Attachment E - 2W for IR-CATH-EP CDs Drawings 1 of 5.pdf
PDF 10 MB Posted
- Solicitation number
- 36C26323R0002
About this file
This document provides details for a federal contract solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23. Solicitation number 36C26323R0002 seeks proposals to remodel the 2nd floor west wing for interventional radiology, cardiac catheterization, and electrophysiology services at facility 636A8. Proposals are due by February 1, 2022 as part of acquisition plan 3804 to upgrade medical equipment and reconfigure related clinical spaces. The scope of work involves construction and design services to create new interventional radiology, cardiac cath, and electrophysiology clinic areas within the specified wing.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SITE
MAIN
ENTRANCE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT NAME:
SITE ADDRESS:
VA PROJECT NUMBER:
OWNER AND CONSULTANTS:
VICINITY MAP:
ARCHITECT/ENGINEER OF RECORD
NOT FOR CONSTRUCTION
BUILDING 1
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
A
E S
R V
\p ro je c ts
\1
\1
IA
C
IT
Y V
A H
C S
R
E M
O D
E L
W I R
-C A
T H
-E P
A rc h
B
IM
f ile s \C e n tr a l M o d e l\
I A
C
IT
Y V
A H
C S
R
E M
O D
E L
W
I R
-C A
T H
-E P
.r v t
/1
/2
:2
:1
P
M
1-I1
COVER SHEET REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
04/08/2022 JU PC
BLDG 1 IOWA CITY VA HEALTH CARE SYSTEM
REMODEL 2W FOR IR-CATH-EP
DEPARTMENT OF VETERAN AFFAIRS
IOWA CITY VA HEALTH CARE SYSTEM
601 HIGHWAY 6 WEST, IOWA CITY, IA 25246
636A8-21-001
16133
VA COR:
CONTACT:
ADDRESS:
PHONE:
MARK GORTON
DEPARTMENT OF VETERANS AFFAIRS
IOWA CITY VA HEALTH CARE SYSTEM
601 HIGHWAY 6 WEST,
IOWA CITY, IA 52246
319-631-9823
ARCHITECT:
NAME:
ADDRESS:
CONTACT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
TOM OLESAK
PHONE: 763-412-4000
STRUCTURAL ENGINEER:
NAME:
ADDRESS:
CONTACT:
IMEG CORP.
2882 106TH STREET,
DES MOINES, IA 50322
JOHN GOEDKEN
PHONE: 515-334-4327
KEY PLAN:
TRUE
NORTH
MECHANICAL ENGINEER:
NAME:
ADDRESS:
CONTACT:
IMEG CORP.
2882 106TH STREET,
DES MOINES, IA 50322
ERIC HENDERSON
PHONE: 630-717-2433
ELECTRICAL ENGINEER:
NAME:
ADDRESS:
CONTACT:
IMEG CORP.
2882 106TH STREET,
DES MOINES, IA 50322
ISSAC STOLL
PHONE: 515-334-4321
SHEET INDEX - ARCHITECTURAL
SHEET NO. SHEET TITLE C
D
/0
8/
03 ARCHITECTURAL
1-A1 SECOND FLOOR DEMOLITION PLAN █
1-A2 SECOND FLOOR PLAN █
1-A3 SECOND FLOOR DIMENSION PLAN █
1-A4 THIRD FLOOR PLAN █
1-A5 ROOF PLAN █
1-A6 SECOND FLOOR REFLECTED CEILING PLAN █
1-A7 EXTERIOR ELEVATION, WALL SECTIONS AND DETAILS █
1-A8 MOUNTING HEIGHTS █
1-A9 ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONS █
1-A10 ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONS █
1-A11 ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONS █
1-A12 ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONS █
1-A13 ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONS █
1-A14 INTERIOR DETAILS AND SECTIONS █
1-A15 INTERIOR PARTITION TYPES AND DETAILS █
1-A16 DOOR SCHEDULES, DOOR & FRAME TYPES AND DETAILS █
1-A17 CASEWORK DETAILS █
1-A18 SECOND FLOOR FINISH PLAN █
1-A19 MATERIAL AND ROOM FINISH SCHEDULE █
1-A20 SECOND & THIRD FLOOR WAYFINDING PLANS █
1-A21 WAYFINDING MESSAGE SCHEDULES & SIGNAGE DETAILS █
1-A22 SECOND FLOOR FURNITURE PLAN █
1-DE1 SECOND FLOOR EQUIPMENT PLAN █
1-DE2 EQUIPMENT ENLARGED PLANS AND SCHEDULES █
1-DE3 EQUIPMENT ENLARGED FLOOR PLANS AND SCHEDULE █
1-DE4 EQUIPMENT ENLARGED PLANS AND SCHEDULES █
SHEET INDEX - STRUCTURAL
SHEET NO. SHEET TITLE C
D
/0
8/
1- S0.1 GENERAL NOTES █
1- S1.1 SECOND FLOOR PLAN █
1- S1.2 THIRD FLOOR PLAN █
1- S1.3 FOURTH FLOOR PLAN █
1- S5.1 STRUCTURAL DETAILS █
SHEET INDEX - GENERAL
SHEET NO. SHEET TITLE C
D
/0
8/
00 GENERAL
1-I1 COVER SHEET █
1-I2 ABBREVIATIONS █
1-I3 SECOND FLOOR LIFE SAFETY PLAN █
1-I4 THIRD FLOOR LIFE SAFETY PLAN █
1-I5 SECOND FLOOR INFECTION CONTROL & PHASING PLAN █
SHEET INDEX - VENTILATION
SHEET NO. SHEET TITLE C
D
/0
8/
1-MH0 VENTILATION COVERSHEET █
1-MH1 SECOND FLOOR DEMOLITION - VENTILATION █
1-MH2 THIRD FLOOR DEMOLITION - VENTILATION █
1-MH3 ROOF DEMOLITION - VENTILATION █
1-MH4 SECOND FLOOR PLAN - VENTILATION █
1-MH5 THIRD FLOOR PLAN - VENTILATION █
1-MH6 ROOF PLAN - VENTILATION █
1-MH7 VENTILATION DETAILS █
1-MH8 VENTILATION DETAILS █
1-MH9 VENTILATION ENLARGED PLANS █
1-MH10 VENTILATION SCHEDULES █
SHEET INDEX - ELECTRICAL
SHEET NO. SHEET TITLE C
D
/0
8/
1-E0 ELECTRICAL COVERSHEET █
1-ED1 SECOND FLOOR DEMOLITION - ELECTRICAL █
1-ED2 THIRD FLOOR DEMOLITION - ELECTRICAL █
1-EL1 SECOND FLOOR PLAN - LIGHTING █
1-EL2 THIRD FLOOR PLAN - LIGHTING █
1-EP1 SECOND FLOOR PLAN - POWER █
1-EP2 THIRD FLOOR PLAN - POWER █
1-EP3 ROOF PLAN - POWER █
1-ES1 SECOND FLOOR PLAN - SYSTEMS █
1-ES2 THIRD FLOOR PLAN - SYSTEMS █
1-E4 ELECTRICAL ENLARGED PLANS █
1-E5 ELECTRICAL ENLARGED PLANS █
1-E6 ELECTRICAL DETAILS █
1-E7 ELECTRICAL DETAILS █
1-E8 ELECTRICAL RISER DIAGRAMS █
1-E9 ELECTRICAL SCHEDULES █
1-E10 ELECTRICAL SCHEDULES █
1-E11 ELECTRICAL SCHEDULES █
1-E12 ELECTRICAL SCHEDULES █
SHEET INDEX - FIRE PROTECTION
SHEET NO. SHEET TITLE C
D
/0
8/
1-F0 FIRE PROTECTION COVERSHEET █
1-F1 SECOND FLOOR DEMOLITION - FIRE PROTECTION █
1-F2 SECOND FLOOR PLAN - FIRE PROTECTION █
1-F3 THIRD FLOOR PLAN - FIRE PROTECTION █
SHEET INDEX - PLUMBING
SHEET NO. SHEET TITLE C
D
/0
8/
1-P0 PLUMBING COVERSHEET █
1-P1 SECOND FLOOR PLAN DEMOLITION - PLUMBING █
1-P2 SECOND FLOOR UNDERFLOOR DEMOLITION - PLUMBING █
1-P3 THIRD FLOOR PLAN DEMOLITION - PLUMBING █
1-P4 FIRST FLOOR PLAN - PLUMBING █
1-P5 SECOND FLOOR PLAN - PLUMBING █
1-P6 THIRD FLOOR PLAN - PLUMBING █
1-P7 PLUMBING DETAILS █
1-P8 PLUMBING MARTERIAL LIST █
SHEET INDEX - MEDICAL GAS
SHEET NO. SHEET TITLE C
D
/0
8/
1-MG0 MEDICAL GAS COVERSHEET █
1-MG1 SECOND FLOOR DEMOLITION - MEDICAL GAS █
1-MG2 SECOND FLOOR PLAN - MEDICAL GAS █
1-MG3 THIRD FLOOR PLAN - MEDICAL GAS █
1-MG4 MEDICAL GAS DETAILS █
1-MG5 MEDICAL GAS MATERIAL LIST █
SHEET INDEX - TECHNOLOGY
SHEET NO. SHEET TITLE C
D
/0
8/
1-T0 TECHNOLOGY COVERSHEET █
1-T1 SECOND FLOOR DEMOLITION - TECHNOLOGY █
1-T2 SECOND FLOOR PLAN - TECHNOLOGY █
1-T5 TECHNOLOGY DETAILS █
1-T6 TECHNOLOGY RISER DIAGRAMS █
1-T7 TECHNOLOGY SCHEDULES █
SHEET INDEX - PIPING
SHEET NO. SHEET TITLE C
D
/0
8/
1-MP0 PIPING COVERSHEET █
1-MP1 SECOND FLOOR DEMOLITION - PIPING █
1-MP2 THIRD FLOOR DEMOLITION - PIPING █
1-MP3 ROOF DEMOLITION - PIPING █
1-MP4 SECOND FLOOR PLAN - PIPING █
1-MP5 THIRD FLOOR PLAN - PIPING █
1-MP6 ROOF PLAN - PIPING █
1-MP7 PIPING DETAILS █
1-MP8 PIPING SCHDULES █
TRUE
NORTH
CATH LAB EQUIPMENT DRAWINGS FOR REFERENCE ONLY
SHEET NO. SHEET TITLE C
D
/0
8/
CATH-A-101 CATH LAB - ARCHITECTURAL EQUIPMENT PLAN █
CATH-A-102 CATH LAB - REFELCTED CEILING PLAN █
CATH-S-101 CATH LAB - STRUCTURAL FLOOR PLAN █
CATH-S-102 CATH LAB - STRUCTURAL CEILING PLAN █
CATH-E-101 CATH LAB - ELECTRICAL RACEWAY PLAN █
CATH-E-102 CATH LAB - ELECTRICAL DIMENSION PLAN █
CATH-E-501 CATH LAB - ELECTRICAL POWER SCHEDULES █
CATH-M-501 CATH LAB - CEILING BOOM COORDINATION █
EP LAB EQUIPMENT DRAWINGS FOR REFERENCE ONLY
SHEET NO. SHEET TITLE C
D
/0
8/
EP-A-101 EP LAB - ARCHITECTURAL EQUIPMENT PLAN █
EP-A-102 EP LAB - REFELCTED CEILING PLAN █
EP-S-101 EP LAB - STRUCTURAL FLOOR PLAN █
EP-S-102 EP LAB - STRUCTURAL CEILING PLAN █
EP-E-101 EP LAB - ELECTRICAL RACEWAY PLAN █
EP-E-102 EP LAB - ELECTRICAL DIMENSION PLAN █
EP-E-501 EP LAB - ELECTRICAL POWER SCHEDULES █
EP-M-501 EP LAB - CEILING BOOM COORDINATION █
IR LAB EQUIPMENT DRAWINGS FOR REFERENCE ONLY
SHEET NO. SHEET TITLE C
D
/0
8/
IR-A-101 IR LAB - ARCHITECTURAL EQUIPMENT PLAN █
IR-A-102 IR LAB - REFELCTED CEILING PLAN █
IR-S-101 IR LAB - STRUCTURAL FLOOR PLAN █
IR-S-102 IR LAB - STRUCTURAL CEILING PLAN █
IR-E-101 IR LAB - ELECTRICAL RACEWAY PLAN █
IR-E-102 IR LAB - ELECTRICAL DIMENSION PLAN █
IR-E-501 IR LAB - ELECTRICAL POWER SCHEDULES █
IR-M-501 IR LAB - CEILING BOOM COORDINATION █
MULTI-PURPOSE RAD. EQUIPMENT DRAWINGS FOR REFERENCE ONLY
SHEET NO. SHEET TITLE C
D
/0
8/
MU-A-101 MULTI-PURPOSE RAD - ARCHITECTURAL EQUIPMENT PLAN █
MU-A-102 MULTI-PURPOSE RAD - REFELCTED CEILING PLAN █
MU-S-101 MULTI-PURPOSE RAD - STRUCTURAL FLOOR PLAN █
MU-S-102 MULTI-PURPOSE RAD - STRUCTURAL CEILING PLAN █
MU-E-101 MULTI-PURPOSE RAD - ELECTRICAL RACEWAY PLAN █
MU-E-102 MULTI-PURPOSE RAD - ELECTRICAL DIMENSION PLAN █
MU-E-501 MULTI-PURPOSE RAD - ELECTRICAL POWER SCHEDULES █
MU-M-501 MULTI-PURPOSE RAD - CEILING BOOM COORDINATION █
FLUOROSCOPY RAD. EQUIPMENT DRAWINGS FOR REFERENCE ONLY
SHEET NO. SHEET TITLE C
D
/0
8/
FL-A-101 FLUOROSCOPY RAD - ARCHITECTURAL EQUIPMENT PLAN █
FL-A-102 FLUOROSCOPY RAD - REFELCTED CEILING PLAN █
FL-S-101 FLUOROSCOPY RAD - STRUCTURAL FLOOR PLAN █
FL-S-102 FLUOROSCOPY RAD - STRUCTURAL CEILING PLAN █
FL-E-101 FLUOROSCOPY RAD - ELECTRICAL RACEWAY PLAN █
FL-E-102 FLUOROSCOPY RAD - ELECTRICAL DIMENSION PLAN █
Revisions: Date:
SHEET INDEX - TEMPERATURE...
SHEET NO. SHEET NAME CD
4/
/2
1-MT1 SECOND FLOOR PLAN - TEMPERATURE CONTROLS █
1-MT2 AHU CONTROL DIAGRAM █
1-MT3 CONTROL DIAGRAMS █
JUlland Snapshot
ARCHITECTURAL ABBREVIATIONS
A/C
A/C UNIT
A/E
AAMA
AAP
AB
ABC
ACC
ACI
ACT
ACS DR
ACS FLR
ACS PNL
ACST
AD
ADA
ADC
ADDL
ADDN
ADH
ADJ
ADMIN
AFF
AFG
AFS
AGC
AGGR
AHJ
AHR
AHU
AIA
AISC
ALT
ALT NO
ALUM
AMT
ANOD
ANSI
ANT
AP
APA
APC
APPD
APPROX
AR
ARCH
ASB
ASI
ASKLR
ASPH
ASSN
ASTM
ATCH
ATM
AUTO
AUX
AV
AVG
AW
AWI
AWPA
AWS
B PL
BAT
BD
BD FT
BEV
BHMA
BI FLD DR
BITUM
BKG
BLD
BLDG
BM
BOT
BRCG
BRDG
BRDG JST
BRG
BRG PL
BRKT
BRZ
BSMT
BTWN
BUR
C CONC
C TO C
CAB
CAC
CB
CBB
CCD
CCTV
CCW
CD
CEM
CEM PLAS
CER
CF
CF/CI
CF/OI
CFLG
CFMF
CG
CGSFU
CH
CHEM
CHFR
CHK
CI
CIP
CIR
CIRC
CJ
CL
CLDG
CLG
CLR
CM
CMU
AIR CONDITION
AIR CONDITIONING UNIT
ARCHITECT/ENGINEER
AMERICAN ARCHITECTURAL MANUFACTURERS ASSN
ALARM ANNUNCIATOR PANEL
ANCHOR BOLT
AGGREGATE BASE COURSE
ACCESSIBLE
AMERICAN CONCRETE INSTITUTE
ACOUSTICAL CEILING TILE
ACCESS DOOR
ACCESS FLOOR
ACCESS PANEL
ACOUSTIC
AREA DRAIN
AMERICANS WITH DISABILITIES ACT
AUTOMATIC DOOR CLOSER
ADDITIONAL
ADDITION
ADHESIVE
ADJACENT, ADJOINING, OR ADJUSTABLE
ADMINISTRATION
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ABOVE FINISHED SLAB
ASSOCIATED GENERAL CONTRACTORS
AGGREGATE
AUTHORITY HAVING JURISDICTION
ANCHOR
AIR HANDLING UNIT
AMERICAN INSTITUTE OF ARCHITECTS
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALTERNATE
ALTERNATE NUMBER
ALUMINUM
AMOUNT
ANODIZE
AMERICAN NATIONAL STANDARDS INSTITUTE
ANTENNA
ACCESS PANEL
AMERICAN PLYWOOD ASSOCIATION
ARCHITECTURAL PRECAST CONCRETE
APPROVED
APPROXIMATE
AS REQUIRED
ARCHITECT
ASBESTOS
ARCHITECT'S SUPPLEMENTAL INSTRUCTION
AUTOMATIC SPRINKLER
ASPHALT
ASSOCIATION
AMERICAN SOCIETY FOR TESTING AND MATERIALS
ATTACHMENT
AUTOMATIC TELLER MACHINE
AUTOMATIC
AUXILIARY
AUDIO VISUAL
AVERAGE
ACID WASTE
ARCHITECTURAL WOODWORKING INSTITUTE
AMERICAN WOOD PRESERVERS' ASSOCIATION
AMERICAN WELDING SOCIETY
BASE PLATE
BATTEN
BOARD
BOARD FEET (FOOT)
BEVEL
BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION
BIFOLDING DOORS
BITUMINOUS
BACKING
BUILD
BUILDING
BEAM OR BENCHMARK
BOTTOM
BRACING
BRIDGING
BRIDGING JOIST
BEARING
BEARING PLATE
BRACKET
BRONZE
BASEMENT
BETWEEN
BUILT-UP ROOFING
CAST CONCRETE
CENTER TO CENTER
CABINET
CEILING ATTENUATION CLASS
CATCH BASIN OR CORNER BEAD
CEMENTITIOUS (BACKER) BOARD
CONSTRUCTION CHANGE DIRECTIVE
CLOSED CIRCUIT TELEVISION
COUNTERCLOCKWISE
CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS
CEMENT
CEMENT PLASTER
CERAMIC
CONTRACTOR FURNISHED
CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CONTRACTOR FURNISHED/OWNER INSTALLED
COUNTERFLASHING
COLD-FORMED METAL FRAMING
CORNER GUARD
CERAMIC GLAZED STRUCTURAL FACING UNITS
COAT HOOK
CHEMICAL
CHAMFER
CHECK
CAST IRON
CAST-IN-PLACE
CIRCLE
CIRCULAR
CONSTRUCTION JOINT OR CONTROL JOINT
CENTER LINE
CLADDING
CEILING
CLEAR
CONSTRUCTION MANAGEMENT
CONCRETE MASONRY UNIT
CNR
CNTR
CRTP
CO
CO2
COL
COM
COMB
COMM
COMP
CONC
CONC FLR
COND
CONF
CONN
CONSTR
CONT
CONTR
COORD
CORR
CPM
CPRS
CR
CRS
CRSI
CSB
CSG
CSI
CSK
CSMT
CSWK
CTG
CTR
CTRL
CTV
CU FT
CU IN
CU YD
CURT
CYL
CYL L
D
DAT
DBL
DBL GLZ
DCS
DP
DEG
DEL
DEMO
DEPT
DET
DF
DIA
DIAG
DIFF
DIM
DIR
DISP
DIST
DIV
DL
DOC
DR
DR CL
DR FR
DR OPNG
DS
DSGN
DW
DWG
E
EA
EFF
EFS
EIFS
EJ
EL
ELAST
ELEC
ELEC DR OP
ELEV
EMER
EMER SHR
ENCL
ENGR
ENVIR
EO
EPA
EPDM
EPO
EPS
EQ
EQL SP
EQUIP
EQUIV
ERD
ESC
ESMT
ESP
EST
ETC
EW
EWC
EWS
EXH
EXIST
EXP
EXP BT
EXST GR
EXT
EXT GR
CORNER
COUNTER
COUNTERTOP
CARBON MONOXIDE
CARBON DIOXIDE
COLUMN
COMMON
COMBINATION, COMBINED
COMMUNICATION
COMPONENT
CONCRETE
CONCRETE FLOOR
CONDENSER OR CONDITION
CONFERENCE
CONNECT
CONSTRUCTION
CONTINUE
CONTRACTOR
COORDINATE
CORRIDOR
CRITICAL PATH METHOD
COMPRESSIBLE
CARD READER
COLD ROLLED STEEL
CONCRETE REINFORCING STEEL INSTITUTE
CONCRETE SPLASH BLOCK
CASING
CONSTRUCTION SPECIFICATIONS INSTITUTE
COUNTER SUNK
CASEMENT
CASEWORK
COATING
CENTER
CONTROL
CABLE TELEVISION
CUBIC FEET
CUBIC INCH
CUBIC YARD
CURTAIN
CYLINDER
CYLINDER LOCK
DEPTH OR PENNY (NAIL)
DATUM
DOUBLE
DOUBLE GLAZE
DIAPER CHANGING STATION
DECORATIVE PANEL
DEGREE
DELETE
DEMOLITION
DEPARTMENT
DETAIL
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIFFERENCE OR DIFFUSER
DIMENSION
DIRECTION
DISPENSER
DISTANCE
DIVIDE OR DIVISION
DEAD LOAD
DOCUMENT
DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DOOR CLOSER
DOOR FRAME
DOOR OPENING
DOWNSPOUT
DESIGN
DISHWASHER
DRAWING
EAST
EACH
EFFICIENCY
EXTERIOR FINISH SYSTEM
EXTERIOR INSULATION AND FINISH SYSTEM
EXPANSION JOINT
ELEVATION
ELASTOMERIC
ELECTRIC
ELECTRIC DOOR OPENER
ELEVATOR
EMERGENCY
EMERGENCY SHOWER
ENCLOSURE
ENGINEER
ENVIRONMENT
ELECTRICAL OUTLET
ENVIRONMENTAL PROTECTION AGENCY
ETHYLENE PROPYLENE DIENE MONOMER
EMERGENCY POWER OFF
EXPANDED POLYSTYRENE BOARD (INSULATION)
EQUAL
EQUALLY SPACED
EQUIPMENT
EQUIVALENT
EXISTING ROOF DRAIN
ESCAPE OR ESCUTCHEON
EASEMENT
ESPECIALLY
ESTIMATE
AND SO FORTH OR ET CETERA
EACH WAY
ELECTRIC WATER COOLER
EYE WASH STATION
EXHAUST
EXISTING
EXPANSION OR EXPOSED
EXPANSION BOLT
EXISTING GRADE
EXTERIOR, EXTERNAL, OR EXTINGUISHER
EXTERIOR GRADE
F
FA
FAB
FAC
FACIL
FAS
FAS BD
FCU
FCO
FCTY
FD
FDC
FDTN
FE
FEC
FF
FF EL
FF&E
FHC
FHP
FIG
FIL
FIN
FIN FLR
FIN GR
FIN WD
FIXT
FL
FLASH
FLDG
FLEX
FLG
FLR
FLR FIN
FLR SK
FLUOR
FLUOR FIX
FM
FM-G
FO
FOC
FOF
FOM
FOS
FOUNT
FOW
FP
FR
FR SNK
FREQ
FRMG
FRP
FRZ
FS
FSB
FSTNR
FT
FTG
FURG
FURN
FUT
FVC
GA
GAL
GALV
GALV STL
GB
GC
GD
GDR
GEN
GFRC
GFRG
GFRP
GI
GL
GL BLK
GLU LAM
GP
GR FL
GRAN
GRTG
GSB
GSM
GSU
GT
GUAR
GUT
GYP
GYP BD
GYP PLAS
H
HAZ MAT
HB
HC
HCWD
HDBD
HDO
HDR
HDW
HDWD
HEPA
HEX
HGR
HM
HMD
HMDF
HMF
HNDRL
HO
HORIZ
HOSP
HP
HPD
HPDL
HQ
HS
HSE
HSKPG
FAHRENHEIT OR FEMALE
FIRE ALARM
FABRIC
FACTOR
FACILITY
FASCIA
FASCIA BOARD
FAN COIL UNIT
FLOOR CLEANOUT
FACTORY
FLOOR DRAIN
FIRE DEPARTMENT CONNECTION
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FINISH FACE
FINISH FLOOR ELEVATION
FURNITURE, FIXTURE, AND EQUIPMENT
FIRE HOSE CABINET
FULL HEIGHT PARTITION
FIGURE
FILLET
FINISH
FINISH FLOOR
FINISH GRADE
FINISH WOOD
FIXTURE
FLOORLINE
FLASHING
FOLDING
FLEXIBLE
FLOORING
FLOOR
FLOOR FINISH
FLOOR SINK
FLUORESCENT
FLUORESCENT FIXTURE
FACTORY MUTUAL
FACTORY MUTUAL GLOBAL
FINISHED OPENING
FACE OF CONCRETE OR FACE OF CURB
FACE OF FINISH
FACE OF MASONRY
FACE OF SLAB OR FACE OF STUD
FOUNTAIN
FACE OF WALL
FIRE PROTECTION OR FIREPROOF
FIRE RATING, FIRE RESISTANT, OR FRAME
FLUSHING RIM SINK
FREQUENCY
FRAMING
FIBERGLASS REINFORCED PLASTIC
FREEZER
FEDERAL SPECIFICATION
FOLDING SHOWER BENCH
FASTENER
FEET OR FOOT
FOOTING
FURRING
FURNISH OR FURNITURE
FUTURE
FIRE VALVE CABINET
GAGE OR GYPSUM ASSOCIATION
GALLON
GALVANIC OR GALVANIZED
GALVANIZED STEEL
GRAB BAR
GENERAL CONTRACTOR
GUARD
GUARD RAIL
GENERAL OR GENERATOR
GLASS-FIBER-REINFORCED CONCRETE
GLASS-FIBER-REINFORCED GYPSUM
GLASS-FIBER-REINFORCED PLASTIC
GALVANIZED IRON
GLASS
GLASS BLOCK
GLUED LAMINATED WOOD
GRAB BAR
GROUND FLOOR
GRANITE
GRATING
GYPSUM SHEATHING BOARD
GALVANIZED SHEET METAL
GLAZED STRUCTURAL UNIT
GROUT
GUARANTEE
GUTTER
GYPSUM
GYPSUM BOARD
GYPSUM PLASTER
HIGH OR HUMIDISTAT
HAZARDOUS MATERIALS
HOSE BIBB
HOLLOW CORE
HOLLOW CORE WOOD DOOR
HARDBOARD
HIGH DENSITY OVERLAY
HEADER
HARDWARE
HARDWOOD
HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEXAGON
HANGER
HOLLOW METAL
HOLLOW METAL DOOR
HOLLOW METAL DOOR AND FRAME
HOLLOW METAL FRAME
HANDRAIL
HOLD OPEN
HORIZONTAL
HOSPITAL
HIGH PRESSURE
HYGIENE PRODUCT DISPOSAL
HIGH PRESSURE DECORATIVE LAMINATE
HEADQUARTERS
HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH
HOUSE
HOUSEKEEPING
HST
HSS
HT
HVAC
HVY
HW
HYD
HYDR
IAQ
IBC
IC
ICW
ID
ID NO
ILLUM
INCL
IND
INFO
INSUL
INT
INTL
IWH
JAN
KD
KIT
KO
KPL
LAB
LAD
LAM
LAM GL
LAU
LAV
LBR
LBS
LCS
LD BRG
LDR
LED
LF
LIB
LIN
LIQ
LKR
LKR RM
LL
LMST
LRG
LRV
LS
LT
LT GA
LT WT
LTG
LTNG
LVD
LVR
LWC
LWIC
LYR
MACH
MACH RM
MAINT
MAN
MATL
MATV
MAX
MBD
MCB
MD
ME
MEAS
MECH
MECH RM
MED
MEK
MEMB
MEMO
MEZZ
MF
MFD
MFG
MFR
MFR REC
MGT
MIC
MID
MIL STD
MIN
MIR
MISC
MIT
MKR
ML
MLDG
MLWK
mm
MO
MOD
MOD BIT
MON
MOPR
MR
MS
MTD
MTG
MTL
MULL
MW
MWP
HOIST
HOLLOW STRUCTURAL STEEL
HEIGHT
HEATING, VENTILATING, AND AIR CONDITIONING
HEAVY
HOT WATER
HYDRANT
HYDRAULIC
INDOOR AIR QUALITY
INTERNATIONAL BUILDING CODE
INFECTION CONTROL
INFECTION CONTROL WALL
INSIDE DIAMETER
IDENTIFICATION NUMBER
ILLUMINATION
INCLUDED
INDEPENDENT OR INDUSTRIAL
INFORMATION
INSULATION
INTERIOR
INTERNATIONAL
INSTANTANEOUS WATER HEATER
JANITOR
KILN DRIED OR KNOCKED DOWN
KITCHEN
KNOCKOUT
KICKPLATE
ANGLE
LABORATORY
LADDER
LAMINATE
LAMINATED GLASS
LAUNDRY
LAVATORY
LUMBER
POUND
LOCKABLE CHARTING STATION/MED CABINET
LOAD-BEARING
LEADER
LIGHT EMITTING DIODE
LINEAR FEET (FOOT)
LIBRARY
LINEAR
LIQUID
LOCKER
LOCKER ROOM
LEAD LINED
LIMESTONE
LARGE
LOUVERED ROOF VENT
LIGHT SWITCH
LIGHT
LIGHT GAGE
LIGHTWEIGHT
LIGHTING
LIGHTNING
LOUVERED
LOUVER
LIGHTWEIGHT CONCRETE
LIGHTWEIGHT INSULATING CONCRETE
LAYER
MACHINE
MACHINE ROOM
MAINTENANCE
MANUAL
MATERIAL
MASTER ANTENNA TELEVISION SYSTEM
MAXIMUM
MARKER BOARD
METAL CORNER BEAD
DECK
MECHANICAL ENGINEER
MEASURE
MECHANICAL
MECHANICAL ROOM
MEDICAL, MEDIUM
METHYL ETHYL KETONE
MEMBRANE
MEMORANDUM
MEZZANINE
MILL FINISH
MANUFACTURED
MANUFACTURING
MANUFACTURER
MANUFACTURER'S RECOMMENDATION
MANAGEMENT
MICROPHONE
MIDDLE
MILITARY STANDARD
MINIMUM
MIRROR
MISCELLANEOUS
MITER
MARKER
METAL LATH
MOLDING (MOULDING)
MILLWORK
MILLIMETER
MASONRY OPENING
MODEL, MODIFY OR MODULE
MODIFIED BITUMEN
MONITOR
MOP RACK
MOISTURE RESISTANT
MOP SINK
MOUNTED
MOUNTING
METAL
MULLION
MICROWAVE
MEMBRANE WATERPROOFING
N
NA
NAT
NATL
NC
NCOMBL
NEC
NEG
NEMA
NEUT
NFC
NFPA
NIC
NO
NOM
NR
NRC
NRCA
NRP
NS
NUM
O/O O
OA
OC
OCC
OCT
OD
OD
OF/CI
OFD
OFF
OF/OI
OH
OH DR
OPH
OPNG
OPP
OPR
OPT
OR
ORD
ORG
ORIG
ORN
OSHA
OUT
OZ
P
PAR
PARA
PART
PAT
PB
PBD
PC
PCA
PCC
PCCP
PCD
PCF
PCP
PCT
PED
PEN
PEND
PERF
PERIM
PERP
PHAR
PHOTO
PKG
PL
PL GL
PLAM
PLAS
PLBG
PLYWD
PMTL
PNEU
PNL
PO
POLY
PP
PR
PRCST
PREFAB
PREFIN
PRELIM
PREP
PRESS
PREV
PRKG
PRMLD
PROJ
PROP
PSF
PSI
PT
PTD
PTN
PTS
PVC
PVG
PWR
QA
QC
QRY
QTR
QTY
QUAD
QUAL
R
RA
RAD
RBM
RBR
NORTH
NOT APPLICABLE
NATURAL
NATIONAL
NOISE CRITERIA OR NURSE CALL
NONCOMBUSTIBLE
NATIONAL ELECTRICAL CODE
NEGATIVE
NATIONAL ELECTRICAL MANUFACTURERS ASSN
NEUTRAL
NATIONAL FIRE CODE
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NUMBER
NOMINAL
NOISE REDUCTION
NOISE REDUCTION COEFFICIENT
NATIONAL ROOFING CONTRACTORS ASSOCIATION
NONREMOVABLE
NARROW STILE
NUMERAL
OUT TO OUT
OXYGEN
OUTSIDE AIR OR OVERALL
ON CENTER
OCCUPY
OCTAGON
OUTSIDE DIAMETER, OUTSIDE DIMENSION
OUTSIDE DIAMETER/OUTSIDE DIMENSION
OWNER FURNISHED/CONTRACTOR INSTALLED
OVERFLOW DRAIN
OFFICE
OWNER FURNISHED/OWNER INSTALLED
OVERHANG
OVERHEAD (COILING) DOOR
OPPOSITE HAND
OPENING
OPPOSITE
OPERABLE
OPTIONAL
OPERATING ROOM OR OUTSIDE RADIUS
ORDNANCE OR OVERFLOW ROOF DRAIN
ORGANIC
ORIGINAL
ORNAMENTAL
OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION
OUTLET
OUNCE
PAINT
PARALLEL OR PARAPET
PARAGRAPH
PARTIAL
PATTERN
PUSHBUTTON
PARTICLEBOARD
PIECE, POLYCARBONATE OR PORTLAND CEMENT
PORTLAND CEMENT ASSOCIATION
PRECAST CONCRETE
CONCRETE PAVEMENT
PAPER CUP DISPENSER
POUNDS PER CUBIC FOOT
PORTLAND CEMENT PLASTER
PRIVACY CURTAIN TRACK
PEDESTAL
PENETRATE
PENDANT
PERFORATED
PERIMETER
PERPENDICULAR
PHARMACY
PHOTOGRAPH
PACKAGE
PROPERTY LINE
PLATE GLASS
PLASTIC LAMINATE
PLASTER OR PLASTIC
PLUMBING
PLYWOOD
PAINTED METAL
PNEUMATIC
PANEL
POST OFFICE, PURCHASE ORDER
POLYETHYLENE (PLASTIC)
PUSH PLATE
PAIR
PRECAST
PREFABRICATE
PREFINISH
PRELIMINARY
PREPARATION
PRESSURE
PREVIOUS
PARKING
PREMOLDED
PROJECT
PROPERTY
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PORCELAIN TILE OR PRESSURE TREATED
PAPER TOWEL DISPENSER
PARTITION
PNEUMATIC TUBE STATION
POLYVINYL CHLORIDE (PLASTIC)
PAVING
POWER
QUALITY ASSURANCE
QUALITY CONTROL
QUARRY
QUARTER
QUANTITY
QUADRANT
QUALITY
RADIUS OR RISER
RETURN AIR
RADIATOR
REINFORCED BRICK MASONRY
RUBBER
RC
RCP
RCVR
RD
REC
RECD
RECPT
RECT
REF
REFR
REG
REINF
REP
REPL
REQ
REQD
RET
REV
RFG
RFI
RFP
RFS
RL
RLG
RM
RM LT
RND
RO
ROW
RS
RSV
RT
RV
RVS
RWL
S
SA
SALV
SAMP
SAN
SB
SBS
SBSTR
SC
SCH
SCHED
SCHEM
SCP
SCRN
SCT
SCWD
SD
SDG
SECT
SEG
SEL
SEP
SF
SFTWD
SGD
SGL
SHR
SHR HD
SHRD
SHT
SHTHG
SHV
SIM
SJ
SJI
SK
SKLT
SLDG
SLNT
SM
SMK
SND INS
SPEC
SPKLR
SPKR
SPLY
SPR
SQ
SQ IN
SQ YD
SST
ST
STC
STD
STIF
STL JST
STL LNTL
STL PL
STL RF DK
STL TB
STL TR
STNLS
STOR
STR
STRUCT
STRUCT STL
SUB
SURF
SUSP
SUSP CLG
SW
SWDR
SYM
SYNTH
SYS
REMOTE CONTROL
REFLECTED CEILING PLAN
RECEIVER
ROAD OR ROOF DRAIN
RECESSED
RECEIVED
RECEPTACLE
RECTANGLE
REFERENCE OR REFRIGERATOR
REFRACTORY, REFRIGERATION
REGISTER
REINFORCE
REPAIR
REPLACE
REQUIRE
REQUIRED
RETURN
REVISION
ROOFING
REQUEST FOR INFORMATION
REQUEST FOR PROPOSAL
ROOM FINISH SCHEDULE
ROOF LEADER
RAILING
ROOM
NURSE CALL LIGHT/ROOM LIGHT
ROUND
ROUGH OPENING
RIGHT OF WAY
ROUGH SAWN
RESILIENT SHEET VINYL
RIGHT
ROOF VENT
REVERSE
RAIN WATER LEADER
SOLID SURFACE
SUPPLY AIR
SALVAGE
SAMPLE
SANITARY
SPLASH BLOCK
STYRENE BUTADIEN STYRENE
SUBSTRATE
SHARPS CONTAINER
SCHOOL
SCHEDULE
SCHEMATIC
SCUPPER
SCREEN
SHOWER CURTAIN TRACK
SOLID CORE WOOD DOOR
SMOKE DETECTOR/SOAP DISPENSER
SIDING
SECTION
SEGMENT
SELECT
SEPARATE
SQUARE FOOT (FEET)
SOFTWOOD
SLIDING GLASS DOOR
SINGLE
SHOWER
SHOWER HEAD
SHOWER DRAIN
SHEET
SHEATHING
SHELVING
SIMILAR
SCORED JOINT
STEEL JOIST INSTITUTE
SKETCH
SKYLIGHT
SLIDING
SEALANT
SHEET METAL
SMOKE
SOUND INSULATION
SPECIFICATION
SPRINKLER
SPEAKER
SUPPLY
SINGLE PLY ROOF SYSTEM
SQUARE
SQUARE INCH
SQUARE YARD
STAINLESS STEEL
STAIRS OR STREET
SOUND TRANSMISSION CLASS
STANDARD
STIFFENER
STEEL JOIST
STEEL LINTEL
STEEL PLATE
STEEL ROOF DECK
STEEL TUBE
STEEL TRUSS
STAINLESS
STORAGE
STRINGERS
STRUCTURAL
STRUCTURAL STEEL
SUBSTITUTE
SURFACE
SUSPEND
SUSPENDED CEILING
SWITCH
SWING DOOR
SYMBOL
SYNTHETIC
SYSTEM
T T&M
TB
TBD
TECH
TEL
TEMP
THERM
THK
THRES
THRU
THRUOUT
TMPD
TMPD GL
TN
TO
TO FDN
TOB
TOM
TOP
TOS
TOW
TPD
TRANS
TRTD
TS
TSTAT
TV
TYP
U
UC
UGND
UL
ULT
UNFIN
UNO
UPS
UR
UTIL
UV
VAC
VAR
VEH
VENT
VERT
VEST
VFD
VIC
VID
VIF
VNR
VOC
VOL
VR
VTR
W/ W/O
WBL
WC
WD
WDW
WF
WFR
WFS
WH
WHSE
WP
WPM
WR
WS
WSCT
WT
X BRACE
XPS
YD
TREAD OR THERMOSTAT
TIME AND MATERIALS
TOWEL BAR
TACK BOARD
TECHNICAL
TELEPHONE
TEMPERATURE OR TEMPORARY
THERMAL
THICKNESS
THRESHOLD
THROUGH
THROUGHOUT
TEMPERED
TEMPERED GLASS
TRUE NORTH
TOP OF ___
TOP OF FOUNDATION
TOP OF BEAM
TOP OF MASONRY
TOP OF PARAPET
TOP OF STEEL
TOP OF WALL
TOILET PAPER DISPENSER
TRANSOM
TREATED
TUBE STEEL
THERMOSTAT
TELEVISION
TYPICAL
HEAT TRANSFER COEFFICIENT
UNDERCUT
UNDERGROUND
UNDERWRITERS LABORATORIES
ULTIMATE
UNFINISH
UNLESS NOTED OTHERWISE
UNINTERRUPTIBLE POWER SUPPLY
URINAL
UTILITY
ULTRAVIOLET
VACUUM
VARIES
VEHICLE
VENTILATION
VERTICAL
VESTIBULE
VARIABLE FREQUENCY DRIVE
VICINITY
VIDEO
VERIFY IN FIELD
VENEER
VOLATILE ORGANIC COMPOUND
VOLUME
VAPOR RETARDER
VENT THROUGH ROOF
WITH
WITHOUT
WOOD BLOCKING
WATER CLOSET
WOOD
WINDOW
WIDE FLANGE
WOOD FRAME
WOOD FURRING STRIPS
WATER HEATER
WAREHOUSE
WATERPROOFING
WATERPROOF MEMBRANE
WEATHER RESISTANT
WEATHERSTRIP OR WALL SCONCE
WAINSCOT
WEIGHT OR WINDOW TREATMENT
CROSS BRACE
EXTRUDED POLYSTYRENE BOARD
YARD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
BUILDING 1
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C U s e rs \P u b lic
\D o c u m e n ts
\R e v it P ro je c ts
\1
I A
C
IT
Y V
A H
C S
R
E M
O D
E L
W
I R
-C A
T H
-E P
Y e u n y o u n g .r v t
/8
/2
:1
:4
A M
1-I2
ABBREVIATIONS REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
04/08/2022 JU PC16133Revisions: Date:
SHAFT
2W222
2W221
2CP05
2W220
2W218
2CP04
2W219
2W213
2W202
2W223
2W218B
SHAFT
D
2W04
2ST06
2S08C
2W105
2C01
2W172
2W124
2W172A
2CW01A
2W164
2W170
2W169
2W171
2C03
2W142C
2W158
2W149
2W142B
2W145
2W147
2W144 2W143
2W142A
2C05
2W142
2C03
2W29
2W27
2W30
2W36
2W33
2W141
2W12
2W141A
2W137 2C04A
2C04
2CW01B
2W100
2C05
2W150
2W148
2W146
2W166
2W162
2W1402W139
2W160
803 SF
2W151
EP LAB
815 SF
2W153
CATH LAB
205 SF
2W153A
CONTROL
199 SF
2W151A
CONTROL
781 SF
2W154
IR LAB
155 SF
2W154A
CONTROL
167 SF
2C03A
CORRIDOR
77 SF
2W156A
MEN'S
SHOWER149 SF
2W156
MEN'S
LOCKER
148 SF
2W157
WOMEN'S
LOCKER
83 SF
2W157A
WOMEN'S
SHOWER
127 SF
2W155
STERILE
SUPPLY
55 SF
2W180
ELEC
218 SF
2ST07
STAIR
162 SF
2C07A
CIRCULATION
116 SF
2W178
MED PREP/
NOURISH
151 SF
2W177
NURSE
STATION
69 SF
2C07
CIRCULATION
690 SF
2W175
RECOVERY
108 SF
2W175E
PRE/POST
BAY
111 SF
2W175D
PRE/POST
BAY
111 SF
2W175C
PRE/POST
BAY
111 SF
2W175B
PRE/POST
BAY
106 SF
2W175A
PRE/POST
BAY
108 SF
2W173
CLEAN
UTILITY
ROOM
19 SF
2W174
CLEAN
LINEN
28 SF
2W179
EP
EQUIPMENT
ROOM
747 SF
2C06
CORRIDOR
375 SF
2W131
RADIOLOGY/
MULTI-PURPOSE
408 SF
2W130
RADIOLOGY/
FLUOROSCOPY
100 SF
2W129C
NURSE
MANAGER
OFFICE
100 SF
2W129D
IR
MANAGER
OFFICE
820 SF
2W129
OPEN
OFFICE
CUBICLES
408 SF
2C02
ELEVATOR
LOBBY
2W176
TOILET
2W132
ULTRASOUND
2W130A
TOILET
637 SF
2C03B
SEMI
RESTRICTED
CORRIDOR
NON-SLEEPING
SUITE (2,390 SF)
NON-SLEEPING
SUITE (1,240 SF)
(EXISTING)
NON-SLEEPING
SUITE (5,664 SF)
(EXISTING)
NON-SLEEPING
SUITE (1,980 SF)
EA
EA
EXIT
EXIT
EA
FEC
EYEWASH
EA
TRAVEL DISTANCE
162'-3"
FEC
FEC
EA
EA
EA
EYEWASHEYEWASH
EA
TRAVEL DISTANCE
162'-3"
TRAVEL DISTANCE
172'-10"
EA
TRAVEL DISTANCE
99'-9"
EA
EA
EA
87 SF
2W181
EQUIPMENT
PARK
AMBULATORY HEALTH CARE OCCUPANCY
2S32
TOILET
PATIENT
2S33
TOILET
STAFF
2S34
ECHO 1
2S35
CARDIOVERSION
ECHO/TEE
2S37
ECHO 3
2S38
ECHO 2
2CS11
CORRIDOR
2S36
ELEC
2S41
EKG 1
2S40
TREADMILL
EKG/STRESS
2S39
EKG 2
2S42
HOLDING
SOILED
2S43A
TECH AREA
EKG
2S43
WORK ROOM
EKG
2CS12
CORRIDOR
105 SF
2W129B
OFFICE
52 SF
2W129E
ALCOVE
TRAVEL DISTANCE
148'-0"
EA
160 SF
2W###
(FUTURE)
IT ROOM
KEY PLAN - SECOND FLOOR
NOYES
APPLICABLE REGULATIONS
GENERAL TYPE OF PROJECT
NFPA NATIONAL FIRE CODES (EXCEPTION: NFPA 5000 & 900)
ASHRAE STANDARDS
2021 NFPA 101 (LIFE SAFETY CODE)
ABA STANDARDS (2015) (ABAAS)
2021 IBC
REMODEL
ADDITION
NEW BUILDING
PROJECT DESCRIPTION
CODE SUMMARY
Remodel part of 2nd level relcoating Cath & IR lab. Build new EP Lab, Pre/Post Recovery and support spaces. Relocate Fluoroscopy & Multipurpose Radiology rooms and staff offices. Provides new AHU to serve Labs and modifies existing HVAC to serve remaining spaces.
VA BARRIER FREE DESIGN STANDARD (PG-18-13)
NOYESAUTHORITIES HAVING JURISDICTION (AHJ's)
THE JOINT COMMISSION (TJC)
CENTER FOR MEDICARE/MEDICAID SERVICES (CMS)
TESTRATING (HRS)
EXTERIOR DOORS AND WINDOWS
SHAFTS AND EXIT PASSAGEWAYS
OTHER
ROOF CONSTRUCTION
PRIME & SEC. FLOOR BEAMS, JOISTS
FLOOR/CEILING ASSEMBLY
FLOOR CONSTRUCTION
INTERIOR
NON-BEARING WALLS AND PARTITIONS
BEARING WALLS
COLUMNS
GIRDERS
TRUSSES
ROOF/CEILING ASSEMBLY
PRIME & SEC. ROOF BEAMS, JOISTS
EXTERIOR
INTERIOR BEARING WALLS
EXTERIOR BEARING WALLS
STRUCTURAL FRAME
AREA SEPARATIONS / FIRE WALLS
FIRE-RESISTIVE REQUIREMENTS
TYPE(S) OF CONSTRUCTION
CONSTRUCTION TYPE(S)
SEE LIFE SAFETY PLANS
See Life Safety Plans
3 EXISTING
(NFPA 220 TABLE 4.1.1) TYPE I (332)
OSHA STANDARDS
VA SEISMIC DESIGN REQUIREMENTS H-18-8
NATIONAL ELECTRIC CODE (NEC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,
AMERICAN CONCRETE INSTITUTE AND COMETARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
ENERGY POLICY ACT OF 2005 (EPAct)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS
FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE
RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL
BUILDINGS, 10 CFR PARTS 433,434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE
BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
EXECUTIVE ORDER 13834
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED
IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA
MASTER CONSTRUCTION SPECIFICATION
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE
STANDARD 62.1-2004
SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE
STANDARD 15 -2007
VA FIRE PROTECTION DESIGN MANUAL
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA
NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER
GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)
NOYES
(Section 8.3)
CHANGE OF OCCUPANCY?
SEPARATED OCCUPANCIES?
FIRE BARRIER RATING(S) SEE LIFE SAFETY PLANS
OCCUPANCY CLASSIFICATION(S)
OCCUPANCIES
(If Remodeling)
2021 LSC (TABLE 6.1.14.1)
(LSC CH 12-42)
NOYES
FIRE RESISTIVE CORRIDORS?
SMOKE TIGHT CORRIDORS (SMOKE PARTITIONS)
INCIDENTAL USE AREA RATING(S) SEE PLANS
MISCELLANEOUS
INTERIOR FINISHES CLASSIFICATION A, B(EXISTING) EXITS
A, B EXIT ACCESS CORRIDORS
A, B, COTHER SPACES
2021 NFPA 220 (STANDARD on TYPES OF BUILDING CONSTRUCTION)
AMBULATORY
HEALTHCARE
1.5
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
TRAVEL DISTANCE
ARRANGEMENT OF MEANS OF EGRESS
COMMON PATH OF TRAVEL
DEAD END
EXISTING AMBULATORY -- FULLY SPRINKLERED
HEALTH CARE OCCUPANCY
(NFPA 101 21.2.6.2.2)
(NFPA 101 21.2.5.1)
(NFPA 101 21.2.5.3)
200 FT
100 FT
50 FT
(EXISTING)
LIFE SAFETY SYMBOLS
1 HOUR FIRE
BARRIER
2 HOUR FIRE
BARRIER
SMOKE ZONE
BARRIER
2 HOUR FIRE &
SMOKE BARRIER
HE
TRAVEL DISTANCE
100'-10"
TRAVEL
DISTANCE
EA
EXIT
EXIT
HORIZONTAL
EXIT
EXIT
EXIT ACCESS
FIRE
EXTINGUISHER
FIRE
EXTINGUISHER
CABINET
FEC
LIMITS OF
CONSTRUCTION
HEALTH CARE SUITE
NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN
SMOKE RESESTIVE
ASSEMBLY
(HAZARDOUS
ROOM
ENCLOSURE)
NON-RATED
SMOKE ZONE
PARTITION
HEALTHCARE AREA OPEN TO CORRIDOR WITH 24/7
SUPERVISION - NO SMOKE DETECTION REQUIRED
HEALTHCARE AREA OPEN TO CORRIDOR WITH 24/7
SUPERVISION - SMOKE DETECTION PROVIDED
SMOKE TIGHT
ASSEMBLY
(HEALTHCARE
ASSEMBLY
CORRIDORS)
SHAFT
ADJACENT SYMBOLS SHOW PARTITION RATING
AND DAMPER REQUIREMENTS
EXIT PASSAGEWAY
RATE AS STAIR
ALL OPENINGS TO BE RATED AS STAIR SHAFT
1 HOUR FIRE BARRIER HAZARDOUS ROOM ENCLOSURE
SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE
SUITE DESCRIPTION
SUITE NUMBER
SUITE NAME SUITE SIZE TYPE OF SUITE EXIT NUMBER
PREP / RECOVERY
OFFICES
RADIOLOGY SUITE
CARDIOLOGY SUITE 1,980 Sq. Ft.
2,390 Sq. Ft.
1,240 Sq. Ft.
5,664 Sq. Ft.
NON SLEEPING PATIENT CARE
NON SLEEPING PATIENT CARE
NON PATIENT CARE
NON SLEEPING PATIENT CARE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
BUILDING 1
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C U s e rs \P u b lic
\D o c u m e n ts
\R e v it P ro je c ts
\1
I A
C
IT
Y V
A H
C S
R
E M
O D
E L
W
I R
-C A
T H
-E P
Y e u n y o u n g .r v t
/8
/2
:1
:5
A M
1-I3
SECOND FLOOR LIFE SAFETY
PLAN
REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
04/08/2022 JU PC16133
1/8" = 1'-0"1 SECOND LEVEL LIFE SAFETY PLAN
0 8' 16'4'
PLAN
NORTH
TRUE
Revisions: Date:
3W101
3W09
3CW01
3S01
3C01
3CW01A
3W100
3W07
DW-2
3W102A
3W102
3CO1A
3C03
MECH SHAFT
3CW02
3W19
3W19D
3W19A3W11
3CW02A
3C02
3W17A
3W101A
CL-1
3W17
3W15
3W17B
3W101B
3W17C
3W19B
B1
S H A F T
S H A F T
3W103D
3W19C
SHAFT
3W223
PACT ROOF
D1
B3
C1
C2
3W103C
3W222
B2
3W14
3W101C
SPECIAL PURPOSE
INDUSTRAIL OCCUPANCY
BUSINESS OCCUPANCY
3W03
ROOM
MECHANICAL
3W03B
ROOM
MECHANICAL
MECHANICAL
SHAFT
3W136
EQUIPMENT
ELECTRICAL
ROOM
3ST06
3W104
3ST07
3W103A
EXIT
EXITEA
EA
EA
EA
EA
LIFE SAFETY SYMBOLS
1 HOUR FIRE
BARRIER
2 HOUR FIRE
BARRIER
SMOKE ZONE
BARRIER
2 HOUR FIRE &
SMOKE BARRIER
HE
TRAVEL DISTANCE
100'-10"
TRAVEL
DISTANCE
EA
EXIT
EXIT
HORIZONTAL
EXIT
EXIT
EXIT ACCESS
FIRE
EXTINGUISHER
FIRE
EXTINGUISHER
CABINET
FEC
LIMITS OF
CONSTRUCTION
HEALTH CARE SUITE
NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN
SMOKE RESESTIVE
ASSEMBLY
(HAZARDOUS
ROOM
ENCLOSURE)
NON-RATED
SMOKE ZONE
PARTITION
HEALTHCARE AREA OPEN TO CORRIDOR WITH 24/7
SUPERVISION - NO SMOKE DETECTION REQUIRED
HEALTHCARE AREA OPEN TO CORRIDOR WITH 24/7
SUPERVISION - SMOKE DETECTION PROVIDED
SMOKE TIGHT
ASSEMBLY
(HEALTHCARE
ASSEMBLY
CORRIDORS)
SHAFT
ADJACENT SYMBOLS SHOW PARTITION RATING
AND DAMPER REQUIREMENTS
EXIT PASSAGEWAY
RATE AS STAIR
ALL OPENINGS TO BE RATED AS STAIR SHAFT
1 HOUR FIRE BARRIER HAZARDOUS ROOM ENCLOSURE
SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE
KEY PLAN - THIRD FLOOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
BUILDING 1
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C U s e rs \P u b lic
\D o c u m e n ts
\R e v it P ro je c ts
\1
I A
C
IT
Y V
A H
C S
R
E M
O D
E L
W
I R
-C A
T H
-E P
Y e u n y o u n g .r v t
/8
/2
:1
:5
A M
1-I4
THIRD FLOOR LIFE SAFETY PLAN REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
04/08/2022 JU PC16133
1/8" = 1'-0"1 THIRD FLOOR LIFE SAFETY PLAN
0 8' 16'4'
PLAN
NORTH
TRUE
INFECTION CONTROL & CONSTRUCTION
BARRIER GENERAL NOTES
1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL
INFORMATION
2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND
PARTICULATE MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA
PERIMETER NEEDS TO BE SEALED COMPLETELY WITH SHEET PLASTIC AS
SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE PERMITTED BY CLASS.
ICRA - CONSTRUCTION BARRIER TO BE PROVIDED AS SPECIFIED AND LISTED IN
ICRA CLASS.
3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION
OPERATIONS AS SPECIFIED. MONITOR TO MEASURE PRESSURE DIFFERENTIAL
BETWEEN CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS
DIRECTED BY VA.
4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON,
PROVIDE A REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE
VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT
TYPE OF CONSTRUCTION. PROVIDE AT LEAST TEN (10) WORKING DAYS NOTICE
FOR EACH PERMIT.
5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM
FLOOR TO DECK/FLOOR ABOVE. EXCEPTION. IF BARRIER IS ADJACENT TO
SMOKE, FIRE, OR EXISTING WALL CONSTRUCTION WHICH WILL NOT BE
DEMOLISHED AND TERMINATES TO FLOOR/DECK ABOVE, THEN CONSTRUCT DUST
PROOF IC BARRIER, SEE DETAIL(S). TAPE, MUD, SAND JOINTS AND PAINT ON NON-
CONSTRUCTION SIDE OF BARRIER.
6. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00
AM AND AFTER 8:00 PM OR DIRECTED BY COR
7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE
NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF,
(2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR
AREAS BETWEEN 5000 SF AND 10000 SF.
8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO
COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL
TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF
UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE
REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE
ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE
NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR.
PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE AND/OR
EMERGENCY IN AN ADJACENT AREA.
10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS,
CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER
PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE
BARRIER.
CONSTRUCION PHASING GENERAL NOTES
1. THE WORK UNDER THIS CONTRACT SHALL BE DIVIDED INTO PHASES. A PHASE
CAN INVOLVE MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00
1.6.G PHASING.
2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING AND SEQUENCING
WITH ALL TRADES AND THE OWNER. THE GENERAL CONTRACTOR SHALL PROVIDE
A WRITTEN NARRATIVE TO OUTLINE CONSTRUCTION PHASING AND SEQUENCE
PLANS, VALIDATING AND ELABORATING ON THIS PHASING DESCRIPTION.
3. THE GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH THE OWNER SO
WORK MAY BE CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR
DELAYING WORK UNDER THIS CONTRACT, OR OTHER CONTRACTS ON THE
PROJECT SITE OR WORK BY OWNER.
4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL INDICATE THE
SEQUENCE, COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND
APPROVAL DATES AND MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL
FOR ALL PHASES OF THE WORK.
5. THE GENERAL CONTRACTOR SHALL PERFORM THE WORK IN EACH PHASE IN THE
SEQUENCE SHOWN ON THE PHASING PLAN DRAWING(S) AND CONSTRUCTION
PHASING DESCRIPTION.
6. THE GENERAL CONTRACTOR MUST COMPLETE ALL WORK IN EACH PHASE WITH
THE VA INSPECTING AND ACCEPTING THE WORK PRIOR TO VA OCCUPANCY AND
THE CONTRACTOR PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON
COMPLETION OF A PARTICULAR PHASE, THE ENTIRE AREA COVERED BY THAT
PHASE CAN BE OCCUPIED BY THE VA PERSONNEL WITH ALL SYSTEMS
FUNCTIONING PROPERLY.
7. BEFORE COMMENCING WORK ON EACH SUCCESSIVE PHASE, THE GENERAL
CONTRACTOR SHALL SUBMIT AN UPDATED COPY OF THE SCHEDULE.
8. ANY DUST PARTITIONS OR ICRA-CONSTRUCION BARRIERS CONSTRUCTED BY THE
CONTRACTOR PRIOR TO THE START OF DEMOLITION MUST REMAIN IN PLACE UNTIL
THE COMPLETION OF THAT PHASE OR SUBSEQUENT PHASE WHERE REQUIRED.
9. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO VA OCCUPIED
AREAS IN SUCH A MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED
USE OF ALL OCCUPIED AREAS, INCLUDING THE APPLICABLE MECHANICAL AND
ELECTRICAL SYSTEMS SERVING THESE AREAS.
10. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL
DRAWING(S) AND DEMOLITION PLANS.
11. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENTS IS
FOR ARCHITECT-OWNER PLANNING PURPOSES ONLY.
12. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS
OF EGRESS THROUGHOUT ALL PHASING.
13. THE CONTRACTOR SHALL PLAN FOR A MINIMUM OF 4 WEEKS' TIME BETWEEN
PHASES TO ALLOW THE VA TO OCCUPY THE NEWLY ACCEPTED SPACE AND
VACATE THE FOLLOW-ON PHASES. THE VA WILL ACCELERATE THIS TIME WHEN
POSSIBLE AND WILL NOTIFY THE CONTRACTOR IF THIS OCCURS.
14. WORK BELOW (OR ABOVE) 2ND LEVEL SHALL BE TREATED ON A CASE-BY-CASE
BASIS, AND SHALL BE CAREFULLY COORDINATED BETWEEN ICVA AND
CONTRACTOR TO ENSURE PROPER PRECAUTIONS ARE TAKEN, PROPER
CONSTRUCTION BARRIERS ARE IN PLACE, AND WORK IS DONE IN A WAY TO
MINIMIZE DISRUPTION/IMPACT TO AFFECTED AREAS.
PHASE 1:
CONSTRUCTION PROJECT ACTIVITY TYPE - D
INFECTION CONTROL RISK GROUP - GROUP 2 : MEDIUM RISK
CONTROL PROCEDURE CLASS - III
PHASE 2 :
CONSTRUCTION PROJECT ACTIVITY TYPE - D
INFECTION CONTROL RISK GROUP - GROUP 2 : MEDIUM RISK
CONTROL PROCEDURE CLASS - III
PHASE 3:
CONSTRUCTION PROJECT ACTIVITY TYPE - D
INFECTION CONTROL RISK GROUP - GROUP 2 : MEDIUM RISK
CONTROL PROCEDURE CLASS - III
INFECTION CONTROL RISK ASSESSMENT (ICRA)
BY PROJECT AREA USE AND PHASE
CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)
TYPE A
TYPE B
TYPE C
TYPE D
INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT NOT
LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION
LIMITED TO 1 TILE PER 50 SQUARE FEET, PAINTING BUT NOT SANDING
WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND
ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF
WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL
DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE
AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF
WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.
FLOOR COVERING REMOVAL (WITHOUT SANDING OR GRINDING).
ANY WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR
REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO,
SANDING OF WALL FOR PAINTING OR WALLCOVERING, REMOVAL OF
FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL
CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE
CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH
CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT. FLOOR
COVERING REMOVAL (WITH SANDING OR GRINDING).
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS
NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK
SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE
CEILING SYSTEM, FLOORING AND NEW CONSTRUCTION.
GROUP 1
LOW RISK
• MECHANICAL SPACES: AREAS NOT DIRECTLY ADJACENT TO PATIENT
CARE, INCLUDING INTERSTITIAL SPACES.
• ENGINEERING OR EMS OFFICE/WORK AREAS
• OFFICE AREAS: AREAS NOT ATTACHED TO/ADJOINING PATIENT CARE
AREAS, NOT USED FOR PATIENT INTERVIEWS, EVALUATIONS OR
EXAMINATIONS.
• PUBLIC CORRIDORS: SPACES NOT ON OR DIRECTLY ATTACHED TO
PATIENT UNITS OR TREATMENT LOCATIONS.
GROUP 2
MEDIUM
RISK
• OUTPATIENT AREAS:
1. PRIMARY CARE OR SPECIALTY CARE CLINIC AREAS
2. BEHAVIORAL/MENTAL HEALTH AREAS
3. EXTENDED CARE / REHAB CLINIC AREAS
4. COMMUNITY BASED OUT PATIENT CLINICS (CBOC’S)
GROUP 3
HIGH RISK
• IN-PATIENT UNITS:
1. INCLUDING, BUT NOT LIMITED TO: EMERGENCY DEPT.; NURSING
UNITS; RADIOLOGY/MRI/CT/ULTRASOUND; NUCLEAR MEDICINE;
CAFETERIA/KITCHEN/CANTEEN; LABORATORIES; RADIATION /
ONCOLOGY; DIALYSIS
GROUP 4
HIGHEST
RISK
• ICU/SICU
• OR/PACU/ENDOSCOPY
• GI
• STERILE PROCESSING SERVICES (SPS)
• PHARMACY
• CATH LAB
CLASS
I
KEEP AREAS FREE OF DEBRIS, TRASH
EXECUTE WORK TO MINIMIZE OF DUST MIGRATION (E.G. WET MOPPING, HEPA VACUUM)
IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION
(INVOLVING MINOR DEMOLITION IN MAINTENANCE OR REMODELING.)
CLASS
II
SAME AS CLASS I PLUS:
1. ESTABLISH MATERIAL AND DEBRIS ROUTE USING NON-PATIENT/VISITOR PATHWAY
2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE CUTTING OR DRILLING.
3. BLOCK OFF AND SEAL AIR VENTS
4. SEAL UNUSED DOORS WITH PLASTIC SHEATHING AND DUCT TAPE.
5. CREATE BARRIERS AS DEFINED BY INFECTION PREVENTION
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINER; TAPE COVERING UNLESS SOLID LID.
7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
8. PLACE STICKY MAT AT ALL WORK AREA ENTRANCES AND EXITS.
9. REMOVE OR ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA
CLASS
III
SAME AS CLASS I AND II PLUS:
1. ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA TO PREVENT DUCT SYSTEM CONTAMINATION
2. COMPLETE CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, PLASTIC) AT ALL CONSTRUCTION ENTRIES AND EXITS; MONITOR FOR SEAL AND TAKE IMMEDIATE
CORRECTIVE ACTION AS NEEDED
3. MAINTAIN AND MONITOR NEGATIVE AIR PRESSURE WITHIN CONSTRUCTION SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
4. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING PERFORMED.
5. CHECK AND REPLACE AIR FILTERS AS NEEDED REGULARLY
6. DO NOT REMOVE BARRIERS FROM WORK SITE UNTIL PROJECT IS COMPLETE & HAS BEEN THOROUGHLY CLEANED; REMOVE BARRIERS CAREFULLY TO MINIMIZE
SPREADING DUST. DEBRIS.
7. VACUUM WORK WITH HEPA FILTERED VACUUM.
8. WET MOP AREA WITH CLEANER/DISINFECTANT.
9. MITIGATE VIBRATION AND NOISE TO LOWEST IMPACT WHERE POSSIBLE.
10. DISPLAY ICRA AT SITE
11. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES.
CLASS
IV
SAME AS CLASS I, II AND III PLUS:
1. INSPECT ADJACENT AREAS FOR DUST MIGRATION; TAKE IMMEDIATE CORRECTIVE AS NEEDED
2. USE HEPA VACUUM IN AREA PRIOR TO START OF CONSTRUCTION
3. CONSTRUCT ANTE ROOM; ALL PERSONNEL MUST ENTER THROUGH IT TO BE VACUUMED USING HEPA VACUUM BEFORE LEAVING OR TO DON/DOFF PPE
CONTINUOUS FIRE
RETARDANT TREATED
WOOD NAILER
EXISTING CEILING
CONTINUOUS DUCT
TAPE SEAL EACH SIDE
AT CEILING
COMPRESSIBLE
INSULATION
CONTINUOUS DUCT
TAPE SEAL EACH
SIDE
EXISTING FINISHED
FLOOR
(1) LAYER 5/8" GYP BD EACH
SIDE. FINISH OCCUPIED SIDE
WITH GLOSS PAINT
3 5/8" STEEL STUDS @ 16"
OC WITH FULL BATT SOUND
ATTENUATING INSULATION
CONTINUOUS FIRE
RETARDANT TREATED
WOOD NAILER
CLOSE INTERSTITIAL SPACE WITH
6 MIL POLYETHYLENE
BARRIER. SEAL ALL JOINTS,
PENETRATIONS AND ENTIRE
PERIMETER OF BARRIER
WITH CONTINUOUS DUCT TAPE
CLOSE OPEN DUCTS WITH
6 MIL POLYETHYLENE
BARRIER. SEAL EDGES
WITH CONTINUOUS DUCT
TAPE
"WORK" SIDE OF BARRIER OCCUPIED SIDE OF
BARRIER
COMPRESSIBLE INSULATION
3 5/8" STEEL STUDS @ 16"
OC WITH FULL BATT SOUND
ATTENUATING INSULATION
3 5/8" STEEL STUDS @ 16"
OC WITH FULL BATT SOUND
ATTENUATING INSULATION
KEY PLAN - SECOND FLOOR
PHASE 1
PHASE 2
PHASE 3
PHASE 4
2S32
TOILET
PATIENT
2S33
TOILET
STAFF
2S34
ECHO 1
2S35
CARDIOVERSION
ECHO/TEE
2S37
ECHO 3
2S38
ECHO 2
2CS11
CORRIDOR
2S36
ELEC
2S41
EKG 1
2S40
TREADMILL
EKG/STRESS
2S39
EKG 2
2S42
HOLDING
SOILED
2S43A
TECH AREA
EKG
2S43
WORK ROOM
EKG
2CS12
CORRIDOR
EXIT
EXIT
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
PHASE 1
PHASE 2
PHASE 3
PHASE 4
2S32
TOILET
PATIENT
2S33
TOILET
STAFF
2S34
ECHO 1
2S35
CARDIOVERSION
ECHO/TEE
2S37
ECHO 3
2S38
ECHO 2
2CS11
CORRIDOR
2S36
ELEC
2S41
EKG 1
2S40
TREADMILL
EKG/STRESS
2S39
EKG 2
2S42
HOLDING
SOILED
2S43A
TECH AREA
EKG
2S43
WORK ROOM
EKG
2CS12
CORRIDOR
EXIT
EXIT
EA
EA
EA
5'-6"
EA
5'-0"
EA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
BUILDING 1
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C U s e rs \P u b lic
\D o c u m e n ts
\R e v it P ro je c ts
\1
I A
C
IT
Y V
A H
C S
R
E M
O D
E L
W
I R
-C A
T H
-E P
Y e u n y o u n g .r v t
/8
/2
:1
:0
A M
1-I5
SECOND FLOOR INFECTION
CONTROL & PHASING PLAN
REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
04/08/2022 JU PC16133
1/2" = 1'-0"3 TYP DUST PROOF BARRIER
PLAN
NORTH
TRUE
NORTH
1/16" = 1'-0"2 SECOND FLOOR ICRA, CONSTRUCTION BARRIER & PHASING PLAN - COMPLETED CONSTRCUTION PLAN
PLAN
NORTH
TRUE
NORTH
0 16' 32'8' 0 16' 32'8'
0 2' 4'1'
1/16" = 1'-0"1 SECOND FLOOR ICRA, CONSTRUCTION BARRIER & PHASING PLAN - EXISTING AS-IS PLAN
1. NEITHER THE PROFESSIONAL ACTIVITIES OF THE ENGINEER, NOR THE PRESENCE OF THE
ENGINEER OR THEIR EMPLOYEES AND SUBCONSULTANTS AT THE CONSTRUCTION SITE,
SHALL RELIEVE THE CONTRACTOR AND ANY OTHER ENTITY OF THEIR OBLIGATIONS,
DUTIES AND RESPONSIBILITIES INCLUDING BUT NOT LIMITED TO, CONSTRUCTION MEANS,
METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES NECESSARY FOR PERFORMING,
SUPERINTENDING OR COORDINATING ALL PORTIONS OF THE CONSTRUCTION WORK IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS AND ANY HEALTH OR SAFETY
PRECAUTIONS REQUIRED BY ANY REGULATORY AGENCIES. THE ENGINEER AND THEIR
PERSONNEL HAVE NO AUTHORITY TO EXERCISE ANY CONTROL OVER ANY
CONSTRUCTION CONTRACTOR OR OTHER ENTITY OR THEIR EMPLOYEES IN CONNECTION
WITH THEIR WORK OR ANY HEALTH OR SAFETY PRECAUTIONS. THE CONTRACTOR IS
SOLELY RESPONSIBLE FOR THE JOBSITE SAFETY. THE ENGINEER AND THE ENGINEER’S
CONSULTANTS SHALL BE MADE ADDITIONAL INSUREDS UNDER THE CONTRACTOR’S
GENERAL LIABILITY INSURANCE POLICY.
2. ALL DRAWINGS AND SPECIFICATIONS ARE CONSIDERED TO BE A PART OF THE CONTRACT
DOCUMENTS. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE REVIEW AND
COORDINATION OF ALL DRAWINGS AND SPECIFICATIONS PRIOR TO THE START OF
CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT PRIOR TO THE START OF CONSTRUCTION SO A CLARIFICATION CAN BE
ISSUED. ANY WORK PERFORMED IN CONFLICT WITH THE CONTRACT DOCUMENTS OR ANY
CODE REQUIREMENTS SHALL BE CORRECTED BY THE CONTRACTOR AT THEIR OWN
EXPENSE AND AT NO EXPENSE TO THE OWNER OR ARCHITECT.
3. ALL DIMENSIONS AND SITE CONDITIONS SHALL BE VERIFIED BY THE CONTRACTOR AT THE
JOBSITE PRIOR TO CONSTRUCTION, START OF SHOP DRAWINGS, START OF
CONSTRUCTION, AND/OR FABRICATION OF MATERIALS. IF DISCREPANCIES ARE
ENCOUNTERED, OR CONDITIONS DEVELOP THAT ARE NOT COVERED BY THE CONTRACT
DOCUMENTS, THE ARCHITECT SHALL BE NOTIFIED FOR CLARIFICATION.
4. CONTRACTOR SHALL PROVIDE AND BE RESPONSIBLE FOR THE PROTECTION AND REPAIR
OF ADJACENT EXISTING SURFACES AND AREAS WHICH MAY BE DAMAGED AS A RESULT
OF NEW WORK.
5. STRUCTURAL DRAWINGS INCLUDE DESIGN REQUIREMENTS AND DIMENSIONS FOR
STRUCTURAL INTEGRITY BUT DO NOT SHOW ALL DETAIL DIMENSIONS TO FIT INTRICATE
ARCHITECTURAL AND MECHANICAL DETAILS. CONTRACTOR SHALL SO CONSTRUCT THE
WORK SO IT WILL CONFORM TO THE CLEARANCES REQUIRED BY ARCHITECTURAL,
MECHANICAL AND ELECTRICAL DESIGN.
6. ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED TO BE
CONSTRUCTION STANDARDS. IF CLARIFICATION IS REQUIRED, THE CONTRACTOR SHALL
NOTIFY THE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK.
7. DO NOT SCALE DRAWINGS. PRINTED DIMENSIONS HAVE PRECEDENCE OVER SCALED
DRAWINGS AND LARGE-SCALE OVER SMALL-SCALE DRAWINGS. CONTRACTOR TO
DETERMINE FINAL DIMENSION WITH ARCHITECT.
8. TYPICAL DETAILS SHALL APPLY TO SITUATIONS OCCURRING ON THE PROJECT THAT ARE
THE SAME OR SIMILAR TO THOSE SPECIFICALLY REFERENCED. WHERE NO DETAILS ARE
GIVEN, CONSTRUCTION SHALL BE AS SHOWN FOR SIMILAR WORK.
9. THE CONTRACT DOCUMENTS AND SPECIFICATIONS REPRESENT THE FINISHED
STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE
CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE
AND SAFETY OF WORKMEN DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE,
BUT NOT BE LIMITED TO, BRACING AND SHORING FOR LOADS DUE TO CONSTRUCTION
EQUIPMENT, ETC. OBSERVATION VISITS TO THE SITE BY THE ARCHITECT OR STRUCTURAL
ENGINEER SHALL NOT INCLUDE INSPECTION OR APPROVAL OF THE ABOVE ITEMS AND
DOES NOT IN ANY WAY RELIEVE THE CONTRACTOR OF THEIR RESPONSIBILITIES FOR THE
ABOVE.
10. SEE ARCHITECTURAL, ELECTRICAL AND MECHANICAL DRAWINGS FOR DETAILS,
CONDITIONS, PITS, TRENCHES, PADS, DEPRESSIONS, ROOF/FLOOR OPENINGS, STAIRS,
SLEEVES, ITEMS TO BE EMBEDDED OR ATTACHED TO STRUCTURAL ELEMENTS, ETC., NOT
SHOWN ON THE STRUCTURAL DRAWINGS.
11. ESTABLISH AND VERIFY ALL OPENINGS AND INSERTS FOR MECHANICAL, ELECTRICAL AND
PLUMBING WITH APPROPRIATE TRADE CONTRACTORS. OPENING SIZES AND LOCATIONS
SHOWN FOR DUCTS, PIPE, INSERTS AND OTHER PENETRATIONS WHEN SHOWN ARE FOR
GENERAL INFORMATION ONLY AND SHALL BE VERIFIED PRIOR TO FORMING.
12. NO HOLES, NOTCHES, BLOCKOUTS, ETC. ARE ALLOWED IN STRUCTURAL ELEMENTS
UNLESS SPECIFICALLY DETAILED ON THE STRUCTURAL DRAWINGS OR APPROVED BY THE
STRUCTURAL ENGINEER.
13. BEFORE SUBMITTING A PROPOSAL FOR THIS WORK, EACH BIDDER SHALL VISIT THE
PREMISES AND BECOME FULLY ACQUAINTED WITH THE EXISTING CONDITIONS,
TEMPORARY CONSTRUCTION REQUIRED, QUANTITIES AND TYPE OF EQUIPMENT, ETC. THE
BID SHALL INCLUDE ALL SUMS REQUIRED TO DO THE WORK WITHIN THE EXISTING
CONDITIONS.
14. SHOP DRAWINGS SHALL BE REVIEWED AND COORDINATED PRIOR TO SUBMITTING TO THE
ARCHITECT. EACH SHOP DRAWING SUBMITTED SHALL BE STAMPED INDICATING REVIEW
BY THE CONSTRUCTION MANAGER/GENERAL CONTRACTOR AND REVIEW BY THE
ARCHITECT SHALL NOT BEGIN UNTIL THIS IS COMPLETE. WORK SHALL NOT BEGIN
WITHOUT REVIEW BY THE ARCHITECT/STRUCTURAL ENGINEER.
15. SHOP DRAWINGS SHALL BE REVIEWED BY THE ARCHITECT/STRUCTURAL ENGINEER FOR
GENERAL CONFORMANCE WITH DESIGN CONCEPT ONLY. NOTATIONS MADE BY THE
ARCHITECT/STRUCTURAL ENGINEER ON THE SHOP DRAWINGS DO NOT RELIEVE THE
CONTRACTOR FROM COMPLYING WITH THE REQUIREMENTS OF THE DRAWINGS AND
SPECIFICATIONS.
16. ELEVATIONS ARE BASED ON THE FIRST FLOOR ELEVATION OF ( +0' - 0" ).
17. EXISTING CONDITIONS:
A. EXISTING STRUCTURAL INFORMATION SHOWN WAS OBTAINED FROM EXISTING
DRAWINGS DATED 06-16-1986 BY HANSEN LIND MEYER.
B. EXISTING STRUCTURAL INFORMATION SHOWN WAS OBTAINED FROM FIELD TAKE-OFF
BY IMEG AS PERMITTED BY ACCESS RESTRICTIONS DURING DESIGN.
C. ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS
GIVEN AS THE BEST PRESENT KNOWLEDGE. CONTRACTOR TO VERIFY EXISTING
INFORMATION, DIMENSIONS AND SIZES AS REQUIRED TO COMPLETE THEIR WORK.
WHERE ACTUAL CONDITIONS CONFLICT WITH THE DRAWINGS, THEY SHALL BE
REPORTED TO THE AOR OR SEOR SO PROPER CLARIFICATION MAY BE MADE.
MODIFICATION OF CONSTRUCTION DETAILS SHALL NOT BE MADE WITHOUT WRITTEN
APPROVAL OF THE ARCHITECT OR STRUCTURAL ENGINEER.
GENERAL
DEMOLITION
1. ALL DEMOLITION SHALL BE CARRIED OUT IN SUCH A WAY AS TO NOT DAMAGE
EXISTING ELEMENTS WHICH ARE TO REMAIN.
2. ALL ELEMENTS WHICH ARE TO REMAIN AND WHICH ARE DAMAGED DURING
DEMOLITION WORK SHALL BE REPLACED AT NO ADDED COST. EXISTING
ELEMENTS ARE TO BE PROTECTED TO THE FULLEST EXTENT POSSIBLE TO
REDUCE SUCH DAMAGE TO A MINIMUM.
1. STRUCTURE HAS BEEN DESIGNED TO COMPLY WITH:
IBC 2021
ASCE/SEI 7-16
ACI 318-19
AISC 360-16
AWS D1.1
AISI S100
TMS 402/602-16
2. RISK CATEGORY IV
3. SEISMIC:
SEISMIC DESIGN CATEGORY A
IMPORTANCE FACTOR 1.50
SOIL CLASSIFICATION D (ASSUMED)
THE PROPOSED MODIFICATIONS WILL NOT ALTER THE EXISTING BUILDING SEISMIC
LOAD OR THE EXISTING LATERAL LOAD RESISTING SYSTEM.
4. WIND:
THE PROPOSED MODIFICATIONS WILL NOT ALTER THE EXISTING BUILDING WIND LOAD
OR THE EXISTING LATERAL LOAD RESISTING SYSTEM.
5. LIVE LOADS:
TYPICAL FLOOR 100 PSF (REDUCIBLE)
MECHANICAL 150 PSF (UNREDUCIBLE)
CORRIDORS, STAIR & PUBLIC AREAS 100 PSF (UNREDUCIBLE)
PARTITION LOAD 15 PSF (UNREDUCIBLE)
6. SNOW: N/A
7. PHYSICAL SECURITY AND…