Attachment G - 2W for IR-CATH-EP CDs Drawings 3 of 5.pdf

PDF 10 MB Posted

Attached to
Z1DA--636A8-21-001 CON Remodel 2W for IR/CATH/EP 36C263-22-AP-3804
Solicitation number
36C26323R0002
Issued by

About this file

This document provides details for a federal contract solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23. Solicitation number 36C26323R0002 seeks proposals for a remodel of the 2nd floor for interventional radiology, cardiac catheterization, and electrophysiology services at facility 636A8. The solicitation type is for a firm-fixed price contract with an estimated award date of April 2022. Proposals are due by February 2022 and the work includes construction drawings as an attachment in the related file.

View the file

Other files

File Type Posted
Attachment N - Questions Request Form-all questions combined_Response_12132022.doc DOC document
Attachment S- 2W IR CATH EP_Luminos Agile Max_Site Specific.pdf PDF
Attachment P - 2W IR CATH EP_Draeger-Boom Install_Site Specific.pdf PDF
Attachment O - 2W IR CATH EP_Cath Lab_Site Specific.pdf PDF
36C26323R0002 0001.docx DOCX document
Attachment U - Shielding Documents.pdf PDF
636A8-21-001 Pre-Proposal Conference Sign-in List 11222022.pdf PDF
Evaluation Factors -Amendment 0001.docx DOCX document
Attachment R- 2W IR CATH EP_IR Lab_Site Specific.pdf PDF
Attachment J.1 636A8-21-001 Sole Source List.pdf PDF
Attachment T - 2W IR CATH EP_Multi-Use Rad Room_Site Specific.pdf PDF
Attachment J - Brand Name Only JAs_Redacted.pdf PDF
Attachment H - 2W for IR-CATH-EP CDs Drawings 4 of 5.pdf PDF
Attachment F - 2W for IR-CATH-EP CDs Drawings 2 of 5.pdf PDF
Attachment C - 2W IR CATH EP_CDs_ SPECS Vol1.pdf PDF
Attachment K - Wage Determination IA20210068 dated 09-02-2022.pdf PDF
Attachment I - 2W for IR-CATH-EP CDs Drawings 5 of 5.pdf PDF
36C26323R0002.docx DOCX document
Attachment A - SOW 636A8-21-001 final.pdf PDF
Attachment M - Past Performance Questionnaire - 3 Pages.docx DOCX document
Attachment B - Price Schedule Breakdown Sheet - 1 page.xlsx XLSX spreadsheet
Attachment N - Questions Request Form.doc DOC document
Attachment L - NARA Contract Language 2021.pdf PDF
Attachment D - 2W IR CATH EP_CDs_ SPECS Vol2.pdf PDF
Attachment E - 2W for IR-CATH-EP CDs Drawings 1 of 5.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE PROTECTION SYMBOL LIST

SYMBOL: DESCRIPTION:

FIRE PROTECTIONFP

ANGLE VALVE

BUTTERFLY VALVE WITH MONITOR SWITCH

OS&Y GATE VALVE

OS&Y GATE VALVE WITH MONITOR SWITCH

PRESSURE SWITCH

P

NO HATCH LIGHT HAZARD

ORDINARY GROUP 1

ORDINARY GROUP 2

EXTRA GROUP 1

EXTRA GROUP 2

INSPECTOR TEST AND DRAIN VALVE

MONITOR SWITCH

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

SHUTOFF VALVE NORMALLY OPEN

DEMOLITION

DRAINDFP

NOT ALL SYMBOLS MAY APPLY.

AUTOMATIC DRAIN VALVE

UNION/FLANGE

DIRECTION OF FLOW IN PIPE

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

CHECK VALVE

FLOW SWITCH

F

ROUTE TO DRAIN

AREA BOUNDARY

FIRE PROTECTION ABBREVIATION KEY

AD ACCESS DOOR

N.C. NORMALLY CLOSED

ABOVE FINISHED FLOORAFF

NOT IN CONTRACTNIC

NORMALLY OPENN.O.

ABBR: DESCRIPTION:

TYPICALTYP

UNLESS NOTED OTHERWISEUNO

SHORT CIRCUIT CURRENT RATINGSCCR

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

SIMSIM

INDICATES SIMILAR DETAIL REFERENCED

IN MULTIPLE LOCATIONS

LEVEL NAME

10' - 0" HEIGHT ABOVE

PROJECT 0' - 0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N O R

HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

LINE TYPE AND TAG KEY:

NEW WORK BY THIS CONTRACTOR (WIDE LINE)

NEW

EXISTING TO BE REMOVED (SHORT DASHED PATTERN)

NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)

EXISTING

EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)

EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

HALFTONING DOES NOT MODIFY SCOPE.

'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING

TAG-1 UNDERLINED TEXT INDICATES ADDITIONAL INFORMATION CAN BE FOUND

ELSEWHERE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST

INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL

T101

CONTACT PERSONS:

PROJECT MANAGER

MECHANICAL

ELECTRICAL

TECHNOLOGY

STRUCTURAL

ERIC HENDERSON

ERIC HENDERSON

ISAAC STOLL

DAMON DEEN

JOHN PAUL GOEDKEN

DESCRIPTION: PERSON:

TEMPERATURE CONTROLS CONTRACTORT.C.C.

FIRE PROTECTION CONTRACTORF.P.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

MECHANICAL CONTRACTORM.C.

ELECTRICAL CONTRACTORE.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

TECHNOLOGY CONTRACTORT.C.

CONTRACTING OFFICER'S REPRESENTATIVEC.O.R

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE

PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS

PANELS PRIOR TO BIDDING.

10. SEAL ALL FLOOR, WALL AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,

AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE

SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER

FOR OUTDOOR USE.

11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,

PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE

TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS

WITHIN ROOMS.

12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED

OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL

RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.

13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.

15. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR

STARTERS, SWITCHES, AND DISCONNECTS.

16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL

EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.

17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER

NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

MECHANICAL RENOVATION NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD

SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND

REPORT ANY CONFLICTS BEFORE PROCEEDING.

2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS

BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.

3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE

FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD

CONDITIONS.

4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK

AND SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE

REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER AREA OF

WORK.

5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF

ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.

CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.

6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF

CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL

CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO

BIDDING.

7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH

NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL

EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT

DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL

SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.

8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING

CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT

REMAIN ACTIVE.

9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY

REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW

SYSTEMS ARE INSTALLED.

10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR

TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND

CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY

DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.

11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT

THAT HAS BEEN REMOVED.

MECHANICAL PHASING NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO

CONSTRUCTION MANAGER'S/GENERAL CONTRACTOR'S/ARCHITECT'S INSTRUCTIONS FOR

MORE DETAILS AND PHASING SCHEDULES AND FOR CONCURRENT WORK. MECHANICAL,

ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT THE INTENT OF THE FINAL DESIGN. THE

MECHANICAL, ELECTRICAL, AND TECHNOLOGY DRAWINGS DO NOT DEPICT THE MEANS AND

METHODS TO MEET THE REQUIREMENTS OF THE PHASING CRITERIA.

2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC.

WITH AFFECTED ADJACENT AREAS.

3. PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE

ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS DURING ALL PHASES OF

PROJECT.

4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP

ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT

5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.

TEST DATE:

LOCATION:

SUCTION PRESSURE:

DISCHARGE PRESSURE:

TOTAL FLOW:

FIRE FLOW TEST DATA

07/11/2020

AT EXISTING FIRE PUMP

71 PSI

136 PSI

0 GPM AT 160 PSI, 755 GPM AT 136 PSI, 1133 GPM AT 110 PSI

1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE

CONTRACTOR. CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS

REQUIRED FOR FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.

2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID

TO THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS

RESPONSIBLE FOR COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND

IN THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL

TAKES PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER IS THE

BASIS OF DESIGN.

3. CENTER SPRINKLERS IN CEILING TILES IN BOTH DIRECTIONS IN ALL AREAS. IN AREAS

WITH 2’X4’ CEILING TILES CENTERING USING A 2’X2’ CEILING PATTERN IS ACCEPTABLE.

SPRINKLER HEADS SHALL BE ALIGNED WITH OTHER SPRINKLER HEADS, LIGHTING,

DIFFUSERS, AND ANY OTHER FEATURES IN THE CEILING.

4. NEW SPRINKLERS SHALL BE QUICK RESPONSE TYPE, UNLESS OTHERWISE NOTED.

CONTRACTOR SHALL NOT MIX STANDARD RESPONSE SPRINKLERS WITH QUICK

RESPONSE SPRINKLERS IN UNPARTITIONED SPACES.

5. PROVIDE COVERAGE ABOVE AND BELOW ALL DUCTWORK GREATER THAN 48" WIDE.

6. PROVIDE COVERAGE ABOVE (IF APPLICABLE) AND BELOW FLOATING CEILINGS, REFER

TO ARCHITECTURAL PLANS.

7. FIRE PROTECTION PIPE ROUTING IS SHOWN FOR GENERAL LAYOUT. DETERMINE EXACT

NUMBER OF SPRINKLERS, PIPE SIZING, AND PIPE ROUTING.

8. THE FIRE PROTECTION SYSTEM SHALL BE DESIGNED TO MEET OWNER'S INSURANCE

COMPANY STANDARDS WHERE APPLICABLE. THE MORE STRINGENT OF THE OWNER'S

INSURANCE UNDERWRITER'S DESIGN CRITERIA AND THE NFPA STANDARDS SHALL BE

USED.

9. ALL BUILDING AREA SHALL BE FULLY SPRINKLERED INCLUDING CANOPIES, WALKWAYS,

OVERHANGS, SOFFITS, AND BUILDING PROJECTIONS. ALL ACCESSIBLE COMBUSTIBLE

CONCEALED SPACES SHALL BE FULLY PROTECTED BY THE SPRINKLER SYSTEM.

10. EACH ASSEMBLY SHALL INCLUDE CHECK VALVE BUTTERFLY CONTROL VALVE

INDICATING "OPEN" OR "CLOSED" POSITION, TEST INSPECTION VALVE, FLOW SWITCH

AND PRESSURE GAUGES.

11. PROVIDE RISER ROOM IDENTIFICATION SIGNAGE OUTSIDE THE FIRE RISER ROOM.

COORDINATE EXACT SIGN LANGUAGE WITH AHJ.

12. WHERE FEASIBLE INSTALL PIPES HIGH AS POSSIBLE TO AVOID CONFLICT WITH OTHER

DISCIPLINES, AND TO REDUCE THE AMOUNT OF REQUIRED ROD STIFFENER SUPPORTS.

13. INSTALL SYSTEM DRAINS AT LOW POCKET AREAS CONTAINING FIVE GALLONS OF

WATER OR MORE, PROVIDE WITH ISOLATION VALVE AND THREADED HOSE

CONNECTION.

14. MAIN PIPING PASSING BELOW SKYLIGHTS OR CLERESTORIES ARE NOT PERMITTED.

15. FOLLOW STRUCTURAL DETAILS WHEN PENETRATING OR PASSING THROUGH

STRUCTURAL ELEMENTS. ALTERNATE DESIGNS WILL NEED TO BE APPROVED THROUGH

THE STRUCTURAL ENGINEER.

16. PROVIDE INTERMEDIATE TEMPERATURE SPRINKLER HEADS WHERE REQUIRED BY NFPA

13 UNLESS OTHERWISE NOTED.

17. FINAL HEAD LOCATION, TYPE AND FINISH SHALL BE REVIEWED AND APPROVED BY THE

ARCHITECT.

18. A GRAPHIC ANNUNCIATOR PANEL SHALL BE PROVIDED TO INCLUDE AREAS BEING

PROVIDED WITH A PRE-ACTION OR CLEAN AGENT SYSTEM WHICH HAVE CONCEALED

AREAS.

19. EXACT LOCATION OF THE ALL PANELS SHALL BE VERIFIED ON SITE AND COORDINATED

WITH THE ELECTRICAL CONTRACTOR.

20. PAINT ALL EXPOSED PIPING TO MATCH BACKGROUND OR AS DIRECTED BY THE

ARCHITECT.

21. THE OWNER MUST BE NOTIFIED PRIOR TO EACH AND EVERY DRAINING OR RECHARGING

OF THE SPRINKLER SYSTEM.

22. THE CONTRACTOR SHALL PREPARE A COORDINATED SET OF SHOP DRAWINGS AND

SHALL OBTAIN APPROVAL FROM THE AUTHORITIES HAVING JURISDICTION AND THE

LOCAL FIRE DEPARTMENT PRIOR TO ANY INSTALLATION.

23. WALLS WHERE PIPE PASSES THROUGH HOLES IN PLATFORMS, FOUNDATIONS, WALL,

OR FLOORS, THE HOLES SHALL BE SIZED SUCH THAT DIAMETER OF THE HOLE IS

NOMINALLY 2 INCHES LARGER THAN THE PIPE FOR 1” NOMINAL TO 3 ½” NOMINAL AND 4”

LARGER THAN THE PIPE FOR PIPE 4” AND LARGER.

24. DRAWING SHOW LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT,

ETC. AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

25. VERIFY ALL DIMENSIONS AND CLEARANCES FROM ARCHITECTURAL, STRUCTURAL,

SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR PHYSICALLY AT SITE. REVIEW

ALL DRAWINGS. INCLUDING THOSE OF OTHER TRADES.

FIRE PROTECTION GENERAL NOTES:

FIRE PROTECTION SHEET INDEX

1-F0 FIRE PROTECTION COVERSHEET

1-F1 SECOND FLOOR DEMOLITION - FIRE PROTECTION

1-F2 SECOND FLOOR PLAN - FIRE PROTECTION

1-F3 THIRD FLOOR PLAN - FIRE PROTECTION

GRAND TOTAL: 4

I O W A

S E

D

PROFESS IO NA

20825

L

IC

E N

L E

N G

I N E

E R

ERIC J.

HENDERSON

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com

C R e v it L o c a l F ile s \M

E P

T .0

V

A -V

IS

N

-I o w a C it y -R e m o d e l

IR

-C a th

-E P

C

D e lla n .J

.L le w e lly n .r v t

/8

/2

:1 :1

P

M

1-F0

FIRE PROTECTION COVERSHEET REMODEL 2W IR-CATH-EP

IOWA CITY VAHCS

636A8-21-001

BUILDING 1

04/08/2022 BLAOBR APUSHA16133

NOTES:

1. SEE FLOOR PLANS FOR ZONING REQUIREMENTS.

2. SPRINKLERS SHALL HAVE COLOR CODED BULB THERMAL ELEMENT.

3. ALL SPRINKLERS SHALL BE UL AND FM LISTED.

4. CONTRACTOR TO VERIFY SPRINKLER REQUIREMENTS BASED ON ACTUAL INSTALLATION, USAGE, ARCHITECTURAL CEILING PLAN AND NFPA 13 REQUIREMENTS.

5. TAG NAME IS PRIMARILY FOR IDENTIFIYING SPRINKLERS IN SUBMITTALS. IT MAY OR MAY NOT BE FOUND ELSEWHERE ON THE DRAWINGS. CONTRACTOR TO SUBMIT ALL

SPRINKLER TYPES TO BE USED.

6. AREAS ARE GENERAL IN NATURE. CONTRACTOR TO MATCH UNSCHEDULED AREAS TO SIMILAR SPACES.

FIRE SPRINKLER USAGE SCHEDULE

AREA TYPE

(NOTE 1 & 6)

AREA

HAZARD

SPRINKLER

TEMPERATURE

°F MANUFACTURER & MODEL NOTES

TAG NAME

(NOTE 4 & 5)

SPRINKLER

TYPE

RESPONSE

CATEGORY FINISH

EXPOSED STRUCTURE WITH NO

OBSTRUCTIONS

SEE PLANS SPR-1 UPRIGHT QUICK ROUGH

BRASS

155 VIKING VK, RELIABLE F1FR,

TYCO TY-FRB, VICTAULIC

V2704

NOTE 3

EXPOSED STRUCTURE WITH

OBSTRUCTIONS

SEE PLANS SPR-2 UPRIGHT QUICK ROUGH

BRASS

155 VIKING VK, RELIABLE F1FR,

TYCO TY-FRB, VICTAULIC

V2704

NOTE 3

IT/ ELECTRICAL ROOMS SEE PLANS SPR-3 UPRIGHT QUICK ROUGH

BRASS

200 VIKING VK, RELIABLE F1FR,

TYCO TY-FRB, VICTAULIC

V2704

NOTE 3

FINISHED AREA SEE PLANS SPR-4 RECESSED

PENDENT

QUICK WHITE 155 VIKING VK, RELIABLE G4A,

TYCO RFII, VICTAULIC

V3802

NOTE 3

Revisions: Date:

A BA' C D D1 E F

0.9

G

14 M

FF

H

7'

EXISTING FIRE

SPRINKLER RISER

EXISTING FIRE

SPRINKLER RISER

BOUNDARY INDICATES AREA OF WORK.

DEMO ALL FIRE PROTECTION PIPING,

SPRINKLERS, AND ASSOCIATED

SUPPORTS IN AREA OF WORK.

COORDINATE DEMOLITION WITH

ARCHITECTURAL PHASING PLAN.

AREA CURRENTLY SERVED BY FIRE

ALARM/SPRINKLER ZONE 19. ZONE

ISOLATION VALVES LOCATED IN

ADJACENT STAIRWELL.

AREA CURRENTLY SERVED BY FIRE

ALARM/SPRINKLER ZONE 18. ZONE

ISOLATION VALVES LOCATED IN

ADJACENT STAIRWELL.

BOUNDARY INDICATES AREA OF WORK.

DEMO ALL FIRE PROTECTION PIPING,

SPRINKLERS, AND ASSOCIATED

SUPPORTS IN AREA OF WORK.

COORDINATE DEMOLITION WITH

ARCHITECTURAL PHASING PLAN.

KEY PLAN - SECOND FLOOR

I O W A

S E

D

PROFESS IO NA

20825

L

IC

E N

L E

N G

I N E

E R

ERIC J.

HENDERSON

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com

C R e v it L o c a l F ile s \M

E P

T .0

V

A -V

IS

N

-I o w a C it y -R e m o d e l

IR

-C a th

-E P

C

D e lla n .J

.L le w e lly n .r v t

/8

/2

:1 :1

P

M

1-F1

SECOND FLOOR DEMOLITION -

FIRE PROTECTION

REMODEL 2W IR-CATH-EP

IOWA CITY VAHCS

636A8-21-001

BUILDING 1

04/08/2022 BLAOBR APUSHA16133

N O R

HT

1/8" = 1'-0"

SECOND FLOOR DEMOLITION - FIRE PROTECTION

0.9

G

14 M

FF

H

7'

CIRCULATION

2C07A

MED PREP/ NOURISH

2W178

TOILET

2W176

NURSE STATION

2W177

CIRCULATION

2C07

EP LAB

2W151

CONTROL

2W151A

CATH LAB

2W153

CONTROL

2W153A

IR LAB

2W154

CONTROL

2W154A

HAC

2W158

CORRIDOR

2C03A

SEMI RESTRICTED CORRIDOR

2C03B

EQUIPMENT PARK

2W181

MEN'S LOCKER

2W156

WOMEN'S LOCKER

2W157

WOMEN'S SHOWER

2W157A

RECOVERY

2W175

CLEAN LINEN

2W174

CLEAN UTILITY ROOM

2W173

ULTRASOUND

2W132

RADIOLOGY/ MULTI-PURPOSE

2W131

TOILET

2W130A

RADIOLOGY/ FLUOROSCOPY

2W130

IR MANAGER OFFICE

2W129D

NURSE MANAGER OFFICE

2W129C

OPEN OFFICE CUBICLES

2W129

ELEVATOR LOBBY

2C02

EP EQUIPMENT ROOM

2W179

PRE/POST BAY

2W175E

PRE/POST BAY

2W175D

PRE/POST BAY

2W175C

ALCOVE

2W175F

PRE/POST BAY

2W175B

PRE/POST BAY

2W175A

SHAFT

2W103

SHAFT

2W104

CORRIDOR

2C06

ELEC

2W180

STAIR

2ST07

MEN'S SHOWER

2W156A

CIRCULATION

2C05

CATH EQUIPMENT ROOM

2W134

UTILITY SOILED ROOM

2W133

STERILE SUPPLY

2W155

IR EQUIPMENT ROOM

2W150

OFFICE

2W129B

ALCOVE

2W129E

ELEC

2W152

EXISTING FIRE

SPRINKLER RISER

EXISTING FIRE

SPRINKLER RISER

BOUNDARY INDICATES AREA OF WORK.

RECONFIGURE EXISTING FIRE PROTECTION SYSTEMS

TO PROVIDE FULL SPRINKLER COVERAGE PER NFPA

13 AND VA FIRE PROTECTION DESIGN MANUAL.

PROVIDE NEW PIPING, SPRINKLERS, AND SUPPORTS

TO PROVIDE FULL COVERAGE OF RENOVATED AREAS.

AREA TO BE

SERVED BY FIRE

SPRINKLER ZONE 18

AREA TO BE

SERVED BY FIRE

SPRINKLER

ZONE 19

AREA TO BE

SERVED BY FIRE

SPRINKLER

ZONE 19

KEY PLAN - SECOND FLOOR

I O W A

S E

D

PROFESS IO NA

20825

L

IC

E N

L E

N G

I N E

E R

ERIC J.

HENDERSON

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com

C R e v it L o c a l F ile s \M

E P

T .0

V

A -V

IS

N

-I o w a C it y -R e m o d e l

IR

-C a th

-E P

C

D e lla n .J

.L le w e lly n .r v t

/8

/2

:1 :2

P

M

1-F2

SECOND FLOOR PLAN - FIRE

PROTECTION

REMODEL 2W IR-CATH-EP

IOWA CITY VAHCS

636A8-21-001

BUILDING 1

04/08/2022 BLAOBR APUSHA16133

N O R

HT

1/8" = 1'-0"

SECOND FLOOR PLAN - FIRE PROTECTION

GENERAL SHEET NOTES :

1. PIPE SIZES AND ROUTING ARE SHOWN FOR

CONTRACTOR REFERENCE ONLY.

CONTRACTOR SHALL DETERMINE FINAL

ROUTING AND PIPE SIZING BASED ON NFPA 13

AND HYDRAULIC CALCULATIONS.

2. PROVIDE LIGHT HAZARD AND ORDINARY

HAZARD SPRINKLER COVERAGE IN THE AREA

OF WORK AS INDICATED. ALL WORK SHALL BE

PER NFPA 13 AND 21 13 13. DO NOT RESTRICT

DESIGN AREA REDUCTIONS PERMITTED FOR

USING QUICK RESPONSE SPRINKLERS

THROUGHOUT BY THE REQUIRED USE OF

STANDARD RESPONSE SPRINKLERS IN THE

AREAS IDENTIFIED IN SPECIFICATION SECTION

21 13 13.

3. COORDINATE ALL REQUIRED SYSTEM

SHUTDOWNS WITH OWNER.

4. REFER TO FIRE SPRINKLER USAGE SCHEDULE

FOR TYPES OF SPRINKLERS TO BE USED.

5. THE CONTRACTOR SHALL PROVIDE

TEMPORARY FIRE PROTECTION DURING

CONSTRUCTION. PROVIDE AND INSTALL NEW

TEMPORARY UPRIGHT SPRINKLERS AND

REVISE BRANCH AND RUN-OUT PIPING TO NEW

TEMPORARY HEADS AS REQUIRED TO

PROVIDE FULL COVERAGE PER NFPA 13 AND

THE VA FIRE PROTECTION DESIGN MANUAL.

3W103B

3ST07

3W103

3W105

MECH SHAFT

3W103A

3W104

3ST06

3W101

3W09

3S01

3C01

3CW01A

3W100

3W07

DW-2

3W102A

3W102

3CO1A

3C03

MECH SHAFT

3W19A3W11

3CW02A

3C02

3W17A

3W101A

CL-1

3W17

3W17B

3W101B

3W17C

3S08D

3W19B

B1

S H A F T

S H A F T

3W103D

3W19C

SHAFT

3W223

B3

C1

C2

3W103C

3W222

B2

3W101C

A BA' C D D1 E F

0.9

G

14 M

FF

H

7'

EQUIPMENT ELECTRICAL ROOM

3W136

RECONFIGURE EXISTING SPRINKLER PIPING

AND ASSOCIATED SPRINKLERS IN INDICATED

AREA DUE TO INSTALLATION OF NEW AIR

HANDLING UNIT, DUCTWORK, PIPING AND

EQUIPMENT. REMOVE EXISTING SPRINKLER

HEADS AND PROVIDE NEW SPRINKLER HEADS

TO PROVIDE FULL COVERAGE PER NFPA 13 AND

THE VA FIRE PROTECTION DESIGN MANUAL.

THE COVERAGE CLASSIFICATION FOR THIS

SPACE IS ORDINARY GROUP 1.

KEY PLAN - THIRD FLOOR

I O W A

S E

D

PROFESS IO NA

20825

L

IC

E N

L E

N G

I N E

E R

ERIC J.

HENDERSON

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com

C R e v it L o c a l F ile s \M

E P

T .0

V

A -V

IS

N

-I o w a C it y -R e m o d e l

IR

-C a th

-E P

C

D e lla n .J

.L le w e lly n .r v t

/8

/2

:1 :2

P

M

1-F3

THIRD FLOOR PLAN - FIRE

PROTECTION

REMODEL 2W IR-CATH-EP

IOWA CITY VAHCS

636A8-21-001

BUILDING 1

04/08/2022 BLAOBR APUSHA16133

N O R

HT

1/8" = 1'-0"

THIRD FLOOR PLAN - FIRE PROTECTION

GENERAL SHEET NOTES :

1. PIPE SIZES AND ROUTING ARE SHOWN FOR

CONTRACTOR REFERENCE ONLY.

CONTRACTOR SHALL DETERMINE FINAL

ROUTING AND PIPE SIZING BASED ON NFPA 13

AND HYDRAULIC CALCULATIONS.

2. PROVIDE LIGHT HAZARD AND ORDINARY

HAZARD SPRINKLER COVERAGE IN THE AREA

OF WORK AS INDICATED. ALL WORK SHALL BE

PER NFPA 13 AND 21 13 13.

3. COORDINATE ALL REQUIRED SYSTEM

SHUTDOWNS WITH OWNER.

4. REFER TO FIRE SPRINKLER USAGE SCHEDULE

FOR TYPES OF SPRINKLERS TO BE USED.

5. THE CONTRACTOR SHALL PROVIDE

TEMPORARY FIRE PROTECTION DURING

CONSTRUCTION.

PLUMBING SYMBOL LIST

SYMBOL: DESCRIPTION:

PIPE SERVING FIXTURE ON FLOOR ABOVE

(EXAMPLE: FD = FLOOR DRAIN)FD

PITCH PIPE IN DIRECTION

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

DIRECTION OF FLOW IN PIPE

COLD WATER - POTABLECW

HOT WATER - POTABLEHW

HOT WATER CIRCULATING - POTABLEHWC

SANITARY DRAINAGESAN

STS STORM DRAINAGE (SECONDARY)

VENTV

TW TEMPERED WATER

DRAIND

G NATURAL GAS

NOT ALL SYMBOLS MAY APPLY.

SERVICE WATER - POTABLEW

PIPE CONTINUATION

ROUTE TO DRAIN

DT DRAIN TILE

NON-POTABLE COLD WATERNCW

PUMPED DISCHARGEPD

ST(1,000) STORM DRAINAGE (ROOF SQUARE FOOTAGE)

DIELECTRIC CONNECTION

UNION/FLANGE

SHUTOFF VALVE NORMALLY OPEN

SHUTOFF VALVE NORMALLY CLOSED

RD-1

6"(1000)

ROOF DRAIN PROPERTIES SYMBOL

SIZE (ROOF SQ. FT.)

BALANCING VALVE (NUMBER INDICATES GPM)

CHECK VALVE

BACKFLOW PREVENTER

SOLENOID VALVE

SAFETY/RELIEF VALVE

VACUUM BREAKER

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

TEMPERATURE SENSOR WITH WELL

THERMOMETER WITH WELL (DIAL TYPE)

THERMOMETER WITH WELL (FILLED TYPE)

REDUCER - REFERENCE SPECIFICATION

FOR CONCENTRIC/ECCENTRIC AND FOT/FOB

M

PRESSURE REDUCING VALVE (LIQUID/GAS)

PUMP

METER

P

GPM

PLUMBING ABBREVIATION KEY

CO CLEANOUT

ABOVE FINISHED FLOORAFF

BFP BACKFLOW PREVENTER

ABBR: DESCRIPTION:

AD ACCESS DOOR

CAST IRONCI

NOT IN CONTRACTNIC

FD FLOOR DRAIN

TRANSFER DUCTTD

TYPICALTYP

CO CLEANOUT

CLINICAL SINKCS

EMERGENCY EYEWASHEE

FLOOR CLEANOUTFCO

FLOOR SINKFS

HOSE BIBBHB

LAVATORYLAV

MOP BASINMB

MIXING VALVEMV

ROOF DRAINRD

SHOWERSH

SINKSK

SCRUB SINKSS

TRAP PRIMERTP

URINALUR

WATER CLOSETWC

WALL CLEANOUTWCO

WATER HEATERWH

WASHING MACHINE FIXTUREWMF

UTILITY BOXUB

EMERGENCY SHOWERES

EMERGENCY SHOWER/EYEWASHESE

ELECTRIC WATER COOLEREWC

VENT THROUGH ROOFVTR

EXISTINGE

WATER METERWM

DIALYSIS BOXDB

CAST IRONCI

DUCTILE IRONDI

SCCR SHORT CIRCUIT CURRENT RATING

UNLESS NOTED OTHERWISEUNO

NEW CONNECTIONNC

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

SIMSIM

INDICATES SIMILAR DETAIL REFERENCED

IN MULTIPLE LOCATIONS

LEVEL NAME

10' - 0" HEIGHT ABOVE

PROJECT 0' - 0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N O R

HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

LINE TYPE AND TAG KEY:

NEW WORK BY THIS CONTRACTOR (WIDE LINE)

NEW

EXISTING TO BE REMOVED (SHORT DASHED PATTERN)

NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)

EXISTING

EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)

EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

HALFTONING DOES NOT MODIFY SCOPE.

'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING

TAG-1 UNDERLINED TEXT INDICATES ADDITIONAL INFORMATION CAN BE FOUND

ELSEWHERE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST

INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL

T101

TEMPERATURE CONTROLS CONTRACTORT.C.C.

FIRE PROTECTION CONTRACTORF.P.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

MECHANICAL CONTRACTORM.C.

ELECTRICAL CONTRACTORE.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

TECHNOLOGY CONTRACTORT.C.

CONTRACTING OFFICER'S REPRESENTATIVEC.O.R

CONTACT PERSONS:

PROJECT MANAGER

MECHANICAL

ELECTRICAL

TECHNOLOGY

STRUCTURAL

ERIC HENDERSON

ERIC HENDERSON

ISAAC STOLL

DAMON DEEN

JOHN PAUL GOEDKEN

DESCRIPTION: PERSON:

MECHANICAL PHASING NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO

CONSTRUCTION MANAGER'S/GENERAL CONTRACTOR'S/ARCHITECT'S INSTRUCTIONS FOR

MORE DETAILS AND PHASING SCHEDULES AND FOR CONCURRENT WORK. MECHANICAL,

ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT THE INTENT OF THE FINAL DESIGN. THE

MECHANICAL, ELECTRICAL, AND TECHNOLOGY DRAWINGS DO NOT DEPICT THE MEANS AND

METHODS TO MEET THE REQUIREMENTS OF THE PHASING CRITERIA.

2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC.

WITH AFFECTED ADJACENT AREAS.

3. PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE

ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS DURING ALL PHASES OF

PROJECT.

4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP

ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT

5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE

PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS

PANELS PRIOR TO BIDDING.

10. SEAL ALL FLOOR, WALL AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,

AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE

SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER

FOR OUTDOOR USE.

11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,

PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE

TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS

WITHIN ROOMS.

12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED

OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL

RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.

13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.

15. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR

STARTERS, SWITCHES, AND DISCONNECTS.

16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL

EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.

17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER

NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

MECHANICAL RENOVATION NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD

SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND

REPORT ANY CONFLICTS BEFORE PROCEEDING.

2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS

BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.

3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE

FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD

CONDITIONS.

4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK

AND SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE

REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER AREA OF

WORK.

5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF

ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.

CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.

6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF

CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL

CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO

BIDDING.

7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH

NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL

EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT

DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL

SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.

8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING

CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT

REMAIN ACTIVE.

9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY

REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW

SYSTEMS ARE INSTALLED.

10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR

TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND

CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY

DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.

11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT

THAT HAS BEEN REMOVED.

1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.

CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR

FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.

2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO

THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS

RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN

THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES

PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER LISTED IS THE

BASIS OF DESIGN.

3. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL

APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES.

4. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874

5. INVERT ELEVATIONS ARE FROM EXISTING DRAWINGS AND MAY NOT BE ACCURATE. VERIFY

ALL ELEVATIONS BEFORE BEGINNING WORK.

6. VERIFY UNDERGROUND PIPE SIZES, INVERT ELEVATIONS, AND LOCATIONS PRIOR TO

BEGINNING ANY WORK.

7. REFER TO THE PLUMBING ROUGH-IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO

PLUMBING FIXTURES.

8. FOR CLARITY, NOT ALL VALVES HAVE BEEN SHOWN. PROVIDE SHUTOFF VALVES IN

DOMESTIC WATER PIPING SERVING EACH ROOM WITH FIXTURES. ANGLE STOPS SHALL NOT

BE CONSIDERED SHUTOFF VALVES.

9. EXISTING CONDITIONS ON DEMOLITION PLANS ARE PROVIDED TO INDICATE THE GENERAL

SCOPE OF ITEMS TO BE REMOVED. REFER TO SPECIFICATION SECTION 22 05 11 FOR

ADDITIONAL DEMOLITION INFORMATION.

10. P.C. SHALL CUT AND PATCH EXISTING AS REQUIRED FOR NEW OR DEMOLITION WORK

UNLESS NOTED OTHERWISE. REFER TO SPECIFICATION SECTION 22 05 11 FOR ADDITIONAL

INFORMATION.

11. ALL PIPING (ABOVE CEILING, EXPOSED RISERS, EXPOSED AT EQUIPMENT TIE-INS) SHALL BE

LABELED IN ACCORDANCE WITH ANSI/ASME 13.1 PIPE IDENTIFICATION STANDARD.

PLUMBING GENERAL NOTES:

PLUMBING SHEET INDEX

1-P0 PLUMBING COVERSHEET

1-P1 FIRST FLOOR PLAN DEMOLITION - PLUMBING

1-P2 SECOND FLOOR PLAN DEMOLITION - PLUMBING

1-P3 THIRD FLOOR PLAN DEMOLITION - PLUMBING

1-P4 FIRST FLOOR PLAN - PLUMBING

1-P5 SECOND FLOOR PLAN - PLUMBING

1-P6 THIRD FLOOR PLAN - PLUMBING

1-P7 PLUMBING DETAILS

1-P8 PLUMBING MATERIAL LISTS

GRAND TOTAL: 9

I O W A

S E

D

PROFESS IO NA

20825

L

IC

E N

L E

N G

I N E

E R

ERIC J.

HENDERSON

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com

C R e v it L o c a l F ile s \M

E P

T .0

V

A -V

IS

N

-I o w a C it y -R e m o d e l

IR

-C a th

-E P

C

D e lla n .J

.L le w e lly n .r v t

/8

/2

:0 :1

P

M

1-P0

PLUMBING COVERSHEET REMODEL 2W IR-CATH-EP

IOWA CITY VAHCS

636A8-21-001

BUILDING 1

04/08/2022 LEOHEN HETCHA16133Revisions: Date:

0.9

G

14 M

FF

H

7'

1W101

1W101

1W104B

1ST07

1W232

1W237

1ST06 1CP06

1W233

1W234

1W231

1W235

1W214

1W213

1W212

1W211

1W210

1W208

1CP02

1W206

1W204

1W202

1W200B

1C05C

1C05A 1C05B

1W105A

1W105

1W101A

1W101B

1W103D1W103C

1W103

1W103A1W103B

1W101

1C101 B1

B2

B3

1W100

1W15 1W16 1W18 1CW03 1W20 1W21

1C02A 1CW02

C1

ELEVATOR

C2

ELEVATOR

1ST08

1W160

ELEC

1W133

EXAM

1W135

EXAM

1W137

EXAM

1W139

EXAM

1W140

PAIN PT

1W142

TOILET

1W143

STORAGE

PT

1W144

PACT PT

1C07

CIRCULATION

PATIENT

1C09

CIRCULATION

GENERAL

1W145

BREAK ROOM

STAFF

1C05

CIRCULATION

GENERAL

1W141

WOMEN'S EXAM

BARIATRIC/

1W138A

TOILET

BARIATRIC

1W136

EXAM

1W134

EXAM

1W129

AREA

WORK

1C04

CIRCULATION

PATIENT

1W132

EXAM

1W131

EXAM

1W130

EXAM

1W128

EXAM

1W151

ROOM

PACT

1W150

STORAGE

CLEAN

1W149

MEDS

1W148

TOILET

STAFF

1W147

OFFICE

1W129B

AREA

PRINT

1W146

UTILITY

SOILED

1C08

CIRCULATION

STAFF

1W160

AREA

WORK

1W106

TOILET

1W107

TOILET

1W108

EXAM

1W109

EXAM

1W136

AREA

WAITING

1W36A

CLERKS

CHECK-IN

1CW03A

CIRCULATION

GENERAL

1W36C

TOILET

1W36B

TOILET

FAMILY

1W110

CLOSET

COMM.

1W112

EC&R EXAM

SPECIALTY/

1W115

MENTAL HEALTH

COLLAB.

1W116

EXAM

1W114

MENTAL HEALTH

COLLAB.

1W153

CONF.

MED. APPT./

1W152

HAC

1W138

WOMEN'S EXAM

BARIATRIC/

1C06

CIRCULATION

PATIENT

1W122

EXAM

1W123

EXAM

1W124

EXAM

1W125

EXAM

1W126

EXAM

1W117

EXAM

1W118

EXAM

1W119

EXAM

1W120

EXAM

1W121

EXAM

1 1/2"V

1 1/2"V DN

4"SAN UP

1 1/2"V UP

FD

SK-E

SK-E

SK-E

1 1/2"V

1 1/2"SAN UP

2"SAN

2"SAN UP TO OPEN

SITE FOR COMPUTER

ROOM CONDENSATE

DRAIN.

1 1/2"V UP

RELOCATED

ON SHEET 1-P4

"S

A N

CO

1 1/2"SAN

2"SAN UP TO OPEN

SITE FOR COMPUTER

ROOM CONDENSATE

DRAIN.

CO

SK-E

SK-E

SK-E SK-E SK-E

EXISTING 6" ST UP

6"ST UP

RELOCATED ON

SHEET 1-P4

8"ST UP

4"SAN UP

2"V UP

2"V UP

1 1/2"V

UP TO FD

2"V UP

2 1/2"V UP

2"V UP 6"ST UP

1 1/2"V UP

2"V UP

2 1/2"V UP

2 1/2"V UP

2"V UP

8"ST UP

4"SAN DN

3"SAN UP3"V UP

RELOCATED ON

SHEET 1-P4

2"V UP

RELOCATED ON

SHEET 1-P4

2"V UP

SK-E

FD

FD

2"V UP

RELOCATED ON

SHEET 1-P4

FD

1 1/2"V UP

6"ST

"S

T

EXISTING 8"ST DN

CO

CO

4"SAN DN

CUT HERE AND

PREPARE FOR NEW

CONNECTION.

CUT HERE AND

PREPARE FOR NEW

CONNECTION.

2 1/2"V DN

2"V DN

2"V2 1/2"V

1 1/2"V UP

2"V DN

2"V DN

1 1/2"V DN

2"V DN

2"AV UP

SK-E

L-E

SK-E

SK-E

2"V UP

2"V UP, RELOCATED TO

NEW WALL IN ROOM

2W153A ON SHEET 1-P5

1 1/2"V UP RELOCATED

TO NEW WALL IN ROOM

2W154A ON SHEET 1-P5

KEY PLAN - FIRST FLOOR

I O W A

S E

D

PROFESS IO NA

20825

L

IC

E N

L E

N G

I N E

E R

ERIC J.

HENDERSON

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com

C R e v it L o c a l F ile s \M

E P

T .0

V

A -V

IS

N

-I o w a C it y -R e m o d e l

IR

-C a th

-E P

C

D e lla n .J

.L le w e lly n .r v t

/8

/2

:0 :1

P

M

1-P1

FIRST FLOOR PLAN DEMOLITION -

PLUMBING

REMODEL 2W IR-CATH-EP

IOWA CITY VAHCS

636A8-21-001

BUILDING 1

04/08/2022 LEOHEN HETCHA16133

N O R

HT

1/8" = 1'-0"

FIRST FLOOR PLAN DEMOLITION - PLUMBING

0.9

G

14 M

FF

H

7'

3/4"HWC

1 1/4"CW

1 1/4"HW

3/4"HW

2"CW

3/4"HWC

2 1/2"CW

1 1/2"HW

3/4"HWC

2 1/2"CW

1 1/2"HW

/4

"H W

C

FD-E

/2 "C

W

/2 "H

W

2 1/2"CW

1 1/4"HW

1 1/2"V

1 1/4"HW

2 1/2"CW

3/4"HW

2"CW

2"CW

2"CW

3/4"HW

3/4"HW

3/4"CW

1 1/2"CW

SK-E

L-E

3/4"HW

1"HW

1 1/4"HW

L-E

3/4"HW

2"CW

3"VTR

1 1/2"V

2"V

4"VTR

2 1/2"V

2"V DN

2 1/2"V

"V

2"V

1"HW

2"CW

1 1/2"V

/2 "V

2"V

"V

/2

"C W 1

/2 "H

W

2"CW

1"HW

FD-E

1 1/2"CW

1/2"HW

2"V

"V

"V

FD-E

1 1/2"CW

1/2"HW

1/2"HWC

/2

"H W

C

/2

"H W

/2

"C W

/2

"H W

C

/4

"C W

/4

"H W

3/4"HW

1 1/2"CW

2"CW

1 1/2"CW

3/4"HWC

1 1/2"HW

1/2"HWC

3/4"CW

1/2"HW

WC-E

L-E

WC-E

L-E

WC-E

L-E

FD-E

FD-E

1 1/4"HW

1 1/4"CW

3/4"HWC

4" UP TO FD

4"SAN

"S

T

4"STS

4"ST

EXISTING 8" ST DN

"S

T S

4"ST

2"V UP 2"V

/2 "V

3"SAN

RD

8"ST DN

4"SAN DN

4"SAN

4"SAN UP

1 1/2"V UP

CO

CO3"SAN

"S

A N

FD

FD

2"V DN

2"VTR

2"V DN

CO

4"SAN UP

8"ST DNRD

8"ST RD

RD

1 1/2"V UP

2 1/2"V UP

3"V, RELOCATED ON

SHEET 1-P5

FD

3"SAN

2"V UP

3"SAN DN

1 1/2"V UP

CO

6"ST

CO

6"ST DN,

RELOCATED

ON SHEET

1-P5

1 1/2"V

DN TO FD

2"V DN

6"ST

RD

6"ST DN

2"V

2"V DN

1 1/2"V DN

3"VTR

2"V DN

"V

4"V2"V

"V

2 1/2"V

2 1/2"V DN

2 1/2"V DN

2"V

1 1/2"V DN 2"V

1 1/2"V DN

2"V DN

3" V UP, CAP VENT AT

FLOOR PENETRATION.

4" SAN UP

/4

"D

/4

"D

1 1/4"HW

1 1/4"CW

1 1/4"CWSK-E

DRAIN FOR AC

OPEN DRAIN

CONDENSATE

SK-E

3/4"CW

SK-E

2"V DN

L-E

WC-E

SK-E

L-E

WC-E

SK-E

L-E

WC-E

SK-E

1/2"CW DN

SK-E

SK-E

SK-E

SK-E

4"V DN

4"SAN DN

FD

FD

L-E

WC-E

L-E

L-E

L-E

L-E

4"VTR

DEMO BACK TO THE

ACTIVE MAIN AND CAP.

FD FD

FD(EXSITING)

1 1/2"V DN

4"V

4"SAN

FD

1 1/2"V UP

2"V RELOCATED

ON SHEET 1-P5

2"V DN, RELOCATED TO

NEW WALL IN ROOM

2W153A ON SHEET 1-P5

1 1/2"V DN RELOCATED

TO NEW WALL IN ROOM

2W154A ON SHEET 1-P5

2"V DN

4"SAN DN

RELOCATED ON

SHEET 1-P5

1 1/2"V, RELOCATED ON

SHEET 1-P5

3"SAN DN, DEMO SAN

DROP AND CONNECTED

TO NEARBY 4"SAN ON

SHEET 1-P5

2"V RELOCATED

ON SHEET 1-P5

1 1/2"V DN

1 1/2"V DN

EXISTING VENT RISER

EXISTING SAN RISER

FD

CAP EXISTING

SAN PIPE

3/4"HW

2"CW

3/4"HWC

3/4"HWC

2"CW

1"HW

3/4"HWC

1 1/2"CW

1"HW 1"HW

1 1/2"CW

3/4"HWC

CONTRACTOR TO

DEMOLISH

ABANDONED

STORM PIPING

CONTRACTOR TO

DEMOLISH

ABANDONED

STORM PIPING

1 1/2"V UP

TO 3"VTR

WC-E

1 1/2"V DN

4"V UP

2"V DN

2"V DN

AC UNIT

SK-E

SK-E

MB-E

WC-E

L-E

FD

WC-E

L-E

WC-E

FD

DEMO SD PIPE BACK

TO THE MAIN.

KEY PLAN - SECOND FLOOR

I O W A

S E

D

PROFESS IO NA

20825

L

IC

E N

L E

N G

I N E

E R

ERIC J.

HENDERSON

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com

C R e v it L o c a l F ile s \M

E P

T .0

V

A -V

IS

N

-I o w a C it y -R e m o d e l

IR

-C a th

-E P

C

D e lla n .J

.L le w e lly n .r v t

/8

/2

:0 :1

P

M

1-P2

SECOND FLOOR PLAN

DEMOLITION - PLUMBING

REMODEL 2W IR-CATH-EP

IOWA CITY VAHCS

636A8-21-001

BUILDING 1

04/08/2022 LEOHEN HETCHA16133

N O R

HT

1/8" = 1'-0"

SECOND FLOOR PLAN DEMOLITION - PLUMBING

KEYNOTES:

1. VALVE AND CAP 1 1/2"CW, 1"HW AND 3/4" HWC

FOR FUTURE CONNECTION.

2. DEMOLISH EXISTING FIXTURE AND

ASSOCIATED PIPING.

3W101

3W09

3S01

3C01

3CW01A

3W100

3W07

DW-2

3W102A

3W102

3CO1A

3C03

MECH SHAFT

3W19A3W11

3CW02A

3C02

3W17A

3W101A

CL-1

3W17

3W17B

3W101B

3W17C

3S08D

3W19B

B1

S H A F T

S H A F T

3W103D

3W19C

SHAFT

3W223

B3

C1

C2

3W103C

3W222

B2

3W101C

A BA' C D D1 E F

0.9

G

14 M

FF

H

7'

EQUIPMENT ELECTRICAL ROOM

3W136

2"SAN UP

1 1/2"V UP

2"SAN UP

CO

3"SAN

"S

A N

3"SAN

CO

2"SAN UP

4"SAN

"S

A N

4"SAN

/2 "V

1 1/2"V DN

"S

A N

1 1/2"SAN UP

2"V DN

5"ST DN

4"ST

4"

ST

"S

T

1 1/2"V DN

1 1/2"V

4"SAN DN

4"SAN DN

2"V UP

8"ST DN

4"ST UP

4"ST DN

4"SAN

4"SAN UP

2"V UP

"S

A N

1 1/2"SAN UP

1 1/2"SAN

1 1/2"SAN UP

CO

"S

A N

2"SAN UP

3"V DN

FD-E

1 1/2"V DN

1 1/2"V UP

4"SAN DN

CO

2"SAN DN1 1/2"SAN UP

4"ST UP4"ST UP

CO

4"ST

8"ST DN

"S

T

4"ST UP

CO

4"ST UP

6"ST 6"ST

3"ST UP

CO

3"ST UP

4"STS UP CO

"S

T S

4"STS

4"STS

4"STS UP

TO RD

2"SAN UP

"S

A N

3"V DN

2"SAN UP

CO

4"SAN

8" DOWNSPOUT NOZZEL

4"ST UP

4"STS UP

4"STS

4"STS

4"ST UP

4"STS UP

4"V DN

8"STS

"S

T

2"V UP

1 1/2" SAN UP

4" SAN UP

4"STS

4"ST UP

4"STS UP

4"ST UP

TO RD

4"ST UP

4"STS UP

4"ST UP

4"STS UP

"S

T

4"ST UP

4"STS UP

6"ST DN

4"ST

4"STS

1"CW

3"VTR

/4 "H

W "H

W C

"C

W

CW, HW & HWC UP

1 1/2"V DN

TO FD

CW, HW & HWC UP

3"SAN DN

4"V UP/DN

4"SAN UP/DN

1"D

1"D

1"D

1 1/2"SAN DN

CO

4"STS

"S

T

S4"SAN

1 1/2"SAN

"S

A N

WH-E

WH-E

CO

CO

1 1/2"V UP

FROM EX. FD

1"D DN TO

EX. FD

4" SAN DN

4"ST UP

4"ST DN

6"ST

4"V DN

3"V

4"V

RD

3"VTR

DEMO VENT PIPE

BACK TO THE

MAIN.

FD(EXISTING)

FD(EXISTING)

FD(EXISTING)

FD(EXISTING)

FD(EXISTING)

FD(EXISTING)

FD(EXISTING)

FD(EXISTING)

FD(EXISTING)

FD(EXISTING)

2 1/2"V DN

2 1/2"V UP

KEY PLAN - THIRD FLOOR

I O W A

S E

D

PROFESS IO NA

20825

L

IC

E N

L E

N G

I N E

E R

ERIC J.

HENDERSON

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com

C R e v it L o c a l F ile s \M

E P

T .0

V

A -V

IS

N

-I o w a C it y -R e m o d e l

IR

-C a th

-E P

C

D e lla n .J

.L le w e lly n .r v t

/8

/2

:0 :2

P

M

1-P3

THIRD FLOOR PLAN DEMOLITION -

PLUMBING

REMODEL 2W IR-CATH-EP

IOWA CITY VAHCS

636A8-21-001

BUILDING 1

04/08/2022 LEOHEN HETCHA16133

N O R

HT

1/8" = 1'-0"

THIRD FLOOR PLAN DEMOLITION - PLUMBING

0.9

G

14 M

FF

H

7'

1W101

1W101

1W104B

1ST07

1W232

1W237

1ST06 1CP06

1W233

1W234

1W231

1W235

1W214

1W213

1W212

1W211

1W210

1W208

1CP02

1W206

1W204

1W202

1W200B

1C05C

1C05A 1C05B

1W105A

1W105

1W101A

1W101B

1W103D1W103C

1W103

1W103A1W103B

1W101

1C101 B1

B2

B3

1W100

1W15 1W16 1W18 1CW03 1W20 1W21

1C02A 1CW02

C1

ELEVATOR

C2

ELEVATOR

1ST08

1W160

ELEC

1W133

EXAM

1W135

EXAM

1W137

EXAM

1W139

EXAM

1W140

PAIN PT

1W142

TOILET

1W143

STORAGE

PT

1W144

PACT PT

1C07

CIRCULATION

PATIENT

1C09

CIRCULATION

GENERAL

1W145

BREAK ROOM

STAFF

1C05

CIRCULATION

GENERAL

1W141

WOMEN'S EXAM

BARIATRIC/

1W138A

TOILET

BARIATRIC

1W136

EXAM

1W134

EXAM

1W129

AREA

WORK

1C04

CIRCULATION

PATIENT

1W132

EXAM

1W131

EXAM

1W130

EXAM

1W128

EXAM

1W151

ROOM

PACT

1W150

STORAGE

CLEAN

1W149

MEDS

1W148

TOILET

STAFF

1W147

OFFICE

1W129B

AREA

PRINT

1W146

UTILITY

SOILED

1C08

CIRCULATION

STAFF

1W160

AREA

WORK

1W106

TOILET

1W107

TOILET

1W108

EXAM

1W109

EXAM

1W136

AREA

WAITING

1W36A

CLERKS

CHECK-IN

1CW03A

CIRCULATION

GENERAL

1W36C

TOILET

1W36B

TOILET

FAMILY

1W110

CLOSET

COMM.

1W112

EC&R EXAM

SPECIALTY/

1W115

MENTAL HEALTH

COLLAB.

1W116

EXAM

1W114

MENTAL HEALTH

COLLAB.

1W153

CONF.

MED. APPT./

1W152

HAC

1W138

WOMEN'S EXAM

BARIATRIC/

1C06

CIRCULATION

PATIENT

1W122

EXAM

1W123

EXAM

1W124

EXAM

1W125

EXAM

1W126

EXAM

1W117

EXAM

1W118

EXAM

1W119

EXAM

1W120

EXAM

1W121

EXAM

LAV

SK

SK

SK

SK

WC

FD

4"SAN

2"SAN

FD

WC

LAV

SH

SH

WC

LAV

FD

SK

4"SAN

4"SAN DN

NC

1 1/2"V UP

1 1/2"V UP

4"SAN

4"SAN DN

SK

SS

SS

3"SAN

3"SAN

FCO CO

CO

8"ST UP

4"SAN UP

2"V UP

2"V UP

1 1/2"V

UP TO FD

2"V UP

2 1/2"V UP

2"V UP 6"ST UP

1 1/2"V UP

2"V UP

2 1/2"V UP

2 1/2"V UP

SK

2"V UP

2"V UP, RELOCATED

TO NEW WALL.

FD

8"ST UP

NC

NC

3V UP

RELOCATED TO

THIS LOCATION.

NC

SK

2"V UP

RELOCATED TO

THIS LOCATION.

2"V UP

RELOCATED TO

THIS LOCATION.

1 1/2"V UP

RELOCATED TO

THIS LOCATION.

4"SAN UP

1 1/2"V UP

RELOCATED TO

THIS LOCATION.

6"ST UP

RELOCATED TO

THIS LOCATION.

4"SAN UP

NC

SK

LAV

WC

FCO

FD

4"SAN

2"SAN

1 1/2"V UP

NC

1 1/2"V

NC

EXISTING 8" ST UP

CO

CO

CO

NC

4"SAN

"S

A N

NC

"S

A N

LAV

1 1/2"V UP

1 1/2"V UP

MB

1 1/2"V UP

2"D FROM NEPTUNE

DOCKING STATION

4"SAN

CO

3"SAN

4"SAN

4"SAN

4"SAN

2"V UP

2 1/2"V DN

2"V DN

1 1/2"V DN

2"V DN

1 1/2"V DN

2"V DN

2"V UP

CO

2"V UP

1 1/2"V1 1/2"V

UB

KEY PLAN - FIRST FLOOR

I O W A

S E

D

PROFESS IO NA

20825

L

IC

E N

L E

N G

I N E

E R

ERIC J.

HENDERSON

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com

C R e v it L o c a l F ile s \M

E P

T .0

V

A -V

IS

N

-I o w a C it y -R e m o d e l

IR

-C a th

-E P

C

D e lla n .J

.L le w e lly n .r v t

/8

/2

:0 :2

P

M

1-P4

FIRST FLOOR PLAN - PLUMBING REMODEL 2W IR-CATH-EP

IOWA CITY VAHCS

636A8-21-001

BUILDING 1

04/08/2022 LEOHEN HETCHA16133

N O R

HT

1/8" = 1'-0"

FIRST FLOOR PLAN - PLUMBING

0.9

G

14 M

FF

H

7'

CIRCULATION

2C07A

MED PREP/ NOURISH

2W178

TOILET

2W176

NURSE STATION

2W177

CIRCULATION

2C07

EP LAB

2W151

CONTROL

2W151A

CATH LAB

2W153

CONTROL

2W153A

IR LAB

2W154

CONTROL

2W154A

HAC

2W158

CORRIDOR

2C03A

SEMI RESTRICTED CORRIDOR

2C03B

EQUIPMENT PARK

2W181

MEN'S LOCKER

2W156

WOMEN'S LOCKER

2W157

WOMEN'S SHOWER

2W157A

RECOVERY

2W175

CLEAN LINEN

2W174

CLEAN UTILITY ROOM

2W173

ULTRASOUND

2W132

RADIOLOGY/ MULTI-PURPOSE

2W131

TOILET

2W130A

RADIOLOGY/ FLUOROSCOPY

2W130

IR MANAGER OFFICE

2W129D

NURSE MANAGER OFFICE

2W129C

OPEN OFFICE CUBICLES

2W129

ELEVATOR LOBBY

2C02

EP EQUIPMENT ROOM

2W179

PRE/POST BAY

2W175E

PRE/POST BAY

2W175D

PRE/POST BAY

2W175C

ALCOVE

2W175F

PRE/POST BAY

2W175B

PRE/POST BAY

2W175A

SHAFT

2W103

SHAFT

2W104

CORRIDOR

2C06

ELEC

2W180

STAIR

2ST07

MEN'S SHOWER

2W156A

CIRCULATION

2C05

CATH EQUIPMENT ROOM

2W134

UTILITY SOILED ROOM

2W133

STERILE SUPPLY

2W155

IR EQUIPMENT ROOM

2W150

OFFICE

2W129B

ALCOVE

2W129E

ELEC

2W152

3/4"HWC

1 1/4"CW

1 1/4"HW

3/4"HW

2"CW

3/4"HWC

2 1/2"CW

1 1/2"HW

3/4"HWC

2 1/2"CW

1 1/2"HW

/4

"H W

C

/2 "C

W

/2 "H

W

2 1/2"CW

1 1/4"HW

1 1/2"V

1 1/4"HW

2 1/2"CW

3/4"HW

2"CW

1 1/2"CW

2 1/2"V

"V

1"HW

2"CW

1 1/2"V

/2 "V

2"V 2"V

/2

"C W 1

/2 "H

W

2"CW

1"HW

1 1/2"CW

1/2"HW

2"V

"V

"V

1 1/2"CW

1/2"HW

/2

"H W

C

/2

"H W

/2

"C W

/2

"H W

C

/4

"C W

/4

"H W

3/4"HW

1 1/2"CW

2"CW

1 1/2"CW

1 1/2"HW

1/2"HWC

3/4"CW

1/2"HW

WC-E

L-E

WC-E

L-E

WC-E

L-E

1 1/4"HW

1 1/4"CW

3/4"HWC

EXISTING 8" ST DN

2"V UP

FD

3"SAN

RD

8"ST DN

4"SAN DN

4"SAN

4"SAN UP

1 1/2"V UP

CO

CO3"SAN

"S

A N

FD

FD

2"V DN

2"VTR

2"V DN

CO

4"V UP

4"SAN UP

8"ST DNRD

RD

3"SAN

6"ST

1 1/2"V

DN TO FD

2"V DN

6"ST

RD

6"ST DN

2"V

2"V DN

1 1/2"V DN

3"VTR

2"V DN

"V

4"V2"V

"V

2 1/2"V

2 1/2"V DN

2 1/2"V DN

2"V

1 1/2"V DN 2"V

1 1/2"V DN

2"V DN

L-1

P-103

L-1

P-103

P-701

P-408

P-103

P-519

(SINGLE)

P-519

(DOUBLE)1 1/2"V UP

FD

1"HW

2"CW

NC

NC

FD

FD

1 1/2"V UP

SK-E

2"V UP

4" SAN UP

L-E

WC-E

2"V DN

NC

3/4"HW

3"SAN UP

L-E

WC-E

4"V DN

4"V

4"SAN

SK-E

FD

1 1/2"V UP

L-E

L-E

L-E

L-E

P-408

P-114

P-528

P-528

WHA-1

WHA-1

2"CW

1"HW

1 1/2"V DN

FCO-1

NC

3"V DN

2"V

"V

2"V

2"V

3"V UP

1 1/2"V DN

2"V 2"V

2"V UP

3"V UP

FD

1 1/2"V UP

WHA-1

3/4"HW

1 1/2"CW

/4

"H W

C

3/4"HWC

NC

1 1/2"CW

3/4"CW

1 1/2"CW

1 1/4"HW

2"CW

2"V DN, RELOCATED

TO NEW WALL.

NC

2"V DN

RELOCATED TO

NEW WALL.

2"V DN

RELOCATED TO

NEW WALL.

1 1/2"V DN,

RELOCATED TO

NEW WALL.

2"V DN

3"V

3"V

4"V DN

4"SAN DN

1 1/2"V DN

CO

CO

6"ST DN,

RELOCATED

TO THE CHASE

NC

"S

A N

4"SAN DN

P-502

WHA-1

FCO-1

2"V

2"V

2"V

NC

1 1/2"V DN

4"SAN UP

4"SAN

NC

6"ST

SK-1

P-528

EE-1

EE-1

P-408

3/4"HW

2"CW

3/4"HW

2"V

2 1/2"V

3/4"CW

FD-C

FD-C

FD-C

FD-C

P-701

FD-C

FD-C

EXISTING VENT RISER

EXISTING SAN RISER

NC

8"ST

3/4"HW

2"CW

3/4"HWC

3/4"HWC

2"CW

1"HW

3/4"HWC

1 1/2"CW

1"HW

1"HW

1 1/2"CW

3/4"HWC

SK-1

SK-1

EE-2

1"HW

1"CW

3/4"HW

2"V

2"V

NC

3/4"HWC

1 1/2"CW

1"HW

1"HW

1 1/2"CW

1 1/4"V

3/4"HW

1 1/2"CW

0.5

0.5

0.5

0.5

3/4"HWC

3/4"HW

3/4"CW

1"HW

1"HW

1"CW

0.5

0.5

SK-1

SK-1

1 1/2"CW

3"V

ROUTE TO 3"V EXISTING

VENT ABOVE THE STAFF

TOILET. REFER TO VA

PROJECT NO. 636A8-18-002

FOR EXACT LOCATION.

SK-E

2"V DN

3/4"HWC

2 1/2"V UP

2"V UP

FD(EXISTING)

FD(EXISTING)

FD(EXISTING)

FD(EXISTING)

FD(EXISTING)

FD(EXISTING)

3"V

F-1

3/4"HW

BFP-2

CAP EXISTING

SAN PIPE

UB-1

3/4"D

/4

"D

3/4"D

3/4"D DN TO

MOP BASIN

CRU-2W150

CRU-2W134

CRU-2W179

KEY PLAN - SECOND FLOOR

I O W A

S E

D

PROFESS IO NA

20825

L

IC

E N

L E

N G

I N E

E R

ERIC J.

HENDERSON

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106th Street, Des Moines, IA 50322 630-717-2433 WWW. imegcorp.com

C R e v it L o c a l F ile s \M

E P

T .0

V

A -V

IS

N

-I o w a C it y -R e m o d e l

IR

-C a th

-E P

C

D e lla n .J

.L le w e lly n .r v t

/8

/2

:0 :3

P

M

1-P5

SECOND FLOOR PLAN - PLUMBING REMODEL 2W IR-CATH-EP

IOWA CITY VAHCS

636A8-21-001

BUILDIN…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .