Attachment_F-2024-04-24_RW_Cert_for_State_Funded_Projects_-D7_-_Signed.pdf

PDF 166 KB Posted

Attached to
ITB 25-111 Small County Outreach Program (SCOP) Road Resurfacing Project for S. Apopka Ave. from E. Anna Jo Drive to US 41
Solicitation number
ITB 25-111
Issued by
Citrus County, Florida

About this file

This is a Right of Way Certification for State-Funded Projects issued by the Florida Department of Transportation (FDOT) for Citrus County related to the S. Apopka Avenue road resurfacing project extending from E. Anna Jo Drive to US 41, approximately 3.6 miles. The certification confirms that title to all property and easements required for the construction project is vested in FDOT or a state or local government, with sufficient authority obtained to maintain the proposed improvements. The project, with financial project number 449062-1-54-01, has a scheduled letting date of June 1, 2026, and is located in FDOT District D7. The certification was signed by Charles Leazott, Engineering Operations Manager, on April 24, 2024.

The certification documents that no right of way acquisition, relocation of persons or businesses, demolition of structures or improvements, or asbestos abatement was required for this project. All checkboxes confirm that either no actions in these categories were necessary or that any required actions have been completed in compliance with applicable state law. The project falls under the Small County Outreach Program (SCOP) and involves milling and resurfacing operations with specific asphalt mix specifications, material transfer vehicle requirements, pavement marking work, and associated incidental activities as defined in the related Invitation to Bid (ITB 25-111).

View the file

Other files

File Type Posted
ITB_25-111_Small_County_Outreach_Program_(SCOP)_Road_Resurfacing_Project_for_S._Apopka_Ave._from_E._Anna_Jo_Drive_to_US_41_(Addendum_#1_Revision).pdf PDF
ITB_25-111_Small_County_Outreach_Program_(SCOP)_Road_Resurfacing_Project_for_S._Apopka_Ave._from_E._Anna_Jo_Drive_to_US_41.pdf PDF
ITB_25-111_SAMPLE_Agreement_2-20-26.pdf PDF
ITB_25-111_Solicitation_COMPLETE_2-20-26.pdf PDF
Attachment_J-2025-09-26_Exhibit_Map_-Markup.pdf PDF
Attachment_I-Cert_Disb_of_Prev_Periodic_Pymt_to_Subs.pdf PDF
Attachment_H.2-_Scanned_G703_sample.pdf PDF
Attachment_H.1_-_Scanned_G702_sample.pdf PDF
Attachment_G-2024-04-24_Utility_Certification_Memo_-_Signed.pdf PDF
Attachment_E-2024-04-24_Railroad_Clear_Memo_-_Signed.pdf PDF
Attachment_D-2024-04-24_Contamination_Certification_-_Signed.pdf PDF
Attachment_C_-_No_Permits_required_memo.pdf PDF
Attachment_B_-_Typical_Roadway_Intersection_Joint.pdf PDF
Attachment_A.5_Typical_Section_-_S_Apopka_Ave_from_Daffodil_St_to_E_Anna_Jo_Dr.pdf PDF
Attachment_A.4_Typical_Section_-_S_Apopka_Ave_from_E_Relief_St_to_Daffodil_St.pdf PDF
Attachment_A.3_Typical_Section_-_S_Apopka_Ave_from_E_Hill_St_to_E_Relief_St.pdf PDF
Attachment_A.2_Typical_Section_-_S_Apopka_Ave_from_E_Highland_Blvd_to_E_Hill_St.pdf PDF
Attachment_A.1_Typical_Section_-_S_Apopka_Ave_from_US_41_to_E_Highland_Blvd.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RIGHT OF WAY CERTIFICATION

FINANCIAL PROJECT NO

STATE / COUNTY ROAD:

DESCRIPTION:

LETTING DATE:

DISTRICT: D7

COUNTY:

The undersigned hereby certifies as follows:

Title to all property and easements needed for the above construction project is vested in the Florida Department of Transportation (Department) or a state or local government. Sufficient authority has been obtained to maintain the proposed improvements on property and easements owned by state or local governments. Further:

Acquisition

Right of way was not acquired for this project.

Right of way was acquired for this project in compliance with applicable state law.

Relocation No persons or businesses were required to move or move personal property from the project right of way.

All persons and businesses that were required to move or move personal property from the project right of way have been provided relocation assistance in compliance with applicable state law.

Demolition No structures or improvements, including encroachments, required removal from the project right of way.

All structures and/or improvements, including encroachments, have been removed from the project right of way in compliance with applicable state law, or will be included in the construction contract.

Asbestos Abatement No structures or improvements requiring asbestos abatement were located on the project right of way.

___ Asbestos abatement of buildings and/or structures, including those to be removed by the construction contractor, has been completed in compliance with applicable state law, or will be included in the construction contract.

Certified by Local Agency:

Title: Date:

Certified by FDOT:

Title: Date:

ATTACHMENT "F"

Acquisition
Relocation
Demolition
Asbestos Abatement
DISTRICT D7: 449062-1-54-01
COUNTY: S Apopka Ave
undefined:
1: S Apopka Ave from E Anna Jo Drive to US 41
2: 06/01/2026
Title: Charles Leazott, Engineering Operations Manager
Date: 04/24/2024
Certified by FDOT:
Dropdown1: [Citrus]
Check Box2: Yes
Check Box3: Off
Check Box4: Yes
Check Box5: Off
Check Box6: Yes
Check Box7: Off
Check Box8: Yes
Check Box9: Off
Text10:

File details come from the government source that posted it. Updated .