About this file

This Contamination Impact Certification document, issued by Citrus County, Florida's Department of Management & Budget through its Engineering Operations division, certifies the environmental status of the S. Apopka Avenue resurfacing project spanning from E. Anna Jo Drive to US 41. The certification, signed by Charles G. Leazott, Engineering Operations Supervisor, on April 24, 2024, confirms that no potential for contamination was identified during the contamination impact evaluation conducted in accordance with the Florida Department of Transportation Project Development and Environment Manual, Part II Chapter 20. The project, identified by Financial Project Number 449062-1-54-01, encompasses approximately 3.6 miles of roadway requiring milling and resurfacing operations across two distinct segments with specific asphalt placement specifications and Material Transfer Vehicle requirements.

The certification satisfies environmental prerequisite requirements for the ITB 25-111 Small County Outreach Program road resurfacing project, enabling the project to proceed to competitive bidding and construction phases. This clearance is critical for the project timeline, with the mandatory pre-bid conference scheduled for March 3, 2026, bid submission deadline of March 24, 2026 at 2:00 PM, and anticipated Board approval for June 22, 2026. The project is funded entirely through a Florida Department of Transportation Small County Outreach Program grant, with the County budgeting approximately $1,630,270 for completion. Contractors must meet FDOT prequalification requirements in Hot Plant-Mixed Bituminous Courses and Pavement Marking, with substantial completion required within 90 calendar days and final completion within 120 calendar days from Notice to Proceed.

View the file

Other files

File Type Posted
ITB_25-111_Small_County_Outreach_Program_(SCOP)_Road_Resurfacing_Project_for_S._Apopka_Ave._from_E._Anna_Jo_Drive_to_US_41_(Addendum_#1_Revision).pdf PDF
ITB_25-111_Small_County_Outreach_Program_(SCOP)_Road_Resurfacing_Project_for_S._Apopka_Ave._from_E._Anna_Jo_Drive_to_US_41.pdf PDF
ITB_25-111_SAMPLE_Agreement_2-20-26.pdf PDF
ITB_25-111_Solicitation_COMPLETE_2-20-26.pdf PDF
Attachment_J-2025-09-26_Exhibit_Map_-Markup.pdf PDF
Attachment_I-Cert_Disb_of_Prev_Periodic_Pymt_to_Subs.pdf PDF
Attachment_H.2-_Scanned_G703_sample.pdf PDF
Attachment_H.1_-_Scanned_G702_sample.pdf PDF
Attachment_G-2024-04-24_Utility_Certification_Memo_-_Signed.pdf PDF
Attachment_F-2024-04-24_RW_Cert_for_State_Funded_Projects_-D7_-_Signed.pdf PDF
Attachment_E-2024-04-24_Railroad_Clear_Memo_-_Signed.pdf PDF
Attachment_D-2024-04-24_Contamination_Certification_-_Signed.pdf PDF
Attachment_C_-_No_Permits_required_memo.pdf PDF
Attachment_B_-_Typical_Roadway_Intersection_Joint.pdf PDF
Attachment_A.5_Typical_Section_-_S_Apopka_Ave_from_Daffodil_St_to_E_Anna_Jo_Dr.pdf PDF
Attachment_A.4_Typical_Section_-_S_Apopka_Ave_from_E_Relief_St_to_Daffodil_St.pdf PDF
Attachment_A.3_Typical_Section_-_S_Apopka_Ave_from_E_Hill_St_to_E_Relief_St.pdf PDF
Attachment_A.2_Typical_Section_-_S_Apopka_Ave_from_E_Highland_Blvd_to_E_Hill_St.pdf PDF
Attachment_A.1_Typical_Section_-_S_Apopka_Ave_from_US_41_to_E_Highland_Blvd.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTAMINATION IMPACT CERTIFICATION

The following information is based upon the contamination impact evaluation performed on this project in accordance with the procedure requirements of the Project Development and Environment Manual, Part II Chapter 20.

Financial Project No: 449062-1-54-01

_X_a.

b.

C.

Comments:

No potential for contamination was found.

Contamination was identified; however, its location/condition has no impact to the proposed project.

Contamination was identified within the project area that could/would impact the proposed project. Separate provisions have been made to remediate/mitigate identified contamination impact prior to or during construction in the affected project area. Project plans have been annotated showing details of the area of concern.

Roadway/Project Description: SCOP Resurfacing of S Apopka Ave from E Anna Jo Drive to US 41.

Oigitaly aignod by Charles G Laazott ON: C-US, Ezchar1cs.loazott@citrusboo:::.com, O=Citrus County BOCC. OU,.Tcchiical

Charles G Leazott =�c.:-tyc� ..

Reason· I am apprO\ling !Nsdocl..lrnent Contact Info: 352-527-5269

Certification: _________ 08_'°_' 202_•_-04-_2•_13,54_, .. _-04_·ro

Charles Leazott, Engineering Operations Supervisor

Date: 4/24/24

To be filed in District Project File Marcel Goss District 7 Contamination Impact Coordinator

H:\engrg_admin\fdot\SCOP _small_county_outreach_J)fogram\21-050 S Apopka Ave tm Anna Jo Dr to US411Clear Letters\Contamination Certification.docx

Attachment "D"