Attachment_D-2024-04-24_Contamination_Certification_-_Signed.pdf

PDF 100 KB Posted

Attached to
ITB 25-111 Small County Outreach Program (SCOP) Road Resurfacing Project for S. Apopka Ave. from E. Anna Jo Drive to US 41
Solicitation number
ITB 25-111
Issued by
Citrus County, Florida

About this file

This is a Contamination Impact Certification document issued by Citrus County, Florida's Engineering Operations Supervisor for the Small County Outreach Program (SCOP) road resurfacing project on S Apopka Avenue from E Anna Jo Drive to US 41. The certification, dated April 24, 2024, confirms that no potential for contamination was found during the contamination impact evaluation conducted in accordance with the Project Development and Environment Manual, Part II Chapter 20. The project involves milling and resurfacing of approximately 3.6 miles of roadway in two distinct segments: US 41 to Daffodil Street with a minimum 2.25-inch milling and 2.25 inches of FC-12.5 asphalt placement, and Daffodil Street to E Anna Jo Drive with uniform 2.5-inch milling followed by two 1.5-inch lifts of FC-12.5 asphalt. Work must comply with current Florida Department of Transportation Standard Specifications for Road and Bridge Construction, FY 2025-26, and all applicable special provisions, with all hot-mix asphalt operations requiring a Material Transfer Vehicle for continuous, non-contact transfer.

The certification was executed by Charles G. Leazott, Engineering Operations Supervisor, with contact information at 352-527-5269, and is intended to be filed in the District Project File under Marcel Goss, District 7 Contamination Impact Coordinator. The document's approval confirms that no remediation or mitigation of contamination is required prior to or during construction, allowing the project to proceed without additional environmental remediation measures or cost impacts related to contamination concerns.

View the file

Other files

File Type Posted
ITB_25-111_Small_County_Outreach_Program_(SCOP)_Road_Resurfacing_Project_for_S._Apopka_Ave._from_E._Anna_Jo_Drive_to_US_41_(Addendum_#1_Revision).pdf PDF
ITB_25-111_Small_County_Outreach_Program_(SCOP)_Road_Resurfacing_Project_for_S._Apopka_Ave._from_E._Anna_Jo_Drive_to_US_41.pdf PDF
ITB_25-111_SAMPLE_Agreement_2-20-26.pdf PDF
ITB_25-111_Solicitation_COMPLETE_2-20-26.pdf PDF
Attachment_J-2025-09-26_Exhibit_Map_-Markup.pdf PDF
Attachment_I-Cert_Disb_of_Prev_Periodic_Pymt_to_Subs.pdf PDF
Attachment_H.2-_Scanned_G703_sample.pdf PDF
Attachment_H.1_-_Scanned_G702_sample.pdf PDF
Attachment_G-2024-04-24_Utility_Certification_Memo_-_Signed.pdf PDF
Attachment_F-2024-04-24_RW_Cert_for_State_Funded_Projects_-D7_-_Signed.pdf PDF
Attachment_E-2024-04-24_Railroad_Clear_Memo_-_Signed.pdf PDF
Attachment_C_-_No_Permits_required_memo.pdf PDF
Attachment_B_-_Typical_Roadway_Intersection_Joint.pdf PDF
Attachment_A.5_Typical_Section_-_S_Apopka_Ave_from_Daffodil_St_to_E_Anna_Jo_Dr.pdf PDF
Attachment_A.4_Typical_Section_-_S_Apopka_Ave_from_E_Relief_St_to_Daffodil_St.pdf PDF
Attachment_A.3_Typical_Section_-_S_Apopka_Ave_from_E_Hill_St_to_E_Relief_St.pdf PDF
Attachment_A.2_Typical_Section_-_S_Apopka_Ave_from_E_Highland_Blvd_to_E_Hill_St.pdf PDF
Attachment_A.1_Typical_Section_-_S_Apopka_Ave_from_US_41_to_E_Highland_Blvd.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTAMINATION IMPACT CERTIFICATION

The following information is based upon the contamination impact evaluation performed on this project in accordance with the procedure requirements of the Project Development and Environment Manual, Part II Chapter 20.

Financial Project No: 449062-1-54-01

_X_a.

b.

C.

Comments:

No potential for contamination was found.

Contamination was identified; however, its location/condition has no impact to the proposed project.

Contamination was identified within the project area that could/would impact the proposed project. Separate provisions have been made to remediate/mitigate identified contamination impact prior to or during construction in the affected project area. Project plans have been annotated showing details of the area of concern.

Roadway/Project Description: SCOP Resurfacing of S Apopka Ave from E Anna Jo Drive to US 41.

Oigitaly aignod by Charles G Laazott ON: C-US, Ezchar1cs.loazott@citrusboo:::.com, O=Citrus County BOCC. OU,.Tcchiical

Charles G Leazott =�c.:-tyc� ..

Reason· I am apprO\ling !Nsdocl..lrnent Contact Info: 352-527-5269

Certification: _________ 08_'°_' 202_•_-04-_2•_13,54_, .. _-04_·ro

Charles Leazott, Engineering Operations Supervisor

Date: 4/24/24

To be filed in District Project File Marcel Goss District 7 Contamination Impact Coordinator

H:\engrg_admin\fdot\SCOP _small_county_outreach_J)fogram\21-050 S Apopka Ave tm Anna Jo Dr to US411Clear Letters\Contamination Certification.docx

Attachment "D"