Attachment R- 2W IR CATH EP_IR Lab_Site Specific.pdf

PDF 4 MB Posted

Attached to
Z1DA--636A8-21-001 CON Remodel 2W for IR/CATH/EP 36C263-22-AP-3804
Solicitation number
36C26323R0002
Issued by

About this file

This document includes reference drawings and specifications for a remodel project at a Veterans Affairs medical center in Iowa City, Iowa. The project involves remodeling space for interventional radiology, cardiac catheterization, and electrophysiology services. Key requirements and specifications include storage space for items during installation, completed lead shielding, climate control, verified delivery paths for large equipment, finished casework, primed and painted walls and installed flooring, completed and functional room lighting, obtained IP addresses for remote service, verified floor thickness and anchoring, installed conduits and cable runs ensuring maximum length limits are not exceeded, installed x-ray warning lights and wiring, installed electrical wiring and pigtails, located cable inlets per plans, installed and functional emergency power-off switches and uninterruptible power supply, installed ancillary equipment, installed breakers, and ensuring all rooms are clean and dust-free prior to equipment installation.

View the file

Other files

File Type Posted
Attachment N - Questions Request Form-all questions combined_Response_12132022.doc DOC document
Attachment S- 2W IR CATH EP_Luminos Agile Max_Site Specific.pdf PDF
Attachment P - 2W IR CATH EP_Draeger-Boom Install_Site Specific.pdf PDF
Attachment O - 2W IR CATH EP_Cath Lab_Site Specific.pdf PDF
36C26323R0002 0001.docx DOCX document
Attachment U - Shielding Documents.pdf PDF
636A8-21-001 Pre-Proposal Conference Sign-in List 11222022.pdf PDF
Evaluation Factors -Amendment 0001.docx DOCX document
Attachment J.1 636A8-21-001 Sole Source List.pdf PDF
Attachment T - 2W IR CATH EP_Multi-Use Rad Room_Site Specific.pdf PDF
Attachment J - Brand Name Only JAs_Redacted.pdf PDF
Attachment H - 2W for IR-CATH-EP CDs Drawings 4 of 5.pdf PDF
Attachment F - 2W for IR-CATH-EP CDs Drawings 2 of 5.pdf PDF
Attachment C - 2W IR CATH EP_CDs_ SPECS Vol1.pdf PDF
Attachment K - Wage Determination IA20210068 dated 09-02-2022.pdf PDF
Attachment I - 2W for IR-CATH-EP CDs Drawings 5 of 5.pdf PDF
36C26323R0002.docx DOCX document
Attachment A - SOW 636A8-21-001 final.pdf PDF
Attachment M - Past Performance Questionnaire - 3 Pages.docx DOCX document
Attachment B - Price Schedule Breakdown Sheet - 1 page.xlsx XLSX spreadsheet
Attachment N - Questions Request Form.doc DOC document
Attachment G - 2W for IR-CATH-EP CDs Drawings 3 of 5.pdf PDF
Attachment L - NARA Contract Language 2021.pdf PDF
Attachment D - 2W IR CATH EP_CDs_ SPECS Vol2.pdf PDF
Attachment E - 2W for IR-CATH-EP CDs Drawings 1 of 5.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA IOWA CITY 584

2104151

A-101ATTENTION:

R E

F E

R E

N C

E

D

O C

U M

E N

T

N

O T

F

R

C

N

S T

R U

C T

I O

N

WITH TILTING TABLE

PROJECT MILESTONES TO BE COMPLETED BEFORE EQUIPMENT DELIVERY

Storage area available for storing items during installation

Lead shielding (walls, doors, windows) complete

Climate control functioning 24 hours a day, 7 days a week

Delivery path verified for largest piece, including rails

Casework complete in control room

All walls primed and painted. Flooring installed

Room lighting complete and functional

Network drops active and IP addresses obtained for Siemens Remote Services (SRS)

Nothing hanging below ceiling in area shaded on drawing

Floor thickness and anchoring spec's verified. If req'd, alt solutions per engineer of record in place

All conduits, troughs, in-floor pull boxes and/or core drills avoid conflict with floor plate anchors

Unistrut installed to correct height, location, and levelness (check minimum ceiling height)

Cable runs checked to ensure maximum lengths not exceeded

X-Ray warning light and wiring installed

Contractor supplied electrical wiring / pigtails installed

Cable inlets located per plans

EPO's installed and functional

UPS started and functional

Ancillary equipment (OEM items, booms, etc) installed

Breakers installed and facility power available

All rooms containing Siemens equipment are clean and dust-free

REFERENCE SHEET

A-101

A-101

A-101

A-101

A-101

A-101

A-101

A-102

A-102

S-101

S-101

S-102

E-101

E-101

E-102

E-102

E-102

E-102

E-102

E-501

A-101

A-102ATTENTION:

R E

F E

R E

N C

E

D

O C

U M

E N

T

N

N

S T

R U

C T

I

N

S-101ATTENTION:

R E

F E

R E

N C

E

D

O C

U M

E N

T

N

N

S T

R U

C T

I

S-102ATTENTION:

R E

F E

R E

N C

E

D

O C

U M

E N

T

N

N

S T

R U

C T

I

E-101ATTENTION:

R E

F E

R E

N C

E

D

O C

U M

E N

T

N

N

S T

R U

C T

I

E-102ATTENTION:

R E

F E

R E

N C

E

D

O C

U M

E N

T

N

N

S T

R U

C T

I

E-501ATTENTION:

R E

F E

R E

N C

E

D

O C

U M

E N

T

N

N

S T

R U

C T

I

M-501ATTENTION:

R E

F E

R E

N C

E

D

O C

U M

E N

T

N

N

S T

R U

C T

I O

N

ATTENTION:

R E

F E

R E

N C

E

D

O C

U M

E N

T

N

N

S T

R U

C T

I

File details come from the government source that posted it. Updated .