About this file

This is a Contamination Impact Certification document issued by Citrus County, Florida's Department of Management & Budget for the Small County Outreach Program (SCOP) Road Resurfacing Project on S. Apopka Avenue from E. Anna Jo Drive to US 41 (Financial Project No. 449062-1-54-01). The certification, executed on April 24, 2024, by Charles G. Leazott, Engineering Operations Supervisor, confirms that no potential for contamination was found during the contamination impact evaluation performed in accordance with the Florida Department of Transportation's Project Development and Environment Manual, Part II Chapter 20. This determination eliminates the need for remediation or mitigation measures related to environmental contamination within the project area prior to or during construction.

The project encompasses approximately 3.6 miles of roadway resurfacing divided into two segments with distinct specifications: US 41 to Daffodil Street requiring 2.25-inch milling and FC-12.5 asphalt placement, and Daffodil Street to E. Anna Jo Drive requiring 2.5-inch milling followed by two 1.5-inch asphalt lifts. The mandatory pre-bid conference is scheduled for March 3, 2026, at 10:00 AM via Microsoft Teams, with written questions due March 13, 2026, and bids due March 24, 2026, at 2:00 PM. The project is 100 percent funded through an FDOT Small County Outreach Program grant with an estimated budget of $1,630,270. Contractors must be prequalified by FDOT in Hot Plant-Mixed Bituminous Courses and maintain continuous on-site supervision, with substantial completion required within 90 calendar days and final completion within 120 calendar days of the Notice to Proceed. Liquidated damages are assessed at $1,685 per day for delays beyond the final completion date.

View the file

Other files

File Type Posted
ITB_25-111_Small_County_Outreach_Program_(SCOP)_Road_Resurfacing_Project_for_S._Apopka_Ave._from_E._Anna_Jo_Drive_to_US_41_(Addendum_#1_Revision).pdf PDF
ITB_25-111_Small_County_Outreach_Program_(SCOP)_Road_Resurfacing_Project_for_S._Apopka_Ave._from_E._Anna_Jo_Drive_to_US_41.pdf PDF
ITB_25-111_SAMPLE_Agreement_2-20-26.pdf PDF
ITB_25-111_Solicitation_COMPLETE_2-20-26.pdf PDF
Attachment_J-2025-09-26_Exhibit_Map_-Markup.pdf PDF
Attachment_I-Cert_Disb_of_Prev_Periodic_Pymt_to_Subs.pdf PDF
Attachment_H.2-_Scanned_G703_sample.pdf PDF
Attachment_H.1_-_Scanned_G702_sample.pdf PDF
Attachment_G-2024-04-24_Utility_Certification_Memo_-_Signed.pdf PDF
Attachment_F-2024-04-24_RW_Cert_for_State_Funded_Projects_-D7_-_Signed.pdf PDF
Attachment_E-2024-04-24_Railroad_Clear_Memo_-_Signed.pdf PDF
Attachment_D-2024-04-24_Contamination_Certification_-_Signed.pdf PDF
Attachment_C_-_No_Permits_required_memo.pdf PDF
Attachment_B_-_Typical_Roadway_Intersection_Joint.pdf PDF
Attachment_A.5_Typical_Section_-_S_Apopka_Ave_from_Daffodil_St_to_E_Anna_Jo_Dr.pdf PDF
Attachment_A.4_Typical_Section_-_S_Apopka_Ave_from_E_Relief_St_to_Daffodil_St.pdf PDF
Attachment_A.3_Typical_Section_-_S_Apopka_Ave_from_E_Hill_St_to_E_Relief_St.pdf PDF
Attachment_A.2_Typical_Section_-_S_Apopka_Ave_from_E_Highland_Blvd_to_E_Hill_St.pdf PDF
Attachment_A.1_Typical_Section_-_S_Apopka_Ave_from_US_41_to_E_Highland_Blvd.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTAMINATION IMPACT CERTIFICATION

The following information is based upon the contamination impact evaluation performed on this project in accordance with the procedure requirements of the Project Development and Environment Manual, Part II Chapter 20.

Financial Project No: 449062-1-54-01

_X_a.

b.

C.

Comments:

No potential for contamination was found.

Contamination was identified; however, its location/condition has no impact to the proposed project.

Contamination was identified within the project area that could/would impact the proposed project. Separate provisions have been made to remediate/mitigate identified contamination impact prior to or during construction in the affected project area. Project plans have been annotated showing details of the area of concern.

Roadway/Project Description: SCOP Resurfacing of S Apopka Ave from E Anna Jo Drive to US 41.

Oigitaly aignod by Charles G Laazott ON: C-US, Ezchar1cs.loazott@citrusboo:::.com, O=Citrus County BOCC. OU,.Tcchiical

Charles G Leazott =�c.:-tyc� ..

Reason· I am apprO\ling !Nsdocl..lrnent Contact Info: 352-527-5269

Certification: _________ 08_'°_' 202_•_-04-_2•_13,54_, .. _-04_·ro

Charles Leazott, Engineering Operations Supervisor

Date: 4/24/24

To be filed in District Project File Marcel Goss District 7 Contamination Impact Coordinator

H:\engrg_admin\fdot\SCOP _small_county_outreach_J)fogram\21-050 S Apopka Ave tm Anna Jo Dr to US411Clear Letters\Contamination Certification.docx

Attachment "D"