Attachment E - 2W for IR-CATH-EP CDs Drawings 1 of 5.pdf

PDF 10 MB Posted

Attached to
Z1DA--636A8-21-001 CON Remodel 2W for IR/CATH/EP 36C263-22-AP-3804
Solicitation number
36C26323R0002
Issued by

About this file

This document provides details for a federal contract solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23. Solicitation number 36C26323R0002 seeks proposals to remodel the 2nd floor west wing for interventional radiology, cardiac catheterization, and electrophysiology services at facility 636A8. Proposals are due by February 1, 2022 as part of acquisition plan 3804 to upgrade medical equipment and reconfigure related clinical spaces. The scope of work involves construction and design services to create new interventional radiology, cardiac cath, and electrophysiology clinic areas within the specified wing.

View the file

Other files

File Type Posted
Attachment N - Questions Request Form-all questions combined_Response_12132022.doc DOC document
Attachment S- 2W IR CATH EP_Luminos Agile Max_Site Specific.pdf PDF
Attachment P - 2W IR CATH EP_Draeger-Boom Install_Site Specific.pdf PDF
Attachment O - 2W IR CATH EP_Cath Lab_Site Specific.pdf PDF
36C26323R0002 0001.docx DOCX document
Attachment U - Shielding Documents.pdf PDF
636A8-21-001 Pre-Proposal Conference Sign-in List 11222022.pdf PDF
Evaluation Factors -Amendment 0001.docx DOCX document
Attachment R- 2W IR CATH EP_IR Lab_Site Specific.pdf PDF
Attachment J.1 636A8-21-001 Sole Source List.pdf PDF
Attachment T - 2W IR CATH EP_Multi-Use Rad Room_Site Specific.pdf PDF
Attachment J - Brand Name Only JAs_Redacted.pdf PDF
Attachment H - 2W for IR-CATH-EP CDs Drawings 4 of 5.pdf PDF
Attachment F - 2W for IR-CATH-EP CDs Drawings 2 of 5.pdf PDF
Attachment C - 2W IR CATH EP_CDs_ SPECS Vol1.pdf PDF
Attachment K - Wage Determination IA20210068 dated 09-02-2022.pdf PDF
Attachment I - 2W for IR-CATH-EP CDs Drawings 5 of 5.pdf PDF
36C26323R0002.docx DOCX document
Attachment A - SOW 636A8-21-001 final.pdf PDF
Attachment M - Past Performance Questionnaire - 3 Pages.docx DOCX document
Attachment B - Price Schedule Breakdown Sheet - 1 page.xlsx XLSX spreadsheet
Attachment N - Questions Request Form.doc DOC document
Attachment G - 2W for IR-CATH-EP CDs Drawings 3 of 5.pdf PDF
Attachment L - NARA Contract Language 2021.pdf PDF
Attachment D - 2W IR CATH EP_CDs_ SPECS Vol2.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SITE

MAIN

ENTRANCE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

PROJECT NAME:

SITE ADDRESS:

VA PROJECT NUMBER:

OWNER AND CONSULTANTS:

VICINITY MAP:

ARCHITECT/ENGINEER OF RECORD

NOT FOR CONSTRUCTION

BUILDING 1

2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com

A

E S

R V

\p ro je c ts

\1

\1

IA

C

IT

Y V

A H

C S

R

E M

O D

E L

W I R

-C A

T H

-E P

A rc h

B

IM

f ile s \C e n tr a l M o d e l\

I A

C

IT

Y V

A H

C S

R

E M

O D

E L

W

I R

-C A

T H

-E P

.r v t

/1

/2

:2

:1

P

M

1-I1

COVER SHEET REMODEL 2W IR-CATH-EP

IOWA CITY VAHCS

636A8-21-001

04/08/2022 JU PC

BLDG 1 IOWA CITY VA HEALTH CARE SYSTEM

REMODEL 2W FOR IR-CATH-EP

DEPARTMENT OF VETERAN AFFAIRS

IOWA CITY VA HEALTH CARE SYSTEM

601 HIGHWAY 6 WEST, IOWA CITY, IA 25246

636A8-21-001

16133

VA COR:

CONTACT:

ADDRESS:

PHONE:

MARK GORTON

DEPARTMENT OF VETERANS AFFAIRS

IOWA CITY VA HEALTH CARE SYSTEM

601 HIGHWAY 6 WEST,

IOWA CITY, IA 52246

319-631-9823

ARCHITECT:

NAME:

ADDRESS:

CONTACT:

ANDERSON ENGINEERING OF MN, LLC

13605 1ST AVE NORTH, SUITE 100

PLYMOUTH, MN 55441

TOM OLESAK

PHONE: 763-412-4000

STRUCTURAL ENGINEER:

NAME:

ADDRESS:

CONTACT:

IMEG CORP.

2882 106TH STREET,

DES MOINES, IA 50322

JOHN GOEDKEN

PHONE: 515-334-4327

KEY PLAN:

TRUE

NORTH

MECHANICAL ENGINEER:

NAME:

ADDRESS:

CONTACT:

IMEG CORP.

2882 106TH STREET,

DES MOINES, IA 50322

ERIC HENDERSON

PHONE: 630-717-2433

ELECTRICAL ENGINEER:

NAME:

ADDRESS:

CONTACT:

IMEG CORP.

2882 106TH STREET,

DES MOINES, IA 50322

ISSAC STOLL

PHONE: 515-334-4321

SHEET INDEX - ARCHITECTURAL

SHEET NO. SHEET TITLE C

D

/0

8/

03 ARCHITECTURAL

1-A1 SECOND FLOOR DEMOLITION PLAN █

1-A2 SECOND FLOOR PLAN █

1-A3 SECOND FLOOR DIMENSION PLAN █

1-A4 THIRD FLOOR PLAN █

1-A5 ROOF PLAN █

1-A6 SECOND FLOOR REFLECTED CEILING PLAN █

1-A7 EXTERIOR ELEVATION, WALL SECTIONS AND DETAILS █

1-A8 MOUNTING HEIGHTS █

1-A9 ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONS █

1-A10 ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONS █

1-A11 ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONS █

1-A12 ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONS █

1-A13 ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONS █

1-A14 INTERIOR DETAILS AND SECTIONS █

1-A15 INTERIOR PARTITION TYPES AND DETAILS █

1-A16 DOOR SCHEDULES, DOOR & FRAME TYPES AND DETAILS █

1-A17 CASEWORK DETAILS █

1-A18 SECOND FLOOR FINISH PLAN █

1-A19 MATERIAL AND ROOM FINISH SCHEDULE █

1-A20 SECOND & THIRD FLOOR WAYFINDING PLANS █

1-A21 WAYFINDING MESSAGE SCHEDULES & SIGNAGE DETAILS █

1-A22 SECOND FLOOR FURNITURE PLAN █

1-DE1 SECOND FLOOR EQUIPMENT PLAN █

1-DE2 EQUIPMENT ENLARGED PLANS AND SCHEDULES █

1-DE3 EQUIPMENT ENLARGED FLOOR PLANS AND SCHEDULE █

1-DE4 EQUIPMENT ENLARGED PLANS AND SCHEDULES █

SHEET INDEX - STRUCTURAL

SHEET NO. SHEET TITLE C

D

/0

8/

1- S0.1 GENERAL NOTES █

1- S1.1 SECOND FLOOR PLAN █

1- S1.2 THIRD FLOOR PLAN █

1- S1.3 FOURTH FLOOR PLAN █

1- S5.1 STRUCTURAL DETAILS █

SHEET INDEX - GENERAL

SHEET NO. SHEET TITLE C

D

/0

8/

00 GENERAL

1-I1 COVER SHEET █

1-I2 ABBREVIATIONS █

1-I3 SECOND FLOOR LIFE SAFETY PLAN █

1-I4 THIRD FLOOR LIFE SAFETY PLAN █

1-I5 SECOND FLOOR INFECTION CONTROL & PHASING PLAN █

SHEET INDEX - VENTILATION

SHEET NO. SHEET TITLE C

D

/0

8/

1-MH0 VENTILATION COVERSHEET █

1-MH1 SECOND FLOOR DEMOLITION - VENTILATION █

1-MH2 THIRD FLOOR DEMOLITION - VENTILATION █

1-MH3 ROOF DEMOLITION - VENTILATION █

1-MH4 SECOND FLOOR PLAN - VENTILATION █

1-MH5 THIRD FLOOR PLAN - VENTILATION █

1-MH6 ROOF PLAN - VENTILATION █

1-MH7 VENTILATION DETAILS █

1-MH8 VENTILATION DETAILS █

1-MH9 VENTILATION ENLARGED PLANS █

1-MH10 VENTILATION SCHEDULES █

SHEET INDEX - ELECTRICAL

SHEET NO. SHEET TITLE C

D

/0

8/

1-E0 ELECTRICAL COVERSHEET █

1-ED1 SECOND FLOOR DEMOLITION - ELECTRICAL █

1-ED2 THIRD FLOOR DEMOLITION - ELECTRICAL █

1-EL1 SECOND FLOOR PLAN - LIGHTING █

1-EL2 THIRD FLOOR PLAN - LIGHTING █

1-EP1 SECOND FLOOR PLAN - POWER █

1-EP2 THIRD FLOOR PLAN - POWER █

1-EP3 ROOF PLAN - POWER █

1-ES1 SECOND FLOOR PLAN - SYSTEMS █

1-ES2 THIRD FLOOR PLAN - SYSTEMS █

1-E4 ELECTRICAL ENLARGED PLANS █

1-E5 ELECTRICAL ENLARGED PLANS █

1-E6 ELECTRICAL DETAILS █

1-E7 ELECTRICAL DETAILS █

1-E8 ELECTRICAL RISER DIAGRAMS █

1-E9 ELECTRICAL SCHEDULES █

1-E10 ELECTRICAL SCHEDULES █

1-E11 ELECTRICAL SCHEDULES █

1-E12 ELECTRICAL SCHEDULES █

SHEET INDEX - FIRE PROTECTION

SHEET NO. SHEET TITLE C

D

/0

8/

1-F0 FIRE PROTECTION COVERSHEET █

1-F1 SECOND FLOOR DEMOLITION - FIRE PROTECTION █

1-F2 SECOND FLOOR PLAN - FIRE PROTECTION █

1-F3 THIRD FLOOR PLAN - FIRE PROTECTION █

SHEET INDEX - PLUMBING

SHEET NO. SHEET TITLE C

D

/0

8/

1-P0 PLUMBING COVERSHEET █

1-P1 SECOND FLOOR PLAN DEMOLITION - PLUMBING █

1-P2 SECOND FLOOR UNDERFLOOR DEMOLITION - PLUMBING █

1-P3 THIRD FLOOR PLAN DEMOLITION - PLUMBING █

1-P4 FIRST FLOOR PLAN - PLUMBING █

1-P5 SECOND FLOOR PLAN - PLUMBING █

1-P6 THIRD FLOOR PLAN - PLUMBING █

1-P7 PLUMBING DETAILS █

1-P8 PLUMBING MARTERIAL LIST █

SHEET INDEX - MEDICAL GAS

SHEET NO. SHEET TITLE C

D

/0

8/

1-MG0 MEDICAL GAS COVERSHEET █

1-MG1 SECOND FLOOR DEMOLITION - MEDICAL GAS █

1-MG2 SECOND FLOOR PLAN - MEDICAL GAS █

1-MG3 THIRD FLOOR PLAN - MEDICAL GAS █

1-MG4 MEDICAL GAS DETAILS █

1-MG5 MEDICAL GAS MATERIAL LIST █

SHEET INDEX - TECHNOLOGY

SHEET NO. SHEET TITLE C

D

/0

8/

1-T0 TECHNOLOGY COVERSHEET █

1-T1 SECOND FLOOR DEMOLITION - TECHNOLOGY █

1-T2 SECOND FLOOR PLAN - TECHNOLOGY █

1-T5 TECHNOLOGY DETAILS █

1-T6 TECHNOLOGY RISER DIAGRAMS █

1-T7 TECHNOLOGY SCHEDULES █

SHEET INDEX - PIPING

SHEET NO. SHEET TITLE C

D

/0

8/

1-MP0 PIPING COVERSHEET █

1-MP1 SECOND FLOOR DEMOLITION - PIPING █

1-MP2 THIRD FLOOR DEMOLITION - PIPING █

1-MP3 ROOF DEMOLITION - PIPING █

1-MP4 SECOND FLOOR PLAN - PIPING █

1-MP5 THIRD FLOOR PLAN - PIPING █

1-MP6 ROOF PLAN - PIPING █

1-MP7 PIPING DETAILS █

1-MP8 PIPING SCHDULES █

TRUE

NORTH

CATH LAB EQUIPMENT DRAWINGS FOR REFERENCE ONLY

SHEET NO. SHEET TITLE C

D

/0

8/

CATH-A-101 CATH LAB - ARCHITECTURAL EQUIPMENT PLAN █

CATH-A-102 CATH LAB - REFELCTED CEILING PLAN █

CATH-S-101 CATH LAB - STRUCTURAL FLOOR PLAN █

CATH-S-102 CATH LAB - STRUCTURAL CEILING PLAN █

CATH-E-101 CATH LAB - ELECTRICAL RACEWAY PLAN █

CATH-E-102 CATH LAB - ELECTRICAL DIMENSION PLAN █

CATH-E-501 CATH LAB - ELECTRICAL POWER SCHEDULES █

CATH-M-501 CATH LAB - CEILING BOOM COORDINATION █

EP LAB EQUIPMENT DRAWINGS FOR REFERENCE ONLY

SHEET NO. SHEET TITLE C

D

/0

8/

EP-A-101 EP LAB - ARCHITECTURAL EQUIPMENT PLAN █

EP-A-102 EP LAB - REFELCTED CEILING PLAN █

EP-S-101 EP LAB - STRUCTURAL FLOOR PLAN █

EP-S-102 EP LAB - STRUCTURAL CEILING PLAN █

EP-E-101 EP LAB - ELECTRICAL RACEWAY PLAN █

EP-E-102 EP LAB - ELECTRICAL DIMENSION PLAN █

EP-E-501 EP LAB - ELECTRICAL POWER SCHEDULES █

EP-M-501 EP LAB - CEILING BOOM COORDINATION █

IR LAB EQUIPMENT DRAWINGS FOR REFERENCE ONLY

SHEET NO. SHEET TITLE C

D

/0

8/

IR-A-101 IR LAB - ARCHITECTURAL EQUIPMENT PLAN █

IR-A-102 IR LAB - REFELCTED CEILING PLAN █

IR-S-101 IR LAB - STRUCTURAL FLOOR PLAN █

IR-S-102 IR LAB - STRUCTURAL CEILING PLAN █

IR-E-101 IR LAB - ELECTRICAL RACEWAY PLAN █

IR-E-102 IR LAB - ELECTRICAL DIMENSION PLAN █

IR-E-501 IR LAB - ELECTRICAL POWER SCHEDULES █

IR-M-501 IR LAB - CEILING BOOM COORDINATION █

MULTI-PURPOSE RAD. EQUIPMENT DRAWINGS FOR REFERENCE ONLY

SHEET NO. SHEET TITLE C

D

/0

8/

MU-A-101 MULTI-PURPOSE RAD - ARCHITECTURAL EQUIPMENT PLAN █

MU-A-102 MULTI-PURPOSE RAD - REFELCTED CEILING PLAN █

MU-S-101 MULTI-PURPOSE RAD - STRUCTURAL FLOOR PLAN █

MU-S-102 MULTI-PURPOSE RAD - STRUCTURAL CEILING PLAN █

MU-E-101 MULTI-PURPOSE RAD - ELECTRICAL RACEWAY PLAN █

MU-E-102 MULTI-PURPOSE RAD - ELECTRICAL DIMENSION PLAN █

MU-E-501 MULTI-PURPOSE RAD - ELECTRICAL POWER SCHEDULES █

MU-M-501 MULTI-PURPOSE RAD - CEILING BOOM COORDINATION █

FLUOROSCOPY RAD. EQUIPMENT DRAWINGS FOR REFERENCE ONLY

SHEET NO. SHEET TITLE C

D

/0

8/

FL-A-101 FLUOROSCOPY RAD - ARCHITECTURAL EQUIPMENT PLAN █

FL-A-102 FLUOROSCOPY RAD - REFELCTED CEILING PLAN █

FL-S-101 FLUOROSCOPY RAD - STRUCTURAL FLOOR PLAN █

FL-S-102 FLUOROSCOPY RAD - STRUCTURAL CEILING PLAN █

FL-E-101 FLUOROSCOPY RAD - ELECTRICAL RACEWAY PLAN █

FL-E-102 FLUOROSCOPY RAD - ELECTRICAL DIMENSION PLAN █

Revisions: Date:

SHEET INDEX - TEMPERATURE...

SHEET NO. SHEET NAME CD

4/

/2

1-MT1 SECOND FLOOR PLAN - TEMPERATURE CONTROLS █

1-MT2 AHU CONTROL DIAGRAM █

1-MT3 CONTROL DIAGRAMS █

JUlland Snapshot

ARCHITECTURAL ABBREVIATIONS

A/C

A/C UNIT

A/E

AAMA

AAP

AB

ABC

ACC

ACI

ACT

ACS DR

ACS FLR

ACS PNL

ACST

AD

ADA

ADC

ADDL

ADDN

ADH

ADJ

ADMIN

AFF

AFG

AFS

AGC

AGGR

AHJ

AHR

AHU

AIA

AISC

ALT

ALT NO

ALUM

AMT

ANOD

ANSI

ANT

AP

APA

APC

APPD

APPROX

AR

ARCH

ASB

ASI

ASKLR

ASPH

ASSN

ASTM

ATCH

ATM

AUTO

AUX

AV

AVG

AW

AWI

AWPA

AWS

B PL

BAT

BD

BD FT

BEV

BHMA

BI FLD DR

BITUM

BKG

BLD

BLDG

BM

BOT

BRCG

BRDG

BRDG JST

BRG

BRG PL

BRKT

BRZ

BSMT

BTWN

BUR

C CONC

C TO C

CAB

CAC

CB

CBB

CCD

CCTV

CCW

CD

CEM

CEM PLAS

CER

CF

CF/CI

CF/OI

CFLG

CFMF

CG

CGSFU

CH

CHEM

CHFR

CHK

CI

CIP

CIR

CIRC

CJ

CL

CLDG

CLG

CLR

CM

CMU

AIR CONDITION

AIR CONDITIONING UNIT

ARCHITECT/ENGINEER

AMERICAN ARCHITECTURAL MANUFACTURERS ASSN

ALARM ANNUNCIATOR PANEL

ANCHOR BOLT

AGGREGATE BASE COURSE

ACCESSIBLE

AMERICAN CONCRETE INSTITUTE

ACOUSTICAL CEILING TILE

ACCESS DOOR

ACCESS FLOOR

ACCESS PANEL

ACOUSTIC

AREA DRAIN

AMERICANS WITH DISABILITIES ACT

AUTOMATIC DOOR CLOSER

ADDITIONAL

ADDITION

ADHESIVE

ADJACENT, ADJOINING, OR ADJUSTABLE

ADMINISTRATION

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

ABOVE FINISHED SLAB

ASSOCIATED GENERAL CONTRACTORS

AGGREGATE

AUTHORITY HAVING JURISDICTION

ANCHOR

AIR HANDLING UNIT

AMERICAN INSTITUTE OF ARCHITECTS

AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ALTERNATE

ALTERNATE NUMBER

ALUMINUM

AMOUNT

ANODIZE

AMERICAN NATIONAL STANDARDS INSTITUTE

ANTENNA

ACCESS PANEL

AMERICAN PLYWOOD ASSOCIATION

ARCHITECTURAL PRECAST CONCRETE

APPROVED

APPROXIMATE

AS REQUIRED

ARCHITECT

ASBESTOS

ARCHITECT'S SUPPLEMENTAL INSTRUCTION

AUTOMATIC SPRINKLER

ASPHALT

ASSOCIATION

AMERICAN SOCIETY FOR TESTING AND MATERIALS

ATTACHMENT

AUTOMATIC TELLER MACHINE

AUTOMATIC

AUXILIARY

AUDIO VISUAL

AVERAGE

ACID WASTE

ARCHITECTURAL WOODWORKING INSTITUTE

AMERICAN WOOD PRESERVERS' ASSOCIATION

AMERICAN WELDING SOCIETY

BASE PLATE

BATTEN

BOARD

BOARD FEET (FOOT)

BEVEL

BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION

BIFOLDING DOORS

BITUMINOUS

BACKING

BUILD

BUILDING

BEAM OR BENCHMARK

BOTTOM

BRACING

BRIDGING

BRIDGING JOIST

BEARING

BEARING PLATE

BRACKET

BRONZE

BASEMENT

BETWEEN

BUILT-UP ROOFING

CAST CONCRETE

CENTER TO CENTER

CABINET

CEILING ATTENUATION CLASS

CATCH BASIN OR CORNER BEAD

CEMENTITIOUS (BACKER) BOARD

CONSTRUCTION CHANGE DIRECTIVE

CLOSED CIRCUIT TELEVISION

COUNTERCLOCKWISE

CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS

CEMENT

CEMENT PLASTER

CERAMIC

CONTRACTOR FURNISHED

CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CONTRACTOR FURNISHED/OWNER INSTALLED

COUNTERFLASHING

COLD-FORMED METAL FRAMING

CORNER GUARD

CERAMIC GLAZED STRUCTURAL FACING UNITS

COAT HOOK

CHEMICAL

CHAMFER

CHECK

CAST IRON

CAST-IN-PLACE

CIRCLE

CIRCULAR

CONSTRUCTION JOINT OR CONTROL JOINT

CENTER LINE

CLADDING

CEILING

CLEAR

CONSTRUCTION MANAGEMENT

CONCRETE MASONRY UNIT

CNR

CNTR

CRTP

CO

CO2

COL

COM

COMB

COMM

COMP

CONC

CONC FLR

COND

CONF

CONN

CONSTR

CONT

CONTR

COORD

CORR

CPM

CPRS

CR

CRS

CRSI

CSB

CSG

CSI

CSK

CSMT

CSWK

CTG

CTR

CTRL

CTV

CU FT

CU IN

CU YD

CURT

CYL

CYL L

D

DAT

DBL

DBL GLZ

DCS

DP

DEG

DEL

DEMO

DEPT

DET

DF

DIA

DIAG

DIFF

DIM

DIR

DISP

DIST

DIV

DL

DOC

DR

DR CL

DR FR

DR OPNG

DS

DSGN

DW

DWG

E

EA

EFF

EFS

EIFS

EJ

EL

ELAST

ELEC

ELEC DR OP

ELEV

EMER

EMER SHR

ENCL

ENGR

ENVIR

EO

EPA

EPDM

EPO

EPS

EQ

EQL SP

EQUIP

EQUIV

ERD

ESC

ESMT

ESP

EST

ETC

EW

EWC

EWS

EXH

EXIST

EXP

EXP BT

EXST GR

EXT

EXT GR

CORNER

COUNTER

COUNTERTOP

CARBON MONOXIDE

CARBON DIOXIDE

COLUMN

COMMON

COMBINATION, COMBINED

COMMUNICATION

COMPONENT

CONCRETE

CONCRETE FLOOR

CONDENSER OR CONDITION

CONFERENCE

CONNECT

CONSTRUCTION

CONTINUE

CONTRACTOR

COORDINATE

CORRIDOR

CRITICAL PATH METHOD

COMPRESSIBLE

CARD READER

COLD ROLLED STEEL

CONCRETE REINFORCING STEEL INSTITUTE

CONCRETE SPLASH BLOCK

CASING

CONSTRUCTION SPECIFICATIONS INSTITUTE

COUNTER SUNK

CASEMENT

CASEWORK

COATING

CENTER

CONTROL

CABLE TELEVISION

CUBIC FEET

CUBIC INCH

CUBIC YARD

CURTAIN

CYLINDER

CYLINDER LOCK

DEPTH OR PENNY (NAIL)

DATUM

DOUBLE

DOUBLE GLAZE

DIAPER CHANGING STATION

DECORATIVE PANEL

DEGREE

DELETE

DEMOLITION

DEPARTMENT

DETAIL

DRINKING FOUNTAIN

DIAMETER

DIAGONAL

DIFFERENCE OR DIFFUSER

DIMENSION

DIRECTION

DISPENSER

DISTANCE

DIVIDE OR DIVISION

DEAD LOAD

DOCUMENT

DOOR, DRAIN, DRESSING ROOM, OR DRIVE

DOOR CLOSER

DOOR FRAME

DOOR OPENING

DOWNSPOUT

DESIGN

DISHWASHER

DRAWING

EAST

EACH

EFFICIENCY

EXTERIOR FINISH SYSTEM

EXTERIOR INSULATION AND FINISH SYSTEM

EXPANSION JOINT

ELEVATION

ELASTOMERIC

ELECTRIC

ELECTRIC DOOR OPENER

ELEVATOR

EMERGENCY

EMERGENCY SHOWER

ENCLOSURE

ENGINEER

ENVIRONMENT

ELECTRICAL OUTLET

ENVIRONMENTAL PROTECTION AGENCY

ETHYLENE PROPYLENE DIENE MONOMER

EMERGENCY POWER OFF

EXPANDED POLYSTYRENE BOARD (INSULATION)

EQUAL

EQUALLY SPACED

EQUIPMENT

EQUIVALENT

EXISTING ROOF DRAIN

ESCAPE OR ESCUTCHEON

EASEMENT

ESPECIALLY

ESTIMATE

AND SO FORTH OR ET CETERA

EACH WAY

ELECTRIC WATER COOLER

EYE WASH STATION

EXHAUST

EXISTING

EXPANSION OR EXPOSED

EXPANSION BOLT

EXISTING GRADE

EXTERIOR, EXTERNAL, OR EXTINGUISHER

EXTERIOR GRADE

F

FA

FAB

FAC

FACIL

FAS

FAS BD

FCU

FCO

FCTY

FD

FDC

FDTN

FE

FEC

FF

FF EL

FF&E

FHC

FHP

FIG

FIL

FIN

FIN FLR

FIN GR

FIN WD

FIXT

FL

FLASH

FLDG

FLEX

FLG

FLR

FLR FIN

FLR SK

FLUOR

FLUOR FIX

FM

FM-G

FO

FOC

FOF

FOM

FOS

FOUNT

FOW

FP

FR

FR SNK

FREQ

FRMG

FRP

FRZ

FS

FSB

FSTNR

FT

FTG

FURG

FURN

FUT

FVC

GA

GAL

GALV

GALV STL

GB

GC

GD

GDR

GEN

GFRC

GFRG

GFRP

GI

GL

GL BLK

GLU LAM

GP

GR FL

GRAN

GRTG

GSB

GSM

GSU

GT

GUAR

GUT

GYP

GYP BD

GYP PLAS

H

HAZ MAT

HB

HC

HCWD

HDBD

HDO

HDR

HDW

HDWD

HEPA

HEX

HGR

HM

HMD

HMDF

HMF

HNDRL

HO

HORIZ

HOSP

HP

HPD

HPDL

HQ

HS

HSE

HSKPG

FAHRENHEIT OR FEMALE

FIRE ALARM

FABRIC

FACTOR

FACILITY

FASCIA

FASCIA BOARD

FAN COIL UNIT

FLOOR CLEANOUT

FACTORY

FLOOR DRAIN

FIRE DEPARTMENT CONNECTION

FOUNDATION

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

FINISH FACE

FINISH FLOOR ELEVATION

FURNITURE, FIXTURE, AND EQUIPMENT

FIRE HOSE CABINET

FULL HEIGHT PARTITION

FIGURE

FILLET

FINISH

FINISH FLOOR

FINISH GRADE

FINISH WOOD

FIXTURE

FLOORLINE

FLASHING

FOLDING

FLEXIBLE

FLOORING

FLOOR

FLOOR FINISH

FLOOR SINK

FLUORESCENT

FLUORESCENT FIXTURE

FACTORY MUTUAL

FACTORY MUTUAL GLOBAL

FINISHED OPENING

FACE OF CONCRETE OR FACE OF CURB

FACE OF FINISH

FACE OF MASONRY

FACE OF SLAB OR FACE OF STUD

FOUNTAIN

FACE OF WALL

FIRE PROTECTION OR FIREPROOF

FIRE RATING, FIRE RESISTANT, OR FRAME

FLUSHING RIM SINK

FREQUENCY

FRAMING

FIBERGLASS REINFORCED PLASTIC

FREEZER

FEDERAL SPECIFICATION

FOLDING SHOWER BENCH

FASTENER

FEET OR FOOT

FOOTING

FURRING

FURNISH OR FURNITURE

FUTURE

FIRE VALVE CABINET

GAGE OR GYPSUM ASSOCIATION

GALLON

GALVANIC OR GALVANIZED

GALVANIZED STEEL

GRAB BAR

GENERAL CONTRACTOR

GUARD

GUARD RAIL

GENERAL OR GENERATOR

GLASS-FIBER-REINFORCED CONCRETE

GLASS-FIBER-REINFORCED GYPSUM

GLASS-FIBER-REINFORCED PLASTIC

GALVANIZED IRON

GLASS

GLASS BLOCK

GLUED LAMINATED WOOD

GRAB BAR

GROUND FLOOR

GRANITE

GRATING

GYPSUM SHEATHING BOARD

GALVANIZED SHEET METAL

GLAZED STRUCTURAL UNIT

GROUT

GUARANTEE

GUTTER

GYPSUM

GYPSUM BOARD

GYPSUM PLASTER

HIGH OR HUMIDISTAT

HAZARDOUS MATERIALS

HOSE BIBB

HOLLOW CORE

HOLLOW CORE WOOD DOOR

HARDBOARD

HIGH DENSITY OVERLAY

HEADER

HARDWARE

HARDWOOD

HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HEXAGON

HANGER

HOLLOW METAL

HOLLOW METAL DOOR

HOLLOW METAL DOOR AND FRAME

HOLLOW METAL FRAME

HANDRAIL

HOLD OPEN

HORIZONTAL

HOSPITAL

HIGH PRESSURE

HYGIENE PRODUCT DISPOSAL

HIGH PRESSURE DECORATIVE LAMINATE

HEADQUARTERS

HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH

HOUSE

HOUSEKEEPING

HST

HSS

HT

HVAC

HVY

HW

HYD

HYDR

IAQ

IBC

IC

ICW

ID

ID NO

ILLUM

INCL

IND

INFO

INSUL

INT

INTL

IWH

JAN

KD

KIT

KO

KPL

LAB

LAD

LAM

LAM GL

LAU

LAV

LBR

LBS

LCS

LD BRG

LDR

LED

LF

LIB

LIN

LIQ

LKR

LKR RM

LL

LMST

LRG

LRV

LS

LT

LT GA

LT WT

LTG

LTNG

LVD

LVR

LWC

LWIC

LYR

MACH

MACH RM

MAINT

MAN

MATL

MATV

MAX

MBD

MCB

MD

ME

MEAS

MECH

MECH RM

MED

MEK

MEMB

MEMO

MEZZ

MF

MFD

MFG

MFR

MFR REC

MGT

MIC

MID

MIL STD

MIN

MIR

MISC

MIT

MKR

ML

MLDG

MLWK

mm

MO

MOD

MOD BIT

MON

MOPR

MR

MS

MTD

MTG

MTL

MULL

MW

MWP

HOIST

HOLLOW STRUCTURAL STEEL

HEIGHT

HEATING, VENTILATING, AND AIR CONDITIONING

HEAVY

HOT WATER

HYDRANT

HYDRAULIC

INDOOR AIR QUALITY

INTERNATIONAL BUILDING CODE

INFECTION CONTROL

INFECTION CONTROL WALL

INSIDE DIAMETER

IDENTIFICATION NUMBER

ILLUMINATION

INCLUDED

INDEPENDENT OR INDUSTRIAL

INFORMATION

INSULATION

INTERIOR

INTERNATIONAL

INSTANTANEOUS WATER HEATER

JANITOR

KILN DRIED OR KNOCKED DOWN

KITCHEN

KNOCKOUT

KICKPLATE

ANGLE

LABORATORY

LADDER

LAMINATE

LAMINATED GLASS

LAUNDRY

LAVATORY

LUMBER

POUND

LOCKABLE CHARTING STATION/MED CABINET

LOAD-BEARING

LEADER

LIGHT EMITTING DIODE

LINEAR FEET (FOOT)

LIBRARY

LINEAR

LIQUID

LOCKER

LOCKER ROOM

LEAD LINED

LIMESTONE

LARGE

LOUVERED ROOF VENT

LIGHT SWITCH

LIGHT

LIGHT GAGE

LIGHTWEIGHT

LIGHTING

LIGHTNING

LOUVERED

LOUVER

LIGHTWEIGHT CONCRETE

LIGHTWEIGHT INSULATING CONCRETE

LAYER

MACHINE

MACHINE ROOM

MAINTENANCE

MANUAL

MATERIAL

MASTER ANTENNA TELEVISION SYSTEM

MAXIMUM

MARKER BOARD

METAL CORNER BEAD

DECK

MECHANICAL ENGINEER

MEASURE

MECHANICAL

MECHANICAL ROOM

MEDICAL, MEDIUM

METHYL ETHYL KETONE

MEMBRANE

MEMORANDUM

MEZZANINE

MILL FINISH

MANUFACTURED

MANUFACTURING

MANUFACTURER

MANUFACTURER'S RECOMMENDATION

MANAGEMENT

MICROPHONE

MIDDLE

MILITARY STANDARD

MINIMUM

MIRROR

MISCELLANEOUS

MITER

MARKER

METAL LATH

MOLDING (MOULDING)

MILLWORK

MILLIMETER

MASONRY OPENING

MODEL, MODIFY OR MODULE

MODIFIED BITUMEN

MONITOR

MOP RACK

MOISTURE RESISTANT

MOP SINK

MOUNTED

MOUNTING

METAL

MULLION

MICROWAVE

MEMBRANE WATERPROOFING

N

NA

NAT

NATL

NC

NCOMBL

NEC

NEG

NEMA

NEUT

NFC

NFPA

NIC

NO

NOM

NR

NRC

NRCA

NRP

NS

NUM

O/O O

OA

OC

OCC

OCT

OD

OD

OF/CI

OFD

OFF

OF/OI

OH

OH DR

OPH

OPNG

OPP

OPR

OPT

OR

ORD

ORG

ORIG

ORN

OSHA

OUT

OZ

P

PAR

PARA

PART

PAT

PB

PBD

PC

PCA

PCC

PCCP

PCD

PCF

PCP

PCT

PED

PEN

PEND

PERF

PERIM

PERP

PHAR

PHOTO

PKG

PL

PL GL

PLAM

PLAS

PLBG

PLYWD

PMTL

PNEU

PNL

PO

POLY

PP

PR

PRCST

PREFAB

PREFIN

PRELIM

PREP

PRESS

PREV

PRKG

PRMLD

PROJ

PROP

PSF

PSI

PT

PTD

PTN

PTS

PVC

PVG

PWR

QA

QC

QRY

QTR

QTY

QUAD

QUAL

R

RA

RAD

RBM

RBR

NORTH

NOT APPLICABLE

NATURAL

NATIONAL

NOISE CRITERIA OR NURSE CALL

NONCOMBUSTIBLE

NATIONAL ELECTRICAL CODE

NEGATIVE

NATIONAL ELECTRICAL MANUFACTURERS ASSN

NEUTRAL

NATIONAL FIRE CODE

NATIONAL FIRE PROTECTION ASSOCIATION

NOT IN CONTRACT

NUMBER

NOMINAL

NOISE REDUCTION

NOISE REDUCTION COEFFICIENT

NATIONAL ROOFING CONTRACTORS ASSOCIATION

NONREMOVABLE

NARROW STILE

NUMERAL

OUT TO OUT

OXYGEN

OUTSIDE AIR OR OVERALL

ON CENTER

OCCUPY

OCTAGON

OUTSIDE DIAMETER, OUTSIDE DIMENSION

OUTSIDE DIAMETER/OUTSIDE DIMENSION

OWNER FURNISHED/CONTRACTOR INSTALLED

OVERFLOW DRAIN

OFFICE

OWNER FURNISHED/OWNER INSTALLED

OVERHANG

OVERHEAD (COILING) DOOR

OPPOSITE HAND

OPENING

OPPOSITE

OPERABLE

OPTIONAL

OPERATING ROOM OR OUTSIDE RADIUS

ORDNANCE OR OVERFLOW ROOF DRAIN

ORGANIC

ORIGINAL

ORNAMENTAL

OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION

OUTLET

OUNCE

PAINT

PARALLEL OR PARAPET

PARAGRAPH

PARTIAL

PATTERN

PUSHBUTTON

PARTICLEBOARD

PIECE, POLYCARBONATE OR PORTLAND CEMENT

PORTLAND CEMENT ASSOCIATION

PRECAST CONCRETE

CONCRETE PAVEMENT

PAPER CUP DISPENSER

POUNDS PER CUBIC FOOT

PORTLAND CEMENT PLASTER

PRIVACY CURTAIN TRACK

PEDESTAL

PENETRATE

PENDANT

PERFORATED

PERIMETER

PERPENDICULAR

PHARMACY

PHOTOGRAPH

PACKAGE

PROPERTY LINE

PLATE GLASS

PLASTIC LAMINATE

PLASTER OR PLASTIC

PLUMBING

PLYWOOD

PAINTED METAL

PNEUMATIC

PANEL

POST OFFICE, PURCHASE ORDER

POLYETHYLENE (PLASTIC)

PUSH PLATE

PAIR

PRECAST

PREFABRICATE

PREFINISH

PRELIMINARY

PREPARATION

PRESSURE

PREVIOUS

PARKING

PREMOLDED

PROJECT

PROPERTY

POUNDS PER SQUARE FOOT

POUNDS PER SQUARE INCH

PORCELAIN TILE OR PRESSURE TREATED

PAPER TOWEL DISPENSER

PARTITION

PNEUMATIC TUBE STATION

POLYVINYL CHLORIDE (PLASTIC)

PAVING

POWER

QUALITY ASSURANCE

QUALITY CONTROL

QUARRY

QUARTER

QUANTITY

QUADRANT

QUALITY

RADIUS OR RISER

RETURN AIR

RADIATOR

REINFORCED BRICK MASONRY

RUBBER

RC

RCP

RCVR

RD

REC

RECD

RECPT

RECT

REF

REFR

REG

REINF

REP

REPL

REQ

REQD

RET

REV

RFG

RFI

RFP

RFS

RL

RLG

RM

RM LT

RND

RO

ROW

RS

RSV

RT

RV

RVS

RWL

S

SA

SALV

SAMP

SAN

SB

SBS

SBSTR

SC

SCH

SCHED

SCHEM

SCP

SCRN

SCT

SCWD

SD

SDG

SECT

SEG

SEL

SEP

SF

SFTWD

SGD

SGL

SHR

SHR HD

SHRD

SHT

SHTHG

SHV

SIM

SJ

SJI

SK

SKLT

SLDG

SLNT

SM

SMK

SND INS

SPEC

SPKLR

SPKR

SPLY

SPR

SQ

SQ IN

SQ YD

SST

ST

STC

STD

STIF

STL JST

STL LNTL

STL PL

STL RF DK

STL TB

STL TR

STNLS

STOR

STR

STRUCT

STRUCT STL

SUB

SURF

SUSP

SUSP CLG

SW

SWDR

SYM

SYNTH

SYS

REMOTE CONTROL

REFLECTED CEILING PLAN

RECEIVER

ROAD OR ROOF DRAIN

RECESSED

RECEIVED

RECEPTACLE

RECTANGLE

REFERENCE OR REFRIGERATOR

REFRACTORY, REFRIGERATION

REGISTER

REINFORCE

REPAIR

REPLACE

REQUIRE

REQUIRED

RETURN

REVISION

ROOFING

REQUEST FOR INFORMATION

REQUEST FOR PROPOSAL

ROOM FINISH SCHEDULE

ROOF LEADER

RAILING

ROOM

NURSE CALL LIGHT/ROOM LIGHT

ROUND

ROUGH OPENING

RIGHT OF WAY

ROUGH SAWN

RESILIENT SHEET VINYL

RIGHT

ROOF VENT

REVERSE

RAIN WATER LEADER

SOLID SURFACE

SUPPLY AIR

SALVAGE

SAMPLE

SANITARY

SPLASH BLOCK

STYRENE BUTADIEN STYRENE

SUBSTRATE

SHARPS CONTAINER

SCHOOL

SCHEDULE

SCHEMATIC

SCUPPER

SCREEN

SHOWER CURTAIN TRACK

SOLID CORE WOOD DOOR

SMOKE DETECTOR/SOAP DISPENSER

SIDING

SECTION

SEGMENT

SELECT

SEPARATE

SQUARE FOOT (FEET)

SOFTWOOD

SLIDING GLASS DOOR

SINGLE

SHOWER

SHOWER HEAD

SHOWER DRAIN

SHEET

SHEATHING

SHELVING

SIMILAR

SCORED JOINT

STEEL JOIST INSTITUTE

SKETCH

SKYLIGHT

SLIDING

SEALANT

SHEET METAL

SMOKE

SOUND INSULATION

SPECIFICATION

SPRINKLER

SPEAKER

SUPPLY

SINGLE PLY ROOF SYSTEM

SQUARE

SQUARE INCH

SQUARE YARD

STAINLESS STEEL

STAIRS OR STREET

SOUND TRANSMISSION CLASS

STANDARD

STIFFENER

STEEL JOIST

STEEL LINTEL

STEEL PLATE

STEEL ROOF DECK

STEEL TUBE

STEEL TRUSS

STAINLESS

STORAGE

STRINGERS

STRUCTURAL

STRUCTURAL STEEL

SUBSTITUTE

SURFACE

SUSPEND

SUSPENDED CEILING

SWITCH

SWING DOOR

SYMBOL

SYNTHETIC

SYSTEM

T T&M

TB

TBD

TECH

TEL

TEMP

THERM

THK

THRES

THRU

THRUOUT

TMPD

TMPD GL

TN

TO

TO FDN

TOB

TOM

TOP

TOS

TOW

TPD

TRANS

TRTD

TS

TSTAT

TV

TYP

U

UC

UGND

UL

ULT

UNFIN

UNO

UPS

UR

UTIL

UV

VAC

VAR

VEH

VENT

VERT

VEST

VFD

VIC

VID

VIF

VNR

VOC

VOL

VR

VTR

W/ W/O

WBL

WC

WD

WDW

WF

WFR

WFS

WH

WHSE

WP

WPM

WR

WS

WSCT

WT

X BRACE

XPS

YD

TREAD OR THERMOSTAT

TIME AND MATERIALS

TOWEL BAR

TACK BOARD

TECHNICAL

TELEPHONE

TEMPERATURE OR TEMPORARY

THERMAL

THICKNESS

THRESHOLD

THROUGH

THROUGHOUT

TEMPERED

TEMPERED GLASS

TRUE NORTH

TOP OF ___

TOP OF FOUNDATION

TOP OF BEAM

TOP OF MASONRY

TOP OF PARAPET

TOP OF STEEL

TOP OF WALL

TOILET PAPER DISPENSER

TRANSOM

TREATED

TUBE STEEL

THERMOSTAT

TELEVISION

TYPICAL

HEAT TRANSFER COEFFICIENT

UNDERCUT

UNDERGROUND

UNDERWRITERS LABORATORIES

ULTIMATE

UNFINISH

UNLESS NOTED OTHERWISE

UNINTERRUPTIBLE POWER SUPPLY

URINAL

UTILITY

ULTRAVIOLET

VACUUM

VARIES

VEHICLE

VENTILATION

VERTICAL

VESTIBULE

VARIABLE FREQUENCY DRIVE

VICINITY

VIDEO

VERIFY IN FIELD

VENEER

VOLATILE ORGANIC COMPOUND

VOLUME

VAPOR RETARDER

VENT THROUGH ROOF

WITH

WITHOUT

WOOD BLOCKING

WATER CLOSET

WOOD

WINDOW

WIDE FLANGE

WOOD FRAME

WOOD FURRING STRIPS

WATER HEATER

WAREHOUSE

WATERPROOFING

WATERPROOF MEMBRANE

WEATHER RESISTANT

WEATHERSTRIP OR WALL SCONCE

WAINSCOT

WEIGHT OR WINDOW TREATMENT

CROSS BRACE

EXTRUDED POLYSTYRENE BOARD

YARD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

BUILDING 1

2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com

C U s e rs \P u b lic

\D o c u m e n ts

\R e v it P ro je c ts

\1

I A

C

IT

Y V

A H

C S

R

E M

O D

E L

W

I R

-C A

T H

-E P

Y e u n y o u n g .r v t

/8

/2

:1

:4

A M

1-I2

ABBREVIATIONS REMODEL 2W IR-CATH-EP

IOWA CITY VAHCS

636A8-21-001

04/08/2022 JU PC16133Revisions: Date:

SHAFT

2W222

2W221

2CP05

2W220

2W218

2CP04

2W219

2W213

2W202

2W223

2W218B

SHAFT

D

2W04

2ST06

2S08C

2W105

2C01

2W172

2W124

2W172A

2CW01A

2W164

2W170

2W169

2W171

2C03

2W142C

2W158

2W149

2W142B

2W145

2W147

2W144 2W143

2W142A

2C05

2W142

2C03

2W29

2W27

2W30

2W36

2W33

2W141

2W12

2W141A

2W137 2C04A

2C04

2CW01B

2W100

2C05

2W150

2W148

2W146

2W166

2W162

2W1402W139

2W160

803 SF

2W151

EP LAB

815 SF

2W153

CATH LAB

205 SF

2W153A

CONTROL

199 SF

2W151A

CONTROL

781 SF

2W154

IR LAB

155 SF

2W154A

CONTROL

167 SF

2C03A

CORRIDOR

77 SF

2W156A

MEN'S

SHOWER149 SF

2W156

MEN'S

LOCKER

148 SF

2W157

WOMEN'S

LOCKER

83 SF

2W157A

WOMEN'S

SHOWER

127 SF

2W155

STERILE

SUPPLY

55 SF

2W180

ELEC

218 SF

2ST07

STAIR

162 SF

2C07A

CIRCULATION

116 SF

2W178

MED PREP/

NOURISH

151 SF

2W177

NURSE

STATION

69 SF

2C07

CIRCULATION

690 SF

2W175

RECOVERY

108 SF

2W175E

PRE/POST

BAY

111 SF

2W175D

PRE/POST

BAY

111 SF

2W175C

PRE/POST

BAY

111 SF

2W175B

PRE/POST

BAY

106 SF

2W175A

PRE/POST

BAY

108 SF

2W173

CLEAN

UTILITY

ROOM

19 SF

2W174

CLEAN

LINEN

28 SF

2W179

EP

EQUIPMENT

ROOM

747 SF

2C06

CORRIDOR

375 SF

2W131

RADIOLOGY/

MULTI-PURPOSE

408 SF

2W130

RADIOLOGY/

FLUOROSCOPY

100 SF

2W129C

NURSE

MANAGER

OFFICE

100 SF

2W129D

IR

MANAGER

OFFICE

820 SF

2W129

OPEN

OFFICE

CUBICLES

408 SF

2C02

ELEVATOR

LOBBY

2W176

TOILET

2W132

ULTRASOUND

2W130A

TOILET

637 SF

2C03B

SEMI

RESTRICTED

CORRIDOR

NON-SLEEPING

SUITE (2,390 SF)

NON-SLEEPING

SUITE (1,240 SF)

(EXISTING)

NON-SLEEPING

SUITE (5,664 SF)

(EXISTING)

NON-SLEEPING

SUITE (1,980 SF)

EA

EA

EXIT

EXIT

EA

FEC

EYEWASH

EA

TRAVEL DISTANCE

162'-3"

FEC

FEC

EA

EA

EA

EYEWASHEYEWASH

EA

TRAVEL DISTANCE

162'-3"

TRAVEL DISTANCE

172'-10"

EA

TRAVEL DISTANCE

99'-9"

EA

EA

EA

87 SF

2W181

EQUIPMENT

PARK

AMBULATORY HEALTH CARE OCCUPANCY

2S32

TOILET

PATIENT

2S33

TOILET

STAFF

2S34

ECHO 1

2S35

CARDIOVERSION

ECHO/TEE

2S37

ECHO 3

2S38

ECHO 2

2CS11

CORRIDOR

2S36

ELEC

2S41

EKG 1

2S40

TREADMILL

EKG/STRESS

2S39

EKG 2

2S42

HOLDING

SOILED

2S43A

TECH AREA

EKG

2S43

WORK ROOM

EKG

2CS12

CORRIDOR

105 SF

2W129B

OFFICE

52 SF

2W129E

ALCOVE

TRAVEL DISTANCE

148'-0"

EA

160 SF

2W###

(FUTURE)

IT ROOM

KEY PLAN - SECOND FLOOR

NOYES

APPLICABLE REGULATIONS

GENERAL TYPE OF PROJECT

NFPA NATIONAL FIRE CODES (EXCEPTION: NFPA 5000 & 900)

ASHRAE STANDARDS

2021 NFPA 101 (LIFE SAFETY CODE)

ABA STANDARDS (2015) (ABAAS)

2021 IBC

REMODEL

ADDITION

NEW BUILDING

PROJECT DESCRIPTION

CODE SUMMARY

Remodel part of 2nd level relcoating Cath & IR lab. Build new EP Lab, Pre/Post Recovery and support spaces. Relocate Fluoroscopy & Multipurpose Radiology rooms and staff offices. Provides new AHU to serve Labs and modifies existing HVAC to serve remaining spaces.

VA BARRIER FREE DESIGN STANDARD (PG-18-13)

NOYESAUTHORITIES HAVING JURISDICTION (AHJ's)

THE JOINT COMMISSION (TJC)

CENTER FOR MEDICARE/MEDICAID SERVICES (CMS)

TESTRATING (HRS)

EXTERIOR DOORS AND WINDOWS

SHAFTS AND EXIT PASSAGEWAYS

OTHER

ROOF CONSTRUCTION

PRIME & SEC. FLOOR BEAMS, JOISTS

FLOOR/CEILING ASSEMBLY

FLOOR CONSTRUCTION

INTERIOR

NON-BEARING WALLS AND PARTITIONS

BEARING WALLS

COLUMNS

GIRDERS

TRUSSES

ROOF/CEILING ASSEMBLY

PRIME & SEC. ROOF BEAMS, JOISTS

EXTERIOR

INTERIOR BEARING WALLS

EXTERIOR BEARING WALLS

STRUCTURAL FRAME

AREA SEPARATIONS / FIRE WALLS

FIRE-RESISTIVE REQUIREMENTS

TYPE(S) OF CONSTRUCTION

CONSTRUCTION TYPE(S)

SEE LIFE SAFETY PLANS

See Life Safety Plans

3 EXISTING

(NFPA 220 TABLE 4.1.1) TYPE I (332)

OSHA STANDARDS

VA SEISMIC DESIGN REQUIREMENTS H-18-8

NATIONAL ELECTRIC CODE (NEC)

ASME BOILER AND PRESSURE VESSEL CODE

ASME CODE FOR PRESSURE PIPING

BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,

AMERICAN CONCRETE INSTITUTE AND COMETARY (ACI 318)

MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE

FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

ENERGY POLICY ACT OF 2005 (EPAct)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS

FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE

RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL

BUILDINGS, 10 CFR PARTS 433,434 AND 435

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE

BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

EXECUTIVE ORDER 13834

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED

IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA

MASTER CONSTRUCTION SPECIFICATION

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE

STANDARD 62.1-2004

SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE

STANDARD 15 -2007

VA FIRE PROTECTION DESIGN MANUAL

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA

NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER

GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)

NOYES

(Section 8.3)

CHANGE OF OCCUPANCY?

SEPARATED OCCUPANCIES?

FIRE BARRIER RATING(S) SEE LIFE SAFETY PLANS

OCCUPANCY CLASSIFICATION(S)

OCCUPANCIES

(If Remodeling)

2021 LSC (TABLE 6.1.14.1)

(LSC CH 12-42)

NOYES

FIRE RESISTIVE CORRIDORS?

SMOKE TIGHT CORRIDORS (SMOKE PARTITIONS)

INCIDENTAL USE AREA RATING(S) SEE PLANS

MISCELLANEOUS

INTERIOR FINISHES CLASSIFICATION A, B(EXISTING) EXITS

A, B EXIT ACCESS CORRIDORS

A, B, COTHER SPACES

2021 NFPA 220 (STANDARD on TYPES OF BUILDING CONSTRUCTION)

AMBULATORY

HEALTHCARE

1.5

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

TRAVEL DISTANCE

ARRANGEMENT OF MEANS OF EGRESS

COMMON PATH OF TRAVEL

DEAD END

EXISTING AMBULATORY -- FULLY SPRINKLERED

HEALTH CARE OCCUPANCY

(NFPA 101 21.2.6.2.2)

(NFPA 101 21.2.5.1)

(NFPA 101 21.2.5.3)

200 FT

100 FT

50 FT

(EXISTING)

LIFE SAFETY SYMBOLS

1 HOUR FIRE

BARRIER

2 HOUR FIRE

BARRIER

SMOKE ZONE

BARRIER

2 HOUR FIRE &

SMOKE BARRIER

HE

TRAVEL DISTANCE

100'-10"

TRAVEL

DISTANCE

EA

EXIT

EXIT

HORIZONTAL

EXIT

EXIT

EXIT ACCESS

FIRE

EXTINGUISHER

FIRE

EXTINGUISHER

CABINET

FEC

LIMITS OF

CONSTRUCTION

HEALTH CARE SUITE

NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN

SMOKE RESESTIVE

ASSEMBLY

(HAZARDOUS

ROOM

ENCLOSURE)

NON-RATED

SMOKE ZONE

PARTITION

HEALTHCARE AREA OPEN TO CORRIDOR WITH 24/7

SUPERVISION - NO SMOKE DETECTION REQUIRED

HEALTHCARE AREA OPEN TO CORRIDOR WITH 24/7

SUPERVISION - SMOKE DETECTION PROVIDED

SMOKE TIGHT

ASSEMBLY

(HEALTHCARE

ASSEMBLY

CORRIDORS)

SHAFT

ADJACENT SYMBOLS SHOW PARTITION RATING

AND DAMPER REQUIREMENTS

EXIT PASSAGEWAY

RATE AS STAIR

ALL OPENINGS TO BE RATED AS STAIR SHAFT

1 HOUR FIRE BARRIER HAZARDOUS ROOM ENCLOSURE

SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE

SUITE DESCRIPTION

SUITE NUMBER

SUITE NAME SUITE SIZE TYPE OF SUITE EXIT NUMBER

PREP / RECOVERY

OFFICES

RADIOLOGY SUITE

CARDIOLOGY SUITE 1,980 Sq. Ft.

2,390 Sq. Ft.

1,240 Sq. Ft.

5,664 Sq. Ft.

NON SLEEPING PATIENT CARE

NON SLEEPING PATIENT CARE

NON PATIENT CARE

NON SLEEPING PATIENT CARE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

BUILDING 1

2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com

C U s e rs \P u b lic

\D o c u m e n ts

\R e v it P ro je c ts

\1

I A

C

IT

Y V

A H

C S

R

E M

O D

E L

W

I R

-C A

T H

-E P

Y e u n y o u n g .r v t

/8

/2

:1

:5

A M

1-I3

SECOND FLOOR LIFE SAFETY

PLAN

REMODEL 2W IR-CATH-EP

IOWA CITY VAHCS

636A8-21-001

04/08/2022 JU PC16133

1/8" = 1'-0"1 SECOND LEVEL LIFE SAFETY PLAN

0 8' 16'4'

PLAN

NORTH

TRUE

Revisions: Date:

3W101

3W09

3CW01

3S01

3C01

3CW01A

3W100

3W07

DW-2

3W102A

3W102

3CO1A

3C03

MECH SHAFT

3CW02

3W19

3W19D

3W19A3W11

3CW02A

3C02

3W17A

3W101A

CL-1

3W17

3W15

3W17B

3W101B

3W17C

3W19B

B1

S H A F T

S H A F T

3W103D

3W19C

SHAFT

3W223

PACT ROOF

D1

B3

C1

C2

3W103C

3W222

B2

3W14

3W101C

SPECIAL PURPOSE

INDUSTRAIL OCCUPANCY

BUSINESS OCCUPANCY

3W03

ROOM

MECHANICAL

3W03B

ROOM

MECHANICAL

MECHANICAL

SHAFT

3W136

EQUIPMENT

ELECTRICAL

ROOM

3ST06

3W104

3ST07

3W103A

EXIT

EXITEA

EA

EA

EA

EA

LIFE SAFETY SYMBOLS

1 HOUR FIRE

BARRIER

2 HOUR FIRE

BARRIER

SMOKE ZONE

BARRIER

2 HOUR FIRE &

SMOKE BARRIER

HE

TRAVEL DISTANCE

100'-10"

TRAVEL

DISTANCE

EA

EXIT

EXIT

HORIZONTAL

EXIT

EXIT

EXIT ACCESS

FIRE

EXTINGUISHER

FIRE

EXTINGUISHER

CABINET

FEC

LIMITS OF

CONSTRUCTION

HEALTH CARE SUITE

NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN

SMOKE RESESTIVE

ASSEMBLY

(HAZARDOUS

ROOM

ENCLOSURE)

NON-RATED

SMOKE ZONE

PARTITION

HEALTHCARE AREA OPEN TO CORRIDOR WITH 24/7

SUPERVISION - NO SMOKE DETECTION REQUIRED

HEALTHCARE AREA OPEN TO CORRIDOR WITH 24/7

SUPERVISION - SMOKE DETECTION PROVIDED

SMOKE TIGHT

ASSEMBLY

(HEALTHCARE

ASSEMBLY

CORRIDORS)

SHAFT

ADJACENT SYMBOLS SHOW PARTITION RATING

AND DAMPER REQUIREMENTS

EXIT PASSAGEWAY

RATE AS STAIR

ALL OPENINGS TO BE RATED AS STAIR SHAFT

1 HOUR FIRE BARRIER HAZARDOUS ROOM ENCLOSURE

SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE

KEY PLAN - THIRD FLOOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

BUILDING 1

2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com

C U s e rs \P u b lic

\D o c u m e n ts

\R e v it P ro je c ts

\1

I A

C

IT

Y V

A H

C S

R

E M

O D

E L

W

I R

-C A

T H

-E P

Y e u n y o u n g .r v t

/8

/2

:1

:5

A M

1-I4

THIRD FLOOR LIFE SAFETY PLAN REMODEL 2W IR-CATH-EP

IOWA CITY VAHCS

636A8-21-001

04/08/2022 JU PC16133

1/8" = 1'-0"1 THIRD FLOOR LIFE SAFETY PLAN

0 8' 16'4'

PLAN

NORTH

TRUE

INFECTION CONTROL & CONSTRUCTION

BARRIER GENERAL NOTES

1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL

INFORMATION

2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND

PARTICULATE MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA

PERIMETER NEEDS TO BE SEALED COMPLETELY WITH SHEET PLASTIC AS

SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE PERMITTED BY CLASS.

ICRA - CONSTRUCTION BARRIER TO BE PROVIDED AS SPECIFIED AND LISTED IN

ICRA CLASS.

3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION

OPERATIONS AS SPECIFIED. MONITOR TO MEASURE PRESSURE DIFFERENTIAL

BETWEEN CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS

DIRECTED BY VA.

4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON,

PROVIDE A REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE

VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT

TYPE OF CONSTRUCTION. PROVIDE AT LEAST TEN (10) WORKING DAYS NOTICE

FOR EACH PERMIT.

5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM

FLOOR TO DECK/FLOOR ABOVE. EXCEPTION. IF BARRIER IS ADJACENT TO

SMOKE, FIRE, OR EXISTING WALL CONSTRUCTION WHICH WILL NOT BE

DEMOLISHED AND TERMINATES TO FLOOR/DECK ABOVE, THEN CONSTRUCT DUST

PROOF IC BARRIER, SEE DETAIL(S). TAPE, MUD, SAND JOINTS AND PAINT ON NON-

CONSTRUCTION SIDE OF BARRIER.

6. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00

AM AND AFTER 8:00 PM OR DIRECTED BY COR

7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE

NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF,

(2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR

AREAS BETWEEN 5000 SF AND 10000 SF.

8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.

9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO

COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL

TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF

UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE

REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE

ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE

NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR.

PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE AND/OR

EMERGENCY IN AN ADJACENT AREA.

10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS,

CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER

PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE

BARRIER.

CONSTRUCION PHASING GENERAL NOTES

1. THE WORK UNDER THIS CONTRACT SHALL BE DIVIDED INTO PHASES. A PHASE

CAN INVOLVE MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00

1.6.G PHASING.

2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING AND SEQUENCING

WITH ALL TRADES AND THE OWNER. THE GENERAL CONTRACTOR SHALL PROVIDE

A WRITTEN NARRATIVE TO OUTLINE CONSTRUCTION PHASING AND SEQUENCE

PLANS, VALIDATING AND ELABORATING ON THIS PHASING DESCRIPTION.

3. THE GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH THE OWNER SO

WORK MAY BE CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR

DELAYING WORK UNDER THIS CONTRACT, OR OTHER CONTRACTS ON THE

PROJECT SITE OR WORK BY OWNER.

4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL INDICATE THE

SEQUENCE, COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND

APPROVAL DATES AND MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL

FOR ALL PHASES OF THE WORK.

5. THE GENERAL CONTRACTOR SHALL PERFORM THE WORK IN EACH PHASE IN THE

SEQUENCE SHOWN ON THE PHASING PLAN DRAWING(S) AND CONSTRUCTION

PHASING DESCRIPTION.

6. THE GENERAL CONTRACTOR MUST COMPLETE ALL WORK IN EACH PHASE WITH

THE VA INSPECTING AND ACCEPTING THE WORK PRIOR TO VA OCCUPANCY AND

THE CONTRACTOR PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON

COMPLETION OF A PARTICULAR PHASE, THE ENTIRE AREA COVERED BY THAT

PHASE CAN BE OCCUPIED BY THE VA PERSONNEL WITH ALL SYSTEMS

FUNCTIONING PROPERLY.

7. BEFORE COMMENCING WORK ON EACH SUCCESSIVE PHASE, THE GENERAL

CONTRACTOR SHALL SUBMIT AN UPDATED COPY OF THE SCHEDULE.

8. ANY DUST PARTITIONS OR ICRA-CONSTRUCION BARRIERS CONSTRUCTED BY THE

CONTRACTOR PRIOR TO THE START OF DEMOLITION MUST REMAIN IN PLACE UNTIL

THE COMPLETION OF THAT PHASE OR SUBSEQUENT PHASE WHERE REQUIRED.

9. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO VA OCCUPIED

AREAS IN SUCH A MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED

USE OF ALL OCCUPIED AREAS, INCLUDING THE APPLICABLE MECHANICAL AND

ELECTRICAL SYSTEMS SERVING THESE AREAS.

10. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL

DRAWING(S) AND DEMOLITION PLANS.

11. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENTS IS

FOR ARCHITECT-OWNER PLANNING PURPOSES ONLY.

12. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS

OF EGRESS THROUGHOUT ALL PHASING.

13. THE CONTRACTOR SHALL PLAN FOR A MINIMUM OF 4 WEEKS' TIME BETWEEN

PHASES TO ALLOW THE VA TO OCCUPY THE NEWLY ACCEPTED SPACE AND

VACATE THE FOLLOW-ON PHASES. THE VA WILL ACCELERATE THIS TIME WHEN

POSSIBLE AND WILL NOTIFY THE CONTRACTOR IF THIS OCCURS.

14. WORK BELOW (OR ABOVE) 2ND LEVEL SHALL BE TREATED ON A CASE-BY-CASE

BASIS, AND SHALL BE CAREFULLY COORDINATED BETWEEN ICVA AND

CONTRACTOR TO ENSURE PROPER PRECAUTIONS ARE TAKEN, PROPER

CONSTRUCTION BARRIERS ARE IN PLACE, AND WORK IS DONE IN A WAY TO

MINIMIZE DISRUPTION/IMPACT TO AFFECTED AREAS.

PHASE 1:

CONSTRUCTION PROJECT ACTIVITY TYPE - D

INFECTION CONTROL RISK GROUP - GROUP 2 : MEDIUM RISK

CONTROL PROCEDURE CLASS - III

PHASE 2 :

CONSTRUCTION PROJECT ACTIVITY TYPE - D

INFECTION CONTROL RISK GROUP - GROUP 2 : MEDIUM RISK

CONTROL PROCEDURE CLASS - III

PHASE 3:

CONSTRUCTION PROJECT ACTIVITY TYPE - D

INFECTION CONTROL RISK GROUP - GROUP 2 : MEDIUM RISK

CONTROL PROCEDURE CLASS - III

INFECTION CONTROL RISK ASSESSMENT (ICRA)

BY PROJECT AREA USE AND PHASE

CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)

TYPE A

TYPE B

TYPE C

TYPE D

INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT NOT

LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION

LIMITED TO 1 TILE PER 50 SQUARE FEET, PAINTING BUT NOT SANDING

WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND

ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF

WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.

SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL

DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE

AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF

WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.

FLOOR COVERING REMOVAL (WITHOUT SANDING OR GRINDING).

ANY WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR

REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING

COMPONENTS OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO,

SANDING OF WALL FOR PAINTING OR WALLCOVERING, REMOVAL OF

FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL

CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE

CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH

CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT. FLOOR

COVERING REMOVAL (WITH SANDING OR GRINDING).

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS

NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK

SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE

CEILING SYSTEM, FLOORING AND NEW CONSTRUCTION.

GROUP 1

LOW RISK

• MECHANICAL SPACES: AREAS NOT DIRECTLY ADJACENT TO PATIENT

CARE, INCLUDING INTERSTITIAL SPACES.

• ENGINEERING OR EMS OFFICE/WORK AREAS

• OFFICE AREAS: AREAS NOT ATTACHED TO/ADJOINING PATIENT CARE

AREAS, NOT USED FOR PATIENT INTERVIEWS, EVALUATIONS OR

EXAMINATIONS.

• PUBLIC CORRIDORS: SPACES NOT ON OR DIRECTLY ATTACHED TO

PATIENT UNITS OR TREATMENT LOCATIONS.

GROUP 2

MEDIUM

RISK

• OUTPATIENT AREAS:

1. PRIMARY CARE OR SPECIALTY CARE CLINIC AREAS

2. BEHAVIORAL/MENTAL HEALTH AREAS

3. EXTENDED CARE / REHAB CLINIC AREAS

4. COMMUNITY BASED OUT PATIENT CLINICS (CBOC’S)

GROUP 3

HIGH RISK

• IN-PATIENT UNITS:

1. INCLUDING, BUT NOT LIMITED TO: EMERGENCY DEPT.; NURSING

UNITS; RADIOLOGY/MRI/CT/ULTRASOUND; NUCLEAR MEDICINE;

CAFETERIA/KITCHEN/CANTEEN; LABORATORIES; RADIATION /

ONCOLOGY; DIALYSIS

GROUP 4

HIGHEST

RISK

• ICU/SICU

• OR/PACU/ENDOSCOPY

• GI

• STERILE PROCESSING SERVICES (SPS)

• PHARMACY

• CATH LAB

CLASS

I

KEEP AREAS FREE OF DEBRIS, TRASH

EXECUTE WORK TO MINIMIZE OF DUST MIGRATION (E.G. WET MOPPING, HEPA VACUUM)

IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION

(INVOLVING MINOR DEMOLITION IN MAINTENANCE OR REMODELING.)

CLASS

II

SAME AS CLASS I PLUS:

1. ESTABLISH MATERIAL AND DEBRIS ROUTE USING NON-PATIENT/VISITOR PATHWAY

2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE CUTTING OR DRILLING.

3. BLOCK OFF AND SEAL AIR VENTS

4. SEAL UNUSED DOORS WITH PLASTIC SHEATHING AND DUCT TAPE.

5. CREATE BARRIERS AS DEFINED BY INFECTION PREVENTION

6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINER; TAPE COVERING UNLESS SOLID LID.

7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.

8. PLACE STICKY MAT AT ALL WORK AREA ENTRANCES AND EXITS.

9. REMOVE OR ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA

CLASS

III

SAME AS CLASS I AND II PLUS:

1. ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA TO PREVENT DUCT SYSTEM CONTAMINATION

2. COMPLETE CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, PLASTIC) AT ALL CONSTRUCTION ENTRIES AND EXITS; MONITOR FOR SEAL AND TAKE IMMEDIATE

CORRECTIVE ACTION AS NEEDED

3. MAINTAIN AND MONITOR NEGATIVE AIR PRESSURE WITHIN CONSTRUCTION SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

4. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING PERFORMED.

5. CHECK AND REPLACE AIR FILTERS AS NEEDED REGULARLY

6. DO NOT REMOVE BARRIERS FROM WORK SITE UNTIL PROJECT IS COMPLETE & HAS BEEN THOROUGHLY CLEANED; REMOVE BARRIERS CAREFULLY TO MINIMIZE

SPREADING DUST. DEBRIS.

7. VACUUM WORK WITH HEPA FILTERED VACUUM.

8. WET MOP AREA WITH CLEANER/DISINFECTANT.

9. MITIGATE VIBRATION AND NOISE TO LOWEST IMPACT WHERE POSSIBLE.

10. DISPLAY ICRA AT SITE

11. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES.

CLASS

IV

SAME AS CLASS I, II AND III PLUS:

1. INSPECT ADJACENT AREAS FOR DUST MIGRATION; TAKE IMMEDIATE CORRECTIVE AS NEEDED

2. USE HEPA VACUUM IN AREA PRIOR TO START OF CONSTRUCTION

3. CONSTRUCT ANTE ROOM; ALL PERSONNEL MUST ENTER THROUGH IT TO BE VACUUMED USING HEPA VACUUM BEFORE LEAVING OR TO DON/DOFF PPE

CONTINUOUS FIRE

RETARDANT TREATED

WOOD NAILER

EXISTING CEILING

CONTINUOUS DUCT

TAPE SEAL EACH SIDE

AT CEILING

COMPRESSIBLE

INSULATION

CONTINUOUS DUCT

TAPE SEAL EACH

SIDE

EXISTING FINISHED

FLOOR

(1) LAYER 5/8" GYP BD EACH

SIDE. FINISH OCCUPIED SIDE

WITH GLOSS PAINT

3 5/8" STEEL STUDS @ 16"

OC WITH FULL BATT SOUND

ATTENUATING INSULATION

CONTINUOUS FIRE

RETARDANT TREATED

WOOD NAILER

CLOSE INTERSTITIAL SPACE WITH

6 MIL POLYETHYLENE

BARRIER. SEAL ALL JOINTS,

PENETRATIONS AND ENTIRE

PERIMETER OF BARRIER

WITH CONTINUOUS DUCT TAPE

CLOSE OPEN DUCTS WITH

6 MIL POLYETHYLENE

BARRIER. SEAL EDGES

WITH CONTINUOUS DUCT

TAPE

"WORK" SIDE OF BARRIER OCCUPIED SIDE OF

BARRIER

COMPRESSIBLE INSULATION

3 5/8" STEEL STUDS @ 16"

OC WITH FULL BATT SOUND

ATTENUATING INSULATION

3 5/8" STEEL STUDS @ 16"

OC WITH FULL BATT SOUND

ATTENUATING INSULATION

KEY PLAN - SECOND FLOOR

PHASE 1

PHASE 2

PHASE 3

PHASE 4

2S32

TOILET

PATIENT

2S33

TOILET

STAFF

2S34

ECHO 1

2S35

CARDIOVERSION

ECHO/TEE

2S37

ECHO 3

2S38

ECHO 2

2CS11

CORRIDOR

2S36

ELEC

2S41

EKG 1

2S40

TREADMILL

EKG/STRESS

2S39

EKG 2

2S42

HOLDING

SOILED

2S43A

TECH AREA

EKG

2S43

WORK ROOM

EKG

2CS12

CORRIDOR

EXIT

EXIT

EA

EA

EA

EA

EA

EA

EA

EA

EA

EA

PHASE 1

PHASE 2

PHASE 3

PHASE 4

2S32

TOILET

PATIENT

2S33

TOILET

STAFF

2S34

ECHO 1

2S35

CARDIOVERSION

ECHO/TEE

2S37

ECHO 3

2S38

ECHO 2

2CS11

CORRIDOR

2S36

ELEC

2S41

EKG 1

2S40

TREADMILL

EKG/STRESS

2S39

EKG 2

2S42

HOLDING

SOILED

2S43A

TECH AREA

EKG

2S43

WORK ROOM

EKG

2CS12

CORRIDOR

EXIT

EXIT

EA

EA

EA

5'-6"

EA

5'-0"

EA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

BUILDING 1

2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com

C U s e rs \P u b lic

\D o c u m e n ts

\R e v it P ro je c ts

\1

I A

C

IT

Y V

A H

C S

R

E M

O D

E L

W

I R

-C A

T H

-E P

Y e u n y o u n g .r v t

/8

/2

:1

:0

A M

1-I5

SECOND FLOOR INFECTION

CONTROL & PHASING PLAN

REMODEL 2W IR-CATH-EP

IOWA CITY VAHCS

636A8-21-001

04/08/2022 JU PC16133

1/2" = 1'-0"3 TYP DUST PROOF BARRIER

PLAN

NORTH

TRUE

NORTH

1/16" = 1'-0"2 SECOND FLOOR ICRA, CONSTRUCTION BARRIER & PHASING PLAN - COMPLETED CONSTRCUTION PLAN

PLAN

NORTH

TRUE

NORTH

0 16' 32'8' 0 16' 32'8'

0 2' 4'1'

1/16" = 1'-0"1 SECOND FLOOR ICRA, CONSTRUCTION BARRIER & PHASING PLAN - EXISTING AS-IS PLAN

1. NEITHER THE PROFESSIONAL ACTIVITIES OF THE ENGINEER, NOR THE PRESENCE OF THE

ENGINEER OR THEIR EMPLOYEES AND SUBCONSULTANTS AT THE CONSTRUCTION SITE,

SHALL RELIEVE THE CONTRACTOR AND ANY OTHER ENTITY OF THEIR OBLIGATIONS,

DUTIES AND RESPONSIBILITIES INCLUDING BUT NOT LIMITED TO, CONSTRUCTION MEANS,

METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES NECESSARY FOR PERFORMING,

SUPERINTENDING OR COORDINATING ALL PORTIONS OF THE CONSTRUCTION WORK IN

ACCORDANCE WITH THE CONTRACT DOCUMENTS AND ANY HEALTH OR SAFETY

PRECAUTIONS REQUIRED BY ANY REGULATORY AGENCIES. THE ENGINEER AND THEIR

PERSONNEL HAVE NO AUTHORITY TO EXERCISE ANY CONTROL OVER ANY

CONSTRUCTION CONTRACTOR OR OTHER ENTITY OR THEIR EMPLOYEES IN CONNECTION

WITH THEIR WORK OR ANY HEALTH OR SAFETY PRECAUTIONS. THE CONTRACTOR IS

SOLELY RESPONSIBLE FOR THE JOBSITE SAFETY. THE ENGINEER AND THE ENGINEER’S

CONSULTANTS SHALL BE MADE ADDITIONAL INSUREDS UNDER THE CONTRACTOR’S

GENERAL LIABILITY INSURANCE POLICY.

2. ALL DRAWINGS AND SPECIFICATIONS ARE CONSIDERED TO BE A PART OF THE CONTRACT

DOCUMENTS. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE REVIEW AND

COORDINATION OF ALL DRAWINGS AND SPECIFICATIONS PRIOR TO THE START OF

CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE

ARCHITECT PRIOR TO THE START OF CONSTRUCTION SO A CLARIFICATION CAN BE

ISSUED. ANY WORK PERFORMED IN CONFLICT WITH THE CONTRACT DOCUMENTS OR ANY

CODE REQUIREMENTS SHALL BE CORRECTED BY THE CONTRACTOR AT THEIR OWN

EXPENSE AND AT NO EXPENSE TO THE OWNER OR ARCHITECT.

3. ALL DIMENSIONS AND SITE CONDITIONS SHALL BE VERIFIED BY THE CONTRACTOR AT THE

JOBSITE PRIOR TO CONSTRUCTION, START OF SHOP DRAWINGS, START OF

CONSTRUCTION, AND/OR FABRICATION OF MATERIALS. IF DISCREPANCIES ARE

ENCOUNTERED, OR CONDITIONS DEVELOP THAT ARE NOT COVERED BY THE CONTRACT

DOCUMENTS, THE ARCHITECT SHALL BE NOTIFIED FOR CLARIFICATION.

4. CONTRACTOR SHALL PROVIDE AND BE RESPONSIBLE FOR THE PROTECTION AND REPAIR

OF ADJACENT EXISTING SURFACES AND AREAS WHICH MAY BE DAMAGED AS A RESULT

OF NEW WORK.

5. STRUCTURAL DRAWINGS INCLUDE DESIGN REQUIREMENTS AND DIMENSIONS FOR

STRUCTURAL INTEGRITY BUT DO NOT SHOW ALL DETAIL DIMENSIONS TO FIT INTRICATE

ARCHITECTURAL AND MECHANICAL DETAILS. CONTRACTOR SHALL SO CONSTRUCT THE

WORK SO IT WILL CONFORM TO THE CLEARANCES REQUIRED BY ARCHITECTURAL,

MECHANICAL AND ELECTRICAL DESIGN.

6. ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED TO BE

CONSTRUCTION STANDARDS. IF CLARIFICATION IS REQUIRED, THE CONTRACTOR SHALL

NOTIFY THE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK.

7. DO NOT SCALE DRAWINGS. PRINTED DIMENSIONS HAVE PRECEDENCE OVER SCALED

DRAWINGS AND LARGE-SCALE OVER SMALL-SCALE DRAWINGS. CONTRACTOR TO

DETERMINE FINAL DIMENSION WITH ARCHITECT.

8. TYPICAL DETAILS SHALL APPLY TO SITUATIONS OCCURRING ON THE PROJECT THAT ARE

THE SAME OR SIMILAR TO THOSE SPECIFICALLY REFERENCED. WHERE NO DETAILS ARE

GIVEN, CONSTRUCTION SHALL BE AS SHOWN FOR SIMILAR WORK.

9. THE CONTRACT DOCUMENTS AND SPECIFICATIONS REPRESENT THE FINISHED

STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE

CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE

AND SAFETY OF WORKMEN DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE,

BUT NOT BE LIMITED TO, BRACING AND SHORING FOR LOADS DUE TO CONSTRUCTION

EQUIPMENT, ETC. OBSERVATION VISITS TO THE SITE BY THE ARCHITECT OR STRUCTURAL

ENGINEER SHALL NOT INCLUDE INSPECTION OR APPROVAL OF THE ABOVE ITEMS AND

DOES NOT IN ANY WAY RELIEVE THE CONTRACTOR OF THEIR RESPONSIBILITIES FOR THE

ABOVE.

10. SEE ARCHITECTURAL, ELECTRICAL AND MECHANICAL DRAWINGS FOR DETAILS,

CONDITIONS, PITS, TRENCHES, PADS, DEPRESSIONS, ROOF/FLOOR OPENINGS, STAIRS,

SLEEVES, ITEMS TO BE EMBEDDED OR ATTACHED TO STRUCTURAL ELEMENTS, ETC., NOT

SHOWN ON THE STRUCTURAL DRAWINGS.

11. ESTABLISH AND VERIFY ALL OPENINGS AND INSERTS FOR MECHANICAL, ELECTRICAL AND

PLUMBING WITH APPROPRIATE TRADE CONTRACTORS. OPENING SIZES AND LOCATIONS

SHOWN FOR DUCTS, PIPE, INSERTS AND OTHER PENETRATIONS WHEN SHOWN ARE FOR

GENERAL INFORMATION ONLY AND SHALL BE VERIFIED PRIOR TO FORMING.

12. NO HOLES, NOTCHES, BLOCKOUTS, ETC. ARE ALLOWED IN STRUCTURAL ELEMENTS

UNLESS SPECIFICALLY DETAILED ON THE STRUCTURAL DRAWINGS OR APPROVED BY THE

STRUCTURAL ENGINEER.

13. BEFORE SUBMITTING A PROPOSAL FOR THIS WORK, EACH BIDDER SHALL VISIT THE

PREMISES AND BECOME FULLY ACQUAINTED WITH THE EXISTING CONDITIONS,

TEMPORARY CONSTRUCTION REQUIRED, QUANTITIES AND TYPE OF EQUIPMENT, ETC. THE

BID SHALL INCLUDE ALL SUMS REQUIRED TO DO THE WORK WITHIN THE EXISTING

CONDITIONS.

14. SHOP DRAWINGS SHALL BE REVIEWED AND COORDINATED PRIOR TO SUBMITTING TO THE

ARCHITECT. EACH SHOP DRAWING SUBMITTED SHALL BE STAMPED INDICATING REVIEW

BY THE CONSTRUCTION MANAGER/GENERAL CONTRACTOR AND REVIEW BY THE

ARCHITECT SHALL NOT BEGIN UNTIL THIS IS COMPLETE. WORK SHALL NOT BEGIN

WITHOUT REVIEW BY THE ARCHITECT/STRUCTURAL ENGINEER.

15. SHOP DRAWINGS SHALL BE REVIEWED BY THE ARCHITECT/STRUCTURAL ENGINEER FOR

GENERAL CONFORMANCE WITH DESIGN CONCEPT ONLY. NOTATIONS MADE BY THE

ARCHITECT/STRUCTURAL ENGINEER ON THE SHOP DRAWINGS DO NOT RELIEVE THE

CONTRACTOR FROM COMPLYING WITH THE REQUIREMENTS OF THE DRAWINGS AND

SPECIFICATIONS.

16. ELEVATIONS ARE BASED ON THE FIRST FLOOR ELEVATION OF ( +0' - 0" ).

17. EXISTING CONDITIONS:

A. EXISTING STRUCTURAL INFORMATION SHOWN WAS OBTAINED FROM EXISTING

DRAWINGS DATED 06-16-1986 BY HANSEN LIND MEYER.

B. EXISTING STRUCTURAL INFORMATION SHOWN WAS OBTAINED FROM FIELD TAKE-OFF

BY IMEG AS PERMITTED BY ACCESS RESTRICTIONS DURING DESIGN.

C. ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS

GIVEN AS THE BEST PRESENT KNOWLEDGE. CONTRACTOR TO VERIFY EXISTING

INFORMATION, DIMENSIONS AND SIZES AS REQUIRED TO COMPLETE THEIR WORK.

WHERE ACTUAL CONDITIONS CONFLICT WITH THE DRAWINGS, THEY SHALL BE

REPORTED TO THE AOR OR SEOR SO PROPER CLARIFICATION MAY BE MADE.

MODIFICATION OF CONSTRUCTION DETAILS SHALL NOT BE MADE WITHOUT WRITTEN

APPROVAL OF THE ARCHITECT OR STRUCTURAL ENGINEER.

GENERAL

DEMOLITION

1. ALL DEMOLITION SHALL BE CARRIED OUT IN SUCH A WAY AS TO NOT DAMAGE

EXISTING ELEMENTS WHICH ARE TO REMAIN.

2. ALL ELEMENTS WHICH ARE TO REMAIN AND WHICH ARE DAMAGED DURING

DEMOLITION WORK SHALL BE REPLACED AT NO ADDED COST. EXISTING

ELEMENTS ARE TO BE PROTECTED TO THE FULLEST EXTENT POSSIBLE TO

REDUCE SUCH DAMAGE TO A MINIMUM.

1. STRUCTURE HAS BEEN DESIGNED TO COMPLY WITH:

IBC 2021

ASCE/SEI 7-16

ACI 318-19

AISC 360-16

AWS D1.1

AISI S100

TMS 402/602-16

2. RISK CATEGORY IV

3. SEISMIC:

SEISMIC DESIGN CATEGORY A

IMPORTANCE FACTOR 1.50

SOIL CLASSIFICATION D (ASSUMED)

THE PROPOSED MODIFICATIONS WILL NOT ALTER THE EXISTING BUILDING SEISMIC

LOAD OR THE EXISTING LATERAL LOAD RESISTING SYSTEM.

4. WIND:

THE PROPOSED MODIFICATIONS WILL NOT ALTER THE EXISTING BUILDING WIND LOAD

OR THE EXISTING LATERAL LOAD RESISTING SYSTEM.

5. LIVE LOADS:

TYPICAL FLOOR 100 PSF (REDUCIBLE)

MECHANICAL 150 PSF (UNREDUCIBLE)

CORRIDORS, STAIR & PUBLIC AREAS 100 PSF (UNREDUCIBLE)

PARTITION LOAD 15 PSF (UNREDUCIBLE)

6. SNOW: N/A

7. PHYSICAL SECURITY AND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .