Attachment G - 2W for IR-CATH-EP CDs Drawings 3 of 5.pdf
PDF 10 MB Posted
- Solicitation number
- 36C26323R0002
About this file
This document provides details for a federal contract solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23. Solicitation number 36C26323R0002 seeks proposals for a remodel of the 2nd floor for interventional radiology, cardiac catheterization, and electrophysiology services at facility 636A8. The solicitation type is for a firm-fixed price contract with an estimated award date of April 2022. Proposals are due by February 2022 and the work includes construction drawings as an attachment in the related file.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE PROTECTION SYMBOL LIST
SYMBOL: DESCRIPTION:
FIRE PROTECTIONFP
ANGLE VALVE
BUTTERFLY VALVE WITH MONITOR SWITCH
OS&Y GATE VALVE
OS&Y GATE VALVE WITH MONITOR SWITCH
PRESSURE SWITCH
P
NO HATCH LIGHT HAZARD
ORDINARY GROUP 1
ORDINARY GROUP 2
EXTRA GROUP 1
EXTRA GROUP 2
INSPECTOR TEST AND DRAIN VALVE
MONITOR SWITCH
PIPE CAP
PIPE DOWN
PIPE UP OR UP/DOWN
SHUTOFF VALVE NORMALLY OPEN
DEMOLITION
DRAINDFP
NOT ALL SYMBOLS MAY APPLY.
AUTOMATIC DRAIN VALVE
UNION/FLANGE
DIRECTION OF FLOW IN PIPE
PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P
CHECK VALVE
FLOW SWITCH
F
ROUTE TO DRAIN
AREA BOUNDARY
FIRE PROTECTION ABBREVIATION KEY
AD ACCESS DOOR
N.C. NORMALLY CLOSED
ABOVE FINISHED FLOORAFF
NOT IN CONTRACTNIC
NORMALLY OPENN.O.
ABBR: DESCRIPTION:
TYPICALTYP
UNLESS NOTED OTHERWISEUNO
SHORT CIRCUIT CURRENT RATINGSCCR
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
SIMSIM
INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
LEVEL NAME
10' - 0" HEIGHT ABOVE
PROJECT 0' - 0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N O R
HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
TAG-1 UNDERLINED TEXT INDICATES ADDITIONAL INFORMATION CAN BE FOUND
ELSEWHERE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
T101
CONTACT PERSONS:
PROJECT MANAGER
MECHANICAL
ELECTRICAL
TECHNOLOGY
STRUCTURAL
ERIC HENDERSON
ERIC HENDERSON
ISAAC STOLL
DAMON DEEN
JOHN PAUL GOEDKEN
DESCRIPTION: PERSON:
TEMPERATURE CONTROLS CONTRACTORT.C.C.
FIRE PROTECTION CONTRACTORF.P.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
MECHANICAL CONTRACTORM.C.
ELECTRICAL CONTRACTORE.C.
CONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
TECHNOLOGY CONTRACTORT.C.
CONTRACTING OFFICER'S REPRESENTATIVEC.O.R
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE
CONTROL.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO OTHERS.
6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
MOUNTED DEVICES, OTHER THAN SPRINKLERS.
8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
FINISH.
9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE
GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE
PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS
PANELS PRIOR TO BIDDING.
10. SEAL ALL FLOOR, WALL AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,
AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE
SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER
FOR OUTDOOR USE.
11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,
PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
WITHIN ROOMS.
12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.
15. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR
STARTERS, SWITCHES, AND DISCONNECTS.
16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL
EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.
17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER
NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE
CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
MECHANICAL RENOVATION NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE
CONTROL.
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND
REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS
BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.
3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE
FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD
CONDITIONS.
4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK
AND SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE
REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER AREA OF
WORK.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF
ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.
CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.
6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF
CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL
CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO
BIDDING.
7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH
NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL
EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT
DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL
SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT
REMAIN ACTIVE.
9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY
REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW
SYSTEMS ARE INSTALLED.
10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR
TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND
CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY
DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.
11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT
THAT HAS BEEN REMOVED.
MECHANICAL PHASING NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE
CONTROL.
1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO
CONSTRUCTION MANAGER'S/GENERAL CONTRACTOR'S/ARCHITECT'S INSTRUCTIONS FOR
MORE DETAILS AND PHASING SCHEDULES AND FOR CONCURRENT WORK. MECHANICAL,
ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT THE INTENT OF THE FINAL DESIGN. THE
MECHANICAL, ELECTRICAL, AND TECHNOLOGY DRAWINGS DO NOT DEPICT THE MEANS AND
METHODS TO MEET THE REQUIREMENTS OF THE PHASING CRITERIA.
2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC.
WITH AFFECTED ADJACENT AREAS.
3. PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE
ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS DURING ALL PHASES OF
PROJECT.
4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP
ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT
5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.
TEST DATE:
LOCATION:
SUCTION PRESSURE:
DISCHARGE PRESSURE:
TOTAL FLOW:
FIRE FLOW TEST DATA
07/11/2020
AT EXISTING FIRE PUMP
71 PSI
136 PSI
0 GPM AT 160 PSI, 755 GPM AT 136 PSI, 1133 GPM AT 110 PSI
1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE
CONTRACTOR. CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS
REQUIRED FOR FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.
2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID
TO THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS
RESPONSIBLE FOR COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND
IN THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL
TAKES PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER IS THE
BASIS OF DESIGN.
3. CENTER SPRINKLERS IN CEILING TILES IN BOTH DIRECTIONS IN ALL AREAS. IN AREAS
WITH 2’X4’ CEILING TILES CENTERING USING A 2’X2’ CEILING PATTERN IS ACCEPTABLE.
SPRINKLER HEADS SHALL BE ALIGNED WITH OTHER SPRINKLER HEADS, LIGHTING,
DIFFUSERS, AND ANY OTHER FEATURES IN THE CEILING.
4. NEW SPRINKLERS SHALL BE QUICK RESPONSE TYPE, UNLESS OTHERWISE NOTED.
CONTRACTOR SHALL NOT MIX STANDARD RESPONSE SPRINKLERS WITH QUICK
RESPONSE SPRINKLERS IN UNPARTITIONED SPACES.
5. PROVIDE COVERAGE ABOVE AND BELOW ALL DUCTWORK GREATER THAN 48" WIDE.
6. PROVIDE COVERAGE ABOVE (IF APPLICABLE) AND BELOW FLOATING CEILINGS, REFER
TO ARCHITECTURAL PLANS.
7. FIRE PROTECTION PIPE ROUTING IS SHOWN FOR GENERAL LAYOUT. DETERMINE EXACT
NUMBER OF SPRINKLERS, PIPE SIZING, AND PIPE ROUTING.
8. THE FIRE PROTECTION SYSTEM SHALL BE DESIGNED TO MEET OWNER'S INSURANCE
COMPANY STANDARDS WHERE APPLICABLE. THE MORE STRINGENT OF THE OWNER'S
INSURANCE UNDERWRITER'S DESIGN CRITERIA AND THE NFPA STANDARDS SHALL BE
USED.
9. ALL BUILDING AREA SHALL BE FULLY SPRINKLERED INCLUDING CANOPIES, WALKWAYS,
OVERHANGS, SOFFITS, AND BUILDING PROJECTIONS. ALL ACCESSIBLE COMBUSTIBLE
CONCEALED SPACES SHALL BE FULLY PROTECTED BY THE SPRINKLER SYSTEM.
10. EACH ASSEMBLY SHALL INCLUDE CHECK VALVE BUTTERFLY CONTROL VALVE
INDICATING "OPEN" OR "CLOSED" POSITION, TEST INSPECTION VALVE, FLOW SWITCH
AND PRESSURE GAUGES.
11. PROVIDE RISER ROOM IDENTIFICATION SIGNAGE OUTSIDE THE FIRE RISER ROOM.
COORDINATE EXACT SIGN LANGUAGE WITH AHJ.
12. WHERE FEASIBLE INSTALL PIPES HIGH AS POSSIBLE TO AVOID CONFLICT WITH OTHER
DISCIPLINES, AND TO REDUCE THE AMOUNT OF REQUIRED ROD STIFFENER SUPPORTS.
13. INSTALL SYSTEM DRAINS AT LOW POCKET AREAS CONTAINING FIVE GALLONS OF
WATER OR MORE, PROVIDE WITH ISOLATION VALVE AND THREADED HOSE
CONNECTION.
14. MAIN PIPING PASSING BELOW SKYLIGHTS OR CLERESTORIES ARE NOT PERMITTED.
15. FOLLOW STRUCTURAL DETAILS WHEN PENETRATING OR PASSING THROUGH
STRUCTURAL ELEMENTS. ALTERNATE DESIGNS WILL NEED TO BE APPROVED THROUGH
THE STRUCTURAL ENGINEER.
16. PROVIDE INTERMEDIATE TEMPERATURE SPRINKLER HEADS WHERE REQUIRED BY NFPA
13 UNLESS OTHERWISE NOTED.
17. FINAL HEAD LOCATION, TYPE AND FINISH SHALL BE REVIEWED AND APPROVED BY THE
ARCHITECT.
18. A GRAPHIC ANNUNCIATOR PANEL SHALL BE PROVIDED TO INCLUDE AREAS BEING
PROVIDED WITH A PRE-ACTION OR CLEAN AGENT SYSTEM WHICH HAVE CONCEALED
AREAS.
19. EXACT LOCATION OF THE ALL PANELS SHALL BE VERIFIED ON SITE AND COORDINATED
WITH THE ELECTRICAL CONTRACTOR.
20. PAINT ALL EXPOSED PIPING TO MATCH BACKGROUND OR AS DIRECTED BY THE
ARCHITECT.
21. THE OWNER MUST BE NOTIFIED PRIOR TO EACH AND EVERY DRAINING OR RECHARGING
OF THE SPRINKLER SYSTEM.
22. THE CONTRACTOR SHALL PREPARE A COORDINATED SET OF SHOP DRAWINGS AND
SHALL OBTAIN APPROVAL FROM THE AUTHORITIES HAVING JURISDICTION AND THE
LOCAL FIRE DEPARTMENT PRIOR TO ANY INSTALLATION.
23. WALLS WHERE PIPE PASSES THROUGH HOLES IN PLATFORMS, FOUNDATIONS, WALL,
OR FLOORS, THE HOLES SHALL BE SIZED SUCH THAT DIAMETER OF THE HOLE IS
NOMINALLY 2 INCHES LARGER THAN THE PIPE FOR 1” NOMINAL TO 3 ½” NOMINAL AND 4”
LARGER THAN THE PIPE FOR PIPE 4” AND LARGER.
24. DRAWING SHOW LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT,
ETC. AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
25. VERIFY ALL DIMENSIONS AND CLEARANCES FROM ARCHITECTURAL, STRUCTURAL,
SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR PHYSICALLY AT SITE. REVIEW
ALL DRAWINGS. INCLUDING THOSE OF OTHER TRADES.
FIRE PROTECTION GENERAL NOTES:
FIRE PROTECTION SHEET INDEX
1-F0 FIRE PROTECTION COVERSHEET
1-F1 SECOND FLOOR DEMOLITION - FIRE PROTECTION
1-F2 SECOND FLOOR PLAN - FIRE PROTECTION
1-F3 THIRD FLOOR PLAN - FIRE PROTECTION
GRAND TOTAL: 4
I O W A
S E
D
PROFESS IO NA
20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C R e v it L o c a l F ile s \M
E P
T .0
V
A -V
IS
N
-I o w a C it y -R e m o d e l
IR
-C a th
-E P
C
D e lla n .J
.L le w e lly n .r v t
/8
/2
:1 :1
P
M
1-F0
FIRE PROTECTION COVERSHEET REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
BUILDING 1
04/08/2022 BLAOBR APUSHA16133
NOTES:
1. SEE FLOOR PLANS FOR ZONING REQUIREMENTS.
2. SPRINKLERS SHALL HAVE COLOR CODED BULB THERMAL ELEMENT.
3. ALL SPRINKLERS SHALL BE UL AND FM LISTED.
4. CONTRACTOR TO VERIFY SPRINKLER REQUIREMENTS BASED ON ACTUAL INSTALLATION, USAGE, ARCHITECTURAL CEILING PLAN AND NFPA 13 REQUIREMENTS.
5. TAG NAME IS PRIMARILY FOR IDENTIFIYING SPRINKLERS IN SUBMITTALS. IT MAY OR MAY NOT BE FOUND ELSEWHERE ON THE DRAWINGS. CONTRACTOR TO SUBMIT ALL
SPRINKLER TYPES TO BE USED.
6. AREAS ARE GENERAL IN NATURE. CONTRACTOR TO MATCH UNSCHEDULED AREAS TO SIMILAR SPACES.
FIRE SPRINKLER USAGE SCHEDULE
AREA TYPE
(NOTE 1 & 6)
AREA
HAZARD
SPRINKLER
TEMPERATURE
°F MANUFACTURER & MODEL NOTES
TAG NAME
(NOTE 4 & 5)
SPRINKLER
TYPE
RESPONSE
CATEGORY FINISH
EXPOSED STRUCTURE WITH NO
OBSTRUCTIONS
SEE PLANS SPR-1 UPRIGHT QUICK ROUGH
BRASS
155 VIKING VK, RELIABLE F1FR,
TYCO TY-FRB, VICTAULIC
V2704
NOTE 3
EXPOSED STRUCTURE WITH
OBSTRUCTIONS
SEE PLANS SPR-2 UPRIGHT QUICK ROUGH
BRASS
155 VIKING VK, RELIABLE F1FR,
TYCO TY-FRB, VICTAULIC
V2704
NOTE 3
IT/ ELECTRICAL ROOMS SEE PLANS SPR-3 UPRIGHT QUICK ROUGH
BRASS
200 VIKING VK, RELIABLE F1FR,
TYCO TY-FRB, VICTAULIC
V2704
NOTE 3
FINISHED AREA SEE PLANS SPR-4 RECESSED
PENDENT
QUICK WHITE 155 VIKING VK, RELIABLE G4A,
TYCO RFII, VICTAULIC
V3802
NOTE 3
Revisions: Date:
A BA' C D D1 E F
0.9
G
14 M
FF
H
7'
EXISTING FIRE
SPRINKLER RISER
EXISTING FIRE
SPRINKLER RISER
BOUNDARY INDICATES AREA OF WORK.
DEMO ALL FIRE PROTECTION PIPING,
SPRINKLERS, AND ASSOCIATED
SUPPORTS IN AREA OF WORK.
COORDINATE DEMOLITION WITH
ARCHITECTURAL PHASING PLAN.
AREA CURRENTLY SERVED BY FIRE
ALARM/SPRINKLER ZONE 19. ZONE
ISOLATION VALVES LOCATED IN
ADJACENT STAIRWELL.
AREA CURRENTLY SERVED BY FIRE
ALARM/SPRINKLER ZONE 18. ZONE
ISOLATION VALVES LOCATED IN
ADJACENT STAIRWELL.
BOUNDARY INDICATES AREA OF WORK.
DEMO ALL FIRE PROTECTION PIPING,
SPRINKLERS, AND ASSOCIATED
SUPPORTS IN AREA OF WORK.
COORDINATE DEMOLITION WITH
ARCHITECTURAL PHASING PLAN.
KEY PLAN - SECOND FLOOR
I O W A
S E
D
PROFESS IO NA
20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C R e v it L o c a l F ile s \M
E P
T .0
V
A -V
IS
N
-I o w a C it y -R e m o d e l
IR
-C a th
-E P
C
D e lla n .J
.L le w e lly n .r v t
/8
/2
:1 :1
P
M
1-F1
SECOND FLOOR DEMOLITION -
FIRE PROTECTION
REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
BUILDING 1
04/08/2022 BLAOBR APUSHA16133
N O R
HT
1/8" = 1'-0"
SECOND FLOOR DEMOLITION - FIRE PROTECTION
0.9
G
14 M
FF
H
7'
CIRCULATION
2C07A
MED PREP/ NOURISH
2W178
TOILET
2W176
NURSE STATION
2W177
CIRCULATION
2C07
EP LAB
2W151
CONTROL
2W151A
CATH LAB
2W153
CONTROL
2W153A
IR LAB
2W154
CONTROL
2W154A
HAC
2W158
CORRIDOR
2C03A
SEMI RESTRICTED CORRIDOR
2C03B
EQUIPMENT PARK
2W181
MEN'S LOCKER
2W156
WOMEN'S LOCKER
2W157
WOMEN'S SHOWER
2W157A
RECOVERY
2W175
CLEAN LINEN
2W174
CLEAN UTILITY ROOM
2W173
ULTRASOUND
2W132
RADIOLOGY/ MULTI-PURPOSE
2W131
TOILET
2W130A
RADIOLOGY/ FLUOROSCOPY
2W130
IR MANAGER OFFICE
2W129D
NURSE MANAGER OFFICE
2W129C
OPEN OFFICE CUBICLES
2W129
ELEVATOR LOBBY
2C02
EP EQUIPMENT ROOM
2W179
PRE/POST BAY
2W175E
PRE/POST BAY
2W175D
PRE/POST BAY
2W175C
ALCOVE
2W175F
PRE/POST BAY
2W175B
PRE/POST BAY
2W175A
SHAFT
2W103
SHAFT
2W104
CORRIDOR
2C06
ELEC
2W180
STAIR
2ST07
MEN'S SHOWER
2W156A
CIRCULATION
2C05
CATH EQUIPMENT ROOM
2W134
UTILITY SOILED ROOM
2W133
STERILE SUPPLY
2W155
IR EQUIPMENT ROOM
2W150
OFFICE
2W129B
ALCOVE
2W129E
ELEC
2W152
EXISTING FIRE
SPRINKLER RISER
EXISTING FIRE
SPRINKLER RISER
BOUNDARY INDICATES AREA OF WORK.
RECONFIGURE EXISTING FIRE PROTECTION SYSTEMS
TO PROVIDE FULL SPRINKLER COVERAGE PER NFPA
13 AND VA FIRE PROTECTION DESIGN MANUAL.
PROVIDE NEW PIPING, SPRINKLERS, AND SUPPORTS
TO PROVIDE FULL COVERAGE OF RENOVATED AREAS.
AREA TO BE
SERVED BY FIRE
SPRINKLER ZONE 18
AREA TO BE
SERVED BY FIRE
SPRINKLER
ZONE 19
AREA TO BE
SERVED BY FIRE
SPRINKLER
ZONE 19
KEY PLAN - SECOND FLOOR
I O W A
S E
D
PROFESS IO NA
20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C R e v it L o c a l F ile s \M
E P
T .0
V
A -V
IS
N
-I o w a C it y -R e m o d e l
IR
-C a th
-E P
C
D e lla n .J
.L le w e lly n .r v t
/8
/2
:1 :2
P
M
1-F2
SECOND FLOOR PLAN - FIRE
PROTECTION
REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
BUILDING 1
04/08/2022 BLAOBR APUSHA16133
N O R
HT
1/8" = 1'-0"
SECOND FLOOR PLAN - FIRE PROTECTION
GENERAL SHEET NOTES :
1. PIPE SIZES AND ROUTING ARE SHOWN FOR
CONTRACTOR REFERENCE ONLY.
CONTRACTOR SHALL DETERMINE FINAL
ROUTING AND PIPE SIZING BASED ON NFPA 13
AND HYDRAULIC CALCULATIONS.
2. PROVIDE LIGHT HAZARD AND ORDINARY
HAZARD SPRINKLER COVERAGE IN THE AREA
OF WORK AS INDICATED. ALL WORK SHALL BE
PER NFPA 13 AND 21 13 13. DO NOT RESTRICT
DESIGN AREA REDUCTIONS PERMITTED FOR
USING QUICK RESPONSE SPRINKLERS
THROUGHOUT BY THE REQUIRED USE OF
STANDARD RESPONSE SPRINKLERS IN THE
AREAS IDENTIFIED IN SPECIFICATION SECTION
21 13 13.
3. COORDINATE ALL REQUIRED SYSTEM
SHUTDOWNS WITH OWNER.
4. REFER TO FIRE SPRINKLER USAGE SCHEDULE
FOR TYPES OF SPRINKLERS TO BE USED.
5. THE CONTRACTOR SHALL PROVIDE
TEMPORARY FIRE PROTECTION DURING
CONSTRUCTION. PROVIDE AND INSTALL NEW
TEMPORARY UPRIGHT SPRINKLERS AND
REVISE BRANCH AND RUN-OUT PIPING TO NEW
TEMPORARY HEADS AS REQUIRED TO
PROVIDE FULL COVERAGE PER NFPA 13 AND
THE VA FIRE PROTECTION DESIGN MANUAL.
3W103B
3ST07
3W103
3W105
MECH SHAFT
3W103A
3W104
3ST06
3W101
3W09
3S01
3C01
3CW01A
3W100
3W07
DW-2
3W102A
3W102
3CO1A
3C03
MECH SHAFT
3W19A3W11
3CW02A
3C02
3W17A
3W101A
CL-1
3W17
3W17B
3W101B
3W17C
3S08D
3W19B
B1
S H A F T
S H A F T
3W103D
3W19C
SHAFT
3W223
B3
C1
C2
3W103C
3W222
B2
3W101C
A BA' C D D1 E F
0.9
G
14 M
FF
H
7'
EQUIPMENT ELECTRICAL ROOM
3W136
RECONFIGURE EXISTING SPRINKLER PIPING
AND ASSOCIATED SPRINKLERS IN INDICATED
AREA DUE TO INSTALLATION OF NEW AIR
HANDLING UNIT, DUCTWORK, PIPING AND
EQUIPMENT. REMOVE EXISTING SPRINKLER
HEADS AND PROVIDE NEW SPRINKLER HEADS
TO PROVIDE FULL COVERAGE PER NFPA 13 AND
THE VA FIRE PROTECTION DESIGN MANUAL.
THE COVERAGE CLASSIFICATION FOR THIS
SPACE IS ORDINARY GROUP 1.
KEY PLAN - THIRD FLOOR
I O W A
S E
D
PROFESS IO NA
20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C R e v it L o c a l F ile s \M
E P
T .0
V
A -V
IS
N
-I o w a C it y -R e m o d e l
IR
-C a th
-E P
C
D e lla n .J
.L le w e lly n .r v t
/8
/2
:1 :2
P
M
1-F3
THIRD FLOOR PLAN - FIRE
PROTECTION
REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
BUILDING 1
04/08/2022 BLAOBR APUSHA16133
N O R
HT
1/8" = 1'-0"
THIRD FLOOR PLAN - FIRE PROTECTION
GENERAL SHEET NOTES :
1. PIPE SIZES AND ROUTING ARE SHOWN FOR
CONTRACTOR REFERENCE ONLY.
CONTRACTOR SHALL DETERMINE FINAL
ROUTING AND PIPE SIZING BASED ON NFPA 13
AND HYDRAULIC CALCULATIONS.
2. PROVIDE LIGHT HAZARD AND ORDINARY
HAZARD SPRINKLER COVERAGE IN THE AREA
OF WORK AS INDICATED. ALL WORK SHALL BE
PER NFPA 13 AND 21 13 13.
3. COORDINATE ALL REQUIRED SYSTEM
SHUTDOWNS WITH OWNER.
4. REFER TO FIRE SPRINKLER USAGE SCHEDULE
FOR TYPES OF SPRINKLERS TO BE USED.
5. THE CONTRACTOR SHALL PROVIDE
TEMPORARY FIRE PROTECTION DURING
CONSTRUCTION.
PLUMBING SYMBOL LIST
SYMBOL: DESCRIPTION:
PIPE SERVING FIXTURE ON FLOOR ABOVE
(EXAMPLE: FD = FLOOR DRAIN)FD
PITCH PIPE IN DIRECTION
PIPE CAP
PIPE DOWN
PIPE UP OR UP/DOWN
DIRECTION OF FLOW IN PIPE
COLD WATER - POTABLECW
HOT WATER - POTABLEHW
HOT WATER CIRCULATING - POTABLEHWC
SANITARY DRAINAGESAN
STS STORM DRAINAGE (SECONDARY)
VENTV
TW TEMPERED WATER
DRAIND
G NATURAL GAS
NOT ALL SYMBOLS MAY APPLY.
SERVICE WATER - POTABLEW
PIPE CONTINUATION
ROUTE TO DRAIN
DT DRAIN TILE
NON-POTABLE COLD WATERNCW
PUMPED DISCHARGEPD
ST(1,000) STORM DRAINAGE (ROOF SQUARE FOOTAGE)
DIELECTRIC CONNECTION
UNION/FLANGE
SHUTOFF VALVE NORMALLY OPEN
SHUTOFF VALVE NORMALLY CLOSED
RD-1
6"(1000)
ROOF DRAIN PROPERTIES SYMBOL
SIZE (ROOF SQ. FT.)
BALANCING VALVE (NUMBER INDICATES GPM)
CHECK VALVE
BACKFLOW PREVENTER
SOLENOID VALVE
SAFETY/RELIEF VALVE
VACUUM BREAKER
PRESSURE GAUGE (FURNISHED WITH BALL VALVE)
PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P
TEMPERATURE SENSOR WITH WELL
THERMOMETER WITH WELL (DIAL TYPE)
THERMOMETER WITH WELL (FILLED TYPE)
REDUCER - REFERENCE SPECIFICATION
FOR CONCENTRIC/ECCENTRIC AND FOT/FOB
M
PRESSURE REDUCING VALVE (LIQUID/GAS)
PUMP
METER
P
GPM
PLUMBING ABBREVIATION KEY
CO CLEANOUT
ABOVE FINISHED FLOORAFF
BFP BACKFLOW PREVENTER
ABBR: DESCRIPTION:
AD ACCESS DOOR
CAST IRONCI
NOT IN CONTRACTNIC
FD FLOOR DRAIN
TRANSFER DUCTTD
TYPICALTYP
CO CLEANOUT
CLINICAL SINKCS
EMERGENCY EYEWASHEE
FLOOR CLEANOUTFCO
FLOOR SINKFS
HOSE BIBBHB
LAVATORYLAV
MOP BASINMB
MIXING VALVEMV
ROOF DRAINRD
SHOWERSH
SINKSK
SCRUB SINKSS
TRAP PRIMERTP
URINALUR
WATER CLOSETWC
WALL CLEANOUTWCO
WATER HEATERWH
WASHING MACHINE FIXTUREWMF
UTILITY BOXUB
EMERGENCY SHOWERES
EMERGENCY SHOWER/EYEWASHESE
ELECTRIC WATER COOLEREWC
VENT THROUGH ROOFVTR
EXISTINGE
WATER METERWM
DIALYSIS BOXDB
CAST IRONCI
DUCTILE IRONDI
SCCR SHORT CIRCUIT CURRENT RATING
UNLESS NOTED OTHERWISEUNO
NEW CONNECTIONNC
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
SIMSIM
INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
LEVEL NAME
10' - 0" HEIGHT ABOVE
PROJECT 0' - 0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N O R
HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
TAG-1 UNDERLINED TEXT INDICATES ADDITIONAL INFORMATION CAN BE FOUND
ELSEWHERE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
T101
TEMPERATURE CONTROLS CONTRACTORT.C.C.
FIRE PROTECTION CONTRACTORF.P.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
MECHANICAL CONTRACTORM.C.
ELECTRICAL CONTRACTORE.C.
CONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
TECHNOLOGY CONTRACTORT.C.
CONTRACTING OFFICER'S REPRESENTATIVEC.O.R
CONTACT PERSONS:
PROJECT MANAGER
MECHANICAL
ELECTRICAL
TECHNOLOGY
STRUCTURAL
ERIC HENDERSON
ERIC HENDERSON
ISAAC STOLL
DAMON DEEN
JOHN PAUL GOEDKEN
DESCRIPTION: PERSON:
MECHANICAL PHASING NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE
CONTROL.
1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO
CONSTRUCTION MANAGER'S/GENERAL CONTRACTOR'S/ARCHITECT'S INSTRUCTIONS FOR
MORE DETAILS AND PHASING SCHEDULES AND FOR CONCURRENT WORK. MECHANICAL,
ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT THE INTENT OF THE FINAL DESIGN. THE
MECHANICAL, ELECTRICAL, AND TECHNOLOGY DRAWINGS DO NOT DEPICT THE MEANS AND
METHODS TO MEET THE REQUIREMENTS OF THE PHASING CRITERIA.
2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC.
WITH AFFECTED ADJACENT AREAS.
3. PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE
ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS DURING ALL PHASES OF
PROJECT.
4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP
ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT
5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE
CONTROL.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO OTHERS.
6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
MOUNTED DEVICES, OTHER THAN SPRINKLERS.
8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
FINISH.
9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE
GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE
PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS
PANELS PRIOR TO BIDDING.
10. SEAL ALL FLOOR, WALL AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,
AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE
SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER
FOR OUTDOOR USE.
11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,
PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
WITHIN ROOMS.
12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.
15. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR
STARTERS, SWITCHES, AND DISCONNECTS.
16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL
EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.
17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER
NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE
CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
MECHANICAL RENOVATION NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE
CONTROL.
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND
REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS
BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.
3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE
FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD
CONDITIONS.
4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK
AND SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE
REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER AREA OF
WORK.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF
ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.
CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.
6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF
CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL
CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO
BIDDING.
7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH
NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL
EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT
DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL
SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT
REMAIN ACTIVE.
9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY
REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW
SYSTEMS ARE INSTALLED.
10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR
TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND
CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY
DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.
11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT
THAT HAS BEEN REMOVED.
1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.
CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR
FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.
2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO
THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS
RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN
THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES
PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER LISTED IS THE
BASIS OF DESIGN.
3. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL
APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES.
4. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874
5. INVERT ELEVATIONS ARE FROM EXISTING DRAWINGS AND MAY NOT BE ACCURATE. VERIFY
ALL ELEVATIONS BEFORE BEGINNING WORK.
6. VERIFY UNDERGROUND PIPE SIZES, INVERT ELEVATIONS, AND LOCATIONS PRIOR TO
BEGINNING ANY WORK.
7. REFER TO THE PLUMBING ROUGH-IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO
PLUMBING FIXTURES.
8. FOR CLARITY, NOT ALL VALVES HAVE BEEN SHOWN. PROVIDE SHUTOFF VALVES IN
DOMESTIC WATER PIPING SERVING EACH ROOM WITH FIXTURES. ANGLE STOPS SHALL NOT
BE CONSIDERED SHUTOFF VALVES.
9. EXISTING CONDITIONS ON DEMOLITION PLANS ARE PROVIDED TO INDICATE THE GENERAL
SCOPE OF ITEMS TO BE REMOVED. REFER TO SPECIFICATION SECTION 22 05 11 FOR
ADDITIONAL DEMOLITION INFORMATION.
10. P.C. SHALL CUT AND PATCH EXISTING AS REQUIRED FOR NEW OR DEMOLITION WORK
UNLESS NOTED OTHERWISE. REFER TO SPECIFICATION SECTION 22 05 11 FOR ADDITIONAL
INFORMATION.
11. ALL PIPING (ABOVE CEILING, EXPOSED RISERS, EXPOSED AT EQUIPMENT TIE-INS) SHALL BE
LABELED IN ACCORDANCE WITH ANSI/ASME 13.1 PIPE IDENTIFICATION STANDARD.
PLUMBING GENERAL NOTES:
PLUMBING SHEET INDEX
1-P0 PLUMBING COVERSHEET
1-P1 FIRST FLOOR PLAN DEMOLITION - PLUMBING
1-P2 SECOND FLOOR PLAN DEMOLITION - PLUMBING
1-P3 THIRD FLOOR PLAN DEMOLITION - PLUMBING
1-P4 FIRST FLOOR PLAN - PLUMBING
1-P5 SECOND FLOOR PLAN - PLUMBING
1-P6 THIRD FLOOR PLAN - PLUMBING
1-P7 PLUMBING DETAILS
1-P8 PLUMBING MATERIAL LISTS
GRAND TOTAL: 9
I O W A
S E
D
PROFESS IO NA
20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C R e v it L o c a l F ile s \M
E P
T .0
V
A -V
IS
N
-I o w a C it y -R e m o d e l
IR
-C a th
-E P
C
D e lla n .J
.L le w e lly n .r v t
/8
/2
:0 :1
P
M
1-P0
PLUMBING COVERSHEET REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
BUILDING 1
04/08/2022 LEOHEN HETCHA16133Revisions: Date:
0.9
G
14 M
FF
H
7'
1W101
1W101
1W104B
1ST07
1W232
1W237
1ST06 1CP06
1W233
1W234
1W231
1W235
1W214
1W213
1W212
1W211
1W210
1W208
1CP02
1W206
1W204
1W202
1W200B
1C05C
1C05A 1C05B
1W105A
1W105
1W101A
1W101B
1W103D1W103C
1W103
1W103A1W103B
1W101
1C101 B1
B2
B3
1W100
1W15 1W16 1W18 1CW03 1W20 1W21
1C02A 1CW02
C1
ELEVATOR
C2
ELEVATOR
1ST08
1W160
ELEC
1W133
EXAM
1W135
EXAM
1W137
EXAM
1W139
EXAM
1W140
PAIN PT
1W142
TOILET
1W143
STORAGE
PT
1W144
PACT PT
1C07
CIRCULATION
PATIENT
1C09
CIRCULATION
GENERAL
1W145
BREAK ROOM
STAFF
1C05
CIRCULATION
GENERAL
1W141
WOMEN'S EXAM
BARIATRIC/
1W138A
TOILET
BARIATRIC
1W136
EXAM
1W134
EXAM
1W129
AREA
WORK
1C04
CIRCULATION
PATIENT
1W132
EXAM
1W131
EXAM
1W130
EXAM
1W128
EXAM
1W151
ROOM
PACT
1W150
STORAGE
CLEAN
1W149
MEDS
1W148
TOILET
STAFF
1W147
OFFICE
1W129B
AREA
1W146
UTILITY
SOILED
1C08
CIRCULATION
STAFF
1W160
AREA
WORK
1W106
TOILET
1W107
TOILET
1W108
EXAM
1W109
EXAM
1W136
AREA
WAITING
1W36A
CLERKS
CHECK-IN
1CW03A
CIRCULATION
GENERAL
1W36C
TOILET
1W36B
TOILET
FAMILY
1W110
CLOSET
COMM.
1W112
EC&R EXAM
SPECIALTY/
1W115
MENTAL HEALTH
COLLAB.
1W116
EXAM
1W114
MENTAL HEALTH
COLLAB.
1W153
CONF.
MED. APPT./
1W152
HAC
1W138
WOMEN'S EXAM
BARIATRIC/
1C06
CIRCULATION
PATIENT
1W122
EXAM
1W123
EXAM
1W124
EXAM
1W125
EXAM
1W126
EXAM
1W117
EXAM
1W118
EXAM
1W119
EXAM
1W120
EXAM
1W121
EXAM
1 1/2"V
1 1/2"V DN
4"SAN UP
1 1/2"V UP
FD
SK-E
SK-E
SK-E
1 1/2"V
1 1/2"SAN UP
2"SAN
2"SAN UP TO OPEN
SITE FOR COMPUTER
ROOM CONDENSATE
DRAIN.
1 1/2"V UP
RELOCATED
ON SHEET 1-P4
"S
A N
CO
1 1/2"SAN
2"SAN UP TO OPEN
SITE FOR COMPUTER
ROOM CONDENSATE
DRAIN.
CO
SK-E
SK-E
SK-E SK-E SK-E
EXISTING 6" ST UP
6"ST UP
RELOCATED ON
SHEET 1-P4
8"ST UP
4"SAN UP
2"V UP
2"V UP
1 1/2"V
UP TO FD
2"V UP
2 1/2"V UP
2"V UP 6"ST UP
1 1/2"V UP
2"V UP
2 1/2"V UP
2 1/2"V UP
2"V UP
8"ST UP
4"SAN DN
3"SAN UP3"V UP
RELOCATED ON
SHEET 1-P4
2"V UP
RELOCATED ON
SHEET 1-P4
2"V UP
SK-E
FD
FD
2"V UP
RELOCATED ON
SHEET 1-P4
FD
1 1/2"V UP
6"ST
"S
T
EXISTING 8"ST DN
CO
CO
4"SAN DN
CUT HERE AND
PREPARE FOR NEW
CONNECTION.
CUT HERE AND
PREPARE FOR NEW
CONNECTION.
2 1/2"V DN
2"V DN
2"V2 1/2"V
1 1/2"V UP
2"V DN
2"V DN
1 1/2"V DN
2"V DN
2"AV UP
SK-E
L-E
SK-E
SK-E
2"V UP
2"V UP, RELOCATED TO
NEW WALL IN ROOM
2W153A ON SHEET 1-P5
1 1/2"V UP RELOCATED
TO NEW WALL IN ROOM
2W154A ON SHEET 1-P5
KEY PLAN - FIRST FLOOR
I O W A
S E
D
PROFESS IO NA
20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C R e v it L o c a l F ile s \M
E P
T .0
V
A -V
IS
N
-I o w a C it y -R e m o d e l
IR
-C a th
-E P
C
D e lla n .J
.L le w e lly n .r v t
/8
/2
:0 :1
P
M
1-P1
FIRST FLOOR PLAN DEMOLITION -
PLUMBING
REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
BUILDING 1
04/08/2022 LEOHEN HETCHA16133
N O R
HT
1/8" = 1'-0"
FIRST FLOOR PLAN DEMOLITION - PLUMBING
0.9
G
14 M
FF
H
7'
3/4"HWC
1 1/4"CW
1 1/4"HW
3/4"HW
2"CW
3/4"HWC
2 1/2"CW
1 1/2"HW
3/4"HWC
2 1/2"CW
1 1/2"HW
/4
"H W
C
FD-E
/2 "C
W
/2 "H
W
2 1/2"CW
1 1/4"HW
1 1/2"V
1 1/4"HW
2 1/2"CW
3/4"HW
2"CW
2"CW
2"CW
3/4"HW
3/4"HW
3/4"CW
1 1/2"CW
SK-E
L-E
3/4"HW
1"HW
1 1/4"HW
L-E
3/4"HW
2"CW
3"VTR
1 1/2"V
2"V
4"VTR
2 1/2"V
2"V DN
2 1/2"V
"V
2"V
1"HW
2"CW
1 1/2"V
/2 "V
2"V
"V
/2
"C W 1
/2 "H
W
2"CW
1"HW
FD-E
1 1/2"CW
1/2"HW
2"V
"V
"V
FD-E
1 1/2"CW
1/2"HW
1/2"HWC
/2
"H W
C
/2
"H W
/2
"C W
/2
"H W
C
/4
"C W
/4
"H W
3/4"HW
1 1/2"CW
2"CW
1 1/2"CW
3/4"HWC
1 1/2"HW
1/2"HWC
3/4"CW
1/2"HW
WC-E
L-E
WC-E
L-E
WC-E
L-E
FD-E
FD-E
1 1/4"HW
1 1/4"CW
3/4"HWC
4" UP TO FD
4"SAN
"S
T
4"STS
4"ST
EXISTING 8" ST DN
"S
T S
4"ST
2"V UP 2"V
/2 "V
3"SAN
RD
8"ST DN
4"SAN DN
4"SAN
4"SAN UP
1 1/2"V UP
CO
CO3"SAN
"S
A N
FD
FD
2"V DN
2"VTR
2"V DN
CO
4"SAN UP
8"ST DNRD
8"ST RD
RD
1 1/2"V UP
2 1/2"V UP
3"V, RELOCATED ON
SHEET 1-P5
FD
3"SAN
2"V UP
3"SAN DN
1 1/2"V UP
CO
6"ST
CO
6"ST DN,
RELOCATED
ON SHEET
1-P5
1 1/2"V
DN TO FD
2"V DN
6"ST
RD
6"ST DN
2"V
2"V DN
1 1/2"V DN
3"VTR
2"V DN
"V
4"V2"V
"V
2 1/2"V
2 1/2"V DN
2 1/2"V DN
2"V
1 1/2"V DN 2"V
1 1/2"V DN
2"V DN
3" V UP, CAP VENT AT
FLOOR PENETRATION.
4" SAN UP
/4
"D
/4
"D
1 1/4"HW
1 1/4"CW
1 1/4"CWSK-E
DRAIN FOR AC
OPEN DRAIN
CONDENSATE
SK-E
3/4"CW
SK-E
2"V DN
L-E
WC-E
SK-E
L-E
WC-E
SK-E
L-E
WC-E
SK-E
1/2"CW DN
SK-E
SK-E
SK-E
SK-E
4"V DN
4"SAN DN
FD
FD
L-E
WC-E
L-E
L-E
L-E
L-E
4"VTR
DEMO BACK TO THE
ACTIVE MAIN AND CAP.
FD FD
FD(EXSITING)
1 1/2"V DN
4"V
4"SAN
FD
1 1/2"V UP
2"V RELOCATED
ON SHEET 1-P5
2"V DN, RELOCATED TO
NEW WALL IN ROOM
2W153A ON SHEET 1-P5
1 1/2"V DN RELOCATED
TO NEW WALL IN ROOM
2W154A ON SHEET 1-P5
2"V DN
4"SAN DN
RELOCATED ON
SHEET 1-P5
1 1/2"V, RELOCATED ON
SHEET 1-P5
3"SAN DN, DEMO SAN
DROP AND CONNECTED
TO NEARBY 4"SAN ON
SHEET 1-P5
2"V RELOCATED
ON SHEET 1-P5
1 1/2"V DN
1 1/2"V DN
EXISTING VENT RISER
EXISTING SAN RISER
FD
CAP EXISTING
SAN PIPE
3/4"HW
2"CW
3/4"HWC
3/4"HWC
2"CW
1"HW
3/4"HWC
1 1/2"CW
1"HW 1"HW
1 1/2"CW
3/4"HWC
CONTRACTOR TO
DEMOLISH
ABANDONED
STORM PIPING
CONTRACTOR TO
DEMOLISH
ABANDONED
STORM PIPING
1 1/2"V UP
TO 3"VTR
WC-E
1 1/2"V DN
4"V UP
2"V DN
2"V DN
AC UNIT
SK-E
SK-E
MB-E
WC-E
L-E
FD
WC-E
L-E
WC-E
FD
DEMO SD PIPE BACK
TO THE MAIN.
KEY PLAN - SECOND FLOOR
I O W A
S E
D
PROFESS IO NA
20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C R e v it L o c a l F ile s \M
E P
T .0
V
A -V
IS
N
-I o w a C it y -R e m o d e l
IR
-C a th
-E P
C
D e lla n .J
.L le w e lly n .r v t
/8
/2
:0 :1
P
M
1-P2
SECOND FLOOR PLAN
DEMOLITION - PLUMBING
REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
BUILDING 1
04/08/2022 LEOHEN HETCHA16133
N O R
HT
1/8" = 1'-0"
SECOND FLOOR PLAN DEMOLITION - PLUMBING
KEYNOTES:
1. VALVE AND CAP 1 1/2"CW, 1"HW AND 3/4" HWC
FOR FUTURE CONNECTION.
2. DEMOLISH EXISTING FIXTURE AND
ASSOCIATED PIPING.
3W101
3W09
3S01
3C01
3CW01A
3W100
3W07
DW-2
3W102A
3W102
3CO1A
3C03
MECH SHAFT
3W19A3W11
3CW02A
3C02
3W17A
3W101A
CL-1
3W17
3W17B
3W101B
3W17C
3S08D
3W19B
B1
S H A F T
S H A F T
3W103D
3W19C
SHAFT
3W223
B3
C1
C2
3W103C
3W222
B2
3W101C
A BA' C D D1 E F
0.9
G
14 M
FF
H
7'
EQUIPMENT ELECTRICAL ROOM
3W136
2"SAN UP
1 1/2"V UP
2"SAN UP
CO
3"SAN
"S
A N
3"SAN
CO
2"SAN UP
4"SAN
"S
A N
4"SAN
/2 "V
1 1/2"V DN
"S
A N
1 1/2"SAN UP
2"V DN
5"ST DN
4"ST
4"
ST
"S
T
1 1/2"V DN
1 1/2"V
4"SAN DN
4"SAN DN
2"V UP
8"ST DN
4"ST UP
4"ST DN
4"SAN
4"SAN UP
2"V UP
"S
A N
1 1/2"SAN UP
1 1/2"SAN
1 1/2"SAN UP
CO
"S
A N
2"SAN UP
3"V DN
FD-E
1 1/2"V DN
1 1/2"V UP
4"SAN DN
CO
2"SAN DN1 1/2"SAN UP
4"ST UP4"ST UP
CO
4"ST
8"ST DN
"S
T
4"ST UP
CO
4"ST UP
6"ST 6"ST
3"ST UP
CO
3"ST UP
4"STS UP CO
"S
T S
4"STS
4"STS
4"STS UP
TO RD
2"SAN UP
"S
A N
3"V DN
2"SAN UP
CO
4"SAN
8" DOWNSPOUT NOZZEL
4"ST UP
4"STS UP
4"STS
4"STS
4"ST UP
4"STS UP
4"V DN
8"STS
"S
T
2"V UP
1 1/2" SAN UP
4" SAN UP
4"STS
4"ST UP
4"STS UP
4"ST UP
TO RD
4"ST UP
4"STS UP
4"ST UP
4"STS UP
"S
T
4"ST UP
4"STS UP
6"ST DN
4"ST
4"STS
1"CW
3"VTR
/4 "H
W "H
W C
"C
W
CW, HW & HWC UP
1 1/2"V DN
TO FD
CW, HW & HWC UP
3"SAN DN
4"V UP/DN
4"SAN UP/DN
1"D
1"D
1"D
1 1/2"SAN DN
CO
4"STS
"S
T
S4"SAN
1 1/2"SAN
"S
A N
WH-E
WH-E
CO
CO
1 1/2"V UP
FROM EX. FD
1"D DN TO
EX. FD
4" SAN DN
4"ST UP
4"ST DN
6"ST
4"V DN
3"V
4"V
RD
3"VTR
DEMO VENT PIPE
BACK TO THE
MAIN.
FD(EXISTING)
FD(EXISTING)
FD(EXISTING)
FD(EXISTING)
FD(EXISTING)
FD(EXISTING)
FD(EXISTING)
FD(EXISTING)
FD(EXISTING)
FD(EXISTING)
2 1/2"V DN
2 1/2"V UP
KEY PLAN - THIRD FLOOR
I O W A
S E
D
PROFESS IO NA
20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C R e v it L o c a l F ile s \M
E P
T .0
V
A -V
IS
N
-I o w a C it y -R e m o d e l
IR
-C a th
-E P
C
D e lla n .J
.L le w e lly n .r v t
/8
/2
:0 :2
P
M
1-P3
THIRD FLOOR PLAN DEMOLITION -
PLUMBING
REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
BUILDING 1
04/08/2022 LEOHEN HETCHA16133
N O R
HT
1/8" = 1'-0"
THIRD FLOOR PLAN DEMOLITION - PLUMBING
0.9
G
14 M
FF
H
7'
1W101
1W101
1W104B
1ST07
1W232
1W237
1ST06 1CP06
1W233
1W234
1W231
1W235
1W214
1W213
1W212
1W211
1W210
1W208
1CP02
1W206
1W204
1W202
1W200B
1C05C
1C05A 1C05B
1W105A
1W105
1W101A
1W101B
1W103D1W103C
1W103
1W103A1W103B
1W101
1C101 B1
B2
B3
1W100
1W15 1W16 1W18 1CW03 1W20 1W21
1C02A 1CW02
C1
ELEVATOR
C2
ELEVATOR
1ST08
1W160
ELEC
1W133
EXAM
1W135
EXAM
1W137
EXAM
1W139
EXAM
1W140
PAIN PT
1W142
TOILET
1W143
STORAGE
PT
1W144
PACT PT
1C07
CIRCULATION
PATIENT
1C09
CIRCULATION
GENERAL
1W145
BREAK ROOM
STAFF
1C05
CIRCULATION
GENERAL
1W141
WOMEN'S EXAM
BARIATRIC/
1W138A
TOILET
BARIATRIC
1W136
EXAM
1W134
EXAM
1W129
AREA
WORK
1C04
CIRCULATION
PATIENT
1W132
EXAM
1W131
EXAM
1W130
EXAM
1W128
EXAM
1W151
ROOM
PACT
1W150
STORAGE
CLEAN
1W149
MEDS
1W148
TOILET
STAFF
1W147
OFFICE
1W129B
AREA
1W146
UTILITY
SOILED
1C08
CIRCULATION
STAFF
1W160
AREA
WORK
1W106
TOILET
1W107
TOILET
1W108
EXAM
1W109
EXAM
1W136
AREA
WAITING
1W36A
CLERKS
CHECK-IN
1CW03A
CIRCULATION
GENERAL
1W36C
TOILET
1W36B
TOILET
FAMILY
1W110
CLOSET
COMM.
1W112
EC&R EXAM
SPECIALTY/
1W115
MENTAL HEALTH
COLLAB.
1W116
EXAM
1W114
MENTAL HEALTH
COLLAB.
1W153
CONF.
MED. APPT./
1W152
HAC
1W138
WOMEN'S EXAM
BARIATRIC/
1C06
CIRCULATION
PATIENT
1W122
EXAM
1W123
EXAM
1W124
EXAM
1W125
EXAM
1W126
EXAM
1W117
EXAM
1W118
EXAM
1W119
EXAM
1W120
EXAM
1W121
EXAM
LAV
SK
SK
SK
SK
WC
FD
4"SAN
2"SAN
FD
WC
LAV
SH
SH
WC
LAV
FD
SK
4"SAN
4"SAN DN
NC
1 1/2"V UP
1 1/2"V UP
4"SAN
4"SAN DN
SK
SS
SS
3"SAN
3"SAN
FCO CO
CO
8"ST UP
4"SAN UP
2"V UP
2"V UP
1 1/2"V
UP TO FD
2"V UP
2 1/2"V UP
2"V UP 6"ST UP
1 1/2"V UP
2"V UP
2 1/2"V UP
2 1/2"V UP
SK
2"V UP
2"V UP, RELOCATED
TO NEW WALL.
FD
8"ST UP
NC
NC
3V UP
RELOCATED TO
THIS LOCATION.
NC
SK
2"V UP
RELOCATED TO
THIS LOCATION.
2"V UP
RELOCATED TO
THIS LOCATION.
1 1/2"V UP
RELOCATED TO
THIS LOCATION.
4"SAN UP
1 1/2"V UP
RELOCATED TO
THIS LOCATION.
6"ST UP
RELOCATED TO
THIS LOCATION.
4"SAN UP
NC
SK
LAV
WC
FCO
FD
4"SAN
2"SAN
1 1/2"V UP
NC
1 1/2"V
NC
EXISTING 8" ST UP
CO
CO
CO
NC
4"SAN
"S
A N
NC
"S
A N
LAV
1 1/2"V UP
1 1/2"V UP
MB
1 1/2"V UP
2"D FROM NEPTUNE
DOCKING STATION
4"SAN
CO
3"SAN
4"SAN
4"SAN
4"SAN
2"V UP
2 1/2"V DN
2"V DN
1 1/2"V DN
2"V DN
1 1/2"V DN
2"V DN
2"V UP
CO
2"V UP
1 1/2"V1 1/2"V
UB
KEY PLAN - FIRST FLOOR
I O W A
S E
D
PROFESS IO NA
20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C R e v it L o c a l F ile s \M
E P
T .0
V
A -V
IS
N
-I o w a C it y -R e m o d e l
IR
-C a th
-E P
C
D e lla n .J
.L le w e lly n .r v t
/8
/2
:0 :2
P
M
1-P4
FIRST FLOOR PLAN - PLUMBING REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
BUILDING 1
04/08/2022 LEOHEN HETCHA16133
N O R
HT
1/8" = 1'-0"
FIRST FLOOR PLAN - PLUMBING
0.9
G
14 M
FF
H
7'
CIRCULATION
2C07A
MED PREP/ NOURISH
2W178
TOILET
2W176
NURSE STATION
2W177
CIRCULATION
2C07
EP LAB
2W151
CONTROL
2W151A
CATH LAB
2W153
CONTROL
2W153A
IR LAB
2W154
CONTROL
2W154A
HAC
2W158
CORRIDOR
2C03A
SEMI RESTRICTED CORRIDOR
2C03B
EQUIPMENT PARK
2W181
MEN'S LOCKER
2W156
WOMEN'S LOCKER
2W157
WOMEN'S SHOWER
2W157A
RECOVERY
2W175
CLEAN LINEN
2W174
CLEAN UTILITY ROOM
2W173
ULTRASOUND
2W132
RADIOLOGY/ MULTI-PURPOSE
2W131
TOILET
2W130A
RADIOLOGY/ FLUOROSCOPY
2W130
IR MANAGER OFFICE
2W129D
NURSE MANAGER OFFICE
2W129C
OPEN OFFICE CUBICLES
2W129
ELEVATOR LOBBY
2C02
EP EQUIPMENT ROOM
2W179
PRE/POST BAY
2W175E
PRE/POST BAY
2W175D
PRE/POST BAY
2W175C
ALCOVE
2W175F
PRE/POST BAY
2W175B
PRE/POST BAY
2W175A
SHAFT
2W103
SHAFT
2W104
CORRIDOR
2C06
ELEC
2W180
STAIR
2ST07
MEN'S SHOWER
2W156A
CIRCULATION
2C05
CATH EQUIPMENT ROOM
2W134
UTILITY SOILED ROOM
2W133
STERILE SUPPLY
2W155
IR EQUIPMENT ROOM
2W150
OFFICE
2W129B
ALCOVE
2W129E
ELEC
2W152
3/4"HWC
1 1/4"CW
1 1/4"HW
3/4"HW
2"CW
3/4"HWC
2 1/2"CW
1 1/2"HW
3/4"HWC
2 1/2"CW
1 1/2"HW
/4
"H W
C
/2 "C
W
/2 "H
W
2 1/2"CW
1 1/4"HW
1 1/2"V
1 1/4"HW
2 1/2"CW
3/4"HW
2"CW
1 1/2"CW
2 1/2"V
"V
1"HW
2"CW
1 1/2"V
/2 "V
2"V 2"V
/2
"C W 1
/2 "H
W
2"CW
1"HW
1 1/2"CW
1/2"HW
2"V
"V
"V
1 1/2"CW
1/2"HW
/2
"H W
C
/2
"H W
/2
"C W
/2
"H W
C
/4
"C W
/4
"H W
3/4"HW
1 1/2"CW
2"CW
1 1/2"CW
1 1/2"HW
1/2"HWC
3/4"CW
1/2"HW
WC-E
L-E
WC-E
L-E
WC-E
L-E
1 1/4"HW
1 1/4"CW
3/4"HWC
EXISTING 8" ST DN
2"V UP
FD
3"SAN
RD
8"ST DN
4"SAN DN
4"SAN
4"SAN UP
1 1/2"V UP
CO
CO3"SAN
"S
A N
FD
FD
2"V DN
2"VTR
2"V DN
CO
4"V UP
4"SAN UP
8"ST DNRD
RD
3"SAN
6"ST
1 1/2"V
DN TO FD
2"V DN
6"ST
RD
6"ST DN
2"V
2"V DN
1 1/2"V DN
3"VTR
2"V DN
"V
4"V2"V
"V
2 1/2"V
2 1/2"V DN
2 1/2"V DN
2"V
1 1/2"V DN 2"V
1 1/2"V DN
2"V DN
L-1
P-103
L-1
P-103
P-701
P-408
P-103
P-519
(SINGLE)
P-519
(DOUBLE)1 1/2"V UP
FD
1"HW
2"CW
NC
NC
FD
FD
1 1/2"V UP
SK-E
2"V UP
4" SAN UP
L-E
WC-E
2"V DN
NC
3/4"HW
3"SAN UP
L-E
WC-E
4"V DN
4"V
4"SAN
SK-E
FD
1 1/2"V UP
L-E
L-E
L-E
L-E
P-408
P-114
P-528
P-528
WHA-1
WHA-1
2"CW
1"HW
1 1/2"V DN
FCO-1
NC
3"V DN
2"V
"V
2"V
2"V
3"V UP
1 1/2"V DN
2"V 2"V
2"V UP
3"V UP
FD
1 1/2"V UP
WHA-1
3/4"HW
1 1/2"CW
/4
"H W
C
3/4"HWC
NC
1 1/2"CW
3/4"CW
1 1/2"CW
1 1/4"HW
2"CW
2"V DN, RELOCATED
TO NEW WALL.
NC
2"V DN
RELOCATED TO
NEW WALL.
2"V DN
RELOCATED TO
NEW WALL.
1 1/2"V DN,
RELOCATED TO
NEW WALL.
2"V DN
3"V
3"V
4"V DN
4"SAN DN
1 1/2"V DN
CO
CO
6"ST DN,
RELOCATED
TO THE CHASE
NC
"S
A N
4"SAN DN
P-502
WHA-1
FCO-1
2"V
2"V
2"V
NC
1 1/2"V DN
4"SAN UP
4"SAN
NC
6"ST
SK-1
P-528
EE-1
EE-1
P-408
3/4"HW
2"CW
3/4"HW
2"V
2 1/2"V
3/4"CW
FD-C
FD-C
FD-C
FD-C
P-701
FD-C
FD-C
EXISTING VENT RISER
EXISTING SAN RISER
NC
8"ST
3/4"HW
2"CW
3/4"HWC
3/4"HWC
2"CW
1"HW
3/4"HWC
1 1/2"CW
1"HW
1"HW
1 1/2"CW
3/4"HWC
SK-1
SK-1
EE-2
1"HW
1"CW
3/4"HW
2"V
2"V
NC
3/4"HWC
1 1/2"CW
1"HW
1"HW
1 1/2"CW
1 1/4"V
3/4"HW
1 1/2"CW
0.5
0.5
0.5
0.5
3/4"HWC
3/4"HW
3/4"CW
1"HW
1"HW
1"CW
0.5
0.5
SK-1
SK-1
1 1/2"CW
3"V
ROUTE TO 3"V EXISTING
VENT ABOVE THE STAFF
TOILET. REFER TO VA
PROJECT NO. 636A8-18-002
FOR EXACT LOCATION.
SK-E
2"V DN
3/4"HWC
2 1/2"V UP
2"V UP
FD(EXISTING)
FD(EXISTING)
FD(EXISTING)
FD(EXISTING)
FD(EXISTING)
FD(EXISTING)
3"V
F-1
3/4"HW
BFP-2
CAP EXISTING
SAN PIPE
UB-1
3/4"D
/4
"D
3/4"D
3/4"D DN TO
MOP BASIN
CRU-2W150
CRU-2W134
CRU-2W179
KEY PLAN - SECOND FLOOR
I O W A
S E
D
PROFESS IO NA
20825
L
IC
E N
L E
N G
I N E
E R
ERIC J.
HENDERSON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com
C R e v it L o c a l F ile s \M
E P
T .0
V
A -V
IS
N
-I o w a C it y -R e m o d e l
IR
-C a th
-E P
C
D e lla n .J
.L le w e lly n .r v t
/8
/2
:0 :3
P
M
1-P5
SECOND FLOOR PLAN - PLUMBING REMODEL 2W IR-CATH-EP
IOWA CITY VAHCS
636A8-21-001
BUILDIN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .