMILAR SEE SPECIFICATIONS FOR DIFFERENCES BETWEEN FLOOR AND
WALL PENETRATIONS.
3. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
FIRE SEALANT
FIRE SEALANT
NOTE 2
NOTE 3
PENETRATING ITEM
NOTE 4
NOTE 3
NOTE 4
PENETRATING ITEM
NOTE 2
NOTE 3
RATED WALL
(CONSTRUCTION
VARIES)
RATED FLOOR
(CONSTRUCTION
VARIES)
NOTES:
1. THIS GENERAL DETAIL APPLIES TO ALL ITEMS PENETRATING FIRE RATED WALLS OR FLOORS.
THE INTENT IS TO MAINTAIN THE FIRE RATING AND TO ALLOW LONGITUDINAL MOVEMENT.
REFER TO SPECIFICATIONS FOR SELECTION OF THROUGH PENETRATION FIRE STOPPING.
2. SCHEDULE 5 PIPE SLEEVE EMBEDDED IN WALL OR FLOOR, OR SMOOTH CORE DRILL. EACH
CONTRACTOR FURNISHES SLEEVE TO G.C., COORDINATES SLEEVE LOCATIONS AND DEBURS
SLEEVE. G.C. BUILDS SLEEVE INTO WALL OR FLOOR ALLOWING NO GAP AROUND SLEEVE. IF
SLEEVE IS NOT PROVIDED WHEN WALL OR FLOOR IS BUILT, CONTRACTOR SHALL INSTALL
SLEEVE. SLEEVE SIZE SHALL ALLOW ANNULAR SPACE REQUIRED BY THE SELECTED FIRE
STOP SYSTEM.
3. INSTALL BACKING MATERIAL, SUCH AS MINERAL WOOL SAFING, AS REQUIRED FOR FIRE STOP
SYSTEM. INSTALL IN ACCORDANCE WITH FIRE STOP SYSTEM APPLICATION LISTING. SECURE
TO WALL OR FLOOR TO ALLOW LONGITUDINAL MOVEMENT OF PENETRATING ITEM WITHOUT
MOVEMENT OF FIRE BARRIER.
4. WATERTIGHT WELDED 1"x1" 20 GAUGE MINIMUM GALVANIZED SHEET METAL ANGLE FRAME, BY CONTRACTOR IN EQUIPMENT ROOMS FOR WATER STOP. PLACE A BEAD OF WATERPROOF
SEALANT BETWEEN FLOOR AND BOTTOM OF ANGLE FRAME. SECURE TO FLOOR WITH
MASONRY ANCHORS IN CORNERS AND ON 12" MAXIMUM CENTERS. MULTIPLE PENETRATING
ITEMS MAY BE ENCLOSED IN ONE FRAME.
HEATING COIL
CONTROL VALVE
3/4" SHUTOFF VALVE WITH
3/4" MALE HOSE THREAD
ADAPTER AND CAP.
OFFSET PIPING AND
LOCATE UNIONS TO ALLOW
REMOVAL OF COIL
MANUAL AIR VENT AT
HIGH POINT OF PIPING
NEXT TO COIL. (TYP.)
UNION (TYP.)
AIR FLOW
HW
S
HW
R
NOTES:
1. SEE SPECIFICATION SECTION 23 21 00 - HYDRONIC PIPING FOR BALANCE VALVE SIZING REQUIREMENTS.
STACKED
COOLING COIL
PIPE DRAIN PANS
INDIVIDUALLY TO
FLOOR DRAIN.
EXTEND PIPING AS
REQUIRED FOR
ACCESS TO
VALVES. (TYP.)
NOTES:
1. THE NUMBER OF COILS MAY VARY BETWEEN MANUFACTURERS. CONTRACTOR SHALL SIZE PIPING TO EACH COIL SECTION AT NOT OVER 4 FEET OF PRESSURE DROP PER 100 FEET OF PIPE AND
PROVIDE ADDITIONAL UNIONS, VALVES, AND P/T PLUGS AS SHOWN FOR COILS.
CWP-1
VERTICAL
INTEGRAL FACE
AND BYPASS COIL
3/4" HORIZONTAL CHECK
VALVE TO SERVE AS
VACUUM BREAKER.
3" LPS
3" LPS
INSTALL FLEXIBLE CONNECTOR
PARALLEL TO COIL HEADERS AND
AS CLOSE AS POSSIBLE TO COIL
CONDENSATE CONNECTIONS.
THERMOSTATIC
AIR VENT
T-1 T-1
1-1/2" LPC
1-1/2" LPC
SEE PLAN FOR
CONTINUATION
SEE PLAN FOR
CONTINUATION
1-1/2" LPC
STEAM
HUMIDIFICATION
COIL
3/4" HORIZONTAL CHECK
VALVE TO SERVE AS
VACUUM BREAKER.
3" LPS
SEE PLAN FOR
CONTINUATION
T-3
T-4
STEAM
SEPARATOR
LWR
LWS
HEAT PUMP
UNION (TYP.)
3/4" CONDENSATE
P-TRAP (CONSTRUCTED WITH
SHORT RADIUS COPPER ELBOWS).
MINIMUM OF 4" DEEP TRAP.
3/4" CONDENSATE
BALANCING VALVE
FLEXIBLE
FIREPROOF
HOSE
NOTES:
1. INSTALL PIPING PER MANUFACTURER'S RECOMMENDATIONS.
P/T PLUG
INSTALL MANUAL AIR
VENT AT ALL HIGH
POINTS OF SYSTEM
2- POSITION CONTROL
VALVE PROVIDED [BY
MANUFACTURER,
INSTALLED BY
CONTRACTOR] [***OR***]
[AND INSTALLED BY
CONTRACTOR]
OVERSIZE HANGER TO ALLOW LONGITUDINAL
PIPE EXPANSION AND PIPE INSULATION TO
PASS THROUGH UNBROKEN (TYP)
INSULATION SHIELD
THREADED ROD
INSULATION
CLEVIS HANGER
HIGH DENSITY INSULATION INSERT
FOR 1 1/2" PIPES AND LARGER
AS REQUIRED IN SPECIFICATIONS
NOTES:
1. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
INSULATION SHIELD (TYP)INSULATED PIPE HANGER
UNI-STRUT OR EQUIVALENT
HIGH DENSITY INSULATION INSERT
FOR 1 1/2" PIPES AND LARGER
AS REQUIRED IN SPECIFICATIONS
THREADED ROD (TYP)
PIPE INSULATION (TYP)
TRAPEZE HANGER
TOP OF SUPPORT APPLICATION
BOTTOM OF SUPPORT APPLICATION
INSTALL CLAMP ON ALL
PIPES LESS THAN 4"Ø
CADMIUM PLATED LAG SCREWS 12" O.C.
COVER BOTTOM OF CURB OPENING
WITH MINIMUM 18 GAUGE SHEET
METAL
PREFABRICATED CURB WITH WOOD
NAILER
CURB HEIGHT 12" MIN.
ABOVE ROOF DECK
FRAMING, ROOF, &
ROOFING BY G.C.
BATT INSULATION. PROVIDE
THICKNESS TO MATCH ROOF
INSULATION. MINIMUM OF 6" THICK.
CARRY ROOFING UP UNDER COUNTER
FLASHING
RAISED CANT TO MATCH
THICKNESS OF ROOF DECK
INSULATION (BUILT-UP ROOF ONLY)
PIPE CURB CAP AND BOOT
ASSEMBLY. ABS PLASTIC CURB
CAP AND NEOPRENE BOOTS.
EQUAL TO PATE CO PCA SERIES.
VENT PIPE
WATER CUTOFF MASTIC
PRE MOLDED PIPE SEAL
SEALANT
STAINLESS STEEL
CLAMPING RING
1/8" BENT PLATE
GALVANIZED SHEET METAL
COUNTER FLASHING FULL
LENGTH OF CURB & BOTH ENDS.
PREFABRICATED EQUIPMENT
CURB WITH WOOD NAILER.
SINGLE MEMBRANE ROOFING
BY GENERAL CONTRACTOR.
EXTEND ROOFING UP UNDER
COUNTER FLASHING.
PIPING BRACKETED TO
SUPPORT.
CURB HEIGHT 12" MIN.
ABOVE ROOF DECK
RESTRAINED SPRING
VIBRATION ISOLATORS.
LAG SCREW ISOLATOR
INTO WOOD NAILER,
SEAL PENETRATIONS
PREFAB CURB WITH
NAILER.
CHANNEL OF CHILLER
CHILLER
18 GAUGE SHEET METAL CAP.
SLOPE FOR DRAINAGE, CAULK
CORNERS WATER TIGHT
FILL VOID WITH
UNFACED BATT
INSULATION
MAINTAIN ROOF
STRUCTURE
BELOW CURB/CAP
COUNTER FLASHING.
CURB HEIGHT
12" MIN. ABOVE
ROOF DECK
NOTES:
1. PROVIDE FULL PERIMETER CURB WITH SHEET METAL CAP AND SEAL WATER-TIGHT.
M
IN
M
IN
NOTE 3
STEAM
DRIP LEG
THREADED CAP
OR BLIND FLANGE
STRAINER WITH
BLOWDOWN VALVE
TRAP
TRAP CONNECTION SIZE OR
3/4", WHICHEVER IS LARGER
UNION (TYP.)
TEE AND SHUTOFF
VALVE FOR
TESTING TRAP.
NOTES:
1. DRIP AND DIRT LEGS SHALL BE AT LEAST TWICE THE DIAMETER OF THE TRAP
INLET.
2. INSTALL LEGS OF STRAINERS IN HORIZONTAL POSITION TO MINIMIZE
CONDENSATE HOLDING.
3. TEE SHALL BE FULL SIZE FOR 4" AND SMALLER MAINS.
4. LOCATE DRIP TRAPS AT 300 FOOT MAXIMUM INTERVALS AND UPSTREAM OF
ALL EXPANSION DEVICES, BRANCH CONNECTIONS OR CONTROL VALVES.
I O W A
S E
D
PROFESS IO NA
20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C R e v it L o c a l F ile s \M
E P
T .0
V
A -V
IS
N
-I o w a C it y -R e m o d e l
IR
-C a th
-E P
C
D e lla n .J
.L le w e lly n .r v t
/8
/2
:2 :3
P
M
1-MP7
PIPING DETAILS REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
BUILDING 1
04/08/2022 DAVING DELLLE16133
NO SCALE
PIPE THROUGH NON-FIRE RATED WALL
4 NO SCALE
RATED FIRE BARRIER PENETRATION
5 NO SCALE
HOT WATE REHEAT COIL PIPING DIAGRAM
NO SCALE
CHILLED WATER COIL PIPING DIAGRAM
NO SCALE
STEAM HEATING COIL PIPING DIAGRAM
NO SCALE
STEAM HUMIDIFICATION COIL PIPING DIAGRAM
NO SCALE
HEAT PUMP PIPING DIAGRAM
NO SCALE
PIPE - HANGERS AND SUPPORTS
1 NO SCALE
ROOF PENETRATION - INSULATED PIPE CURB
3NO SCALE
ROOF SUPPORT - EXPOSED PIPING RAIL
NO SCALE
EQUIPMENT ROOF SUPPORT RAIL
W/ VIBRATION ISOLATION
8 NO SCALE
STEAM MAIN DRIP CONNECTION
I O W A
S E
D
PROFESS IO NA
20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C R e v it L o c a l F ile s \M
E P
T .0
V
A -V
IS
N
-I o w a C it y -R e m o d e l
IR
-C a th
-E P
C
D e lla n .J
.L le w e lly n .r v t
/8
/2
:2 :4
P
M
1-MP8
PIPING SCHEDULES REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
BUILDING 1
04/08/2022 DAVING DELLLE16133
NOTES:
1.COMPUTER ROOM UNIT IS GLYCOL COOLED. PERFORMANCE SHALL BE BASED ON 40% PROPYLENE GLYCOL WITH 104°F EWT AND 115°F LWT.
2.PROVIDE UNIT WITH AN INTEGRAL GLYCOL ECONOMIZER COIL IN ADDITION TO THE DIRECT EXPANSION COIL. MANUFACTURER’S CONTROLS SHALL ACTIVATE/DEACTIVATE AND MODULATE THE TWO COOLING COILS TO ALLOW THE SYSTEM TO OPERATE AS A MODULATING GLYCOL ECONOMIZER, A GLYCOL REFRIGERATION SYSTEM, OR A COMBINATION OF BOTH.
3.PROVIDE UNIT WITH MANUFACTURER’S CONDENSATE PUMP.
4.PROVIDE WITH MANUFACTURER’S COMBINATION CEILING SUPPLY AND RETURN GRILLE/PLENUM.
COMPUTER ROOM UNIT SCHEDULE - DIRECT EXPANSION
TAG NAME AREA SERVED CFM
EXT.
S.P. IN.
W.C. COIL TYPE
REFRIGERANT
TYPE
# OF
CIRCUITS
STAGES OF
UNLOADING
EAT MBH GLYCOL WATER COIL
FILTER
TYPE
ELECTRICAL MAX. DIMENSIONS
OPERATING
WEIGHT
VIBRATION
ISOLATION
MANUFACTURER MODEL NOTESDB °F WB °F TOTAL SENSIBLE EWT °F LWT °F GPM HP VOLTAGE PHASES FLA MCA MOCP
DISCONNECT
CONTROLLER/
STARTER
LENGTH WIDTH HEIGHT TYPE DEFL.
BY
(NOTE A)
TYPE
(NOTE B)
BY
(NOTE A) SCCR
CRU-2W134 2W134 CATH
EQUIPMENT ROOM
1350 0.20 SLAB R-410A 1 N/A 75.0 61.0 40 32.4 0 °F 0 °F 0 GPM MERV 8 0.5 208 1 7 8 15 MFR NF MFR 5000 56" 30" 24" 328 M1 1/4" LIEBERT MT036H NOTES 1, 3, & 4
CRU-2W150 2W150 IR EQUIPMENT
ROOM
950 0.50 SLAB R-407C 1 NONE (ON-OFF) 75.0 61.0 12 12 105 °F 115 °F 2.6 GPM MERV 8 0.25 208 1 5 6 15 MFR NF MFR 5000 56" 30" 20" 260 M1 1/4" LIEBERT MMD14G NOTES 1, 3, & 4
CRU-2W179 2W179 EP EQUIPMENT
ROOM
950 0.50 SLAB R-407C 1 NONE (ON-OFF) 75.0 61.0 18 18 105 °F 115 °F 2.6 GPM MERV 8 0.25 208 1 8 10 15 MFR NF MFR 5000 56" 30" 20" 260 M1 1/4" LIEBERT MMD14G NOTES 1 & 3
CRU-3W136 3W136 EQUIPMENT
ELECTRICAL ROOM
4300 0.20 TILTED SLAB R-410A 1 DIGITAL SCROLL
(20-100%)
75.0 61.0 102.5 102 105 °F 115 °F 22 GPM MERV 8 4.2 480 3 26 30 45 MFR NF MFR 5000 34 1/2" 34 3/8" 77 1/2" 720 M1 1/4" LIEBERT PX029 NOTES 1, 2, & 3
GCU-2W134 2W134 CATH
EQUIPMENT ROOM
0 0.00 N/A R-410A 1 DIGITAL SCROLL
(40-100%)
75.0 61.0 40 32.4 105 °F 115 °F 8.6 GPM N/A 0 208 1 20 25 45 MFR NF MFR 5000 56" 30" 20" 237 M1 1/4" LIEBERT MTC36W NOTES 1 & 3
NOTES:
1.PROVIDE DRYCOOLER WITH DUAL PUMP PACKAGE WITH 5HP PUMPS.
2.DRYCOOLER PERFORMANCE SHALL BE RATED FOR 40% PROPYLENE GLYCOL.
DRYCOOLER SCHEDULE
TAG
NAME AREA SERVED
NOMINAL
TONS
HEAT
REJECTION
MBH
AMBIENT
AIR
TEMP °F GPM
GLYCOL
ENTERING
FLUID
TEMP °F
LEAVING
FLUID
TEMP °F
TOTAL
CFM
NUMBER
OF FANS
ELECTRICAL MAX. DIMENSIONS
WEIGHT
VIBRATION
ISOLATION
MANUFACTURER MODEL NOTES
NO. OF POWER
CONNECTIONS VOLTAGE PHASES FLA MCA MOCP
DISCONNECT CONTROLLER/ STARTER NO. OF
AUXILIARY
CONNECTIONS LENGTH WIDTH HEIGHT TYPE DEFL.
BY
(NOTE A)
TYPE
(NOTE B)
BY
(NOTE A) SCCR
DC-3W1
IR-CATH-EP LABS
COMPUTER UNITS
15 142 95.0 30.0 40 105 115 13300 2 1 480 3 11 13 20 MFR NF MFR 5000 0 91 1/2" 43 9/16" 37 7/8" 540 M3 0.7500 LIEBERT DDDO173 NOTES 1 & 2
G. CURB TYPE:
MFR = STANDARD CURB BY MANUFACTURER
GC = BY GENERAL CONTRACTOR
SAC = SOUND ATTENUATOR CURB
F. MUST BE WITHIN +/- 10% OF SCHEDULED RPM.
E. NO EQUIPMENT SHALL BE SELECTED ABOVE 90% OF MOTOR NAME
PLATE RATING.
D. FAN RPM SHALL NOT EXCEED 110% OF SCHEDULED VALUE, WITH
THE SCHEDULED WHEEL TYPE. SUBSTITUTION OF BI OR BIA FANS
FOR FC IS ACCEPTABLE IF EFFICIENCY IS NOT LOWER.
C. CONTROLLER STARTER TYPE:
FV = FULL VOLTAGE
WYE = WYE-DELTA
SS = SOLID STATE (SOFT START)
MS = MANUAL STARTER
VFD = VARIABLE FREQUENCY DRIVE
VFD/B = VARIABLE FREQUENCY DRIVE WITH BYPASS
B. DISCONNECT TYPE:
F = FUSED
NF = NON-FUSED
A. DISCONNECT AND CONTROLLER STARTER FURNISHED AND
INSTALLED BY:
MFR = MANUFACTURER
EC = ELECTRICAL CONTRACTOR.
MC = FURNISHED BY MECHANICAL CONTRACTOR, INSTALLED BY
ELECTRICAL CONTRACTOR.
MFR/EC = FURNISHED LOOSE BY MANUFACTURER INSTALLED BY
ELECTRICAL CONTRACTOR
SCHEDULE GENERAL NOTES:
NOTES:
1.PROVIDE SHAFT GROUNDING AS REQUIRED IN THE MOTOR SPECIFICATION 23 05 13.
PUMP SCHEDULE
TAG
NAME SERVICE GPM
PUMP FT.
HEAD AT
DESIGN
MINIMUM PUMP
EFFICIENCY
INLET
SIZE
IMPELLER
SIZE
ELECTRICAL (NOTE 1)
WEIGHT
VIBRATION ISOLATION
MANUFACTURER MODEL NOTES
HP (NOTE
E) RPM VOLTAGE PHASES
DISCONNECT CONTROLLER/ STARTER
TYPE DEFL.
BY
(NOTE A)
TYPE
(NOTE B)
BY
(NOTE A)
TYPE
(NOTE C)
CWP-1 1-AHU-310 80.0 40.00 0.73 3" 11.000 2 1637 480 3 EC NF MFR FV 75 H1 3/4" B & G SERIES 80
NOTES:
1.CAPACITY LISTED IS FOR EACH TRAP AND INCLUDES SAFETY FACTOR.
2.SUITABLE TO 125 PSIG, SIDE INLET & OUTLET, SS FLOAT MECHANISM AND VALVE, CAST IRON BODY, BALANCED PRESSURE THERMOSTATIC AIR VENT, ALL INTERNALS
REPLACEABLE IN-LINE.
3.CAPACITY AT OTHER DIFFERENTIAL PRESSURES SHALL BE AT LEAST 525#/HR AT 10 PSID, AND 1080#/HR AT 75 PSID. 1/8" ORIFICE.
4.WITH INTEGRAL VACUUM BREAKER.
5.SIDE INLET AND OUTLET INVERTED BUCKET TRAP. 250 PSIG RATED. CAST IRON BODY, ALL INTERNAL COMPONENTS OF STAINLESS STEEL AND REPLACEABLE IN-LINE.
6.CAPACITY AT OTHER DIFFERENTIAL PRESSURES SHALL BE AT LEAST 150#/HR AT 10 PSID, 310#/HR AT 40 PSID, & 420#/HR AT 75 PSID. #38 ORIFICE.
TRAP SCHEDULE
TAG
NAME SERVICE TYPE
SAFETY
FACTOR SIZE
CAPACITY LB HR
(NOTE 1)
PRESSURE
DIFFERENTIAL MANUFACTURER MODEL NOTES
T-1 AH1-31 HEATING COIL F & T 2 1 1/2" 1100 15 ARMSTRONG 125-A SERIES NOTES 2, 3, & 4
T-2 AH1-31 HUMIDIFIER DRIP F & T 2 3/4" 100 15 ARMSTRONG 125-A SERIES NOTES 2, 3, & 4
T-3 AH1-31 HUMIDIFIER MANIFOLD F & T 2 3/4" 100 15 ARMSTRONG 125-A SERIES NOTES 2, 3, & 4
T-4 LPS MAIN DRIP F & T 2 3/4" 100 15 ARMSTRONG 125-A SERIES NOTES 2, 3, & 4
DIRECTION OF AIR FLOW
FLEXIBLE DUCT
MANUAL VOLUME DAMPER
DUCT CAP
DUCT DOWN
DUCT UP
SUPPLY/OUTSIDE AIR DUCT SECTION
RETURN AIR DUCT SECTION
EXHAUST/RELIEF AIR DUCT SECTION
4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION
SD-1
6/115
AIR TERMINAL PROPERTIES SYMBOL
NECK SIZE/CFM
TERMINAL AIR BOX (REFER TO SCHEDULE)###
### TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE)
HUMIDIFIERH
OPPOSED BLADE DAMPER (REFER TO SCHEDULE)
PARALLEL BLADE DAMPER (REFER TO SCHEDULE)
DIFFERENTIAL PRESSURE SENSOR
CARBON MONOXIDE SENSORC
CARBON DIOXIDE SENSORC2
HUMIDISTAT SENSORH
HUMIDISTAT/SENSOR (DUCT MOUNTED)H
OCCUPANCY SENSORO
PRESSURE SENSOR/MONITORP
PRESSURE SENSOR (DUCT MOUNTED)P
THERMOSTAT/SENSORT
TEMPERATURE SENSOR (DUCT MOUNTED)T
THERMOSTAT/SENSOR WITH HEAVY DUTY ENCLOSURET
VENTILATION SYMBOL LIST
SYMBOL: DESCRIPTION:
AIRFLOW MEASUREMENT SYMBOL
XX - AHU SYMBOL
Y - SEQUENTIAL NUMBER
XX-Y
NOT ALL SYMBOLS MAY APPLY.
STAINLESS STEEL DUCT
VENTILATION ABBREVIATION KEY
ABBR: DESCRIPTION:
DIFFERENTIAL PRESSURE GAUGE (RANGE)DPG (0-2")
DIFFERENTIAL PRESSURE SWITCHDPS
AD ACCESS DOOR
ABOVE FINISHED FLOORAFF
CFSD CONTROL/FIRE/SMOKE DAMPER
EA EXHAUST/RELIEF AIR
FD FIRE DAMPER
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FSD FIRE/SMOKE DAMPER
MA MIXED AIR
OA OUTSIDE AIR
RA RETURN AIR
SA SUPPLY AIR
SD SMOKE DAMPER
TRANSFER DUCTTD
UC-1 DOOR UNDERCUT BY OTHERS (1" TYPICAL)
ECFSD EXISTING CONTROL FIRE SMOKE DAMPER
EFD EXISTING FIRE DAMPER
EFSD EXISTING FIRE SMOKE DAMPER
ESD EXISTING SMOKE DAMPER
TERMINAL AIR BOXTAB
TYPICALTYP
UNO UNLESS NOTED OTHERWISE
N.C. NORMALLY CLOSED
NOT IN CONTRACTNIC
NORMALLY OPENN.O.
SCCR SHORT CIRCUIT CURRENT RATING
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
SIMSIM
INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
LEVEL NAME
10' - 0" HEIGHT ABOVE
PROJECT 0' - 0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N O R
HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
TAG-1 UNDERLINED TEXT INDICATES ADDITIONAL INFORMATION CAN BE FOUND
ELSEWHERE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
T101
THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR
SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL
MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.
ALL FLOOR ASSEMBLIES SHALL BE DESIGNATED AS 2 HOUR FIRE/SMOKE, BARRIER(S), UNLESS
NOTED OTHERWISE ON THE PLANS. RATINGS WERE ACQUIRED FROM THE ARCHITECTURAL
PLANS DATED 08/27/2021.
FIRE / SMOKE BARRIER DESIGNATIONS
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
SMOKE BARRIER
2 HOUR FIRE/SMOKE BARRIER
TEMPERATURE CONTROLS CONTRACTORT.C.C.
FIRE PROTECTION CONTRACTORF.P.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
MECHANICAL CONTRACTORM.C.
ELECTRICAL CONTRACTORE.C.
CONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
TECHNOLOGY CONTRACTORT.C.
CONTRACTING OFFICER'S REPRESENTATIVEC.O.R
BUILDING CODE: IBC 2018 EDITION
FIRE CODE: IFC 2018 EDITION, VA FIRE PROTECTION DESIGN
MANUAL
PLUMBING CODE: IPC 2018 EDITION, VA PLUMBING DESIGN MANUAL
MECHANICAL CODE: IMC 2018 EDITION, VA HVAC DESIGN MANUAL
ELECTRICAL CODE: NFPA 70 (NEC) 2020 EDITION
LIFE SAFETY CODE: NFPA 101 2021 EDITION
ENERGY CONSERVATION CODE: IECC 2012
HEALTH DEPARTMENT CODE: CURRENT EDITION
LOCAL BUILDING CODE: CURRENT EDITION
APPLICABLE CODES
CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS.
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE
CONTROL.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO OTHERS.
6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
MOUNTED DEVICES, OTHER THAN SPRINKLERS.
8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
FINISH.
9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE
GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE
PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS
PANELS PRIOR TO BIDDING.
10. SEAL ALL FLOOR, WALL AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,
AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE
SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER
FOR OUTDOOR USE.
11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,
PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
WITHIN ROOMS.
12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.
15. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR
STARTERS, SWITCHES, AND DISCONNECTS.
16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL
EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.
17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER
NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE
CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
MECHANICAL PHASING NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE
CONTROL.
1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO
CONSTRUCTION MANAGER'S/GENERAL CONTRACTOR'S/ARCHITECT'S INSTRUCTIONS FOR
MORE DETAILS AND PHASING SCHEDULES AND FOR CONCURRENT WORK. MECHANICAL,
ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT THE INTENT OF THE FINAL DESIGN. THE
MECHANICAL, ELECTRICAL, AND TECHNOLOGY DRAWINGS DO NOT DEPICT THE MEANS AND
METHODS TO MEET THE REQUIREMENTS OF THE PHASING CRITERIA.
2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC.
WITH AFFECTED ADJACENT AREAS.
3. PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE
ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS DURING ALL PHASES OF
PROJECT.
4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP
ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT
5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.
MECHANICAL RENOVATION NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE
CONTROL.
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND
REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS
BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.
3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE
FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD
CONDITIONS.
4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK
AND SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE
REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER AREA OF
WORK.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF
ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.
CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.
6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF
CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL
CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO
BIDDING.
7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH
NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL
EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT
DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL
SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT
REMAIN ACTIVE.
9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY
REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW
SYSTEMS ARE INSTALLED.
10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR
TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND
CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY
DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.
11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT
THAT HAS BEEN REMOVED.
1. UNLESS NOTED OTHERWISE, THE SIZE OF EACH BRANCH DUCT TO A TERMINAL AIR BOX
(TAB) SHALL MATCH THE INLET SIZE UNLESS THE BRANCH IS GREATER THAN 6FEET IN
LENGTH, IN WHICH CASE THE BRANCH DUCT SHALL BE SIZED AT A PRESSURE DROP OF
0.07"W.C. PER 100' OF DUCTWORK.
2. UNLESS NOTED OTHERWISE, THE SIZE OF EACH BRANCH DUCT TO AN AIR TERMINAL SHALL
MATCH THE INLET SIZE.
3. ALIGN TEMPERATURE SENSORS WITH LIGHT SWITCHES AND WHEN IN CLOSE PROXIMITY TO
EACH OTHER.
4. PROVIDE ACCESS DOORS AT ALL DUCT MOUNTED EQUIPMENT.
5. EXISTING AIR INLET AND OUTLET CFM SHOWN ON DRAWINGS ARE FROM EXISTING
DRAWINGS, AND ARE FOR REFERENCE ONLY. CONTRACTOR SHALL USE PRE-BALANCE
VALUES, AND NOT EXISTING CFM SHOWN ON DRAWINGS.
6. CONTRACTOR MAY REUSE PORTIONS OF EXISTING DUCT PROVIDED SIZES AND PRESSURE
CLASSES ARE CORRECT, DUCT IS THOROUGHLY CLEANED AND FREE OF DEFECTS, AND ALL
TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS ARE SEALED
AS SPECIFIED FOR NEW DUCTWORK.
VENTILATION GENERAL NOTES:
1. BEFORE ANY DEMOLITION WORK IS BEGUN A COMPLETE AIR BALANCE TEST SHALL BE
PERFORMED BY THE TESTING, ADJUSTING AND BALANCING (TAB) CONTRACTOR ON
EXISTING AIR HANDLERS AND EXHAUST FANS SERVING THE AREAS AFFECTED BY
CONSTRUCTION. EQUIPMENT TO BE DEMOLISHED DOES NOT REQUIRE TESTING. PROVIDE
AIR BALANCE TESTING ONLY ON EQUIPMENT THAT WILL CONTINUE TO BE USED TO SERVE
RENOVATED AREAS AFTER THE CONSTRUCTION PHASE IS COMPLETED.
2. PROVIDE DUCT TRAVERSE READINGS AT LOCATIONS DESIGNATED ON THE DRAWINGS BY
THE "AIRFLOW MEASUREMENT SYMBOL". THOSE MEASUREMENTS SHALL BE INCLUDED IN
THE PRE DEMOLITION REPORT AND SHALL BE DESIGNATED WITH THE IDENTIFIER AS
MARKED ON THE DRAWINGS. READINGS SHALL BE DESIGNATED WITH THE ROOM NAME AND
NUMBER AS MARKED ON THE DRAWINGS. IF FLOOR PLANS DO NOT HAVE UNIQUE ROOM
NAMES AND NUMBERS, TAB CONTRACTOR SHALL INCLUDE FLOOR PLAN WITH UNIQUE
NUMBER DESIGNATIONS ASSIGNED TO READINGS THAT MATCH THOSE USED IN THE FINAL
PRE-DEMOLITION REPORT. DRAWINGS THAT ARE HAND-MARKED WITH RED INK ARE
ACCEPTABLE, PROVIDED THEY ARE LEGIBLE.
3. IN THE EVENT A DUCT TRAVERSE LOCATION AS MARKED ON THIS PLAN IS INACCESSIBLE
FOR MEASUREMENT, THE TAB CONTRACTOR SHALL PERFORM THE TRAVERSE AT AN
ALTERNATE LOCATION OR SHALL TAKE MULTIPLE DUCT TRAVERSES AND/OR READINGS AS
REQUIRED TO DETERMINE THE AIRFLOW READING WHERE THE DUCT TRAVERSE SYMBOL IS
SHOWN. IN THE EVENT TRAVERSES ARE TAKEN AT ALTERNATE LOCATION(S), TAB
CONTRACTOR SHALL INCLUDE A DRAWING THAT SHOWS THE LOCATIONS WHERE THE
ACTUAL MEASUREMENTS WERE TAKEN.
4. TAKE A DUCT STATIC PRESSURE READING AT EACH LOCATION WHERE A DUCT TRAVERSE
READING IS TAKEN AND INCLUDE IN THE FINAL PRE-DEMOLITION TAB REPORT.
5. TAB CONTRACTOR SHALL COMPILE AND SUBMIT FOUR COPIES OF THE FINAL PRE-
DEMOLITION REPORT WITHIN 10 WORKING DAYS AFTER THE FIELD MEASUREMENTS ARE
COMPLETED. FINAL TAB REPORT SHALL BE SUBMITTED FOR REVIEW TO THE
ARCHITECT/ENGINEER. TESTING SHALL INCLUDE ALL ITEMS REQUIRED IN THE
SPECIFICATIONS.
6. TAB CONTRACTOR SHALL PROVIDE DUCT TRAVERSE READINGS AT LOCATIONS
DESIGNATED ON THE DRAWINGS BY THE "AIRFLOW MEASUREMENT SYMBOL". THOSE
MEASUREMENTS SHALL BE INCLUDED IN THE POST-CONSTRUCTION REPORT AND SHALL BE
DESIGNATED WITH THE IDENTIFIER AS MARKED ON THE CONSTRUCTION DRAWINGS. GRILLE
AND DIFFUSER READINGS SHALL BE DESIGNATED WITH THE ROOM NAME AND NUMBER AS
MARKED ON THE DRAWINGS. IF THE DRAWINGS DO NOT HAVE UNIQUE ROOM NAMES AND
NUMBERS, TAB CONTRACTOR SHALL INCLUDE FLOOR PLANS WITH UNIQUE NUMBER
DESIGNATIONS ASSIGNED TO TRAVERSES, GRILLES, AND DIFFUSERS THAT MATCH THOSE
USED IN THE FINAL PRE-DEMOLITION REPORT. SIMILAR ROOM NAMES, NUMBERS, OR
DESIGNATIONS SHALL BE USED TO SIMPLIFY THE CROSS- REFERENCING OF READINGS
TAKEN BETWEEN PRE-DEMOLITION AND POST-CONSTRUCTION REPORTS.
7. BALANCING CONTRACTOR SHALL PRE-BALANCE ALL EXISTING SYSTEMS TO REMAIN PER
SPECIFICATION SECTION 23 05 93. BALANCE READINGS WILL BE REQUIRED AT AIR OUTLETS
AND DUCT TRAVERSES TO VERIFY EXISTING AIRFLOW TO UNAFFECTED SPACES.
TAB PRE-DEMOLITION NOTES:
1. AFTER CONSTRUCTION ACTIVITIES ARE COMPLETE, TESTING, ADJUSTING (TAB) AND
BALANCING CONTRACTOR SHALL REBALANCE AIR HANDLING UNITS AND EXHAUST FANS AS
REQUIRED TO ACHIEVE THE NEW AIRFLOW VALUES SHOWN ON THE CONSTRUCTION
DRAWINGS.
2. AREAS SERVED BY THIS EQUIPMENT WHICH WERE NOT RENOVATED SHALL BE RE-
BALANCED TO THE AIRFLOW RATES MEASURED BEFORE THE RENOVATION OCCURRED
(REFER TO THE FINAL PRE- DEMOLITION REPORT).
3. IF DUCT TRAVERSE LOCATION AS MARKED ON THE DRAWINGS IS INACCESSIBLE FOR
MEASUREMENT, THE TAB CONTRACTOR SHALL PERFORM THE TRAVERSE AT AN ALTERNATE
LOCATION OR SHALL TAKE MULTIPLE DUCT TRAVERSES AND/OR GRILLE READINGS AS
REQUIRED TO DETERMINE THE FLOW RATE. IN THE EVENT TRAVERSES ARE TAKEN AT AN
ALTERNATE LOCATION(S), TAB CONTRACTOR SHALL INCLUDE A DRAWING THAT SHOWS THE
LOCATIONS WHERE THE ACTUAL MEASUREMENTS WERE TAKEN.
4. A DUCT STATIC PRESSURE READING SHALL BE TAKEN AT EACH LOCATION WHERE A DUCT
TRAVERSE READING IS TAKEN AND SHALL BE INCLUDED IN THE FINAL POST-CONSTRUCTION
TAB REPORT.
5. TAB CONTRACTOR SHALL COMPILE AND SUBMIT COPIES OF THE FINAL POST-
CONSTRUCTION TAB REPORT AS REQUIRED BY SECTION 23 05 93.
6. THE FINAL POST CONSTRUCTION REPORT SHALL INCLUDE ALL ITEMS REQUIRED IN THE
SPECIFICATIONS.
TAB POST-CONSTRUCTION NOTES:
1. EQUIPMENT ANCHORAGE NOTE:
ALL MECHANICAL, PLUMBING, AND ELECTRICAL COMPONENTS SHALL BE ANCHORED AND
INSTALLED PER THE DETAILS ON THE DSA APPROVED CONSTRUCTION DOCUMENTS. THE
FOLLOWING COMPONENTS SHALL BE ANCHORED OR BRACED TO MEET THE FORCE AND
DISPLACEMENT REQUIREMENTS PRESCRIBED IN THE 2019 CDC, SECTION 1616A.18
THROUGH 1616A.1.26 AND ASCE 7-16 CHAPTERS 13,26, AND 30.
1. ALL PERMANENT EQUIPMENT AND COMPONENTS.
2. TEMPORARY, MOVABLE OR MOBILE EQUIPMENT THAT IS PERMANENTLY ATTACHED (E.G.
HARED WIRED) TO THE BUILDING UTILITY SERVICES SUCH AS ELECTRICITY, GAS OR
WATER. “PERMANENTLY ATTACHED” SHALL INCLUDE ALL ELECTRICAL CONNECTION
EXCEPT PLUGS FOR 110/220 VOLT RECEPTACLES HAVING A FLEXIBLE CABLE.
3. TEMPORARY, MOVABLE OR MOBILE EQUIPMENT WHICH IS HEAVIER THAN 400 POUNDS
OR HAS A CENTER MASS LOCATED 4 FEET OR MORE ABOVE THE ADJACENT FLOOR OR
ROOF LEVEL THAT DIRECTLY SUPPORT THE COMPONENTS IS REQUIRED TO BE
RETRAINED IN A MANNER APPROVED BY DSA.
THE FOLLOWING MECHANICAL AND ELECTRICAL COMPONENTS SHALL BE POSITIVELY
ATTACHED DOT THE STRUCTURE, BUT NEED NOT DEMONSTRATE DESIGN COMPLIANCE
WITH THE REFERENCES NOTES ABOVE. THESE COMPONENTS SHALL HAVE FLEXIBLE
CONNECTIONS PROVIDED BETWEEN THE COMPONENT AND ASSOCIATED DUCTWORK,
PIPING, AND CONDUIT. FLEXIBLE CONNECTIONS MUST ALLOW MOVEMENT IN BOTH
TRANSFERS AND LONGITUDINAL DIRECTIONS.
A. COMPONENTS WEIGHING LESS THAN 400 POUNDS AND HAVE A CENTER OF MASS
LOCATED 4 FEET OR LESS ABOVE THE ADJACENT FLOOR OR ROOF LEVEL THAT
DIRECTLY SUPPORT THE COMPONENT.
B. COMPONENTS WEIGHING LESS THAN 20 POUNDS, OR IN THE CASE OF DISTRIBUTED
SYSTEMS, LESS THAN 5 POUNDS PER FOOT, WHICH ARE SUSPENDED FROM A ROOF
OR FLOOR OR HUNG FROM A WALL.
THE ANCHORAGE OF ALL MECHANICAL, ELECTRICAL, AND PLUMBING COMPONENTS SHALL
BE SUBJECT TO THE APPROVAL OF THE DESIGN PROFESSIONAL IN GENERAL RESPONSIBLE
CHARGE OF STRUCTURAL ENGINEER DELEGATE RESPONSIBILITY AND ACCEPTANCE BY
DSA. THE PROJECT INSPECTOR WILL VERIFY THAT ALL COMPONENTS AND EQUIPMENT
HAVE BEEN ANCHORED IN ACCORDANCE WITH THE ABOVE REQUIREMENTS.
2. PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEMS BRACING NOTE.
PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEM SHALL BE BRACED TO
COMPLY WITH THE FORCES AND DISPLACEMENT PRESCRIBED IN ASCE 7-16 SECTION 13.3 AS
DEFINED INS ASCE 7-16 SECTION 13.6.5.6, 13.6.7, 13.6.8, AND 2019 CDC, SECTIONS 1616A.1.24, 1616A.1.25 AND 1616A.1.26.
THE METHOD OF SHOWING BRACING AND ATTACHMENTS TO THE STRUCTURE FOR THE
IDENTIFIED DISTRIBUTION SYSTEM ARE AS NOTED BELOW. WHEN BRACING AND
ATTACHMENTS ARE BASED ON A PREAPPROVED INSTALLATION GUIDE (E.G. OSHPD OPM
FOR 2013 OR LATER), COPIES OF THE BRACING SYSTEM INSTALLATION GUIDE OR MANUAL
SHALL BE AVAILABLE ON THE JOBSITE PRIOR TO THE STAR OF AND DURING THE HANGING
AND BRACING OF THE DISTRIBUTION SYSTEMS. THE STRUCTURAL ENGINEER OF RECORD
SHALL VERIFY THE ADEQUACY OF THE STRUCTURE TO SUPPORT THE HANGER AND BRACE
LOADS.
ME COMPONENT ANCHORAGE NOTES:
CONTACT PERSONS:
PROJECT MANAGER
MECHANICAL
ELECTRICAL
TECHNOLOGY
STRUCTURAL
ERIC HENDERSON
ERIC HENDERSON
ISAAC STOLL
DAMON DEEN
JOHN PAUL GOEDKEN
DESCRIPTION: PERSON:
VENTILATION SHEET INDEX
1-MH0 VENTILATION COVERSHEET
1-MH1 SECOND FLOOR DEMOLITION - VENTILATION
1-MH2 THIRD FLOOR DEMOLITION - VENTILATION
1-MH3 ROOF DEMOLITION - VENTILATION
1-MH4 SECOND FLOOR PLAN - VENTILATION
1-MH5 THIRD FLOOR PLAN - VENTILATION
1-MH6 ROOF PLAN - VENTILATION
1-MH7 VENTILATION DETAILS
1-MH8 VENTILATION DETAILS
1-MH9 VENTILATION ENLARGED PLANS
1-MH10 VENTILATION SCHEDULES
GRAND TOTAL: 11
I O W A
S E
D
PROFESS IO NA
20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C R e v it L o c a l F ile s \M
E P
T .0
V
A -V
IS
N
-I o w a C it y -R e m o d e l
IR
-C a th
-E P
C
D e lla n .J
.L le w e lly n .r v t
/8
/2
:1 :5
P
M
1-MH0
VENTILATION COVERSHEET REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
BUILDING 1
04/08/2022 DAVING DELLLE16133Revisions: Date:
T
T
T
T
T
T
T
T
T T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T H
H
T
A BA' C D D1 E F
0.9
G
14 M
FF
H
7' x1 x1 x1
SD-E
6x13
10ø ø
SD-E
SD-E
ø
12x10
SD-E
SD-E
SD-E
SD-E
8ø
6ø ø ø
12ø
4x11
SD-E
6x11
10x11
SD-E
14x14 ø ø x1
SD-E
SD-E
x1
SD-E
SD-E
ø S
A ø S
A
SD-E
SD-E
SD-E
18ø
SD-E
SD-E
ø
SD-E
8x8 x6 ø
8ø x6
RG
RG-E
6x6
8x48x4
RG-E RG-E
x4 x4
RG-E
RG-E
RG-ERG-E
x4 8 x414x8
RG-E
SD-E
SD-ESD-E
18x12
8x11
TAB-E
TAB-E
TAB-E
TAB-E
TAB-E
TAB-E
TAB-E
TAB-E
18ø
18"Ø SA UP
46x16 SA UP
RG-E
12x4
12x4 x6
12x6
RG-E
RG-E
12x4
RG-E
RG-E
RG-E
x8
22x12 22x16 x1
26x1010x10
SD-E
SD-E
SD-E
SD-E
SD-E
SD-E SD-E
RG-E
x1
20x10
TAB-E
6ø
6ø
SD
TAB-E
SD
ø ø
18ø 16ø 13ø
18"Ø SA UP
54x1828x18 x1 x1
18x16
SD-E
SD-E
x1
SD-E
TAB-E
RG-E
x8 x1 ø
16x12 14x10
RG-E
x8 x1
RG-E
20x16 20x14
RG-ERG-E
RG-E
RG-E
12x8
10x8 6x12
RG RG-E
x x
12x16
RG
x1
10x12
13"Ø SA UP
SD-E
SD-E
SD-E
SD-E
7x11
54x18 RA UP
TAB-E
TAB-E
SD
SD
x
8x11 x1 x8
TAB-E
8x13
TAB-E SD-E
SD-E
SD-E
SD-E
8x11
TAB-E
SD-E
10x118ø
RG-E
x1
16x16
SD-E
SD-E
RG-E
14x6
RG-E
RG-E
SD
SD
8x6
RG-E
RG
x2
16x16
18x18 x
12x12
TAB-E
14"Ø SA UP
8x8
14x18
18x18
12x8
EG
x x
8x4
EG-E
12x8
EG-E
x8
10x610x6
EG-E6
x6
EG-E
x8 x8
EG-E
EG-E
EG
x
EG
8x6 x
18x18 RA UP 22x16 x1 x8
22x22 RA UP
SD-E
18x6
TAB-E
SD-E
30x14
RA UP
x1
30x14
SD
SD
x
TAB-E
ø ø ø ø
12x6
RG
SD
TAB-E
TAB-E
TAB-E
TAB-E
SD-E
RG-E
14x8
RG-E
EG-E
x6
10x8
SD-E
TAB-E
TAB-E
SD
SD
SD
SD
SD
SD
SD
TAB-E
RG
SD
SD
SD
TAB-E
10ø
TAB-E
SD
SD
SD SDSD
EG
EG-E
EG
RG
x
12x12 RA
UP
RG
SD
SD-E
12ø
SD
12ø ø
20x20 SA UP x
RG
SD SD
10ø
SD
SD
SD
TAB-E
SD SDTAB-E TAB-E
TAB-E
SG
SG
TAB-E
x
SG
SG SG
16x10 x
SG
x
SG
SG 1
x
16x10
10ø
24x1024x10
EG-E
EG-E
12"Ø SA UP
14x12 x
22x812x12 EA ø
12x12 EA UP 18x18 EA UP
22x20 EA UP
42x24 EA
UP/DN
KEY PLAN - SECOND FLOOR
I O W A
S E
D
PROFESS IO NA
20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C R e v it L o c a l F ile s \M
E P
T .0
V
A -V
IS
N
-I o w a C it y -R e m o d e l
IR
-C a th
-E P
C
D e lla n .J
.L le w e lly n .r v t
/8
/2
:1 :0
P
M
1-MH1
SECOND FLOOR DEMOLITION -
VENTILATION
REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
BUILDING 1
04/08/2022 DAVING DELLLE16133
N O R
HT
1/8" = 1'-0"
SECOND FLOOR DEMOLITION - VENTILATION
KEYNOTES:
1. WHERE EXISTING MECHANICAL
PENETRATIONS IN SLAB ARE SHOWN TO BE
REMOVED, INFILL REMAINING OPENING.
REFERENCE ARCHITECTURAL AND
STRUCTURAL PLANS FOR INFILL DETAILS.
GENERAL VENTILATION NOTES:
1. REFERENCE 1-MH0 VENTILATION COVERSHEET
FOR VENTILATION SYMBOLS LIST,
ABBREVIATIONS LIST, AND GENERAL NOTES.
2. PROJECT IS SPLIT INTO FOUR PHASES.
REFERENCE ARCHITECTURAL PHASING
DIAGRAM FOR ADDITIONAL INFORMATION.
WORK IN EACH PHASE SHALL BE COMPLETED
WITH MINIMAL IMPACT ON AREAS OF PROJECT
IN OTHER PHASES OR AREAS OF THE BUILDING
OUTSIDE THE PROJECT BOUNDARIES. ANY
WORK WHICH WILL NEED TO BE COMPLETED
OUT OF PHASE MUST BE COORDINATED AND
SCHEDULED WITH THE OWNER AND MAY NEED
TO BE COMPLETED DURING OFF HOURS.
3. REMOVE EXISTING MECHANICAL EQUIPMENT,
PIPING, HANGERS, INSULATION, AND
ACCESSORIES UNLESS OTHERWISE NOTED.
4. REMOVE EXISTING CONTROL DEVICES,
WIRING, CONDUIT, HANGERS, AND
ACCESSORIES.
5. IN AREAS WHERE EXISTING STRUCTURE WILL
REMAIN, CUT HANGERS FLUSH WITH
STRUCTURE IF HANGER CANNOT BE REMOVED
COMPLETELY WITHOUT DAMAGING THE
EXISTING STRUCTURE.
6. NOT ALL MECHANICAL DEMOLITION IS
EXPLICITLY SHOWN ON THE DRAWING.
CONTRACTOR SHALL CONFIRM EXTENT OF
DEMOLITION WORK AT THE SITE.
3W103
3W105
3W103A
3W104
3ST06
3W101
3W09
3S01
3C01
3CW01A
3W100
3W07
DW-2
3W102A
3W102
3CO1A
3C03
MECH SHAFT
3W19A3W11
3CW02A
3C02
3W17A
3W101A
CL-1
3W17
3W17B
3W101B
3W17C
3S08D
3W19B
B1
S H A F T
S H A F T
3W103D
3W19C
SHAFT
3W223
B3
C1
C2
3W103C
3W222
B2
3W101C
T
A BA' C D D1 E F
0.9
G
14 M
FF
H
7'
20Ø SA DN
FD-E AT
PENETRATION
24Ø SA DN
FD-E AT
PENETRATION
64x14 RA 84x18 RA
20Ø RA DN
FD-E AT
PENETRATION
x1 R
A
24ø SA 28ø SA x1 R
A
30x14 RA DN
FD-E AT
PENETRATION
36x30 SA DN
TRANSITION
TO 46x16
18ø SA ø S
A ø S
A
18Ø SA DN
x3 S
A
12x12 DN x4 R
A x4 S
A
15ø SA
13ø x1 S
A x1 S
A
HV-E
12x20 UP
66x18 UP
8x6 EA UP
TO EF-E
x6 x3 R
A x3 R
A x6 R
A x4 S
A
60x38 RA UP
96x60x30 OUTSIDE
AIR PLENUM
x2 O
A
42x16 OA
42x16
L-E
12x12
SG-E
12x12
FCU-E
SUPLY FAN
x7 S
A
46x40 SA x3 S
A x5 S
A ø S
A
65x40 SA
36ø SA x1 O
A
26x12 OA x1 O
A x1 O
A
26x12 OA
39x39 EA UP
TO EF-E
AH1-38AH1-37
20x20 x x1 R
A
16x16 SA
AH1-39
AH1-36
(12,000 CFM)
(9,050 CFM)
x3 O
A x3
O
A x
96x60x24 OUTSIDE
AIR PLENUM
12x12 EA UP/DN 18x18 EA UP/DN
22x20 EA UP/DN
42x24 EA UP/DN
20x20 SA DN
12ø SA DN
REMOVE EXISTING
FIRE DAMPER AT
FLOOR PENETRATION
x
REMOVE EXISTING
FIRE DAMPER AT
FLOOR PENETRATION
1-RF-A1
KEY PLAN - THIRD FLOOR
I O W A
S E
D
PROFESS IO NA
20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C R e v it L o c a l F ile s \M
E P
T .0
V
A -V
IS
N
-I o w a C it y -R e m o d e l
IR
-C a th
-E P
C
D e lla n .J
.L le w e lly n .r v t
/8
/2
:1 :0
P
M
1-MH2
THIRD FLOOR DEMOLITION -
VENTILATION
REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
BUILDING 1
04/08/2022…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .