Attachment O - 2W IR CATH EP_Cath Lab_Site Specific.pdf
PDF 4 MB Posted
- Solicitation number
- 36C26323R0002
About this file
This document is a site-specific attachment for a federal solicitation to remodel space at the VA Iowa City Health Care System for interventional radiology, cardiac catheterization, and electrophysiology procedures. The solicitation seeks a contractor to complete construction and installation requirements before equipment delivery, including preparing storage space and the delivery path, installing casework, lighting, network drops, unistrut supports, conduits, and power. The site must be clean and dust-free when work is finished. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 23 for project number 36C26323R0002 to remodel space on the second floor.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA IOWA CITY HEALTH CARE SYSTEM
2104150
A-101ATTENTION:
R E
F E
R E
N C
E
D
O C
U M
E N
T
N
O T
F
R
C
N
S T
R U
C T
I O
N
WITH NON-TILTING TABLE
PROJECT MILESTONES TO BE COMPLETED BEFORE EQUIPMENT DELIVERY
Storage area available for storing items during installation
Lead shielding (walls, doors, windows) complete
Climate control functioning 24 hours a day, 7 days a week
Delivery path verified for largest piece, including rails
Casework complete in control room
All walls primed and painted. Flooring installed
Room lighting complete and functional
Network drops active and IP addresses obtained for Siemens Remote Services (SRS)
Nothing hanging below ceiling in area shaded on drawing
Floor thickness and anchoring spec's verified. If req'd, alt solutions per engineer of record in place
All conduits, troughs, in-floor pull boxes and/or core drills avoid conflict with floor plate anchors
Unistrut installed to correct height, location, and levelness (check minimum ceiling height)
Cable runs checked to ensure maximum lengths not exceeded
X-Ray warning light and wiring installed
Contractor supplied electrical wiring / pigtails installed
Cable inlets located per plans
EPO's installed and functional
UPS started and functional
Ancillary equipment (OEM items, booms, etc) installed
Breakers installed and facility power available
All rooms containing Siemens equipment are clean and dust-free
REFERENCE SHEET
A-101
A-101
A-101
A-101
A-101
A-101
A-101
A-102
A-102
S-101
S-101
S-102
E-101
E-101
E-102
E-102
E-102
E-102
E-102
E-501
A-101
A-102ATTENTION:
R E
F E
R E
N C
E
D
O C
U M
E N
T
N
N
S T
R U
C T
I
N
S-101ATTENTION:
R E
F E
R E
N C
E
D
O C
U M
E N
T
N
N
S T
R U
C T
I
S-102ATTENTION:
R E
F E
R E
N C
E
D
O C
U M
E N
T
N
N
S T
R U
C T
I
E-101ATTENTION:
R E
F E
R E
N C
E
D
O C
U M
E N
T
N
N
S T
R U
C T
I
E-102ATTENTION:
R E
F E
R E
N C
E
D
O C
U M
E N
T
N
N
S T
R U
C T
I
E-501ATTENTION:
R E
F E
R E
N C
E
D
O C
U M
E N
T
N
N
S T
R U
C T
I
M-501ATTENTION:
R E
F E
R E
N C
E
D
O C
U M
E N
T
N
N
S T
R U
C T
I O
N
ATTENTION:
R E
F E
R E
N C
E
D
O C
U M
E N
T
N
N
S T
R U
C T
I
File details come from the government source that posted it. Updated .